25 I‐08805 Fire proofing damage to be repaired. FIN‐GS‐ME‐0393 / D‐2111 UNIT‐21
26 I‐06956 Damage on fireproof to be repaired D‐1104 UNIT‐11
27 I‐06962 Damage fireproofing C‐2102 UNIT‐21
Damage fireproofing , it shall be checked by insulation team 28 I‐06966 after scaffolding removal E‐1502D UNIT‐15 done Damage fireproofing , it shall be checked by insulation team 29 I‐06970 after scaffolding removal E‐1502C UNIT‐15 done
61 I‐10204 fire proofing damage to be repaired. PTJ‐FIN‐ME‐5090 / E‐1502E UNIT‐15 done Damage fireproofing shall be checked by insulation team after 62 I‐10205 scaffolding removal PTJ‐FIN‐ME‐5090 / E‐1502E UNIT‐15 done Damage fireproofing , it shall be checked by insulation team 63 I‐10209 after scaffolding removal FIN‐GS‐ME‐ 0431 / E‐1502B UNIT‐15 N/A Damage fireproofing shall be checked by insulation team after 64 I‐10262 scaffolding removal PTJ‐FIN‐ME‐5090 / E‐1502E UNIT‐15 N/A
65 I‐10267 fire proofing damage to be repaired. FIN‐PTJ‐ME‐5093 / E‐1502 A UNIT‐15 done