1 Lubrication schedule
All lubrication work must take place while the machine is switched off.
1 press = 3.5 g - Lubricant = Lithium soap grease, consistency class 2/3
2a Clutch – main bearing on drive side Top-up with 20g (approx. 6 presses).
(1 unit)
2b Labyrinth ring seal for hydraulic pump (1 unit) Top-up with 1 presses.
2 Maintenance plan
This schedule indicates the maintenance to be performed by the machine user
after 50, 3000 and 8000 operating hours.
This schedule is not a substitute for the services to be performed after
100, 500, 1000, 1500 and 2000 operating hours, which are to be per‐
formed by an authorised RUBBLE MASTER service technician. The rela‐
ted service logs are in the handbook.
Diesel engine
For information on service work on the John Deere diesel engine, please refer
to the John Deere operating instructions.
w Change the engine oil after the first 100 operating hours (approx. 15 l en‐
gine oil ACEA E6 or E7) as well as the oil filter.
w Check the toothed drive belt on the diesel engine for damage. If damaged,
contact your RUBBLE MASTER service partner.
2.1.3 generator
w Check the generator for contamination and clean if required. Unscrew the
cover and carefully remove dust from the generator using compressed air.
generator
2.1.6 Vibro-channel
w Check secure fit of mounting bolts on vibrator motors and ROSTA oscilla‐
tion elements; tighten if required.
w Check condition of vibration absorbers on oscillating parts and replace if
required.
w Check condition of rubber seals and replace if required.
w Check condition of steel structure (weld seams in particular).
Rosta elements
w Check all bolts, nuts and pins on drive motors, drive rollers, chain links and
chain wheels. Check tension of crawler gear track chains.
w Check chassis gearbox, motor, front chain wheels and drive rollers for oil
leaks.
Crawler gear
* John Deere handbook is included in the Rubble Master operator manual package.
The crusher drive belt is measured using length addition method per 1000
mm.
The drive belt on the generator and the hydraulic pump is measured in the
middle of the longest pass between the pulleys using an Optikrik II pretension
meter.
On new belts the tension should be checked again after 4 hours running time.
All V-belts and drive belts (crusher, generator and hydraulic pump) are meas‐
ured in the middle of the longest pass between the pulleys using a pretension
meter (Gates 7401-0076).
On new belts the tension should be checked after 4 hours running time.