You are on page 1of 48

Tests carried out on drives

This documentation pertains to


GH180
F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95
M61 N30 N35 N44 N75 M08 U10 Y15

Reference Manual

Medium-Voltage Drive

SINAMICS PERFECT HARMONY GH180


Type 6SR41

Edition 02/2019 www.siemens.com/drives


14.02.2019 14:41
V8.00
Introduction 1

General scope of services 2

Tests 3
Medium-Voltage Drive

SINAMICS PERFECT HARMONY


GH180
Type 6SR41

Reference Manual

This documentation pertains to


GH180

F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21
K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75
M08 U10 Y15

Edition 02/2019
Legal information
Warning notice system
This manual contains notices you have to observe in order to ensure your personal safety, as well as to prevent
damage to property. The notices referring to your personal safety are highlighted in the manual by a safety alert
symbol, notices referring only to property damage have no safety alert symbol. These notices shown below are
graded according to the degree of danger.

DANGER
indicates that death or severe personal injury will result if proper precautions are not taken.

WARNING
indicates that death or severe personal injury may result if proper precautions are not taken.

CAUTION
indicates that minor personal injury can result if proper precautions are not taken.

NOTICE
indicates that property damage can result if proper precautions are not taken.
If more than one degree of danger is present, the warning notice representing the highest degree of danger will be
used. A notice warning of injury to persons with a safety alert symbol may also include a warning relating to property
damage.
Qualified Personnel
The product/system described in this documentation may be operated only by personnel qualified for the specific
task in accordance with the relevant documentation, in particular its warning notices and safety instructions. Qualified
personnel are those who, based on their training and experience, are capable of identifying risks and avoiding
potential hazards when working with these products/systems.
Proper use of Siemens products
Note the following:

WARNING
Siemens products may only be used for the applications described in the catalog and in the relevant technical
documentation. If products and components from other manufacturers are used, these must be recommended or
approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and
maintenance are required to ensure that the products operate safely and without any problems. The permissible
ambient conditions must be complied with. The information in the relevant documentation must be observed.

Trademarks
All names identified by ® are registered trademarks of Siemens AG. The remaining trademarks in this publication
may be trademarks whose use by third parties for their own purposes could violate the rights of the owner.
Disclaimer of Liability
We have reviewed the contents of this publication to ensure consistency with the hardware and software described.
Since variance cannot be precluded entirely, we cannot guarantee full consistency. However, the information in this
publication is reviewed regularly and any necessary corrections are included in subsequent editions.

Siemens AG Document order number: 8888888888-000088 Copyright © Siemens AG 2019.


Process Industries and Drives Ⓟ 02/2019 Subject to change All rights reserved
Postfach 48 48
90026 NÜRNBERG
GERMANY
Table of contents

1 Introduction...................................................................................................................................................7
2 General scope of services ............................................................................................................................9
2.1 Routine test ............................................................................................................................11
2.2 Visual inspection ....................................................................................................................12
2.3 Function tests.........................................................................................................................13
2.4 Insulation test .........................................................................................................................14
3 Tests...........................................................................................................................................................15
3.1 Visual inspection ....................................................................................................................16
3.1.1 Rating plate ............................................................................................................................16
3.1.2 Housing degree of protection .................................................................................................16
3.1.3 Electrical cabinet components ...............................................................................................17
3.1.4 Cable installation....................................................................................................................17
3.1.5 Cable markings ......................................................................................................................18
3.1.6 Setting values of circuit breakers, if used...............................................................................18
3.1.7 Dimensions ............................................................................................................................18
3.2 Function test...........................................................................................................................20
3.2.1 Auxiliary voltages ...................................................................................................................20
3.2.2 Door limit switches .................................................................................................................20
3.2.3 Door interlocking system........................................................................................................20
3.2.4 Anti-condensation heating......................................................................................................21
3.2.5 Socket outlets and lighting .....................................................................................................22
3.2.6 Remote access via digital and analog inputs and outputs .....................................................22
3.2.7 Phase offset of the output voltage in the three-phase system ...............................................23
3.2.8 Local control via the operator panel .......................................................................................23
3.2.9 Local control via pushbutton ..................................................................................................24
3.2.10 Phase offset between output voltage and current with output reactor ...................................24
3.2.11 Operating state indicator lights...............................................................................................25
3.2.12 Digital inputs and outputs for line synchronization .................................................................25
3.2.13 Checking the evaluation unit for external temperature sensors .............................................26
3.2.14 Remote access via network connection.................................................................................27
3.2.15 Mechanical door interlock ......................................................................................................27
3.2.16 Switched three-phase auxiliary power output ........................................................................28
3.2.17 Switched single-phase auxiliary power output .......................................................................28
3.2.18 Grounding switch ...................................................................................................................29
3.2.19 Failure of a power semiconductor module .............................................................................30
3.2.20 Temperature monitoring – infeed transformer........................................................................31
3.2.21 Fan failure with redundant fans..............................................................................................31
3.2.22 Fan failure ..............................................................................................................................32
3.2.23 Fan change operation ............................................................................................................32
3.2.24 Overtemperature, output reactor or sine-wave filter...............................................................33
3.2.25 Bypass ...................................................................................................................................33
3.2.26 Load test without motor..........................................................................................................34

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 5
Table of contents

3.2.27 Display devices in the cabinet door........................................................................................34


3.3 Cooling system test................................................................................................................36
3.3.1 Air flow direction.....................................................................................................................36
3.4 Interface test ..........................................................................................................................37
3.4.1 Interfaces ...............................................................................................................................37
3.5 Additional optional tests .........................................................................................................38
3.5.1 Temperature-rise test.............................................................................................................38
3.5.2 Temperature behavior of the infeed transformer....................................................................38
3.5.3 Power factor measurement ....................................................................................................39
3.5.4 Efficiency and loss measurement ..........................................................................................39
3.5.5 Harmonics ..............................................................................................................................39
3.5.6 Noise measurement without load...........................................................................................40
Index...........................................................................................................................................................41

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
6 Reference Manual Rev.201902141441 GH180
Introduction 1
This document describes the preconditions when testing drives. The fulfillment of these
preconditions is the basis for achieving the smoothest possible testing process and maximum
possible customer satisfaction.
The following drive tests are described:
● Routine tests
● Tests that are offered as standard

Note
If the scope of testing and inspection cannot fulfill all customer requirements, please consult
your Siemens sales advisor at head office.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 7
Introduction

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
8 Reference Manual Rev.201902141441 GH180
General scope of services 2
A variable-speed drive can include the following components:
● Induction motor, synchronous motor or PEM motor with or without speed encoder
● SINAMICS drives
● Drive transformer
● Cooling unit for water-cooled drives
● Small PLCs with drive functionality.
The Nuremberg Vogelweiherstrasse factory offers test equipment adapted to these types of
systems.

Note
Contact your sales person if additional components must be taken into account for your
particular project.

Scope of services offered


Unless otherwise stated in the quotation, the scope of services includes all activities,
equipment, materials and expendables required to perform the specified tests. The deadline
and testing period stated, and the quoted cost, can be met only if all the test and inspection
procedures to be performed are clarified in detail in advance. Due to the high capacity utilization
of the associated equipment, it might not be possible to carry out individual inspections and
tests that are requested late if the planned test is already in progress.
If you have received specific requirements from your customer, please send these as soon as
possible – with the necessary key data – to the Nuremberg Vogelweiherstrasse factory.

Sequence of a customer acceptance


A customer acceptance test is generally executed in the sequence:
1. Installation and commissioning of the components before the customer arrives.
2. Kickoff with presentation of the test schedule and discussion of individual steps in the
acceptance test workflow.
3. Execution of the tests according to the test schedule
4. Discussion of the test results
5. Preparation of test documentation for the customer.
The test documentation is created before or after the customer leaves depending on the
scope of testing and the time schedule.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 9
General scope of services

Components provided by customer


Components provided by the customer must be available in plenty of time so that tests can be
carried out on time. The Nuremberg Vogelweiherstrasse factory has no access to components
that are not within the PD LD scope of supply. This also applies to components ordered from
other Siemens' Groups. The technical data for these components is required at the latest eight
weeks before the start of the acceptance test, e.g.:
● Dimensions
● Weights
● Energy Requirement
● Interfaces

Location of the customer acceptance


All customer acceptance tests in the test fields for drives are performed as part of the
manufacturing process.

Note
Limited number of persons in the test field
For safety reasons, the number of persons in the test field is limited. In addition to the regional
sales partner, only two persons from the customer are permitted in the test field at the same
time.

Note
Test without load motors or multipulse infeeds via transformers in the test field
Some tests are simulated or performed in test mode with limited rated data.

Note
Tests with the customer's own cooling units or excitation equipment
If the customer's own cooling units or excitation equipment are to be tested, a system test can
be ordered with option F97.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
10 Reference Manual Rev.201902141441 GH180
General scope of services
2.1 Routine test

2.1 Routine test


During production, the drive is subject to an internal routine test.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 11
General scope of services
2.2 Visual inspection

2.2 Visual inspection


The visual inspection is performed to ensure that the equipment complies with the order
specifications. The tests are carried out with the drive in a no-voltage condition.
The visual inspection together with the customer – or with the company accepting the
equipment – is carried out with the drive installed and labeled. Each test step is documented in
the acceptance report with the specific results of the step.
The visual inspection is part of the function test (F72, F73).

Visual inspection Order codes


Without the With the cus‐
customer tomer
present present
● Rating plate
● Housing degree of protection
● Electrical cabinet components - F03
● Cable installation
● Cable markings
● Setting values of circuit breakers, if used
● Dimensions

See also
Visual inspection (Page 16)

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
12 Reference Manual Rev.201902141441 GH180
General scope of services
2.3 Function tests

2.3 Function tests


The drive functions are tested according to IEC 61800-5-1. In addition, excerpts from additional
standards apply, which are listed in the relevant chapters as well as internal Siemens directives
within the scope of quality assurance.
The function tests are performed and documented in the Siemens test field by internal test field
personnel. For the function test, the drive is in the test mode with restricted monitoring functions.
The successful test is confirmed in a 3.1 certificate – or in the case that the customer has
ordered the acceptance test, in a 3.2 certificate.

See also
Function test (Page 20)

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 13
General scope of services
2.4 Insulation test

2.4 Insulation test


The insulation resistance is measured before and after the high-voltage test. The insulation test
can only be ordered and carried out together with the function test (F72, F73).

Insulation test Order codes


Without the With the cus‐
customer tomer
present present
● High-voltage test
● Measuring the insulation resistance F76 F77

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has
ordered the acceptance test, in a 3.2 certificate.
The insulation test is performed on a separate acceptance day prior to the function test.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
14 Reference Manual Rev.201902141441 GH180
Tests 3
In the following you will find the tests that can be additionally ordered for a drive.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 15
Tests
3.1 Visual inspection

3.1 Visual inspection


The visual inspection is performed to ensure that the drive complies with the requirements of
the order. The individual test steps are performed with the drive in a no-voltage condition.
The test together with the customer – or his representative – is carried out with the drive
installed and labeled. The results of all of the tests are documented in the acceptance report.

3.1.1 Rating plate


Fundamentals
The technical data and ordered options on the rating plate and the routine test certificate are
checked to ensure that they match up.

Test procedure
1. The data on the rating plate and the routine test certificate are visually compared.

Result
The test is passed if the data match up.

3.1.2 Housing degree of protection


Fundamentals
A check is made as to whether the housing degree of protection ordered complies with what is
described in the catalog.

Test procedure
1. The housing degree of protection is identified based on what is stamped on the rating plate.
2. Depending on the version, the following components are visually checked, e.g.:
– Canopies
– Cooling slots
– Fittings and rubber seals in the doors and between the cabinet units
– Cable entries
– Openings for water pipes, if available
– Additional components, if available

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
16 Reference Manual Rev.201902141441 GH180
Tests
3.1 Visual inspection

Result
The test is passed if the components required for the specified housing degree of protection are
available.

3.1.3 Electrical cabinet components


Fundamentals
A visual inspection is made to see whether the electrical cabinet components are installed as
defined in the layout diagram and/or circuit diagram.

Test procedure
1. The customer selects electrical cabinet components by random sampling.
2. The selected electrical cabinet components are visually checked to ensure that they are
correctly installed and marked.

Result
The test is passed if the selected electrical cabinet components are installed as specified in the
layout diagram and/or circuit diagram.

3.1.4 Cable installation


Fundamentals
Visual and mechanical checks are made to ensure that cables and conductors have been
installed correctly and are connected correctly according to the circuit diagram.

Test procedure
1. The customer selects cables or conductors by random sampling.
2. The following is inspected:
– Are the cables firmly connected?
– Have edge protectors been attached to sharp edges?
– Are the cables routed according to the circuit diagram?

Result
The inspection is passed if the cable installation does not exhibit any deficiencies and matches
the information in the circuit diagram.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 17
Tests
3.1 Visual inspection

3.1.5 Cable markings


Fundamentals
A visual inspection is made to see whether cables and conductors are marked as defined in the
circuit diagram.

Test procedure
1. The customer selects cables or conductors by random sampling.
– Are the cable end tags and conductor colors of cables and conductors marked as defined
in the circuit diagram?

Result
The test is passed if the cable and conductor markings match what is specified in the circuit
diagram.

3.1.6 Setting values of circuit breakers, if used


Fundamentals
The circuit breaker settings are visually checked against what is specified in the circuit diagram.

Test procedure
1. The customer selects circuit breakers by random sampling.
2. The circuit breaker settings are visually checked against what is specified in the circuit
diagram.

Result
The test is passed if the circuit breaker settings match what is specified in the circuit diagram.

3.1.7 Dimensions
Fundamentals
The drive dimensions are measured. The basis for the visual inspection is the order-specific
dimension drawing.

Test procedure
1. The external dimensions, length, width and height of the drive are measured.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
18 Reference Manual Rev.201902141441 GH180
Tests
3.1 Visual inspection

Result
The test is passed if the dimensions match with what is specified in the dimension drawing.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 19
Tests
3.2 Function test

3.2 Function test

3.2.1 Auxiliary voltages


Fundamentals
Tests are performed according to DIN EN 60146-1. The auxiliary voltages are visually checked
using indicator lights or using a voltmeter.

Test procedure
1. The drive power section is switched off.
2. The auxiliary voltages are switched on.
3. The auxiliary voltages are checked.

Result
The test is passed if all of the auxiliary voltages are available.

3.2.2 Door limit switches


Fundamentals
The doors of the drive power section are monitored using limit switches. This monitoring
function ensures that when the doors are open, the medium voltage cannot be switched-in.

Test procedure
1. The auxiliary voltage is present. All drive doors are closed. -K51 has energized.
2. One door of the drive power section is opened.
-K41 drops out and prevents the medium voltage from being switched-in
It is not permissible that -K41 has energized.

Result
The test is passed if the switching states listed above are complied with.

3.2.3 Door interlocking system


Fundamentals
Tests are performed in accordance with IEC 61800-5-1

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
20 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

To avoid accidents, the drive doors must be closed during operation. This is guaranteed by the
electromagnetic door interlocking system. The doors of the power section remain interlocked
until an appropriate safety wait time has elapsed.

Test procedure
1. The auxiliary voltage is present.
2. All drive doors have been closed.
3. The medium voltage is available.
The electromagnetic door interlocking system locks the power section doors.
4. The power section doors cannot be opened.
5. The power section power supply is switched off. The safety wait time elapses. The power
cells discharge themselves.
6. If a grounding switch is installed, it is closed manually.
7. The selector switch on the drive is set to "OFF". The EMERGENCY STOP is pressed.
The power section doors can be opened.

Result
The test is passed if the door interlocking system functions as described.

3.2.4 Anti-condensation heating


Fundamentals
A check is made as to whether the anti-condensation heating heats up after switching on. This
prevents the formation of condensation in the drive when it is not operational.

Test procedure
1. The temperature of the anti-condensation heating is measured using an infrared
thermometer.
2. The auxiliary voltage for the anti-condensation heating is switched on.
The anti-condensation heating elements heat up.
3. The temperature is measured again.

Result
The test is passed if the anti-condensation heating elements heat up after they have been
switched on.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 21
Tests
3.2 Function test

3.2.5 Socket outlets and lighting


Fundamentals
Socket outlets and lighting are checked.

Test procedure
1. The voltage at the socket outlets is measured.
2. The lighting is checked.

Result
The test is passed if the correct voltage is available at the socket outlets and the lighting
functions.

3.2.6 Remote access via digital and analog inputs and outputs
Fundamentals
With the drive in the remote mode, a check is made as to whether it can be controlled via digital
and analog inputs and outputs.

Test procedure
1. The drive is switched into the remote mode using the "Local-Remote switch".
2. The following operating states are set and monitored at the test station:
– Ready to switch on
– Remote mode
– Drive on
– Drive off
– Various points along the U/f characteristic
– Reset fault
– Remote inhibit
– Emergency Off

Result
The test is passed if the corresponding operating states and specified values occur.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
22 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

3.2.7 Phase offset of the output voltage in the three-phase system


Fundamentals
A check is made whether the three phases of the output voltage have a 120° phase offset.

Test procedure
1. The drive is switched on.
2. The output voltages at measuring points VMA, VMB, VMC are displayed on an oscilloscope.

Result
The test is passed if the phase offset is 120°.

3.2.8 Local control via the operator panel


Fundamentals
With the drive in the local mode, a check is made as to whether it can be controlled from the
operator panel.

Test procedure
1. The drive is switched into the local mode using the "Local-remote switch".
2. The following operating states are set and monitored at the operator panel or at the test
station:
– Drive on
– Drive off
– Various points along the U/f characteristic
– Reset fault
– Emergency Off
– Local control priority

Result
The test is passed if the corresponding operating states and specified values occur.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 23
Tests
3.2 Function test

3.2.9 Local control via pushbutton


Fundamentals
With the drive in the local mode, a check is made as to whether it can be controlled using the
pushbutton and potentiometer at the drive.

Test procedure
1. The drive is switched into the local mode using the "Local-Remote switch".
2. The following operating states are set using the operator controls and monitored at the
operator panel or at the test station:
– The converter is in the local mode.
– Drive on
– Drive off
– Various points along the U/f characteristic
– Reset fault

Result
The test is passed if the corresponding operating states and specified values occur.

3.2.10 Phase offset between output voltage and current with output reactor
Fundamentals
It is tested whether the voltage per phase has a 90° phase offset with respect to the current.

Test procedure
1. The drive is switched on.
2. The phase offset is displayed between the following measuring points using an oscilloscope.
– VMA and IFA
– VMB and IFB
– VMC and IFC

Result
The test is passed if the phase offset is 90°.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
24 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

3.2.11 Operating state indicator lights


Fundamentals
The operating state indicator lights of the drive are tested.

Test procedure
During the various tests, different operating states arise. The signaling of the following states
is recorded during the test.
● Fault (red)
● Alarm (yellow)
● Drive in Operation (green)
● Drive ready (white)
● Local operation (white)

Result
The test is passed if the operating state indicator lights light up in accordance with the operating
states.

3.2.12 Digital inputs and outputs for line synchronization


Fundamentals
Digital inputs and outputs are available for the line synchronization; their evaluation and control
is tested using test software.

Test procedure
The function of the inputs and outputs is tested using switches and/or test LEDs.
● Input for Up Transfer Request signal
● Input for Down Transfer Request signal
● Input for Line Contactor Acknowledge signal
● Input for VFD Contactor Acknowledge signal
● Output for Down Transfer Complete feedback
● Output for Up Transfer Complete feedback
● Output for Down Transfer Permit feedback
● Output for Up Transfer Permit feedback
● Output for Line Contactor Unlatch feedback

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 25
Tests
3.2 Function test

Result
The test is passed if the corresponding digital inputs and outputs can be correctly switched.

3.2.13 Checking the evaluation unit for external temperature sensors


Fundamentals
The evaluation unit for external temperature sensors is checked.

Option Description
L81 2 x 2 thermistor protection relay
L82 3 x 2 thermistor protection relay
L91 2 x Pt100 evaluation units each with 3 inputs
L93 Pt100 evaluation unit with 6 inputs and 2 analog outputs
L95 Pt100 evaluation unit with 6 inputs for explosion-protected motors and 6 analog outputs

Test procedure
1. The drive is switched on.
2. The signal cable for "Alarm" is interrupted.
The drive remains switched on. The following message is displayed on the test station
computer.
"Motor Protect Relay Warn" (= motor overtemperature)
3. The signal cable for "Fault" is interrupted.
The drive is shut down. The following message is displayed on the test station computer.
"Motor Protect Relay Trip" (= motor overtemperature fault)

Result
The test is passed if the appropriate messages are displayed on the test station computer.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
26 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

3.2.14 Remote access via network connection


Fundamentals
Two networks are optionally available to connect to the higher-level process control system
(PLC, S7, ...). With the drive in the remote mode, a check is made as to whether the network
interface can be controlled.

Network Option Network version


1 G21 Mod Bus Plus
G22 Mod Bus RTU
G28 Mod Bus Ethernet
G91 Profi Bus DP
2 G31 Mod Bus Plus
G32 Mod Bus RTU
G38 Mod Bus Ethernet
G93 Profi Bus DP

Test procedure
1. The network cable is inserted in the interface.
2. The drive is switched into the remote mode using the "Local-Remote switch".
3. The following operating states are set and monitored at the test station via network:
– Drive on
– Drive off
– Reset fault

Result
The test is passed if the drive responds as described.

3.2.15 Mechanical door interlock


Fundamentals
The door interlock system locks are tested. The primary key allows access to one or several
secondary keys. The primary key can only be removed if all of the secondary keys are in the key
exchange unit.

Test procedure
1. All drive doors have been closed and interlocked.
2. The locks are locked using the secondary keys.
3. The secondary keys are withdrawn.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 27
Tests
3.2 Function test

4. The secondary keys are inserted in the key exchange unit and interlocked by turning.
5. The primary key is released and withdrawn.

Result
The test is passed if the primary key can be withdrawn.

3.2.16 Switched three-phase auxiliary power output


Fundamentals
The switched, three-phase auxiliary power output is used for the separately-driven fan of the
motor, for example.
The auxiliary power is output when the drive is operational. No auxiliary power is output when
the drive is switched off.

Option Power at 400 V 3AC 50 Hz / Motor circuit breaker


460 V ... 480 V 3AC 60 Hz
N30 4 / 4.8 kW 9 A ... 12.5 A
N31 7 / 8 kW 14 A ... 20 A
N32 11 / 12.7 kW 18 A ... 25 A
N33 15 / 17.5 kW 28 A ... 40 A

Test procedure
1. The drive is switched on.
-K30 energizes.
2. The drive is switched off.
In the OFF state, -K30 deenergizes.

Result
The test is passed if -K30 appropriately responds.

3.2.17 Switched single-phase auxiliary power output


Fundamentals
The switched, single-phase auxiliary power output is used for the motor anti-condensation
heating, for example.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
28 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

No auxiliary power is output when the drive is operational. The auxiliary power is output when
the drive is switched off.

Option Power at 230 V 1AC 50 Hz / 120 V 1AC 60 Hz


N35 1.2 / 0.7 kW
N36 2.2 / 1.2 kW
N37 3.5 / 1.8 kW
N38 4.5 / 2.4 kW

Test procedure
1. The drive is switched off
-K38 energizes.
2. The drive is switched on.
-K38 deenergizes.

Result
The test is passed if -K38 responds appropriately.

3.2.18 Grounding switch


Fundamentals
Depending on the particular version, the drive is equipped with one or two grounding switches.
The switching logic and switching states of the grounding switch are tested. The procedure is
the same for one or two grounding switches.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 29
Tests
3.2 Function test

Test procedure
1. The drive is switched on.
2. The drive is switched off and grounded according to the following scheme.

Action Switching states


-Q1 / Q2 -K21 -K22 -K41 -K51
Initial state with the drive switched on off off off on on
Drive off off off off on on
Medium voltage off off off off on on
Wait 600 s off off off on on
Local-remote switch off and actuate Emer‐ off off on off on
gency Off
Connect grounding switches -Q1 / Q2 on on on off on
Open the doors on on on off off

3. The drive is switched off and grounded, the doors are open.

Action Switching states


-Q1 / Q2 -K21 -K22 -K41 -K51
Initial state with the drive switched off on on on off off
Close the doors on on on off on
Open grounding switches -Q1 / Q2 off off on off on
Local-remote switch to "Local" and re‐ off off off on on
lease Emergency Off
Medium voltage on off off off on on
Drive on off off off on on

Result
The test is passed if the corresponding switching states occur.

3.2.19 Failure of a power semiconductor module


Fundamentals
The power section must shut down if a power semiconductor module fails. The failure is
simulated by withdrawing the fiber-optic cable connector from the gating module of a power
semiconductor module. This interrupts the control.

Test procedure
1. The auxiliary voltage is present.
2. The fiber-optic cable connector of a gating module is withdrawn.
A message is displayed on the test station computer.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
30 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

Result
The test is passed if the appropriate message is displayed on the test station computer and the
inverter is inhibited.

3.2.20 Temperature monitoring – infeed transformer


Fundamentals
The temperature monitoring of the infeed transformer is checked.

Test procedure
1. The drive is switched on.
2. The signal cable for "Alarm" is interrupted.
The drive remains switched on. The following message is displayed on the test station
computer.
"Xformer OT Alarm" (= alarm, transformer overtemperature)
3. The signal cable for "Fault" is interrupted.
The drive remains switched on. The following message is displayed on the test station
computer.
"Xformer OT Trip Alarm" (= fault announcement, transformer overtemperature)
4. The drive is switched off if the fault announcement is uninterrupted for 60 s.
The following messages are displayed on the test station computer:
"Xformer OT Trip" (= fault transformer overtemperature)
"SOP issued MV input trip" (= drive switches off the supply)

Result
The test is passed if the appropriate messages are displayed on the test station computer.

3.2.21 Fan failure with redundant fans


Fundamentals
Depending on the version, the cabinet and/or each cabinet unit (transformer unit, cell unit) is
equipped with one or two fans and a redundant fan.
A check is made that when one of the fan fails, the redundant fan is switched on. In order to
maintain drive operation, at least one fan per cabinet unit must be active.

Test procedure
1. The drive is switched on.
2. The fan power supply of a cabinet unit is interrupted.
The redundant fan switches on. A fan failure message is displayed on the test station
computer.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 31
Tests
3.2 Function test

3. The power supplies of all fans of a cabinet unit are interrupted.


The fault announcement of the cooling system ("Cooling Sys-Trip Alarm") is displayed on
the test station computer.
4. If no fan is switched in again within a specified time, then the drive shuts down.
The following messages are displayed:
– "Cooling Fail VFD / MV Trip" (= cooling system fault)
– "SOP issued MV Input Trip" (= circuit breaker trip)

Result
The test is passed if the appropriate messages are displayed on the test station computer, and
the drive switches off if a fan is no longer running.

3.2.22 Fan failure


Fundamentals
Depending on the version, the cabinet and/or each cabinet unit (transformer unit, cell unit) is
equipped with one or two fans.
In order to maintain drive operation, at least one fan per cabinet unit must be active.

Test procedure
1. The drive is switched on.
2. The power supplies of all fans of a cabinet unit are interrupted.
On the test station computer, a fan failure message and a fault announcement of the cooling
system ("Cooling Sys-Trip Alarm") are displayed.
3. If no fan is switched in again within a specified time, then the drive shuts down.
The following messages are displayed:
– "Cooling Fail VFD / MV Trip" (= cooling system fault)
– "SOP issued MV Input Trip" (= circuit breaker trip)

Result
The test is passed if the appropriate messages are displayed on the test station computer, and
the drive switches off if a fan is no longer running.

3.2.23 Fan change operation


Fundamentals
The fans are controlled alternating in order to guarantee that the operating time is evenly
distributed across the individual fans. A check is made as to whether this alternating operation
functions.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
32 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

Test procedure
1. The auxiliary voltage is present.
2. An operating time of 100 s is entered on the test station computer.
3. The drive is switched on.

Result
The test is passed if the fans switch over after the specified time.

3.2.24 Overtemperature, output reactor or sine-wave filter


Fundamentals
The temperature monitoring of the output reactor and/or the sine-wave filter is checked.

Test procedure
1. The drive is switched on.
2. The signal cable for "Alarm" is interrupted.
The drive remains switched on. The following message is displayed on the test station
computer.
"Reactor OT Alarm" (= overtemperature alarm)
3. The signal cable for "Fault" is interrupted.
The drive remains switched on. The following message is displayed on the test station
computer.
"Reactor OT Trip Alarm" (= fault announcement, overtemperature)
4. The inverter is switched off if the fault announcement is uninterrupted for 60 s.
The following message is displayed on the test station computer:
"Reactor OT Trip" (= overtemperature fault)

Result
The test is passed if the appropriate messages are displayed on the test station computer.

3.2.25 Bypass
Fundamentals
The appropriate bypass contactor must energize if a power semiconductor module fails. The
failure is simulated by withdrawing the fiber-optic cable connector from the gating module of a
power semiconductor module. This interrupts the control.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 33
Tests
3.2 Function test

Test procedure
The test is carried out with reduced power across an inductive load.
1. The drive is switched on.
2. A fiber-optic cable connector of a gating module is withdrawn for each phase.
The corresponding bypass contactor of the failed power semiconductor module energizes.
An alarm message is displayed on the test station computer.
3. The fiber-optic cable connector of an additional gating module is withdrawn.
The inverter is shut down.
A fault message is displayed on the test station computer.

Result
The test is passed if the appropriate messages are displayed on the test station computer.

3.2.26 Load test without motor


Fundamentals
The internal measuring device of the drive is checked for an inductive load. The calibrated
measuring equipment is used as reference.
When testing a version with 60 Hz input transformer on a 50 Hz line supply, the power is
reduced.

Test procedure
1. The drive is switched on in a test mode.
2. The inverter is enabled.
3. The rms values of voltage, current, apparent and active power are measured at the input
and output of the drive.

Result
The test is passed if the values displayed on the test station computer match the reference
values with a tolerance of ±5 %.

3.2.27 Display devices in the cabinet door


Fundamentals
Three display devices are mounted in the cabinet door of the control section. During the "Load
test without motor", a check is made whether the displayed values correspond to the measured
values of the calibrated measuring equipment.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
34 Reference Manual Rev.201902141441 GH180
Tests
3.2 Function test

Test procedure
1. The "Load test without motor" is carried out
The following values are displayed:
– Output current from 0 to +100 %
– Output voltage 0 to +100 %
– Speed in the range from -100 % up to +100 %

Result
The test is passed if the display device values match the reference values with a tolerance of
±5 %.

See also
Load test without motor (Page 34)

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 35
Tests
3.3 Cooling system test

3.3 Cooling system test

3.3.1 Air flow direction


Fundamentals
It is only guaranteed that the drive is correctly cooled when the fan rotates in the correct
direction of rotation.

Test procedure
1. The auxiliary voltage is present.
2. The drive is switched on.
The fans switch on.
3. The air flow direction is checked at the ventilation grilles.

Result
The test is passed if the air flows from the doors up to the roof section.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
36 Reference Manual Rev.201902141441 GH180
Tests
3.4 Interface test

3.4 Interface test

3.4.1 Interfaces
Fundamentals
The customer or its representative parameterize and test the communication of selected
interfaces with their own test equipment. Factory personnel are available to operate the test
station. Only auxiliary power is provided. The interface test is limited to five hours.

Test procedure
1. Using his own test equipment, the customer establishes the hardware connection to the
drive.
2. Factory personnel switch on the auxiliary voltage.
3. The customer establishes the software connection to the drive.
4. The customer parameterizes and tests the communication of selected interfaces.

Result
The interface test has been completed after five hours.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 37
Tests
3.5 Additional optional tests

3.5 Additional optional tests

3.5.1 Temperature-rise test


Fundamentals
Using the temperature-rise test, the temperatures under load at defined measuring points are
determined.

Test procedure
1. The drive is operated for eight hours in the test mode the same as in the "Load test without
motor".
2. The temperature is measured after eight hours at the following measuring points:
– Air discharge 1 at the transformer unit: Fan -E31
– Air discharge 2 at the cell unit: Fan -E32
– Transformer core: At the upper side of the core close to terminals T1:H1, T1:H2, T1:H3
– Reactor core: At the upper side and center of the core (only for option L09)
– Ambient temperature

Result
The measured values are documented together with the "Functional test plan".

See also
Load test without motor (Page 34)

3.5.2 Temperature behavior of the infeed transformer


Fundamentals
In addition to the temperature-rise test, the temperature of each of the windings of the infeed
transformer is measured before and after the temperature-rise test. This test can only be
ordered in conjunction with a temperature rise test.

Test procedure
1. The temperatures of the individual windings are determined before the temperature rise test.
2. The drive is operated for eight hours in the test mode the same as in the "Load test without
motor".
3. The temperatures of the individual windings are determined after the temperature rise test.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
38 Reference Manual Rev.201902141441 GH180
Tests
3.5 Additional optional tests

Result
The maximum temperature rise of the individual windings must not exceed the appropriate limit
values. The measured values are documented together with the "Functional test plan".

3.5.3 Power factor measurement


Fundamentals
The power factor is measured at different operating points.

Test procedure
1. The drive is operated in the test mode the same as in the "Load test without motor".
2. The power factor is measured at the input and output at 50 %, 75 % and 100 % load.

Result
The measured values are documented in the "Functional test plan".

3.5.4 Efficiency and loss measurement


Fundamentals
Efficiency and losses are measured at various operating points.

Test procedure
1. The drive is operated for 20 minutes each in the test mode, the same as in the "Load test
without motor".
2. Efficiency and losses are measured at two minute intervals at the input and output for 50 %,
75 % and 100 % load.

Result
The measured values are documented in the "Functional test plan".

3.5.5 Harmonics
Fundamentals
The effects of the drive on the supply grid/line supply are determined by recording the
harmonics.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 39
Tests
3.5 Additional optional tests

Test procedure
1. The drive is operated in the test mode the same as in the "Load test without motor".
2. The first 50 harmonics are measured for each phase, and the average of the harmonics
calculated on a proportional basis.

Result
The test is passed if the corresponding average limit values are not exceeded.

3.5.6 Noise measurement without load


Fundamentals
The noise measurement is conducted in operation without load, but with the main fans running
according to EN ISO 3744.

Test procedure
1. The drive is switched on.
2. The measuring points defined are documented in the report and evaluated.

Result
The results of the noise measurement are separately recorded and documented together with
the "Functional test plan".

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
40 Reference Manual Rev.201902141441 GH180
Index
Local control via the operator panel, 23
Mechanical door interlock, 27
C Operating state indicator lights, 25
Overtemperature, output reactor or sine-wave
Components provided by customer, 10
filter, 33
Cooling system test
Phase offset between output voltage and current
Air flow direction, 36
with output reactor, 24
Customer acceptance inspection, 9
Phase offset of the output voltage in the three-
phase system, 23
Remote access via digital and analog inputs and
E outputs, 22
Efficiency and loss measurement, 39 Remote access via network connection, 27
Socket outlets and lighting, 22
Switched single-phase auxiliary power output, 28
F Switched three-phase auxiliary power output, 28
Temperature monitoring of the infeed
F03, 12
transformer, 31
F04, 38
F05, 38
F06, 38
F07, 38
G
F14, 39 G21, 27
F15, 39 G22, 27
F28, 40 G28, 27
F29, 40 G31, 27
F48, 39 G32, 27
F49, 39 G38, 27
F68, 39 G91, 27
F69, 39 G93, 27
F76, 14
F77, 14
F79, 37 H
Function tests, 13
Harmonics, 39
Anti-condensation heating, 21
Auxiliary voltages, 20
Bypass, 33
Checking the evaluation unit for external
I
temperature sensors, 26 Insulation test, 14
Digital inputs and outputs for line Interface test, 37
synchronization, 25
Display devices in the cabinet door, 34
Door interlocking system, 21 K
Door limit switches, 20
K20, 25
Failure of a power semiconductor module, 30
K21, 34
Fan change operation, 32
K29, 24
Fan failure, 32
Fan failure with redundant fans, 31
Grounding switch, 29
Load test without motor, 34
L
Local control via pushbutton, 24 L09, 33

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180 41
Index

L29, 25 Cable markings, 18


L50, 22 Dimensions, 18
L55, 21 Electrical cabinet components, 17
L81, 26 Housing degree of protection, 16
L82, 26 Rating plate, 16
L91, 26 Setting values of circuit breakers, if used, 18
L93, 26
L95, 26
Y
Y15, 24, 33
M
M08, 27
M09, 27
M10, 27
M38, 27
M61, 31, 32

N
N30, 28
N31, 28
N32, 28
N33, 28
N35, 28
N36, 28
N37, 28
N38, 28
N44, 29
N45, 29
Noise measurement without load, 40

P
Power factor measurement, 39

T
Temperature behavior of the infeed transformer, 38
Temperature-rise test, 38

U
U10, 33
U11, 33

V
Visual inspection, 12, 16
Cable installation, 17

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
42 Reference Manual Rev.201902141441 GH180
8888888888 000088 01 EN 01

Further Information

www.siemens.com/drives

Siemens AG
Process Industries and Drives
Postfach 48 48
90026 NÜRNBERG
GERMANY

*888888888800008801EN01*
888888888800008801EN01
Process Industries and Drives

Siemens AG, PD LD P MF-NMA EN, Postfach 47 43, 90025 Nürnberg Department PD LD P MF-NMA EN
Tel. +49 (911) 433-6422
Fax +49 (911) 433-6921
Email motoren.doku.aud@internal.siemens.co
m
Our ref. 8888888888000088
Date 14.02.2019

Documentation for 6SR41


Your order no. - 000010

AL: N ECCN: N UL: DE


StWanr (CD): 85234045, StWanr (Print): 49011000

Dear Sir / Madam,

Many thanks for your order, the documentation for which is enclosed.

Yours very truly,

*888888888800008801EN01*
Spine label for binder 50 mm (120 g/m2)

SINAMICS PERFECT
HARMONY GH180
6SR41

GH180

F03 F04 F06 F14 F28 F48 F68 F72


F79 G21 K20 K21 K29 L29 L50 L55
L81 L82 L95 M61 N30 N35 N44 N75
M08 U10 Y15

Tests carried out on drives

Spine label for binder 162 mm (120 g/m2)

SINAMICS PERFECT HARMONY GH180 6SR41


GH180
F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35
N44 N75 M08 U10 Y15
Tests carried out on drives

You might also like