QUALITY ASSURANCE AND HYDROLOGY DIVISION

DAILY ATTENDANCE INDICATOR

PROJECT NAME: Construction Of Mawab-Maragusan-Caraga Road (Section 2), Package G,


Including ROW, Compostela Valley

AM PM
NAME DESIGNATION SIGNATURE
IN OUT IN OUT
ANGELIE M. VITO
3/3/2020 ENGINEERING AIDE 7:39 12:05 12:40 5:05
3/4/2020 ENGINEERING AIDE 7:35 12:02 12:38 5:02
3/5/2020 ENGINEERING AIDE 7:31 12:02 12:33 5:02
3/6/2020 ENGINEERING AIDE 7:36 12:01 12:30 5:05
3/7/2020 ENGINEERING AIDE 7:31 12:05 12:31 5:02
3/8/2020 ENGINEERING AIDE 7:37 12:02 12:42 5:05
3/10/2020 ENGINEERING AIDE 7:31 12:01 12:40 5:05
3/11/2020 ENGINEERING AIDE 7:35 12:09 12:40 5:04
3/12/2020 ENGINEERING AIDE 7:30 12:04 12:35 5:07
3/13/2020 ENGINEERING AIDE 7:41 12:05 12:32 5:05
3/14/2020 ENGINEERING AIDE 7:40 12:01 12:36 5:02