Part 7 Rules for Survey After Construction Chapter 3 Hull Surveys Section 1 Requirements for Internal Examinations of All Vessels 34 7-3-1/13 Notation “SH, SHCM” to read “SH, SHCM”.
Part 7 Rules for Survey After Construction
Chapter 3 Hull Surveys Section 2 Vessels for Unrestricted Service 79 7-3-2/5.7.3(b) Reference “7-3-2/5.1.7(d)” to read “7-3-2/5.1.7(e)”.
Part 7 Rules for Survey After Construction
Appendix Section 2 Surveys of Voyage Repairs to Hull Structure 285 7-A-1/3.1 Renumber second instance of “3.1.8” as “3.1.9”.
Part 7 Rules for Survey After Construction
Appendix Section 15 Report on Thickness Measurement of Bulk Carriers – Double Skin (CSR and Non-CSR Vessels) 608 7-A-15/Figure 4 Title of table for Items 36 to 40 to read “REPORT ON TM6-DSBC”.