Professional Documents
Culture Documents
9
10
)
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
.
29
30
31
32
33
34
35
36
37
38
39
\
40
41
42
43
44
45
Q1
Q2
MCQ type Paper 2 From Boiler Act & Regulation.
Who is the Inspecting Authority
A. Inspector. B. Secretory,CBB. C. Chief Inspector of Boilers. D. Competent Person
Which one is a class I pipe line for the purpose of test,service conditions
A. Pressure 13 Kg/cm2 & Temerature 200°C. B.Pressure 17 Kg/cm2 & Temperature 210°C C.
. Pressure 20 Kg/cm2 & Temperature 60°C D. Pressure D. 25 Kg/cm2 & 55°C
The ------------ is a public servant within the meaning of section 21 of the Indian penal code.
The Chief Inspector may at any time withdraw revoke any certificate,if there is reason to beileve that
A. the certificate has been issued by a Competent person. B.the certificate has been granted without sufficient
inspection. C. the boiler is not running regularly. D.the boiler is running without any rest.
Mean diameter of cylindrical furanace of a fire tube boiler shall not exceed
A. 1800 mm B. 600 mm C. 1200 mm. D. 1000 mm
The minimum hydraulic test pressure of to which the boiler quality tubes is tested at tube manufacturr's work
Maximum permissible Working temperature of the carbon steel Pipe & pipe fittings
A.400 degree C B. 500 degree C C . 454 degree C. D. 325 degree C
Certificate of manufacture and test for dished ends in which IBR Form
A. Form III- I B.Form-H . C. Form III .D.Form II
Exemption from P.W.H.T with additional condition for the 2 1/4 Cr 1 Mo tube is provided for thickness not
exceeding A. 8mm. B. 13mm. C.19mm
Hydraulic
The period permitted for periodic check test of electrodes shall be every
A. 12 months. B. at the discretion of inspecting authority. C. 6 months.
Hydraulic test of a super critical boiler during renewal of steaming certificate shall be
A. 1 1/2 times of maximum W.P. B. from one and quarter to one and half times the working presuure of Boiler.
C. from one and quarter to one and half times the Super heater outlet presuure.
Engraving of Registry Number of a boiler to be done within a period of ---------- from the date of receipt.
A. Six months. B. 3 months. C. one month
Which boiler drum shall be hydraulically tested on completion of manufacturer at maker's work
A. Internal dia 605 mm. B. I.D .650 mmm. C. I. D 730 mm. D. All of the above
In case of boilers with reheaters, the reheaters shall be protected with one or more relieving devices of ---% capacity.
A. 100 B. 105 C. 90
In case of automatic or semi -automatic oil or gas fired boilers ,---- may be fitted instead of fusible plug.
A. Releif valve B. Safety valve. C. Low water alarm
The stress relieving part shall be left to cool in furnace up to a maximum temperature
A.300°C B. 400°C C. 500°C
The Memorandum of Inspection book in respect of Steam pipe and fittings, prepared by inspector in--
A. Form IIIA. B. Form I C. Form XIV
A Boiler of W.P 120 Kg/cm², which class of repairer is eligible to undertake major repairs to the boiler
A. Special Class. B. Class I C. Class II
Pressure vessel in which steam is generated for use external by application of heat is a boiler-
A.Working pressure 1.5 Kg/cm2 & capacity 26 litres.B. Capacity 30 litres & Working Pressure 0.9 Kg/cm2. C.
Working Pressure 40 kg/cm2 & Capacity 22.75 litres.D. Capacity 300 litres & Working Pressure 0.8 Kg/cm2
Which one is IBR 'steam pipe', with following steam pressure & ID
A. 3.4 Kg/cm2 & ID 114 mm. B. 0.9 Kg/cm2 & ID 260mm. C. 1.5 Kg/cm2 & ID 255 mm.
MI book shall be obtained from the concerned boiler inspectorate for in service inspection by competent
person and shall be returned within a perood of --------- from the date of completion of inspection
A. one week. B. Five days. C. two week.
Departure from circularity fussion welded drums permitted is -------% of nominal Internal diameter.
A. 0.5. B. 2 C. 1 D. depends on internal Diameter
Heat treatment of a carbon steel boiler drum after completion of welding to be done in furnace, if the
stress relieving temperature is 615 ± 20 Degree C, what is the soaking time for drum thickness of 75 mm
A.140 Minutes. B. 180 Minutes. C. 160 Minutes
pH value of feed water for a low & medium pressure boiler should be from---
A. 7 to 8 B. 8.5 to 9.5 C. 6.5 to 7.5
Nominal outside diameter of a stay tube is 60.3 mm, minimum thickness should be --------
A. 2.28 mm. B. 3.38mm C. 3.12 mm
Min.thickness of the stand pipe( SA106GrB) for M.S.stop valve, O.D 76.2mm, boiler W.P 10.5 kg/cm2
A.4.343 B.3.243 mm C. 5.343mm
----- - of elliptical manhole on shell should be parrallel to longitudinal centre of the boiler
A. Minor axis. B. Major axis C. None of A & B
Number of tubes to be tested for inspection of 520 nos tubes for certification
A. 6 B. 7 C. 8
The certificate issued by well known tube makers for the tubes manufactured by them is in -----
A. Form IIIA B. Form IIIB C. Form IIID D. Form IIIE
Limitation of socket weld joints with carbon & low alloy steel pipees ,up to
A. 38.1mm O.D B. 25.4 mm O.D C. 50.8 mm O.D DC. 60.3.mm O.D
Pressure gauge dials for a boiler of W.P 36 Kg/cm2 shall be graduated in Kg/cm2 from---
A. 0- 72 B. 0- 54 C. 0- 70
Manufacturing of boilers shall be inspected by Competent person at all stages as per ---
A. Appendix J B. Appendix JA C. Appendix E
When steels are intended for service temperature over 700° F, silicon content shall be not less than
A.0 .05% B. 0..2 % C. 0.10 %
The manufacturer of Boilers/Economisers/pipes etc shall maintain the records for at least
A. 3 years. B, 2 years C. 5 years
A boiler ,WP 150 Kg/cm2 and 21 years of age used exclusively for power generation , having 12 months
steaming certificate. The owners want another 12 months ( total 24 months) certificate from
Competent person with out shutdown. Write the condition & provision in IBR for the same.
Write briefly the duties & responsibilities of Competent person,as per IBR, for in sevice inspection.
A B C D
of ---% capacity.
=