Technical analysis of the failures in a typical drilling mud pump during field
operation
CITATIONS READS
3 1,046
3 authors:
Mohammad Shishesaz
Shahid Chamran University of Ahvaz
71 PUBLICATIONS 353 CITATIONS
SEE PROFILE
Some of the authors of this publication are also working on these related projects:
Design and Analysis of Surface Structure of Belt Driven Sucker Rod Pumping System (Rotaflex) View project
All content following this page was uploaded by Reza Khademi-Zahedi on 03 August 2018.
Technical analysis of the failures in a typical drilling mud pump during field operation
1
National Iranian Drilling Company, Ahvaz, Iran, Email address: khademireza@yahoo.com
2
National Iranian Drilling Company, Ahvaz, Iran, Email address: makvandimehran@yahoo.com
3 Shahid Chamran University, College of Engineering, Mech. Eng. Dept., Ahvaz, Iran, mshishehsaz@scu.ac.ir
Mud pumps have a high discharge capacity and pressure, TABLE II. PERFORMANCE DATA OF HXF-1600 MUD
are usually either duplex double acting or triplex single PUMP [4]
Meanwhile two pinion shaft pulleys with 1050mm outside It was implied from this observation that low quality
diameter and 251.9mm inside diameter and 12 grooves material is used in making pump parts and therefore
were provided. These pulleys assembled on the pinion changing this pulley may improve the pump operation.
shaft by shrinking (press- fitting) with .003” interference Meanwhile new traction motor pulleys and new belts
and to replace the defected pulleys. Also new belts were were provided and installed. Figure number 4 shows the
installed and adjusted. The units were test operated and temperature of the traction motor pulleys after installing
the strokes of both pumps were increased but the belts new ones. This data are recorded from 00:00 o’clock early
started to slip and make noise at 75SPM. Also decreasing in the morning to 8:00 o’clock. The mud pump working
the stroke of the pump did not help any more. To pressure was 3100 Psi with 80 SPM. It is implied from
investigate the problem, the temperature of the pump this figure that changing the pulleys made the condition
parts were measured with digital thermometer. The results better but the temperature of the “B” side is still more that
are compered in figure number 4. This data are recorded “A” side. Also the difference between these temperatures
from 00:00 o’clock early in the morning to 8:00 o’clock. is increasing with operating time.
The mud pump working pressure was 2500 Psi with 75
85
SPM. The temperature of "B" traction motor
80 The temperature of "A" traction motor
85
75
maximum temperature (°C)
80
maximum temperature (°C)
75 70
70 65
65 The temperature of "B" traction motor 60
60 The temperature of "A" traction motor
55
55
50
50
45
45
40 40
35 35
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8
day time (hr) day time (hr)
Figure 2. the temperature of the pump pulley Figure 4. the temperature of the new pump
pulleys
figure number 2 shows that the temperature of “B” side
traction motor pulley is much higher that “A” side. Following the request of company man to increase the
Generated heat in the DC motor transfers to motor pulley, mud GPM, the stroke of pumps were increased until the
belts and pinion shaft pulley. Inspecting the condition of belt temperature of mud pump number 2 reached 124 °C
and started to slip and produce noise. To prevent more
damage it was decided to change the drive between the
mud pump and DC motors from V-belts to multi chain problems, and the need for prompt solutions produces a
drive. New items installed consist of electric motor drive thirst for practical information that can be found here.
and pinion drive shaft sprockets and drive chains. The research effort consists of analytical studies to
Following the pumps refurbishment, drilling operation investigate the effect of different loading conditions on
was continued and at least three times in a four-month the mud pump behavior. Finite element analysis can be
period, the pump had to be shut down in order to change used to study the effect of different loading conditions on
stress distribution in defected parts including pulleys,
the chain drives which were broken. Drilling operation
belts, chain drives, main bearing carrier bolt and
was finished in 26.Jan.2013. In this period no serious crankshaft. The resulting stresses developed in the mud
failure occurred in the pump parts. pump parts should be compared with the strength of these
elements. Different conditions of suction and the system
Case II: Drilling rig No. 71 Fath was moved in to drill pumped into (discharged), and associated malfunctions
well No. 13 in Ghalehnar oilfield. Drilling operation was should be considered as different boundary conditions in
started in 21.Feb.2013. Drilling of 17 ½” hole was analytical models.
continued with bentonite mud with 68 pcf mud weight to As mentioned in case I, the manufacturing error caused
the depth of 939 m in 01.March.2013 [6]. The pumps the stress concentration in pulleys which resulted in
pulley failure. The best design should be obtain to reduce
stroke and pressure was 75 SPM and 2800 Psi
stress concentration through analytical solution.
respectively with 7 inches pump liner size. Following this Meanwhile, in V-belts drive pumps, if the sheave grooves
condition the pump number one had to be shut down after are worn or rounded (as shown in figure number 3), worn
making a loud noise. In this case the main bearing carrier grooves will damage and destroy V-belts rapidly. To
bolt was broken and cracks were inspected in crankshaft. alleviate complaints of excessive wear, the material
Therefore new parts were provided and installed consist should be improved. The effect of different parts material
of crankshaft, main bearings, crossheads, crosshead pins be considered and studied.
As DC traction motors are controlled by SCR AC-DC
and main bearing carrier bolt. Following the pump variable-speed, any malfunctions in SCR (which was
refurbishment, drilling operation was continued and reported in rig No. 71 Fath) may warm up motor and also
finished in 27.May.2013. During this period no serious cause traction motor to produce impact loads which will
failure occurred in the pump parts. be transferred to the pump input shaft. The effects of
these impact forces must be considered in analysis.
Case III: In this case the mud pump number one damaged
seriously. Drilling operation of Ghalehnar well number 14 Acknowledgement
was started in 10.Jun.2013. The drilling of 12 1/4” hole
The authors wish to thank the National Iranian Drilling
was continued with heavy mud with 153 pcf mud weight
Company a subsidiary of Naional Iranian Oil Company,
to the depth of 2259 m in 27.Jul.2013 [7]. The pumps located in Khouzestan, Ahvaz for their kind support and
stroke and pressure was 75 SPM and 2900 Psi cooperation regarding this work.
respectively with 7 inches pump liner size. Following this
condition the failure occurred in pump power end main
parts including main bearings, main bearing carrier bolts,
connecting rod bearings, crankshaft, crankshaft gear and REFERENCES
pinion gear. The estimated costs of pump refurbishment [1] Samuel L. Collier, “Mud Pump Handbook”, Gulf
were not economically acceptable. Therefore a non- Publishing company, Chapter 7, p. 387, 2008.
genuine National model 12-P-160 mud pump supplied [2] Mamdouh. Agawani, “Drilling engineeing”, curtin
university, Chapter 2, p. 2-23, 2006.
and installed. [3] Fink, Donald, M. ‘SCR and New Technology in Electric
Rig Drilling: A Safety and Efficiency Handbook’.
Research steps and expectations from the research [4] ‘Triplex Mud Pump Instruction for use.’ Manufacturer
proposal manual, chaina.
[5] ‘DAILY WELL PROGRESS REPORT.’ National Iranian
Drilling Company, 23.09.2012
Maintenance and repair costs can be held to a minimum,
[6] ‘DAILY WELL PROGRESS REPORT.’ National Iranian
and rig downtime reduced, if we become familiar with the Drilling Company, 01.March.2013
mud pumps used. The need for greater pump performance [7] ‘DAILY WELL PROGRESS REPORT.’ National Iranian
is increasing as wells are drilled to greater depths and Drilling Company, 27.Jul.2013.
high pressure treatments such as fracturing are employed.
The road to higher performance seems to be paved with