hala ANtd REQUEST FOR INSPECTION
YW ORIENTALS CONSTRUCTION OF CENTRALIZED:
eomaesmucenis | INDUSTRIAL AREA AT HALUL ISLAND.
REQUEST No. C.1.A,/MEPD-117 Rev. 0
DETAILS OF SCHEDULED INSPECTION
INTRACT No. =GC11100200 [ob No. 6220 Date: dunt, rime:
1:00 AN
[To QATAR PETROLEUM REFERENCE
REF. /ORAWING No.: (2424-3480 sh 2, 2424-2458 si. 2424-3462 sk), REV. A
JLOCATION: Office Block Building, Area B
For Inspection and Approval
[Responsible Eng: Kareem Masoud
OAM
7] MECHANICAL
ELECTRICAL,
INSTRUMENTATION/TELECOM — - a
WELDING/PIPING 2 - (As per Attachments)
PREFAB BUILDING Leakage test at 26HRS: (Arp Cine cet
DRAINAGE Leakage test at 48 HRS: [Z/igproved Dt aces
PLUMGING —=—=—~—_—teakagetestat 22HRS: [Zaroroved
ee JEmeanioU TANK ue TUR At _6-C-/S,
imo TRO UA TILED At m= F-1S AY
lconrractor: fag: Poviah Pugal-Constaiction Manager ___ Date: 4-Jun-13 Time:
9:00 aM
eu 3) -
SESAME aed \olrar- he
Corres Wei fr Aport Cresco noche eet
“Approval
Approved [——] Rejected [ Ccancpiled [
“The QP comment shal no relieve he contractors of any of his responsibiltes under the contact.
P REPRESENTATIVE: (Mech) fs Pl. Mh ome j2foofoss rm: 0423 PY