You are on page 1of 4
-—— hala ANtd REQUEST FOR INSPECTION YW ORIENTALS CONSTRUCTION OF CENTRALIZED: eomaesmucenis | INDUSTRIAL AREA AT HALUL ISLAND. REQUEST No. C.1.A,/MEPD-117 Rev. 0 DETAILS OF SCHEDULED INSPECTION INTRACT No. =GC11100200 [ob No. 6220 Date: dunt, rime: 1:00 AN [To QATAR PETROLEUM REFERENCE REF. /ORAWING No.: (2424-3480 sh 2, 2424-2458 si. 2424-3462 sk), REV. A JLOCATION: Office Block Building, Area B For Inspection and Approval [Responsible Eng: Kareem Masoud OAM 7] MECHANICAL ELECTRICAL, INSTRUMENTATION/TELECOM — - a WELDING/PIPING 2 - (As per Attachments) PREFAB BUILDING Leakage test at 26HRS: (Arp Cine cet DRAINAGE Leakage test at 48 HRS: [Z/igproved Dt aces PLUMGING —=—=—~—_—teakagetestat 22HRS: [Zaroroved ee JEmeanioU TANK ue TUR At _6-C-/S, imo TRO UA TILED At m= F-1S AY lconrractor: fag: Poviah Pugal-Constaiction Manager ___ Date: 4-Jun-13 Time: 9:00 aM eu 3) - SESAME aed \olrar- he Corres Wei fr Aport Cresco noche eet “Approval Approved [——] Rejected [ Ccancpiled [ “The QP comment shal no relieve he contractors of any of his responsibiltes under the contact. P REPRESENTATIVE: (Mech) fs Pl. Mh ome j2foofoss rm: 0423 PY Page Lof 1 q si fi TS SS

You might also like