You are on page 1of 4

AWARENESS EVALUATION

SUBJECT :VDA 6.3 Date :


PRE TEST
Name
Department

Ques -1 The VDA 6.3 process audit is a standardized procedure to conduct process audits within
a quality management system and assess their capability and performance.
a) True b) false
Ques -2 What is Full Form of CSR?
a) Customer Specific requirement b) Corporate Social responsibility
C ) Customer Social responsibility d) None of the above
Ques -3 What is the use of VDA 6.3
a) Product Audit b) Process Audit c) Quality System d) all of the above

Ques 4 Which Standard Is For Product Audit


a) VDA 6.3 b) VDA 6.5 c) IATF 16949 d) ISO 9001

Ques 5 Process auditors must not accept assignments that would cause them a conflict of
interests.

a) True b) False

Ques 6 What is full Form of APQP


a) Advance Process Quality Plan b) Advance Performance Quality planning
C ) Advance Product Quality Plan d) None of the Above

Ques 7 FMEA stands for


a) Failure mode Effect analysis b) Fail Mold environment analysis
C ) Fail mode effective answer d) NONE OF THE ABOVE

Ques 8 VDA Stands


AWARENESS EVALUATION

a) process audit is a standardized procedure to conduct process audits within a quality


management system and assess their capability and performance.
b) Process Control mechanism
c) System Requirement
d) All of the above

Ques 9 To verify the effectiveness of the product realization processes is definition of


a) Process Audit b) product Audit
c) QMS audit D) None of the above

Ques 10 ECN stands for


a) Engineering change note b) Engineering characterstics
C ) English character note d) all of the above
AWARENESS EVALUATION

Subject: VDA 6.3


POST TEST ANALYSIS
NAME: Dept:
Date of Exam: Score:
Checked By: Training Date:

Ques -1 Can the manufacturing feasibility be evaluated according to the product and
process requirements?

a) True b) False

Ques-2 Are the activities for customer support / customer satisfaction / customer service
planned?
a) True b) false
Ques -3 The manufacturing and inspection characteristics contain all characteristics
from the product and process development (including special characteristics);
a) True b) false
Ques 4 which factors to be considered during shipping audit
a) Storage / part Supply, quality parameter
b) Storage / recall processing / parts supply / shipping, Target agreements,
c) PDI report
d) All of the above
Ques 5 Controlled procedure for planning resources should include Qualified personnel,
budgets, infrastructure, test equipment, lab facilities, machines, plant etc;
a) True b) False

Ques 6 Is change management within the project ensured by the project organization?
a) Evaluation must include the risk assessment for the product quality

b) Changes must be discussed with & agreed upon by customer;


c) Controlled procedure for change management
d) All of The Above

Ques 7 Is process Oriented approach for Risk Identification is an requirement of VDA


6.3
a) True b) False
AWARENESS EVALUATION

Ques 8 Project risks are identified, assessed and reduced through appropriate
measures in escalation process established
a) True b) False

Ques 9 Can the manufacturing feasibility be evaluated according to the product and
process requirements?

a) True b) False

Ques 10 which one is an activity for customer support / customer satisfaction / customer
service
a) CUSTOMER SCORE CARD
b) Inspection Planning for standard and stress testing
c) NTF Processes
d) Both B and C

You might also like