You are on page 1of 30

Approximate Bill of Quantities - Phase 1B

March 2019 | 100% DD Update

Hotel Construction
(Provisional Lump Sum Price)

in connection with the

Faisaliah Redevelopment Upgrade Project

located at

Riyadh, Kingdom of Saudi Arabia


Date : March 2019
Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

SAR -
NOTES SAR -
SAR -
A The Contractor shall take into consideration when pricing the Note SAR -
rates of the bills, the inclusion and allowance for costs or
expenses against all requirements stipulated in the
preambles, drawings, and technical specifications, bearing in
mind that the construction works should not impede or affect
the daily operation.

SAR -
B Rates for excavation are deemed to include for all temporary Note SAR -
earthworks support; to the Engineer's satisfaction.

SAR -
C The Contractor's unit rate for excavation / disposal is deemed Note SAR -
to include all necessary handling of excavated material to
facilitate the excavation operation including temporary stock
of piling of material, prior to disposal off site.

SAR -
D In pricing this BOQ it is assumed that the Contractor has Note SAR -
visited the Site and has familiarized themselves fully with the
nature of the existing site conditions, access, restrictions,
topography, existing services, utilities and the like. No claims
due to unfamiliarity as to the full nature and extent of the Site
and Enabling Works themselves will be entertained.

SAR -
E The quantities as identified below are Indicative Only. All Note SAR -
BOQ Items shall however be priced by the Contractor on a
Lump Sum Basis. As such, the Contractor shall satisfy
himself as to the adequacy of all quantities included herein.

SAR -
F Attention is drawn to the following drawings and Note SAR -
specifications; Structural Design Report and Architects
Specifications.
SAR -
G The Contractor is deemed to have familiarized themselves Note SAR -
with all Local Authority requirements and is deemed to have
included the relevant costs associated with compliance within
their Contract.
SAR -
H The Contractor is requested to insert quantities for items of Note SAR -
work where he thinks applicable and appropriate; hence, no
claim for additional quantities will be entertained.
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

September 2017 - OLD DIV 2 Page 3 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

To Collection SAR -

September 2017 - OLD DIV 2 Page 4 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

Preparatory Works; complete all in accordance with the SAR -


Drawings and Specifications
SAR -
A Concrete topping to structural slab; 40 Mpa 215 m3 SAR 331.00 SAR 71,165.00
SAR -
B Road base topping to structural slab; 40 Mpa 715 m3 SAR 350.00 SAR 250,250.00
SAR -
C Steel reinforcement to concrete topping 26 t SAR 3,561.00 SAR 92,586.00
SAR -
D Sand bedding layer 30mm 5,424 m2 SAR 10.00 SAR 54,240.00
SAR -
E Waterproofing membrane 3,722 m2 SAR 75.00 SAR 279,150.00
SAR -
F Protection mat; to waterproofing layer; to Level 03 3,944 m2 SAR 32.00 SAR 126,208.00
SAR -
G Granular base course; to Level 03 356 m3 SAR 79.00 SAR 28,124.00
SAR -
SAR -
Concrete Paving, comprising of the materials, SAR -
installation, testing and inspection for driveways,
roadways, parking lots, curbs and gutter, and sidewalks,
as applicable and as shown on the site/civil plans and all
in accordance with the Specification Section 321300

SAR -
Paving; to driveways; granite bianco (locally SAR -
manufactured)
SAR -
H Natural Stone paving PV-13 779 m2 SAR 200.00 SAR 155,800.00
SAR -
J Natural Stone paving PV-15 152 m2 SAR 200.00 SAR 30,400.00
SAR -
K Natural Stone paving PV-17 243 m2 SAR 200.00 SAR 48,600.00
SAR -
L Natural Stone paving PV-18 1,806 m2 SAR 200.00 SAR 361,200.00
SAR -
SAR -
Paving; to drop-off; granite bianco (locally manufactured) SAR -

SAR -
M Natural Stone paving PV-18 173 m2 SAR 200.00 SAR 34,600.00
SAR -
SAR -
Paving; to side walk; granite bianco (locally SAR -
manufactured)
SAR -
N Natural Stone paving PV-13 326 m2 SAR 200.00 SAR 65,200.00
SAR -
P Natural Stone paving PV-15 476 m2 SAR 200.00 SAR 95,200.00
SAR -
Q Natural Stone paving PV-18 880 m2 SAR 200.00 SAR 176,000.00
SAR -
SAR -
Paving; special paving SAR -
SAR -
R Natural Stone paving PV-11 256 m SAR 410.00 SAR 104,960.00
SAR -
S Natural Stone paving PV-12 60 m SAR 410.00 SAR 24,600.00
SAR -
T Natural Stone paving PV-16 56 m SAR 410.00 SAR 22,960.00
SAR -

September 2017 - OLD DIV 2 Page 5 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction
SAR -
SAR -

To Collection SAR 2,021,243.00

September 2017 - OLD DIV 2 Page 6 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

Concrete Paving, comprising of the materials, SAR -


installation, testing and inspection for driveways,
roadways, parking lots, curbs and gutter, and sidewalks,
as applicable and as shown on the site/civil plans and all
in accordance with the Specification Section 321300
(cont'n)

SAR -
Water feature paving SAR -
SAR -
A Natural Stone paving PV-15 44 m SAR 410.00 SAR 18,040.00
SAR -
Curb Stone SAR -
SAR -
B Curb stone 733 m SAR 121.00 SAR 88,693.00
SAR -
To Level 03 SAR -
SAR -
C Pavement; concrete slab; 40 Mpa 534 m3 SAR 419.00 SAR 223,746.00
SAR -
D Pre-cast Concrete; curb stone 249 m SAR 121.00 SAR 30,129.00
SAR -
E High tea lounge paving 153 m2 SAR 309.00 SAR 47,277.00
SAR -
SAR -
Landscape planting to include but not limited to on grade SAR -
and planter mixes, soil preparation, planter, subsurface
drainage systems, mulch, ground cover, bulbs,
shrubbery and trees, all in accordance with the Drawings
and Specification

SAR -
To Ground Level SAR -
SAR -
F Irrigation & Plants Area 305 m2 SAR 305.00 SAR 93,025.00
SAR -
G Trees - Pl-100 2 Nr SAR 8,625.00 SAR 17,250.00
SAR -
To Level 03 SAR -
SAR -
H Grass 109 m2 SAR 305.00 SAR 33,245.00
SAR -
J Ground Cover 971 m2 SAR 447.00 SAR 434,037.00
SAR -
SAR -
Trees including planting, cleanout pipe, screed to falls SAR -
and staked where required, drainage mat, waterproofing,
compost and fertilizer all in accordance with the
Drawings and Specifications
SAR -
K Phycosperma Elegans 4 Nr SAR 3,402.00 SAR 13,608.00
SAR -
L Acacia Farnesiana 10 Nr SAR 315.00 SAR 3,150.00
SAR -
M Bucida Buferras 4 Nr SAR 1,869.00 SAR 7,476.00
SAR -
N Caryota Mytis 16 Nr SAR 4,001.00 SAR 64,016.00
SAR -
P Ficas Benjamina 7 Nr SAR 1,409.00 SAR 9,863.00
SAR -
Q Palmeria Obtusa 7 Nr SAR 4,484.00 SAR 31,388.00
SAR -
R Palmeria Rubra 8 Nr SAR 4,484.00 SAR 35,872.00

September 2017 - OLD DIV 2 Page 7 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction
SAR -

To Collection SAR 1,150,815.00

September 2017 - OLD DIV 2 Page 8 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

Shrubs SAR -
SAR -
A Agapanthus Africanus 4 Nr SAR 109.00 SAR 436.00
SAR -
B Agave Altenuata 37 Nr SAR 98.00 SAR 3,626.00
SAR -
C Agave Colorata 45 Nr SAR 98.00 SAR 4,410.00
SAR -
D Alocasia Macrorrhiza 15 Nr SAR 71.00 SAR 1,065.00

E Alpinia Zerumbet 7 Nr SAR 66.00 SAR 462.00


SAR -
F Crysdalidocarpus lutescens 16 Nr SAR 82.00 SAR 1,312.00
SAR -
G Clerodendrum Paniculatum 9 Nr SAR 109.00 SAR 981.00
SAR -
H Colocasia Esculenta " Black Magic" 6 Nr SAR 95.00 SAR 570.00
SAR -
J Etlingera Elatior 19 Nr SAR 85.00 SAR 1,615.00
SAR -
K Hedychium Gardnerianum 16 Nr SAR 66.00 SAR 1,056.00
SAR -
L Hebiscus Rosa-Sinensis 18 Nr SAR 71.00 SAR 1,278.00
SAR -
M Hymenocallis Narcissiflora 29 Nr SAR 99.00 SAR 2,871.00
SAR -
N Monstera Delisiosa 9 Nr SAR 109.00 SAR 981.00
SAR -
P Musa Acuminata ' Dwarf cavendish' 20 Nr SAR 85.00 SAR 1,700.00
SAR -
Q Pennisetum setaceum 66 Nr SAR 71.00 SAR 4,686.00
SAR -
R Philodendrom bipinnatifidum 7 Nr SAR 71.00 SAR 497.00
SAR -
S Phormium tenax 20 Nr SAR 109.00 SAR 2,180.00
SAR -
T Phormium tenax 'Atropurpureum' 19 Nr SAR 124.00 SAR 2,356.00
SAR -
U Rhapis excelsa 30 Nr SAR 85.00 SAR 2,550.00
SAR -
V Strelitzia reginae 13 Nr SAR 87.00 SAR 1,131.00
SAR -
W Xantosoma Violaceum 5 Nr SAR 71.00 SAR 355.00
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

September 2017 - OLD DIV 2 Page 9 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction
SAR -

To Collection SAR 36,118.00

September 2017 - OLD DIV 2 Page 10 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction
SAR -

External Finishes to Level 03 SAR -


SAR -
A Timber decking to Level 03 BBQ terrace 285 m2 SAR 1,200.00 SAR 342,000.00
SAR -
B Natural stone paving; granite bianco (locally manufactured) 2,085 m2 SAR 200.00 SAR 417,000.00
SAR -
C To swimming pool; exclude equipment and structure 209 m2 SAR 3,325.00 SAR 694,925.00
(measured elsewhere)
SAR -
SAR -
Additional Items SAR -
SAR -
The Contractor shall describe and price below the items SAR -
necessary for the full and proper Completion of the
Works as described in the Specifications or shown on
the Drawings and for which either expressed or implied
provision is required and which are not covered by either
the items or the rates in the Bills of Quantities and
whether arising from the class of work, Conditions of
Contract or any other matter whatsoever. Anything not
so separately described shall be deemed to be covered
in the items and rates inserted in the Bills of Quantities.

SAR -
C _______________________________________________ SAR -
SAR -
D _______________________________________________ SAR -
SAR -
E _______________________________________________ SAR -
SAR -
F _______________________________________________ SAR -
SAR -
G _______________________________________________ SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

September 2017 - OLD DIV 2 Page 11 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

To Collection SAR 1,453,925.00

September 2017 - OLD DIV 2 Page 12 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

COLLECTION

Page: 1 SAR -

Page: 2 SAR 2,021,243.00

Page: 3 SAR 1,150,815.00

Page: 4 SAR 36,118.00

Page: 5 SAR 1,453,925.00

September 2017 - OLD DIV 2 Page 13 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 02 - Site Construction

Carried to BOQ "E" General Summary SAR 4,662,101.00

September 2017 - OLD DIV 2 Page 14 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Total

GENERAL SUMMARY - HOTEL CONSTRUCTION

DIVISION 1 - GENERAL REQUIREMENTS N/A #REF!

DIVISION 2 - EXISTING CONDITIONS N/A N/A

DIVISION 3 - CONCRETE Page 03 of 150 SAR -

DIVISION 4 - MASONRY Page 10 of 150 #REF!

DIVISION 5 - METALS Page 18 of 150 #REF!

DIVISION 6 - WOOD, PLASTIC AND COMPOSITES Page 24 of 150 #REF!

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Page 28 of 150 #REF!

DIVISION 8 - OPENINGS Page 32 of 150 #REF!

DIVISION 9 - FINISHES Page 40 of 150 #REF!

DIVISION 10 - SPECIALTIES Page 44 of 150 #REF!

DIVISION 11 - EQUIPMENT Page 48 of 150 #REF!

DIVISION 12 - FURNISHINGS N/A N/A

DIVISION 13 - SPECIAL CONSTRUCTION N/A N/A

DIVISION 14 - CONVEYING EQUIPMENT Page 52 of 150 #REF!

DIVISION 21 - FIRE SUPPRESSION Page 56 of 150 #REF!

DIVISION 22 - PLUMBING Page 62 of 150 #REF!

DIVISION 23 - HEATING, VENTILATING AND AIR


Page 70 of 150 #REF!
CONDITIONING

DIVISION 25 - INTEGRATED AUTOMATION Page 94 of 150 #REF!

DIVISION 26 - ELECTRICAL Page 98 of 150 #REF!

DIVISION 27 - COMMUNICATIONS Page 118 of 150 #REF!

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY Page 122 of 150 #REF!

DIVISION 32 - EXTERIOR IMPROVEMENTS Page 130 of 150 #REF!

DAYWORKS SCHEDULE - LABOUR Page 137 of 150 #REF!

DAYWORKS SCHEDULE - MATERIALS Page 142 of 150 #REF!

DAYWORKS SCHEDULE - PLANT Page 146 of 150 #REF!

05/12/2020- SUMMARY Page 15 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Total

GRAND TOTAL - HOTEL CONSTRUCTION #REF!

05/12/2020- SUMMARY Page 16 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

SAR -
NOTES SAR -
SAR -
A As part of the Lump Sum Fixed Price for the Works, the Note SAR -
Contractor shall include in this section for all items deemed
necessary to complete the Works.
SAR -
B Attention is drawn to the following drawings and Note SAR -
specifications, including but not limited to Architects
Specification - Division 3 Concrete & Structural
Specifications.
SAR -
C The rates / prices in this section shall take cognizance of and Note SAR -
shall be deemed to include but may not be limited to the
following:
SAR -
D All Concrete Works to foundations, beds, pits, soft spots, Note SAR -
walls, columns, beams, slabs, stairs, upstands.
SAR -
E Any / all necessary special concrete finishes to conform with Note SAR -
the Specifications, including; fair faced finishes to exposed
surfaces, touching up finishes, repairs to finishes etc.

SAR -
F Contractor is responsible for temporary stability during Note SAR -
construction and for all temporary works design
SAR -
G All necessary steel reinforcements, treaded couplers, chairs, Note SAR -
spacers, tying wire, accessories and all necessary cutting and
bending.
SAR -
H All necessary, tamping, vibrating, surface treatments (power Note SAR -
floating, trowelling etc.), curing, protection etc.
SAR -
J All / any necessary construction joints (Transverse, Note SAR -
Longitudinal, contraction, isolation etc.), joint filler, mastics.

SAR -
K Integration/forming of all necessary service openings. Note SAR -
SAR -
L All necessary platforms for Mechanical and Electrical Note SAR -
Equipment/Plant, incl any base hardeners or slab thickening
for plant and equipment.
SAR -
M All necessary lifting, hoisting, cranage etc. Note SAR -
SAR -
N The layout for all construction joints must be submitted to the Note SAR -
Engineer prior to commencement. Construction joints are not
measured separately and are deemed to be included within
the rates.
P Allow for liaising with the Steel Contractor as required; note Note SAR -
the Cast-In Fixing Inserts for the Steel Frame are to be
installed by the Steel Contractor as part of the steel works.
The below is deemed to include all costs associated with
progress on same.
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 17 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
Q All BOQ Items shall be priced by the Contractor on a Lump Note SAR -
Sum Basis. As such, the Contractor shall satisfy himself as to
the adequacy of all BOQ Quantities.
SAR -
SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 18 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

SAR -
NOTES (Cont'n) SAR -
SAR -
A The contractor shall note the requirement for noise and Note SAR -
vibration monitoring throughout the Excavation Works. The
Contractor is deemed to have included all costs associated
with same within their tender.
SAR -
B The Contractor is requested to insert quantities for items of Note SAR -
work where he thinks applicable and appropriate; hence, no
claim for additional quantities will be entertained
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 19 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 20 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Section 03 10 00 Concrete Formwork SAR -

Shuttering

Concrete formwork, comprising of fabrication and SAR -


manufacture, construction and erection, shoring together
with associated removal; all in accordance with the
drawings and Specification
SAR -
A To soffits of suspended slabs 33,040 m2 SAR -
SAR -
B To soffits of drop panel 1,525 m2 SAR -
SAR -
C To sides of suspended slabs 3,240 m2 SAR -
SAR -
D To sides of drop panel 400 m2 SAR -
SAR -
E To sides of shear wall 10,434 m2 SAR -
SAR -
F To sides of columns 7,174 m2 SAR -
SAR -
G To sides of hangers 372 m2 SAR -
SAR -
H To sides & soffits of beams 6,660 m2 SAR -
SAR -
J To sides of transfer walls 514 m2 SAR -
SAR -
K To sides of upstand walls 130 m2 SAR -
SAR -
L To sides & soffits of transfer beam 366 m2 SAR -

M To sides & soffits of storey deep transfer beam 2,542 m2 SAR -


SAR -
N To sides of pedestals 36 m2 SAR -
SAR -
P To sides of mechanical bases 6 m2 SAR -
SAR -
Section 03 20 00 Concrete Reinforcement and Embedded SAR -
Assemblies
SAR -
Steel Reinforcement SAR -
SAR -
Deformed Bars; ASTM A615 Grade 60 with minimum SAR -
yield strength of 420 Mpa (60 ksi); all in accordance with
the Drawings and Specification
SAR -
Q In shear wall 431 t SAR -
SAR -
R In columns 348 t SAR -
SAR -
S In hangers 10 t SAR -
SAR -
T In beams 379 t SAR -
SAR -
U In flat slab 1,418 t SAR -
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 21 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
V In transfer walls 40 t SAR -
SAR -
W In upstand walls 2 t SAR -
SAR -
X In transfer girder beams 38 t SAR -

Y In storey deep transfer girder beams 363 t SAR -

SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 22 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Section 03 20 00 Concrete Reinforcement and Embedded SAR -


Assemblies
SAR -
Steel Reinforcement SAR -
SAR -
Deformed Bars; ASTM A615 Grade 60 with minimum SAR -
yield strength of 420 Mpa (60 ksi); all in accordance with
the Drawings and Specification
SAR -
A In PT beam 10 t SAR -
SAR -
B In drop panel 36 t SAR -
SAR -
C In pits 6 t SAR -
SAR -
D In pedestals 1 t SAR -
SAR -
E In mechanical bases 1 t SAR -
SAR -
Section 03 30 00 Cast-In-Place Concrete SAR -
SAR -
Reinforced in situ concrete; 30MPA; portland cement SAR -
American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification
SAR -
F Composite Slab 28 m3 SAR -
SAR -
G Pedestals 4 m3 SAR -
SAR -
Reinforced in situ concrete; 45MPA; portland cement SAR -
American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification
SAR -
P Flat Slabs 11,866 m3 SAR -
SAR -
Q Drop Panel 280 m3 SAR -
SAR -
R Beam 1,334 m3 SAR -

F Transfer Girder 117 m3 SAR -


SAR -
S Ramp Slab 64 m3 SAR -
SAR -
T Mechanical Bases 5 m3 SAR -
SAR -
U Pit 43 m3 SAR -

Reinforced in situ concrete; 60MPA; portland cement SAR -


American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification
SAR -
V Shear Wall 2,501 m3 SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 23 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
W RC Columns 1,538 m3 SAR -
SAR -
X RC Hangers 70 m3 SAR -
SAR -
Y Transfer walls 253 m3 SAR -
SAR -
Z Upstand Wall 20 m3 SAR -
SAR -
AA Storey Deep Transfer Girder 1,232 m3 SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 24 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Section 03 38 00 Post-Tensioned Concrete SAR -


SAR -
Post Tensioned concrete; 45MPA; portland cement SAR -
American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification
SAR -
G PT Beams 44 m3 SAR -
SAR -
Section 03 41 00 Precast Structural Concrete SAR -
SAR -
Precast concrete; including reinforcement and all SAR -
necessary accessories; all in accordance with the
Drawings and Specification
SAR -
H To staircase flights 62 m3 SAR -
SAR -
J To staircase landing 55 m3 SAR -
SAR -
Precast concrete lintels; including reinforcement and all SAR -
necessary accessories; all in accordance with the
Drawings and Specification
SAR -
K 150 x 200mm size 472 m SAR -
SAR -
L 200 x 200mm size 320 m SAR -
SAR -
M 250 x 200mm size 39 m SAR -
SAR -
N To walls exceeding 3m height; 100 x 200mm 1 item SAR -
SAR -
Section 03 53 00 Concrete Topping (Screed) SAR -
SAR -
Concrete Topping (screed), with mesh including all SAR -
necessary accessories; all in accordance with the
Drawings and Specifications
SAR -
P To slab; 100mm thick 1 item SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 25 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

SAR -
SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 26 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

SAR -
Additional Items SAR -
SAR -
The Contractor shall describe and price below the items SAR -
necessary for the full and proper Completion of the
Works as described in the Specifications or shown on
the Drawings and for which either expressed or implied
provision is required and which are not covered by either
the items or the rates in the Bills of Quantities and
whether arising from the class of work, Conditions of
Contract or any other matter whatsoever. Anything not
so separately described shall be deemed to be covered
in the items and rates inserted in the Bills of Quantities.

SAR -
A _______________________________________________ SAR -
SAR -
B _______________________________________________ SAR -
SAR -
C _______________________________________________ SAR -
SAR -
D _______________________________________________ SAR -
SAR -
E _______________________________________________ SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 27 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 28 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

COLLECTION

Page: 3 SAR -

Page: 4 SAR -

Page: 5 SAR -

Page: 6 SAR -

Page: 7 SAR -

Page: 8 SAR -

SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 29 of 30


Faisaliah Redevelopment Upgrade Project - Phase 1B
Main Contract Works - Hotel Construction
Bill of Quantities ''E''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Carried to BOQ "E" General Summary SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 30 of 30

You might also like