PRE COMMISSIONING FORMATS FOR GAS INSULATED


SUBSTATIONS

DOC: D-3-01-09-01-01
Revision-1

POWER GRID CORPORATION OF INDIA LTD.


ASSET MANAGEMENT DEPARTMENT
4
INDEX

S. No. CONTENTS PAGE NO


1 PRE COMMISSIONING TEST ON EOT CRANE 6
2 PRE COMMISISONING TEST SHOCK RECORDERS 6
3 PRE COMMISSIONING CHECKS ON SF6 GAS 7
4 PRE COMMISSIONING CHECKS ON CIRCUIT BREAKERS 10
5 PRE COMMISSIONING CHECKS ON CURRENT TRANSFORMERS 19
6 PRE COMMISSIONING CHECKS ON POTENTIAL TRANSFORMERS 30
PRE COMMISSIONING FORMATS FOR ISOLATOR AND GROUNDING
7 36
SWITCH
8 PRE COMMISSIONING CHECKS ON GIS 66

5
PRE COMMISSIONING TEST - EOT CRANE & SHOCK RECORDER

I. EOT CRANE

Load Test to be conducted on EOT Crane as per IS 3177:1999 (Reaffirmed 2004) “Indian Standard:
Code of Practice for Electric Overhead Cranes and Gantry Cranes other than steel work cranes “

Note: Above test to be conducted before starting installation of GIS bays in GIS hall

*TPC Report Attached.

PRE COMMISSIONING TEST - SHOCK RECORDER

II. SHOCK RECORDER ANALYSIS

Shock Recorders are to be provided in all the critical compartments during transportation like Circuit
Breaker, Voltage Transformers etc. After receipt of compartments at site, shock recorder data needs to
be downloaded preferably at site in presence of POWERGRID representative and analysis of the data
needs to be submitted before start of erection activities. Incase of violation of limit for the shocks in
any of the three directions, internal inspection of the compartment needs to be carried out so as to
decided rectification measures based on the findings.

*All Found OK.

6
PRE COMMISSIONING CHECKS ON SF6 GAS
I. Quality Checks on SF6 Gas
Bay Details: D04 BUSCOUPLER Ambient Temperature: 28 ̊C
Reference Drawing Number:

Date Gas Moisture Dew point at Pressure ( KPa ) % Purity


Of Compartment Content at atmospheric
Measurement atmospheric pressure ( C
̊ )
pressure
(in ppmv)
R Y B R Y B R Y B R Y B
31-07-2018 B0 (R) 75.84 -44.5 711.6 99.7
31-07-2018 B0 (Y) 66.27 -45.6 711.8 99.3
31-07-2018 B0 (B) 66.5 -45.7 711.8 99.9
01-08-2018 B1 29.20 -52.0 676.3 100
01-08-2018 B2 72.0 -44.9 675.8 99.9
01-08-2018 B3 68.54 -45.0 676.3 99.9
01-08-2018 B4 75.61 -44.5 680.8 99.9
02-08-2018 B5 87.62 -43.3 678.1 98.9
02-08-2018 B8 56.62 -47.0 680.3 99.8
02-08-2018 B9 124.4 -40.2 680.2 99.9
02-08-2018 B10 58.43 -46.7 680.0 99.8
04-01-2019 B8-VT 53.76 -47.4 640.9 99.8
04-01-2019 B11-VT 53.82 -47.4 657.0 99.8

Kit Details
Make: MBW S.No:13-1016 Model: MBW 973-SF6 Calibration Validity date: 18-SEP-2018
Permissible limit: Moisture Content (200 ppmv), Dew point (- 36 deg C) & Purity (99 %)

Note:
a) Dew point of SF6 gas to be measured after at least 120 hours of gas filling
b) Gas pressure reading to be monitored and recorded by the executing agency after every two
weeks till energisation for identification of leakage in gas compartment if any and rectification.
c) Gas quality test to be done only by using testing kit which has the pump back facility so that
after measurement of gas quality, SF6 gas is not wasted and sent back to GIS compartment.

7
II. Checks on SF6 Density Monitor

Bay Details: D04 BAY BUSCOUPLER


Ambient Temperature: 20 ̊C
Density Monitor Details: Trafaq AG & 8726.20.2801.AK, 8736.20.2801.A8, 8736.20.2801.AC
(Make & type)

Gas Density Lockout/Trip Alarm Lockout/Trip Alarm Lockout/Trip Alarm


Compart Monitor Stage 3A Stage 3B (Stage 4)
-ment Sr.No: SF6 GAS BLOCKING – 1 SF6 GAS BLOCKING – 2 SF6 Zone Trip
Rated/ Factory Actual Rated/ Factory Actual Rated/ Factory Actual
Design test Value Design test Value Design test Value
Value value 20 ̊C Value value 20 ̊C Value value 20 ̊C
20 ̊C 19.5 ̊C 20 ̊C 19.5 ̊C 20 ̊C 19.5 ̊C

B0.2 (R) 647034-09 600 611 608.2 600 611 604.2 530 542 539.4
B0.2 (Y) 647034-014 600 609 607.0 600 610 604.2 530 541 540.6
B0.2 (B) 647034-004 600 609 600.4 600 609 600.1 530 538 532.0

8
III. SF6 Leakage test
Bay Details: D04 BUSCOUPLER

Initial filling Pressure after Pressure after


Gas
pressure (KPa) 24 hrs (KPa) 7 days (KPa)
Compartment Phase

B0 (R) R 711.6 700.7 700.7


B0 (Y) Y 711.8 700.5 700.5
B0 (B) B 711.8 699.7 699.7
B1 R,Y,B 676.3 676.9 676.9
B2 R,Y,B 675.8 678.2 678.2
B3 R,Y,B 676.3 683.5 683.5
B4 R,Y,B 680.8 684.8 684.8
B5 R,Y,B 678.1 670.2 670.2
B6 R,Y,B 680.3 676.6 676.6
B9 R,Y,B 680.2 676.6 676.6
B10 R,Y,B 680.0 678.5 678.5
B8-VT R,Y,B 640.9 678.4 678.4
B11-VT R,Y,B 657.0 679.2 679.2

PRE COMMISSIONING CHECKS ON CIRCUIT BREAKERS

9
I. General Details

DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS , SABOUR
Bay Name: D04 BUSCOUPLER LOA No:BUSCOUPLER
Make: ABB CHINA Year of Manufacturer: 2017
Equipment Designation: D04 – Q0 Type: ELK -SP14
Sr. No: 501916739 – D04 – Q0 Rated Breaking Capacity (kA): 50 Ka
Rating: 3150 A Control Voltage (DC): 220 V
Operating Voltage: 245Kv Date of Erection:
Date of Receipt at Site: Date of Energisation:

II. Operating System:

Spring
Hydraulic
Hydro-Spring √

i. Hydraulic/Hydro-Spring System

a) Accumulator
R Ø YØ BØ

Make ABB
SD10104-
210005313986/02

SD10104-
210005313988/02

SD10104-
Serial number 210005313988/03

Type HMB-4.2

Year of
2017
manufacture

b) Pump details

10
Make   Volt  

Serial number   Amperes  

Type   Hp/ Kw  

Year of O/L setting

manufacturer   (Thermal O/L)  

Derails of relays/contactors used


Schematic drawing no______________________

Circuit Reference Make Type


Oil Pressure Switch ABB

Closing Lockout ABB

Auto Reclosing Lockout ABB

Operational Lockout ABB

Anti Pumping Contactor ABB

Pole Discrepancy Timer ABB

SF6 Alarm/Lockout ABB

11
a) Operation checks
Date of Hydraulic Oil filling _____________________

Type of Hydraulic Oil (make of oil/ complying standard) _____________________


Pressurising hydraulic system
Sl.No Description Factory Site Test Remark Record
Test Value Value Deficiencies, If
Any

1 Pre-filling pressure of N2 in    
accumulator ( bar / deg. C)

2 Pump running time for charging 80 SEC


hydraulic system from initial pressure
to working pressure

3 Checking over-pressure relief valve OK


(open/close)

4 Hydraulic pressure drop for 12 hr

Breaker ON position Passing criteria:


less than 3% per 12
Breaker OFF position
Hrs

5 Oil pressure monitor

Pump on / off bar

Pump running time

6 Auto reclosing lockout (oil) Pressure


contact _____________ make/break

7 Closing lockout (oil) pressure Contact


__________make/break

8 Trip-1 lockout (oil) Pressure contact


__________ make/break

9 Trip-2 lockout (oil) Pressure contact

12
__________ make/break

Factory test report ref no: ________________________________

Oil pressure drop during operations and pump running time in seconds : -

Sl.N
Description Site Test Value
o

(i) Pressure before operation(Bar)  680 kPa

Pressure after closing operation(Bar)  680 kPa

Pump running time to normalise pressure (Sec)  80 SEC

(ii) Pressure before operation(Bar) 680 kPa

Pressure after opening operation(Bar) 680 kPa

Pump running time to normalise pressure (Sec)  80 SEC

(iii) Pressure before operation(Bar) 680 kPa

Pressure after close/open operation (Bar) 680 kPa

Pump running time to normalise pressure (Sec  80 SEC

(iv) Pressure before operation(Bar) 680 kPa

Pressure after open-close-open operation(Bar) 680 kPa

Pump running time to normalise pressure (Sec  80 SEC

Note: Pump MCB to be kept OFF in order to record drop in pressure after O/C/ CO
operation. Subsequently switch ON MCB to record normalisation time.

Factory test report ref no: ________________________________

13
ii) Spring Operating System

a). Motor details


Make Volt  

Sl no Amperes  

Type Hp/kw  

Setting (thermal
Year of Manufacture overload)  

Current taken by motor for IR of spring charging


charging the spring ( amp) motor

b). Spring operating time

R- Ø Y- Ø B- Ø
Details Factor
Factory Site Factory Site y Site

Charging Time 78 SEC 79 SEC 81 SEC

Spring Charging Motor 120


Supervision Time 120 SEC 120 SEC SEC

Factory test report ref no: ________________________________

c). Details of relays/contactors used : schematic drawing no

Circuit Typ
Reference Make e

Closing lockout ABB  

Auto reclosing ABB


lockout  

General lockout ABB  

Anti pumping ABB


relay

Pole discrepancy ABB 14

timer  
d). Charging of spring of Circuit Breaker manually - Not Possible

III. Trip/ Close Coil Resistance Measurement

COIL DETAILS MEASURED VALUE IN Ohm


R–Ø Y–Ø B–Ø
TRIP COIL – I 95.8 95.8 95.7
TRIP COIL – II 95.8 95.4 95.5
CLOSE COIL 95.7 96.0 95.5
MOTOR 9.5 9.5 9.7

IV. Circuitry and Operational Checks

Sl Operational Check
No Circuit Reference

Local Remote

A Tripping Through TC-I OK OK

B Tripping Through TC-II OK OK

C Closing Circuit OK OK

D Anti-hunting Feature OK OK

E Pole Discrepancy Feature OK OK

F Breaker Position Indication OK OK

G Heater In Switch Cubicle OK OK

H Heater In Control Cubicle OK OK

I Illum. In Switch Cubicle OK OK

J Illum. In Control Cubicle OK OK

15
V. Operating Time ( In mille-seconds )

Make of Kit & S.No: MEGGER TM1800 & 1400951

Date of Calibration: 04.04.2018

Close OCO
(Max Closing Trip Close Open
Tripping Coil
Phase (Ø) 150ms) Coil (OK/NOT OK)
Current
Current
Trip – I Trip - II Trip - I Trip – II Trip - I Trip - II Trip – I Trip - II

R-Ø main
51.0 2.3 15.3 15.2 2.3 2.4 23.1 23.1 OK OK
contact

R-Ø PIR

Y-Ø main
51.2 2.3 15.3 15.4 2.3 2.3 23.9 24.2 OK OK
contact

Y-Ø PIR

B-Ø main
50.3 2.3 15.2 15.3 2.3 2.3 23.6 23.0 OK OK
contact

B-Ø PIR

Auxiliary
56.850 29.150 29.200
contact a

Auxiliary
20.800 13.900 13.275
contact b

Permissible limits

Timing 765 KV 400 KV 220 KV 132 KV

Close 150 ms 150 ms 150 ms 150 ms

Open 25 ms 25 ms 35 ms 40 ms

Phase to Phase time difference – Closing 5.0 ms

Phase to Phase time difference - Opening 3.33 ms

16
VI. IR Value of Control Circuit(using 500 volt megger)

Make of Kit:

Date of Calibration:

Coil Details Unit Value

R – Ø TRIP COIL – I MΩ >1GΩ

R – Ø TRIP COIL – II MΩ >1GΩ

R – Ø CLOSE COIL MΩ >1GΩ

Y – Ø TRIP COIL – I MΩ >1GΩ

Y – Ø TRIP COIL – II MΩ >1GΩ

Y – Ø CLOSE COIL MΩ >1GΩ

B – Ø TRIP COIL – I MΩ >1GΩ

B – Ø TRIP COIL – II MΩ >1GΩ

B – Ø CLOSE COIL MΩ >1GΩ

Permissible limit (Minimum): 50 MΩ

CAUTION: Isolate necessary dc for trip coil I and trip coil II, closing coil before meggaring.

VII. Breaker Operation Counter Reading

Counter Put √
Type Mark

ELECTRICA
L √

MECHANIC
AL (Reading to be recorded before
energisation)

Reading Date
Sl. No Phase
open Close open Close

17
A R-Ø 33 33

B Y-Ø 34 34

C B-Ø 35 33

Approval From CC/OS


Phase (Ø) Factory Site Remarks
Obtained

R        

Y        

B        

VIII. Dynamic Contact Resistance & Travel Measurement

IX.
DDetails are attached in this report

IX. Operation Time Measurement of Pole Discrepancy Relay

Pole discrepancy relay Setting Actual

K42 0.5 SEC 0.5 SEC

K44 1.0 SEC 1.0 SEC

Note- 2.5 Sec for CBs with Auto Reclose Function & 0.5 Sec for CBs without Auto Reclose

Function.

X. Local Close Interlock Checked(with Earth Switch open)


Yes No

18
XI. Final Documentation Review
Yes No

i. Factory test results are available √

ii. Final documents of Pre- Commissioning checks reviewed and Yes No


approved

iii. Document regarding spares equipment, Yes No O&M manuals etc


available at site for O&M purpose

iv. After modification, if any, “As built Drawings” are available at


Yes No
site

v. CC-OS approved DCRM signatures available Yes No

Signature: Signature: Signature: Signature: √

Name: Name: Name: Name:

Designation: Designation: Designation: Designation:

19
Organization: (Erection Agency) (POWERGRID Site (POWERGRID

(Supplier I/C) Commissioning. Team)

Representative) Members:

(Wherever 1.

Applicable) 2.

3.

4.

PRE COMMISSIONING CHECKS ON CURRENT TRANSFORMERS

I. General Details

DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS ,
SABOUR
Bay Name: E04 T1 & T2 BUSCOUPLER LOA : BUSCOUPLER
Make: GUANGDONG Rating: 800-1600-3000/1A
Sr. No:
T1 T2
R-Ø: GD17/220040 R-Ø: GD17/220032 Type: LMGB1-220
Y-Ø: GD17/220040 Y-Ø: GD17/220032
B-Ø: GD17/220040 B-Ø: GD17/220032
Year of Manufacturer: Date of Receipt at site:
R-Ø: 2017 R-Ø: 2017
Y-Ø: 2017 Y-Ø: 2017
B-Ø: 2017 B-Ø: 2017
Date of Erection: Date of Energisation:

II. Rated Data And Duty

20
Core Ratio Class KVp/Burden Imag ( at VK) Protection / Metering
Winding I –T1 800-1600- PS 800-1600-
<50-25-13.3 mA Protection
3000/1A Rct<4-8-15 Ω 3000 V
Winding II –T1 800-1600- PS 800-1600-
<50-25-13.3 mA Protection
3000/1A Rct<4-8-15 Ω 3000 V
Winding III –T2 800-1600- 0.2 S
VA: 20-20-40 FS: 5 Metering
3000/1A
Winding IV –T2 800-1600- PS 800-1600-
<50-25-13.3 mA Protection
3000/1A Rct<4-8-15 Ω 3000 V
Winding V –T2 800-1600- PS 800-1600-
<50-25-13.3 mA Protection
3000/1A Rct<4-8-15 Ω 3000 V

III. Pre-Commissioning Checks:

Remark
Sl. Status
Description
No Record
Yes No Deficiencies, If
Any

1 Equipment is cleaned and free from dust / dirt foreign materials etc. √    

2 Equipment is free from all visible defects on physical inspection √    

3 Levelling and alignment of structure and base frame is checked √    

4 Erection completed as per schematic √    

5 Any paint removed / scratched in transit has been touched up √  

Check primary polarity of CTs erected as per relevant drawing. Name



6 plate details and P1/ P2 marking are available on equipment enclosure.    

All the cable identification tags provided and all cores are provided

7 with identification ferrules in CT sec box and LCC panel.    

Check secondary cables are properly routed and dressed with proper

8 support/ trays and unused holes at cable entry are sealed.    

9 Check the IR value of secondary cable √    

10 Check external cabling from LCC panel to relay panel completed √    

Ensure unused secondary cores, if any, has been shorted and earthed

11 in LCC panel.    

Check star point has been formed properly and grounded at relay

12 panel end only.    

13  Check that lugs used in secondary circuit are of ring type √    

21
14 Check direction of primary (P1/ P2) w.r.t. Bus/ line on erection √    

IV. Insulation Resistance Measurement

a. Insulation Resistance Measurement in MΩ (Using 500 V Megger)


Make & Sl. No of testing kit : MEGGER & 1001943101634422
Date of last Calibration of the kit : 13/03/2018
Ambient temp. In º C : 30 C
̊

Between Unit Phase


RØ YØ BØ
T1 – CORE 1 , CORE 2

Secondary Core I – Earth MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ


Secondary Core II –
MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ
Earth
Core I – Core II MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ

b.

Phase
Between Unit
RØ YØ BØ
T2 – CORE3 , CORE 4 , CORE 5
Secondary Core III –
MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ
Earth
Secondary Core IV –
MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ
Earth
Secondary Core V –
MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ
Earth
Core III – Core IV MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ
Core III – Core V MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ
Core IV – Core V MΩ ≥1 GΩ ≥1 GΩ ≥1 GΩ

22
V. Measurement of Secondary Winding Resistance (In Ohm)

Make & Sl. No of testing kit : OMICRON& MK584L


Date of last Calibration of the kit: 14.11.2018
Ambient temp. In º C : 30 C
̊

Core Terminal Unit RØ YØ BØ


Res at Site Res at Site Res at Site
75◦C 75◦C 75◦C
1S1 – 1S2 Ω 3.076 2.579 3.094 2.594 3.074 2.577
CORE I 1S1 – 1S3 Ω 6.237 5.229 6.272 5.259 6.231 5.224
1S1 – 1S4 Ω 12.13 10.17 12.17 10.21 12.11 10.15
2S1 – 2S2 Ω 3.073 2.577 3.071 2.575 3.076 2.579
CORE II 2S1 – 2S3 Ω 6.227 5.221 6.228 5.221 6.239 5.231
2S1 – 2S4 Ω 12.10 10.15 12.11 10.15 12.11 10.15
3S1 – 3S2 Ω 1.960 1.644 1.948 1.633 1.954 1.631
CORE III 3S1 – 3S3 Ω 3.987 3.343 3.988 3.344 3.985 3.341
3S1 – 3S4 Ω 7.952 6.668 7.945 6.661 7.964 6.678
4S1 – 4S2 Ω 3.072 2.577 3.060 2.566 3.078 2.581
CORE IV 4S1 – 4S3 Ω 6.227 5.221 6.216 5.212 6.249 5.239
4S1 – 4S4 Ω 12.10 10.15 12.16 10.14 12.15 10.19
5S1 – 5S2 Ω 3.077 2.580 3.083 2.585 3.073 2.576
CORE V 5S1 – 5S3 Ω 6.233 5.226 6.341 5.233 6.236 5.229
5S1 – 454 Ω 12.10 10.15 12.12 10.16 12.12 10.16

VI. POLARITY TEST

Core Between Phase


RØ YØ BØ
1S1 (+VE) 1S2 (-VE) OK OK OK
CORE I 1S1 (+VE) 1S3 (-VE) OK OK OK

23
1S1 (+VE) 1S4 (-VE) OK OK OK
2S1 (+VE) 2S2 (-VE) OK OK OK
CORE II 2S1 (+VE) 2S3(-VE) OK OK OK
2S1 (+VE) 2S4 (-VE) OK OK OK
3S1 (+VE) 3S2(-VE) OK OK OK
CORE III 3S1 (+VE) 3S3(-VE) OK OK OK
3S1 (+VE) 3S4(-VE) OK OK OK
4S1 (+VE) 4S2(-VE) OK OK OK
CORE IV 4S1 (+VE) 4S3(-VE) OK OK OK
4S1 (+VE) 4S4(-VE) OK OK OK
5S1 (+VE) 5S2(-VE) OK OK OK
CORE V 5S1 (+VE) 5S3(-VE) OK OK OK
5S1 (+VE) 5S4(-VE) OK OK OK

VII. Current Ratio Test


Make & Sl. No of testing kit : OMICRON & MK584L
Date of last Calibration of the kit: 14.11.2018

R Phase

Core Primary Secondary Theoretical % Error


Current* (A) Current (A) Ratio
CORE I 800 0.9968 800 -0.323
(1S1 - 1S2)
CORE II 800 0.9968 800 -0.320
(2S1 - 2S2)
CORE III 800 1.0004 800 0.043
(3S1 - 3S2)
CORE IV 800 0.996 800 -0.401
(4S1 - 4S2)
CORE V 800 0.9969 800 -0.311
(5S1 - 5S2)
CORE I 1600 0.999 1600 -0.101
(1S1 - 1S3)
CORE II 1600 0.999 1600 -0.104
(2S1 - 2S3)
CORE III 1600 1.0 1600 0.020
(3S1 - 3S3)
CORE IV 1600 0.9981 1600 -0.194
(4S1 - 4S3)
CORE V 1600 0.9988 1600 -0.119
(5S1 - 5S3)
CORE I 3000 1.0 3000 -0.002
(1S1 - 1S4)

24
CORE II 3000 1.0 3000 -0.004
(2S1 - 2S4)
CORE III 3000 1.0001 3000 0.014
(3S1 - 3S4)
CORE IV 3000 0.999 3000 0.080
(4S1 - 4S4)
CORE V 3000 0.9995 3000 0.029
(5S1 - 5S4)

*Primary current to be injected as per the continuous current rating of maintenance Earth switch
(specified by manufacturer)
Incase CT ratio test has been performed by CT Analyzer, direct ratio & error to be filled

NOTE: %Error Values Are Filled By as per CT Analyzer Shown Results Only.
Y Phase

Primary Secondary Theoretical % Error


Core Current* (A) Current (A) Ratio
CORE I 800 0.9968 800 -0.321
(1S1 - 1S2)
CORE II 800 0.9968 800 -0.322
(2S1 - 2S2)
CORE III 800 1.0004 800 0.038
(3S1 - 3S2)
CORE IV 800 0.9958 800 -0.421
(4S1 - 4S2)
CORE V 800 0.997 800 -0.298
(5S1 - 5S2)
CORE I 1600 0.999 1600 -0.104
(1S1 - 1S3)
CORE II 1600 0.9996 1600 -0.038
(2S1 - 2S3)
CORE III 1600 1.0002 1600 0.017
(3S1 - 3S3)
CORE IV 1600 0.9979 1600 -0.215
(4S1 - 4S3)
CORE V 1600 0.9989 1600 -0.106
(5S1 - 5S3)
CORE I 3000 1.0 3000 -0.001
(1S1 - 1S4)
CORE II 3000 1.0 3000 0.000
(2S1 - 2S4)
CORE III 3000 1.0002 3000 0.015
(3S1 - 3S4)
CORE IV 3000 0.9983 3000 -0.166

25
(4S1 - 4S4)
CORE V 3000 0.9995 3000 -0.046
(5S1 - 5S4)

*Primary current to be injected as per the continuous current rating of maintenance


Earth switch (specified by manufacturer)

Incase CT ratio test has been performed by CT Analyzer, direct ratio & error to be filled

NOTE: %Error Values Are Filled By as per CT Analyzer Shown Results Only.

B Phase

Core Primary Secondary Theoretical % Error


Current* (A) Current (A) Ratio
CORE I 800 0.9968 800 -0.323
(1S1 - 1S2)
CORE II 800 0.9968 800 -0.320
(2S1 - 2S2)
CORE III 800 1.0004 800 0.043
(3S1 - 3S2)
CORE IV 800 0.996 800 -0.401
(4S1 - 4S2)
CORE V 800 0.9969 800 -0.311
(5S1 - 5S2)
CORE I 1600 0.999 1600 -0.101
(1S1 - 1S3)
CORE II 1600 0.999 1600 -0.104
(2S1 - 2S3)
CORE III 1600 1.0002 1600 0.020
(3S1 - 3S3)
CORE IV 1600 0.9981 1600 -0.194
(4S1 - 4S3)
CORE V 1600 0.9988 1600 -0.119
(5S1 - 5S3)
CORE I 3000 1.0 3000 -0.002
(1S1 - 1S4)
CORE II 3000 1.0 3000 -0.004
(2S1 - 2S4)
CORE III 3000 1.0001 3000 0.014
(3S1 - 3S4)

26
CORE IV 3000 0.999 3000 -0.104
(4S1 - 4S4)
CORE V 3000 0.9995 3000 -0.053
(5S1 - 5S4)

*Primary current to be injected as per the continuous current rating of maintenance


Earth switch (specified by manufacturer)

Incase CT ratio test has been performed by CT Analyzer, direct ratio & error to be filled

NOTE: %Error Values Are Filled By as per CT Analyzer Shown Results Only.

VIII. Magnetizing Curve Performance


Knee Point Voltage (KVp) = 1000 Volt
R Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S2 2S1-2S2 4S1-4S2 5S1-5S2
0.25 X KVp 250 mA 9.425 10.020 11.037 10.712
0.50 X KVp 500 mA 18.850 20.040 22.075 21.425

0.75 X KVp 750 mA 28.275 30.060 33.125 32.137

1.00 X KVp 1000 mA 37.700 40.080 44.150 42.850

1.10 X KVp 1100 mA 41.470 44.088 48.565 47.135

Note: Magnetizing current to be tested for adopted tap (as per approved schematic)

Y Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S2 2S1-2S2 4S1-4S2 5S1-5S2
0.25 X KVp 250 mA 9.292 9.475 11.570 10.437
0.50 X KVp 500 mA 18.585 18.950 23.140 20.875

0.75 X KVp 750 mA 29.877 28.425 34.710 31.312

1.00 X KVp 1000 mA 37.170 37.900 46.280 41.750

1.10 X KVp 1100 mA 40.887 41.690 50.908 4.925

27
Note: Magnetizing current to be tested for adopted tap (as per approved schematic)

B Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S2 2S1-2S2 4S1-4S2 5S1-5S2
0.25 X KVp 250 mA 9.057 9.872 11.257 10.817
0.50 X KVp 500 mA 18.115 19.745 22.515 21.635

0.75 X KVp 750 mA 27.172 29.617 33.772 32.452

1.00 X KVp 1000 mA 36.230 39.490 45.030 43.270

1.10 X KVp 1100 mA 39.853 43.439 49.533 47.597

Note: Magnetizing current to be tested for adopted tap (as per approved schematic)
Knee Point Voltage (KVp) = 2000 Volt
R Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S3 2S1-2S3 4S1-4S3 5S1-5S3
0.25 X KVp 500 mA 4.695 4.870 5.602 5.270
0.50 X KVp 1000 mA 9.390 9.740 11.205 10.540

0.75 X KVp 1500 mA 14.085 14.610 16.807 15.810

1.00 X KVp 2000 mA 18.780 19.480 22.140 21.080

1.10 X KVp 2200 mA 20.658 21.428 24.651 23.188

Note: Magnetizing current to be tested for adopted tap (as per approved schematic)

Y Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S3 2S1-2S3 4S1-4S3 5S1-5S3
0.25 X KVp 500 mA 4.560 4.750 5.620 5.097
0.50 X KVp 1000 mA 9.120 9.500 11.240 10.195

0.75 X KVp 1500 mA 13.680 14.250 16.860 15.292

1.00 X KVp 2000 mA 18.240 19.000 22.480 20.390

1.10 X KVp 2200 mA 20.064 20.900 24.728 22.429

28
Note: Magnetizing current to be tested for adopted tap (as per approved schematic)

B Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S3 2S1-2S3 4S1-4S3 5S1-5S3
0.25 X KVp 500 mA 4.465 4.880 5.510 5.305
0.50 X KVp 1000 mA 8.930 9.760 11.020 10.610

0.75 X KVp 1500 mA 13.395 14.640 16.530 15.915

1.00 X KVp 2000 mA 17.860 19.520 22.040 21.220

1.10 X KVp 2200 mA 19.646 21.472 24.244 23.342

Note: Magnetizing current to be tested for adopted tap (as per approved schematic)
Knee Point Voltage (KVp) = 3500 Volt
R Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S4 2S1-2S4 4S1-4S4 5S1-5S4
0.25 X KVp 875 mA 2.505 2.590 2.955 2.297
0.50 X KVp 1750 mA 5.010 5.180 5.910 5.595

0.75 X KVp 2625 mA 7.515 7.770 8.865 8.392

1.00 X KVp 3500 mA 10.020 10.360 11.820 11.190

1.10 X KVp 3850 mA 11.022 11.396 13.002 12.309

Note: Magnetizing current to be tested for adopted tap (as per approved schematic)

Y Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S4 2S1-2S4 4S1-4S4 5S1-5S4
0.25 X KVp 875 mA 2.635 2.452 2.925 2.682
0.50 X KVp 1750 mA 5.270 4.905 5.850 5.365

0.75 X KVp 2625 mA 7.905 7.358 8.775 8.047

1.00 X KVp 3500 mA 10.540 9.811 11.700 10.730

1.10 X KVp 3850 mA 11.594 10.792 12.870 11.803

29
Note: Magnetizing current to be tested for adopted tap (as per approved schematic)

B Phase

Voltage Current Measurement


To Be Applied Actual Unit Core – I Core – II Core – IV Core – V
Value 1S1-1S4 2S1-2S4 4S1-4S4 5S1-5S4
0.25 X KVp 875 mA 2.348 2.652 2.957 2.835
0.50 X KVp 1750 mA 4.696 5.305 5.915 5.670

0.75 X KVp 2625 mA 7.044 7.957 8.872 8.505

1.00 X KVp 3500 mA 9.392 10.610 11.830 11.340

1.10 X KVp 3850 mA 10.331 11.671 13.013 12.474

Note: Magnetizing current to be tested for adopted tap (as per approved schematic

IX. Final Documentation Review

i. Final documents of Pre- Commissioning checks reviewed and Yes No


approved

ii. Document regarding spares equipment, O&M manuals etc available at site
for O&M purpose

Yes No

iii. After modification, if any, “As built Drawings” are available at site
Yes No

Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

30
Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID

(Supplier I/C) Commissioning. Team)

Representative) Members:

(Wherever 1.

Applicable) 2.

3.

4.

PRE-COMMISSIONING FORMATS FOR ISOLATOR

I. GENERAL DETAILS
DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS , SABOUR
Feeder name: D04-Q61 BUSCOUPLER LOA No. :BUSCOUPLER
Make: ABB CHINA Type: ELK-DE0
Sr. No: 501916739-D04-Q61 Operating Voltage rating: 245kV
Control Voltage: 231.5 DC Current Carrying capacity: 3150 A
Year of Manufacture: 2017 Date of Receipt at site:
Date of Erection: Date of Energisation :

II. PRE-COMMISSIONING CHECKS


III.

SL.N STATUS
REMARK /  RECORD
DESCRIPTION
YES NO DEFICIENCIES, IF ANY
O
1 Equipment is free from dirt/dust foreign materials etc. √
Equipment is free from all visible defects on physical √
2
Inspection
All nuts and bolts are tightened correctly as per specified √
3
Torque
Equipment erection is complete in all respect as per √
4
instruction Manual (attach remaining activities, if any)
5 Auxiliary contacts and relays have been cleaned √

31
and free from rust / damage
Functional checking of auxiliary contacts for √
6
indications and interlocks
7 Earth switch connected to earth firmly NA

8 Earth switch link grounding point marked clearly NA

Interlocks checked as per approved scheme √


9
with all combinations
Check that operation and positioning of the limit √
10
switch & the auxiliary contacts assembly are ok
Check that all three phase isolators are closing & √
11
opening at a time

12 Position indicator of isolator/earth switch drive checked

13 Checking of manual operation through handle

14 Electrical operation blocking during manual operation

IV. MOTOR DETAILS

R–Ø Y–Ø B–Ø

Make
Type
Volt
Amperes
Hp/ Kw
O/L setting
(Thermal Over
load)
V.
INSULATION RESISTANCE MEASUREMENT

Make of testing kit :

Date of calibration :

Ambient temperature :
Using 500 volt megger measure resistance between the winding of motor and earth

 
SL.
BETWEEN PHASE 
NO
R Ø YØ B Ø

1 Winding to Earth

PERMISSIBLE LIMIT (Min): 50 M ohm

32
VI. OPERATIONAL CHECKS

i. Operate the isolator and record the motor current

MOTOR CURRENT
ISOLATOR R–Ø Y–Ø B–Ø
OPERATION Factory Site
CLOSE 0.20 A 0.487 A
OPEN 1.20 A 0.468 A

ii. Operation of isolator from local / remote Ok/Not Ok

ISOLATOR CONTROL PANEL


OPERATION LOCAL REMOTE
CLOSE
   OK  OK
OPEN  OK  OK

iii. Measurement of Operating Time

OPERATION PHASE
UNIT
R-Ø Y–Ø B–Ø
Sec 1.90
OPENING TIME
Sec 1.72
CLOSING TIME

33
VII. FINAL DOCUMENTATION REVIEW

1. Final documents of Pre- Commissioning checks reviewed and Yes No


approved

2. Document regarding spares equipment, O&M manuals etc


Yes No
available at site for O&M purpose

3. After modification, if any, “As built Drawings” are available at site


Yes No

Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

34
Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID


(Supplier I/C) Commissioning Team)
Representative) Members:
(Wherever 1.
Applicable) 2.
3.
4.

PRE-COMMISSIONING FORMATS FOR ISOLATOR AND GROUNDING SWITCH

I. GENERAL DETAILS
DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS , SABOUR
Feeder name: D04-Q1 LOA No. :BUSCOUPLER
BUSCOUPLER
Make: ABB CHINA Type: ELK-DE0
Sr. No: 501916739-D04-Q1 Operating Voltage rating: 245Kv
Control Voltage: 231.5V DC Current Carrying capacity: 3150 A
Year of Manufacture: 2017 Date of Receipt at site:
Date of Erection: Date of Energisation :

II. PRE-COMMISSIONING CHECKS

SL.N STATUS
REMARK /  RECORD
DESCRIPTION
YES NO DEFICIENCIES, IF ANY
O
1 Equipment is free from dirt/dust foreign materials etc. √
Equipment is free from all visible defects on physical √
2
Inspection
All nuts and bolts are tightened correctly as per specified √
3
Torque
Equipment erection is complete in all respect as per √
4
instruction Manual (attach remaining activities, if any)

35
Auxiliary contacts and relays have been cleaned √
5
and free from rust / damage
Functional checking of auxiliary contacts for √
6
indications and interlocks

7 Earth switch connected to earth firmly

8 Earth switch link grounding point marked clearly

Interlocks checked as per approved scheme √


9
with all combinations
Check that operation and positioning of the limit √
10
switch & the auxiliary contacts assembly are ok
Check that all three phase isolators are closing & √
11
opening at a time

12 Position indicator of isolator/earth switch drive checked

13 Checking of manual operation through handle

14 Electrical operation blocking during manual operation

III. MOTOR DETAILS

R–Ø Y–Ø B–Ø

Make
Type
Volt
Amperes
Hp/ Kw
O/L setting
(Thermal Over
load)

IV. INSULATION RESISTANCE MEASUREMENT

Make of testing kit :

36
Date of calibration :

Ambient temperature :
Using 500 volt megger measure resistance between the winding of motor and earth

 
SL.
BETWEEN PHASE 
NO
R Ø YØ B Ø

1 Winding to Earth

PERMISSIBLE LIMIT (Min): 50 M ohm

V. OPERATIONAL CHECKS

i. Operate the isolator, earth switch and record the motor current

MOTOR CURRENT
OPERATIO ISOLATOR EARTH SWITCH
N R–Ø Y–Ø B–Ø R–Ø Y–Ø B–Ø
Factory Site Factory Site
CLOSE 0.20 A 0.482 A 0.20 A 0.374 A
OPEN 0.20 A 0.449 A 0.20 A 0.420 A

ii. Operation of isolator from local / remote Ok/Not Ok

ISOLATOR/EARTH CONTROL PANEL


SWITCH
OPERATION LOCAL REMOTE
CLOSE   OK  OK
OPEN  OK  OK

iii. Measurement of Operating Time

ISOLATOR EARTH SWITCH


OPERATION UNIT
R-Ø Y–Ø B-Ø R-Ø Y–Ø B–Ø
OPENING Sec 1.89 1.89

37
TIME
CLOSING TIME Sec 1.81 1.80

VI. FINAL DOCUMENTATION REVIEW

i. Final documents of Pre- Commissioning checks reviewed and Yes No


approved

ii. Document regarding spares equipment, O&M manuals etc


Yes No
available at site for O&M purpose

38
iii. After modification, if any, “As built Drawings” are available at
Site Yes No

Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID


(Supplier I/C) Commissioning Team)
Representative) Members:
(Wherever 1.
Applicable) 2.
3.
4.

PRE-COMMISSIONING FORMATS FOR ISOLATOR AND GROUNDING SWITCH

I. GENERAL DETAILS
DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS ,SABOUR
Feeder name: D04-Q2 LOA No. : BUSCOUPLER
BUSCOUPLER
Make: ABB CHINA Type: ELK-DE0
Sr. No: 501916739-D04-Q2 Operating Voltage rating: 245Kv
Control Voltage: 231.5V DC Current Carrying capacity: 3150 A
Year of Manufacture: 2015 Date of Receipt at site:
Date of Erection: Date of Energisation :

39
II. PRE-COMMISSIONING CHECKS

SL.N STATUS
REMARK /  RECORD
DESCRIPTION
YES NO DEFICIENCIES, IF ANY
O
1 Equipment is free from dirt/dust foreign materials etc. √
Equipment is free from all visible defects on physical √
2
Inspection
All nuts and bolts are tightened correctly as per specified √
3
Torque
Equipment erection is complete in all respect as per √
4
instruction Manual (attach remaining activities, if any)
Auxiliary contacts and relays have been cleaned √
5
and free from rust / damage
Functional checking of auxiliary contacts for √
6
indications and interlocks

7 Earth switch connected to earth firmly

8 Earth switch link grounding point marked clearly

Interlocks checked as per approved scheme √


9
with all combinations
Check that operation and positioning of the limit √
10
switch & the auxiliary contacts assembly are ok
Check that all three phase isolators are closing & √
11
opening at a time

12 Position indicator of isolator/earth switch drive checked

13 Checking of manual operation through handle

14 Electrical operation blocking during manual operation

III. MOTOR DETAILS

R–Ø Y–Ø B–Ø

Make
Type
Volt
Amperes
Hp/ Kw
O/L setting
(Thermal Over
load)

40
IV. INSULATION RESISTANCE MEASUREMENT

Make of testing kit :

Date of calibration :

Ambient temperature :
Using 500 volt megger measure resistance between the winding of motor and earth

 
SL.
BETWEEN PHASE 
NO
R Ø YØ B Ø

1 Winding to Earth

PERMISSIBLE LIMIT (Min): 50 M ohm

V. OPERATIONAL CHECKS

i. Operate the isolator, earth switch and record the motor current

MOTOR CURRENT
OPERATIO ISOLATOR EARTH SWITCH
N R–Ø Y–Ø B–Ø R–Ø Y–Ø B–Ø
Factory Site Factory Site
CLOSE 0.30 A 0.380 A 0.30 A 0.407 A
OPEN 0.30 A 0.442 A 0.30 A 0.370 A

ii. Operation of isolator from local / remote Ok/Not Ok

ISOLATOR/EARTH CONTROL PANEL


SWITCH
OPERATION LOCAL REMOTE
CLOSE   OK  OK

41
OPEN  OK  OK

iii. Measurement of Operating Time

ISOLATOR EARTH SWITCH


OPERATION UNIT
R-Ø Y-Ø B-Ø R–Ø Y–Ø B–Ø
OPENING
Sec 1.88 1.89
TIME
CLOSING TIME Sec 1.85 1.83

VI. FINAL DOCUMENTATION REVIEW

42
i. Final documents of Pre- Commissioning checks reviewed and Yes No
approved

ii. Document regarding spares equipment, O&M manuals etc


Yes No
available at site for O&M purpose

iii. After modification, if any, “As built Drawings” are available at


Site Yes No

Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID


(Supplier I/C) Commissioning Team)
Representative) Members:
(Wherever 1.
Applicable) 2.
3.
4.

PRE-COMMISSIONING FORMATS FOR GROUNDING SWITCH

I. GENERAL DETAILS

43
DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS , SABOUR
Feeder name: D04-Q15 LOA No. :BUSCOUPLER
BUSCOUPLER
Make: ABB CHINA Type: ELK-ES0
Sr. No: 501140634-D04-Q15 Operating Voltage rating: 245 Kv
Control Voltage: 231.5 VDC Current Carrying capacity: -
Year of Manufacture: 2015 Date of Receipt at site:
Date of Erection: Date of Energisation :

II. PRE-COMMISSIONING CHECKS

SL.N STATUS
REMARK /  RECORD
DESCRIPTION
YES NO DEFICIENCIES, IF ANY
O
1 Equipment is free from dirt/dust foreign materials etc. √
Equipment is free from all visible defects on physical √
2
Inspection
All nuts and bolts are tightened correctly as per specified √
3
Torque
Equipment erection is complete in all respect as per √
4
instruction Manual (attach remaining activities, if any)
Auxiliary contacts and relays have been cleaned √
5
and free from rust / damage
Functional checking of auxiliary contacts for √
6
indications and interlocks

7 Earth switch connected to earth firmly

8 Earth switch link grounding point marked clearly

Interlocks checked as per approved scheme √


9
with all combinations
Check that operation and positioning of the limit √
10
switch & the auxiliary contacts assembly are ok
Check that all three phase isolators are closing & √
11
opening at a time

12 Position indicator of isolator/earth switch drive checked

13 Checking of manual operation through handle

14 Electrical operation blocking during manual operation

III. MOTOR DETAILS

44
R–Ø Y–Ø B–Ø

Make
Type
Volt
Amperes
Hp/ Kw
O/L setting
(Thermal Over
load)

IV. INSULATION RESISTANCE MEASUREMENT

Make of testing kit :

Date of calibration :

Ambient temperature :
Using 500 volt megger measure resistance between the winding of motor and earth

 
SL.
BETWEEN PHASE 
NO
R Ø YØ B Ø

1 Winding to Earth

PERMISSIBLE LIMIT (Min): 50 M ohm

V. OPERATIONAL CHECKS

i. Operate the ground switch and record the motor current

MOTOR CURRENT
EARTH SWITCH R–Ø Y–Ø B–Ø
OPERATION Factory Site
CLOSE 0.80 A 0.298 A
OPEN 2.30 A 0.550 A

ii. Operation of earth switch from local / remote Ok/Not Ok

45
EARTH SWITCH CONTROL PANEL
OPERATION LOCAL REMOTE
CLOSE
   OK  OK
OPEN  OK  OK

iii. Measurement of Operating Time

OPERATION PHASE
UNIT
R–Ø Y-Ø B–Ø
Sec 1.21
OPENING TIME
Sec 1.40
CLOSING TIME

VI. FINAL DOCUMENTATION REVIEW

46
i. Final documents of Pre- Commissioning checks reviewed Yes No
and approved

ii. Document regarding spares equipment, O&M manuals etc


Yes No
available at site for O&M purpose

iii. After modification, if any, “As built Drawings” are available


at site Yes No

Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID


(Supplier I/C) Commissioning Team)
Representative) Members:
(Wherever 1.
Applicable) 2.
3.
4.

PRE COMMISSIONING CHECKS ON GIS

47
I. Contact Resistance Measurement

Details Attached in this Report.

Contact Resistance Measurement to be conducted for whole GIS by injecting 100 A current or more.
Typical Configuration for performing Contact Resistance Measurement for reference SLD (Double Main
Bus Scheme) attached as Annexure – I have been shown in the table.

Make of Testing Kit: Megger: MOM-600


Serial Number of Kit: 8503171
Date of Calibration of Kit: 29.06.2018
Ambient Temperature: 28 ̊C

DESIGNATION OF PHASE DESIRED ACTUAL VALUE REMARKS


MEASURING VALUE(µΩ) µΩ (MEASURED)
POINT IN
ACCORDANCE
WITH CIRCUIT
DIAGRAM

D04-Q15 TO D04- R 234 223.0 05.01.2019


Q25 Y 209.3 05.01.2019
B 204.8 05.01.2019

II. DS & ES Electrical Operations Test

a. For Double Main Bus Scheme, Sample SLD for reference attached as Annexure - III

48
Bay Details Equipment Operation SCADA LCC Panel Status Indicator
Details Indication Lamp At Equipment
Close OK OK OK
Q1/ISO
Open OK OK OK

Close OK OK OK
Q2/ISO
Open OK OK OK

Close OK OK OK
Q51/ES
Open OK OK OK

Close OK OK OK

D04 Q52/ES
Open OK OK OK

Close OK OK OK
Q61/ISO
Open OK OK OK

Close OK OK OK
Q62/ISO
Open OK OK OK

Close OK OK OK
Q15/ES
Open OK OK OK

Close OK OK OK
Q25/ES
Open OK OK OK

Close OK OK OK
Q0/CB
Open OK OK OK

49
III. Alarms & Annunciation Check

Initiating Point Checked At

Device Name Terminal No LCC Panel SCADA HMI


Description of Alarm
(Density Monitor/ As per Drawing Alarm Alarm
Relay etc)

B0.1 Compartment SF6 Alarm Refill 11 – 12 OK OK


Density Monitor
B0.1 Compartment SF6 Alarm Low 21 – 22 OK OK

B0.2 Compartment SF6 Blocking 11 – 13 OK OK

B0.2 Compartment SF6 Blocking Density Monitor 21 -23 OK OK

B0.2 Compartment Zone Trip 31 – 32 OK OK

B1 Compartment SF6 Alarm Refill 11 – 12 OK OK

B1 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B1 Compartment Zone Trip 31 – 32 OK OK

B1 Compartment SF6 Alarm Refill 11 – 12 OK OK

B1 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B1 Compartment Zone Trip 31 – 32 OK OK

B2 Compartment SF6 Alarm Refill Density Monitor 11 – 12 OK OK

B2 Compartment SF6 Alarm Low 21 -22 OK OK

B2 Compartment Zone Trip 31 – 32 OK OK

B3 Compartment SF6 Alarm Refill 11 – 12 OK OK

B3 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B3 Compartment Zone Trip 31 - 32 OK OK

B4 Compartment SF6 Alarm Refill 11 - 12 OK OK

B4 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B4 Compartment Zone Trip 31 - 32 OK OK

B5 Compartment SF6 Alarm Refill Density Monitor 11 - 12 OK OK

B5 Compartment SF6 Alarm Low 21 -22 OK OK

50
B5 Compartment Zone Trip 31 - 32 OK OK

B6 Compartment SF6 Alarm Refill 11 - 12 OK OK

B6 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B6 Compartment Zone Trip 31 - 32 OK OK

B8 Compartment SF6 Alarm Refill 11 - 12 OK OK

B8 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B8 Compartment Zone Trip 31 - 32 OK OK

B9 Compartment SF6 Alarm Refill 11 - 12 OK OK

B9 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B9 Compartment Zone Trip 31 – 32 OK OK

B10 Compartment SF6 Alarm Refill 11 - 12 OK OK

B10 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B10 Compartment Zone Trip 31 – 32 OK OK

B11 Compartment SF6 Alarm Refill 11 – 12 OK OK

B11 Compartment SF6 Alarm Low Density Monitor 21 -22 OK OK

B11 Compartment Zone Trip 31 – 32 OK OK

CB Close Lockout K23 X202:61-62 OK OK

CB Trip Lockout K23/K26 X202:61-62 / OK OK


X202:63-64

MCB Tripped AC Power K506 X511:01-16 OK OK

C.B. Hydraulic Pump Fault NOT AVAILABLE

CB Phase Discrepancy K43/K45 X202:53-54 / OK OK


X202:55-56

CB Motor Protection NOT AVAILABLE

CB Motor Run Time Exceed K504 X511:01-14 OK OK

CB Spring Discharge F1 X202:71-72 OK OK

MCB Tripped DC Power K507 X511:01-17 OK OK

MCB Tripped Bus PT-T15 K508 X511:01-19 OK OK

MCB Tripped Bus PT-T25 K509 X511:01-20 OK OK

51
Disconnector Q1 Blocked Mode

Disconnector Q2 Blocked Mode

Disconnector Q61 Blocked Mode

Disconnector Q62 Blocked Mode

ES Q51 Blocked Mode

ES Q52 Blocked Mode

ES Q15 Blocked Mode

ES Q25 Blocked Mode


NOT AVAILABLE
Disconnector Q1 Manual Mode

Disconnector Q2 Manual Mode

Disconnector Q61 Manual Mode

Disconnector Q62 Manual Mode

ES Q51 Manual Mode

ES Q52 Manual Mode

ES Q15 Manual Mode

ES Q25 Manual Mode

IV. CHECKING OF INTERLOCKS

For Double Main Bus Scheme

Details Attached in This Report

V. High Voltage and Partial Discharge Measurement

HV test details Attached in this Report

52
VI. Earth Resistance Measurement

Earth Resistance needs to be measured for Outdoor Yard (at each voltage level) and each Bay in GIS
Hall.
*Details Attached in this report.

PRE COMMISSIONING CHECKS ON POTENTIAL TRANSFORMERS

I. General Details

DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS , SABOUR
Bay Name: D04-T15 BUS#1 LOA No: BUS#1
Make: SIEYUAN Primary Voltage Rating: 220000/√3 V
Secondary Voltage Rating: Secondary Voltage Burden:
Winding - I: 110/√3 V Winding - I: 50 VA
Winding - II: 110/√3 V Winding - II: 50 VA
Winding - IIII: 110/√3 V Winding - IIII: 50 VA
Sr. No: Type: JSQXFH-220
R- Ø: 2217917
Y- Ø: 2217917 Class : 3P/3P/0.2
B- Ø: 2217917
Year of Manufacturer: Date of Receipt at site:
R-Ø: 2015
Y-Ø: 2015
B-Ø: 2015
Date of Erection: Date of Energisation:

II. Impact Recorder

Status of Impact Recorder : OK/Not OK (If Not OK case may be referred to manufacturer for
inspection)

53
III. Pre Commissioning Checks

Status Remarks
Sl. Record
Description
No N Deficiencies,
YES O If Any 

Equipment is free from all visible defects on physical



1 inspection

Check VT LV side winding has been provided with



2 double earthing

Check that PT secondary terminal box is earthed



3 correctly as per specified GA drg.

4 All nuts and bolts are tightened √

5 All fittings as per outline general arrangement drawing. √

Labelling and identification marking is available on GIS



6 enclosure.

Any paint removed / scratched in transit has been



7 touched up

Check secondary cable end box is properly fixed and



8 ensure cable entry at the bottom.

Check rating / healthiness of fuses at PT secondary



9 terminal box

Check the IR value of secondary cable ( > 50 M ohms for



10 control cables)  

All the cable identification tags provided and all cores


are provided with identification ferrules at secondary √
11 terminal box and LCC panel

54
IV. Continuity of Winding
i. Between terminals 1a – 1n
Yes No

ii. Between terminals 2a – 1n Yes No

iii. Between terminals 3a – 1n


Yes No

V. Secondary Winding Resistance

Phase Core – I Core – II Core – III


Factory Site Factory Site Factory Site
R -Ø 0.2Ω 0.2Ω 0.2Ω
Y -Ø 0.2Ω 0.2Ω 0.2Ω
B- Ø 0.2Ω 0.2Ω 0.2Ω

VI. Insulation Resistance Measurement

APPLIED VOLT 5000V

55
Secondary Core – I to Earth MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Secondary Core – II to Earth MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Secondary Core - III to Earth MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Core – I to Core – II MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Core - I to Core – III MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Core – II to Core – III MΩ ≥1GΩ ≥1GΩ ≥1GΩ

VII. Voltage Ratio Test


To be tested at the time of HV test (during fifteen minute conditioning)

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

1500 V 1a – 1 n 0.76

R 1500 V 2a – 2 n 0.76

1500 V 3a – 3 n 0.76

y 1500V 1a – 1 n 0.76

1500V 2a – 2 n 0.76

56
1500V 3a – 3 n 0.76

1500V 1a – 1 n 0.76

B 1500V 2a – 2 n 0.76

1500V 3a – 3 n 0.76

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

2500V 1a – 1 n 1.26

R 2500V 2a – 2 n 1.26

2500V 3a – 3 n 1.27

2500V 1a – 1 n 1.26

y 2500V 2a – 2 n 1.26

2500V 3a – 3 n 1.26

2500V 1a – 1 n 1.26

B 2500V 2a – 2 n 1.26

2500V 3a – 3 n 1.26

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

4000V 1a – 1 n 2.0

R 4000V 2a – 2 n 2.0

4000V 3a – 3 n 2.0

4000V 1a – 1 n 2.03

y 4000V 2a – 2 n 2.03

4000V 3a – 3 n 2.04

B 4000V 1a – 1 n 2.02

4000V 2a – 2 n 2.03
57
4000V 3a – 3 n 2.03

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

4500V 1a – 1 n 2.31

R 4500V 2a – 2 n 2.30

4500V 3a – 3 n 2.30

4500V 1a – 1 n 2.27

y 4500V 2a – 2 n 2.28

4500V 3a – 3 n 2.29

4500V 1a – 1 n 2.28

B 4500V 2a – 2 n 2.28

4500V 3a – 3 n 2.28

VIII. Final Documentation Review

i. Final documents of Pre- Commissioning checks reviewed and Yes No


approved

ii. Document regarding spares equipment, O&M manuals etc available at site
for O&M purpose

Yes No

iii. After modification, if any, “As built Drawings” are available at site
Yes No

58
Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID

(Supplier I/C) Commissioning. Team)

Representative) Members:

(Wherever 1.

Applicable) 2.

3.

4.

PRE COMMISSIONING CHECKS ON POTENTIAL TRANSFORMERS

I. General Details

DETAILS
Region: Sub-Station: 220/132/33kV NEW GIS , SABOUR
Bay Name: D04-T25 BUSPT#2 LOA No:
Make: SIEYUAN Primary Voltage Rating: 220000/√3 V
Secondary Voltage Rating: Secondary Voltage Burden:
Winding - I: 110/√3 V Winding - I: 50 VA
Winding - II: 110/√3 V Winding - II: 50 VA
Winding - IIII: 110/√3 V Winding - IIII: 50 VA
Sr. No: Type: JSQXFH-132
R- Ø: 22171918
Y- Ø: 22171918 Class : 3P/3P/0.2
B- Ø: 22171918
59
Year of Manufacturer: Date of Receipt at site:
R-Ø: 2015
Y-Ø: 2015
B-Ø: 2015
Date of Erection: Date of Energisation:

II. Impact Recorder

Status of Impact Recorder : OK/Not OK (If Not OK case may be referred to manufacturer for
inspection)

III. Pre Commissioning Checks

Status Remarks
Sl. Record
Description
No Deficiencies
YES NO , If Any 

Equipment is free from all visible defects on physical



1 inspection

Check VT LV side winding has been provided with



2 double earthing

Check that PT secondary terminal box is earthed



3 correctly as per specified GA drg.

4 All nuts and bolts are tightened √

5 All fittings as per outline general arrangement drawing. √

60
Labelling and identification marking is available on GIS

6 enclosure.

Any paint removed / scratched in transit has been



7 touched up

Check secondary cable end box is properly fixed and



8 ensure cable entry at the bottom.

Check rating / healthiness of fuses at PT secondary



9 terminal box

Check the IR value of secondary cable ( > 50 M ohms for



10 control cables)  

All the cable identification tags provided and all cores


are provided with identification ferrules at secondary √
11 terminal box and LCC panel

IV. Continuity of Winding


i. Between terminals 1a – 1n
Yes No

ii. Between terminals 2a – 1n Yes No


iii. Between terminals 3a – 1n
Yes No

V. Secondary Winding Resistance

Phase Core – I Core – II Core – III


Factory Site Factory Site Factory Site
61
R -Ø 0.2Ω 0.2Ω 0.2Ω
Y -Ø 0.2Ω 0.2Ω 0.2Ω
B- Ø 0.2Ω 0.2Ω 0.2Ω

Factory Test Report Ref. No:

IX. Insulation Resistance Measurement

APPLIED VOLT 500 V


Secondary Core – I to Earth MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Secondary Core – II to Earth MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Secondary Core - III to Earth MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Core – I to Core – II MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Core - I to Core – III MΩ ≥1GΩ ≥1GΩ ≥1GΩ
Core – II to Core – III MΩ ≥1GΩ ≥1GΩ ≥1GΩ

X. Voltage Ratio Test


To be tested at the time of HV test (during fifteen minute conditioning)

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

1500 V 1a – 1 n 0.76

1500 V 2a – 2 n 0.76

62
R 1500 V 3a – 3 n 0.76

1500V 1a – 1 n 0.76

y 1500V 2a – 2 n 0.76

1500V 3a – 3 n 0.76

1500V 1a – 1 n 0.76

B 1500V 2a – 2 n 0.76

1500V 3a – 3 n 0.76

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

2500V 1a – 1 n 1.26

R 2500V 2a – 2 n 1.27

2500V 3a – 3 n 1.27

2500V 1a – 1 n 1.26

y 2500V 2a – 2 n 1.27

2500V 3a – 3 n 1.26

2500V 1a – 1 n 1.26

B 2500V 2a – 2 n 1.26

2500V 3a – 3 n 1.26

Phase Primary Secondary Voltage

63
Measured
Voltage Between
Value

4000V 1a – 1 n 2.0

R 4000V 2a – 2 n 2.0

4000V 3a – 3 n 2.02

4000V 1a – 1 n 2.03

y 4000V 2a – 2 n 2.03

4000V 3a – 3 n 2.02

4000V 1a – 1 n 2.02

B 4000V 2a – 2 n 2.01

4000V 3a – 3 n 2.01

Secondary Voltage
Phase Primary
Measured
Voltage Between
Value

4500V 1a – 1 n 2.30

R 4500V 2a – 2 n 2.30

4500V 3a – 3 n 2.30

4500V 1a – 1 n 2.28

y 4500V 2a – 2 n 2.28

4500V 3a – 3 n 2.28

4500V 1a – 1 n 2.28

B 4500V 2a – 2 n 2.28

4500V 3a – 3 n 2.29

64
VI. Final Documentation Review

i. Final documents of Pre- Commissioning checks reviewed and Yes No


approved

ii. Document regarding spares equipment, O&M manuals etc available at site
for O&M purpose

Yes No

iii. After modification, if any, “As built Drawings” are available at site

Yes No

Signature: Signature: Signature: Signature:

65
Name: Name: Name: Name:

Designation: Designation: Designation: Designation:

Organization: (Erection Agency) (POWERGRID Site (POWERGRID

(Supplier I/C) Commissioning. Team)

Representative) Members:

(Wherever 1.

Applicable) 2.

3.

4.

66
FORMAT FOR RECORD OF MAJOR FAILURES OF EQUIPMENT AND COMPONENTS DURING
PRE-COMMISSIONING STAGE

In order to have complete information of problems observed during pre-commissioning stage for
assessment of quality of product and erection workmanship, record of major problems is required
to be maintained. This helps in identifying the critical area vulnerable/ prone to failure and
analysing the same to avert the same in future during O&M stage with the help of manufacture/
supplier. The record of major problems observed during erection and pre-commissioning stage to
be maintained in the format given below and to be signed by contractor, manufacturer &
POWERGRID. The problems including GIS mechanical assembly parts, motor drives & drive
mechanism, SF6 gas leakage, Density monitor and contacts, items rejected due to transport
/storage damage, failures observed during HV test with details of location and reason found after
opening the compartment, detection of partial discharge during HV test , improper contact
resistance, CB, Isolator, CT, VT improper test values, indication and interlocks etc may be
recorded.

SL. DATE OF BAY NO EQUIPMENT/COMPONENT DESCRIPTION ACTION TAKEN


NO. OBSEARVTION DETAILS OF PROBLEM

1.

 AFTER PRE-COMMISSIONING ALL THE EQUIPMENTS FOUND HEALTHY.

Signature

POWERGRID CONTRACTOR MANUFACTURER