B C D E F G

1 250 MLD Chennai Metro UF Pretreatment


2 Power Consumption Estimates
3
4 Power consumption is evaluated based on operation with the following conditions:
5 -250 MLD Capacity
6 - operation at 95% recovery
7 - all trains are on-line and operating
8
9 Description Units 250 MLD
10 Permeate Pumps P-35-1 to 10
11 Number of pumps operating # 10
12 Operating flow per pump gpm 5,425
13 Operating TDH ft 21.00
14 Pump efficiency at operating conditions % 80.00% Assumed - To be verified by others
15 Motor efficiency at operating conditions % 94.00% Assumed - To be verified by others
16 Motor starter / VFD efficiency % 97.00% Assumed - To be verified by others
17 Power draw during operation (total for all operating units) kW 294.06
18 Hours in operation per day hr/day 20.70
19 Daily power consumption kWh/day 6,087
20 Annual power consumption kWh/year 2,221,785
21
22
23 Backpulse Pumps P-88A/B
24 Number of pumps operating # 1
25 Operating flow per pump gpm 6,117
26 Operating TDH ft 16.73
27 Pump efficiency at operating conditions % 80.00% Assumed - To be verified by others
28 Motor efficiency at operating conditions % 94.00% Assumed - To be verified by others
29 Motor starter / VFD efficiency % 97.00% Assumed - To be verified by others
30 Power draw during operation (total for all operating units) kW 26.42
31 Hours in operation per day per train hr/day 3.20
32 Daily power consumption kWh/day 85
33 Annual power consumption kWh/year 30,861
34
35
36 Drain/Recirculation Pumps P-97A/B (for all trains)
37 Number of pumps operating # 1
38 Operating flow per pump gpm 1,150
39 Operating TDH ft 15.42
40 Pump efficiency at operating conditions % 75.00% Assumed - To be verified by others
41 Motor efficiency at operating conditions % 94.00% Assumed - To be verified by others
42 Motor starter / VFD efficiency % 97.00% Assumed - To be verified by others
43 Power draw during operation (total for all operating units) kW 4.88
44 Hours in operation per day hr/day 18.18
45 Daily power consumption kWh/day 89
46 Annual power consumption kWh/year 32,408
47
48
49 Membrane Aeration Blowers B-85A/B
50 Number of blowers operating # 1
51 Average operating flow per blower scfm 371
52 Average operating blower discharge pressure psi 4.26
53 Blower efficiency at operating conditions % 55.00% Assumed - To be verified by others
54 Blower input power (total for all operating units) BHP 11.4
55 Motor efficiency at operating conditions % 94.00% Assumed - To be verified by others
56 Motor starter / VFD efficiency % 97.00% Assumed - To be verified by others
57 Power draw during operation (total for all operating units) kW 9.34
58 Hours in operation per day per train hr/day 9.58
59 Daily power consumption kWh/day 89
60 Annual power consumption kWh/year 32,667
61
62
63
64 Air Compressors AC-91A/B
65 Number of compressors operating # 1
66 Power draw during operation (total for all operating units) kW 15.0 Estimate based on similar project
67 Hours of Operation per Day hr/day 24.0 Estimate based on similar project
68 Daily power consumption kWh/day 360
69 Annual power consumption kWh/year 131,400
70
71 Vacuum Pumps P-92A/B
72 Number of pumps operating # 1
73 Power draw during operation (total for all operating units) kW 13.1 Estimate based on similar project
74 Hours of Operation per Day hr/day 5.00 Estimate based on similar project
75 Daily power consumption kWh/day 66
76 Annual power consumption kWh/year 23,908
Project 250 MLD Chennai Metro
Proposal No. 3568-05
Design Capacity 250 MLD
Date 8-Dec-05
Operating Prime Mover Motor
Number of VFD / Hours of
Operating Flow TDH or Efficiency at Efficiency at Power Consumed
Equipment Units Starter Operation Power Consumed per Year
per Unit Discharge Operating Operating per Day
Operating Efficiency per Day
Pressure Duty Point Duty Point

Permeate Pumps P-35-1 to 10 10 5,425 USgpm 21.0 ft 80.0% 94.0% 97.0% 20.70 hr 6,087 kW.hr 2,221,785 kW.hr
Backpulse Pumps P-88A/B 1 6,117 USgpm 16.7 ft 80.0% 94.0% 97.0% 3.20 hr 85 kW.hr 30,861 kW.hr
Drain/Recirculation Pumps P-97A/B (for all trains) 1 1,150 USgpm 15.4 ft 75.0% 94.0% 97.0% 18.18 hr 89 kW.hr 32,408 kW.hr
Membrane Aeration Blowers B-85A/B 1 371 scfm 4.3 psig 55.0% 94.0% 97.0% 9.58 hr 89 kW.hr 32,667 kW.hr
Air Compressors AC-91A/B 1 24.00 hr 360 kW.hr 131,400 kW.hr
Vacuum Pumps P-92A/B 1 5.00 hr 66 kW.hr 23,908 kW.hr
Controls & Instrumentation 1 24 kW.hr 8,760 kW.hr
Miscellaneous 1 24 kW.hr 8,760 kW.hr
Daily Estimated Power Consumption 6,823 kW.hr
Annual Estimated Power Consumption 2,490,548 kW.hr
27.29 kWh/ML