Professional Documents
Culture Documents
Recommendations For Drying and Heating-Up Refractory Concrete Linings
Recommendations For Drying and Heating-Up Refractory Concrete Linings
Refratechnik Cement develops, Particularly after repairs, the Once started, the heating-up
produces and sells innovative cement-free “Easy Dry” (ED) procedure must not be interrupted
refractory products and lining refractory concretes permit faster or stopped. For example, if a burner
systems that are adapted to the re-commissioning of the plant. fails, the lining must be kept warm.
latest requirements. In order to Should cooling down be unavoid-
get the most out of the projected The heating and cooling curves able, renewed heating-up must be
and optimized properties of the shown below for refractory con- done with extreme care, and must
refractory concrete linings, such crete linings must be observed in start with the first heating step.
as high thermomechanical and accordance with the recommen-
thermochemical resistance, plus dations, as otherwise structural The specified maximum heating-up
high structural strength – which damage of the refractory concrete and cooldown rates must never be
contribute to long service life and must be expected. Any deviations exceeded. After drying and heat-
commercial success – the drying, necessary e.g. due to adaptations ing-up, the operating temperature
heating-up, and cooldown phases to local conditions or the process should be ideally maintained for at
specified for the different refractory must be discussed and agreed least 24 hours.
concretes must be strictly observed individually with the refractory
with new installations and after material supplier.
repair downtimes.
1500
1400
1300
1200
1100
max. 100 °C/h max. 100 °C/h
temperature / °C
1000
900
800
700
600
max. 50 °C/h
500
400
max. 50 °C/h
300
200
max. 10 °C/h
100
0
0 22 0 24 48
heating-up time / h cooldown time / h
1000
900
700
600
10 h / 500 °C
500
400
max. 25 °C/h
300
200
20 h / 150 °C
100
min. 24 h setting time max. 15 °C/h
0
0 24 48 72
After setting, the physically and chemically time after setting / h
bound water must be expelled.
900
600
500
400
300
8 h / 250 °C
200
10 h / 150 °C
100
max. 50 °C/h
0
0 24 48 72
≤ 200 mm > 200 mm time after setting / h