This document assigns sections of work from Chapter 14 on plumbing specifications and contracts to 21 individuals. It outlines the scope of work each individual is responsible for by listing the specific section and item numbers they will cover. The sections include material requirements, installation specifications, plumbing fixtures, drainage and sewer systems, fire protection, and inspection tests.
This document assigns sections of work from Chapter 14 on plumbing specifications and contracts to 21 individuals. It outlines the scope of work each individual is responsible for by listing the specific section and item numbers they will cover. The sections include material requirements, installation specifications, plumbing fixtures, drainage and sewer systems, fire protection, and inspection tests.
This document assigns sections of work from Chapter 14 on plumbing specifications and contracts to 21 individuals. It outlines the scope of work each individual is responsible for by listing the specific section and item numbers they will cover. The sections include material requirements, installation specifications, plumbing fixtures, drainage and sewer systems, fire protection, and inspection tests.
Plumbing – Chapter 14 1. Benedicto A. Scope of Work 14-A Material Requirements A. Plastic Pipes Nos. 1, 2, 3,and 4
2. Cruz S. 14-A Material Requirements
A. Plastic Pipes Nos. 5, 6, 7, and 8
3. Cua H. 14-A Material Requirements
A. Plastic Pipes No. 9 B. Septic Tank Nos. 1, 2, and 3
4. Escano M. C. Plumbing Fixtures and Nos. 1, 2, 3, and 4a
Fittings K. Water Test on System No. 1 and 2
5. Escober E. C. Plumbing Fixtures and Nos. 4b, 4c, and 4d
Fittings
6. Garcia E. D. Bathroom and Toilet Nos. 1, 2, 3, 4, 5, 6, and 7
Accessories
7. Guimbaolibot R. E. Special Plumbing Fixtures Nos. 1, 2, 3 and 4
8. Jalac K. E. Special Plumbing Fixtures Nos.5 and 6
F. Roof Drains, Overflow No. 1 Pipes and Steel Grating
9. Justo L. F. Roof Drains, Overflow Nos. 2, 2a, 2b, 2c
Pipes and Steel Grating
10. Lazo M. F. Roof Drains, Overflow Nos. 2d, and 2e
Pipes and Steel Grating G. Fire Protection System Nos. 1, 2, and 3
11. Lominoque C. G. Fire Protection System Nos. 4, 5, 6, and 7
12. Manabat L. G. Fire Protection System No. 8
14-2 Construction Requirements A. Installation of Soil, Waste, Nos. 1 and 2 Drain and Vent Pipe Page 2 13. Nagum E. A. Installation of Soil, Waste, Nos. 3, 4, 5 and 6 Drain and Vent Pipe J. Drainage System Test No. 4 M. Disinfection Nos. 1 and 2
14. Obias J. A. Installation of Soil, Waste, Nos. 7, 8, 9, 10, 11, 12 and 13
Drain and Vent Pipe N. As Built Drawings Nos. 1 and
15. Rosales P. B. Water Pipes, Fittings and Nos. 1, 2, 3, and 4
Connections
16. Salvino G. B. Water Pipes, Fittings and Nos. 5, 6, 7 and 8
Connections
17. Tagle D. C. Fire Standpipe System
D. Valves and Hose Bibs Nos. 1, 2, 3, 4, 5, and 6
18. Tonio H. E. Fixtures, Equipments and Nos. 1, 2, 3, 4, and 5
Fastenings
19. Unlayao N. F. Pipe Hangers, Inserts and Nos. 1, 2, 3, 4 and 5
supports L. Defective Works No. 1 and 2
20. Ventolero R. G. Plates and Flashing Nos. 1, 2, and 3
H. Protection and Cleaning Nos. 1, 2, and 3
21. Villanueva R. I. Inspection, Warranty Test No. 1
and Disinfection J. Drainage System Test Nos. 1, 2, and 3 -End-
Treatment and Use of Sewage Effluent for Irrigation: Proceedings of the FAO Regional Seminar on the Treatment and Use of Sewage Effluent for Irrigation Held in Nicosia, Cyprus, 7–9 October, 1985
Environmental Issues and Waste Management Technologies in the Ceramic and Nuclear Industries XI: Proceedings of the 107th Annual Meeting of The American Ceramic Society, Baltimore, Maryland, USA 2005
Constructed Wetlands in Water Pollution Control: Proceedings of the International Conference on the Use of Constructed Wetlands in Water Pollution Control, Held in Cambridge, UK, 24–28 September 1990