The remaining work at T-941 includes completing welding at the platform support and welding the roof rafter to the center ring all around. Additional tasks are making a drain hole according to specification SI-GTP-0193, installing a vent pipe, tightening bolts with washers at step grating, and installing grating clamps.
The remaining work at T-941 includes completing welding at the platform support and welding the roof rafter to the center ring all around. Additional tasks are making a drain hole according to specification SI-GTP-0193, installing a vent pipe, tightening bolts with washers at step grating, and installing grating clamps.
The remaining work at T-941 includes completing welding at the platform support and welding the roof rafter to the center ring all around. Additional tasks are making a drain hole according to specification SI-GTP-0193, installing a vent pipe, tightening bolts with washers at step grating, and installing grating clamps.