7 Steps for Implementing Reliability-based

Maintenance

Today, plant assets play a key role in overall enterprise efficiency. That is why manufacturers
are turning to reliability-based maintenance (RBM) more and more, using RBM as a strategy
to help maintain valuable plant assets and eliminate the costly adverse impacts of
performance issues like delays and unexpected downtime.
Many organizations struggle to manage preventive care and keep pace with the complexity
of operational assets. Without a practical and prescriptive asset reliability process in place,
these companies will continue to take random hit-or-miss shots at maintenance targets, often
wasting resources and experiencing disappointing results. With RBM, it does not have to be
that way.

Technical Evolution Requires Maintenance Evolution


Technology has changed the way plant assets fail. Greater complexity of the components
ultimately means more complex breadth of tasks and the need for advanced warnings of
failure probability.
Most reliability strategies remain time based, such as replacing bearings every six months.
This has limitations, as the bearings may not need to be replaced yet or may have been past
optimal conditions months ago.
A revitalized approach to maintenance strategies is required — one that will better align with
today’s digital evolution, sensor-based innovations, strict compliance mandates and
escalating customer demands. Fortunately, the RBM process provides a sustainable
methodology with optimal results. Following is a primer on the steps to building an RBM
system.
1. Identify Assets in a Master Asset List
To begin, determine the selection criteria, decide the data components, and organize the
criteria to aid in finding, maintaining and analyzing data. When selecting criteria, focus on
distinguishing characteristics. The definition of an asset establishes the physical scope of the
program.
The criteria must speak to the things an organization does in terms of maintenance, quality
and supply chain activity. These aspects of the business keep personnel and the environment
safe while promoting throughput without the adverse effects from a breakdown.
A typical operation may have anywhere from hundreds to thousands of assets, depending on
the operation’s size and how an asset is defined. Establishing the standard asset data
components will enable companies to effectively group assets.

2. Determine the Asset Criticality Ranking


To create a ranking of priorities, it is necessary to define the factors to be considered and the
potential impact a failure would have on the enterprise. When considering the criticality of an
asset or asset group, look at all facets of how a failure would impact the business.
Typical factors in the asset criticality ranking (ACR) calculation include operational, utilization,
quality, safety and environment. This can be customized to any unique drivers an operation
may have. Adequately describing the factors and defining their impact will be essential to
achieve consistency and consensus throughout the organization.
These factors should be well-documented so the ranking can be objective. The higher the
ACR number, the more important it is to track failure symptoms and plan intervention. In the
end, the rankings must be trusted, used to set priorities and effectively drive improvements.

3. Optimize PM Program
Once asset groups are prioritized, the next step is to develop the necessary preventive
maintenance (PM) schedules and task plans with proactive maintenance optimization (PMO).
The sequential steps for PMO are to identify the failure modes, understand the risks affiliated
with each, apply the appropriate proactive maintenance strategy for the risk, and decide
which proactive tasks will be assigned for each of the respective assets.
Several methods can be used to identify the failure modes. Be sure to consider the asset
criticality ranking so the most critical asset groups are evaluated with the highest level of
precision or priority.
Also, evaluate the failure modes that are most important to the asset or asset group. The
calculation used to classify failure modes is the risk priority number (RPN). The standard RPN
factors are severity, likelihood and detectability.

4. Analyze Spare Parts


In addition to the PM schedule and task plan, a spare part analysis (SPA) is also required.
The sequential steps for an SPA are identical to PMO. Spare part analysis begins with the
identification of failure modes, with an emphasis on ensuring all spare parts are linked to a
failure mode and identified based on risks.
Similar to PMO, the risk affiliated with each failure mode must be determined. There is
tremendous synergy in executing PMO and SPA in parallel, as both are driven from failure
mode identification and classification.
Typically, all spare parts affiliated with critical failure numbers and high-risk values should
have stock quantities onsite. Failure modes that have medium RPN values should be
registered in the system for quick ordering with all pertinent order information already
identified but not stocked with quantities onsite.
Lastly, spare parts affiliated with low RPN values will have no action taken and simply looked
up and ordered on demand. Of course, this is just a guideline. Every enterprise must
determine its own strategy on a case-by-case basis.

5. Monitor the PM Program


The purpose of analytics is to measure the reliability of an asset or asset group and the
effectiveness of the reliability strategy. For consistent analytic calculation, the criteria must be
defined, and the cross-functional engineering team should be clear as to why the criteria is
important and what the impact will be on the business.
The primary means of ensuring that analytics are calculated consistently is to confirm the
data sources and the integrity of the data within those sources. A common source for reliability
data would be work orders and closing code histories.

6. Determine Failure Causes


Once the failure modes are listed for each asset group, these values can then be linked to
reactive maintenance work orders. This provides the ability to effectively analyze failure data.
This is the last step of RBM, because once the problem areas are identified, the root causes
can be determined and remediated as part of a continuous improvement program.

7. Rinse and Repeat


Factual data is the key to performing an analysis that generates effective recommendations.
The data-gathering step is the most time consuming but ultimately the most important, as it
directly impacts the accuracy of the problem statement. Depending on the root cause analysis
method, analyzing data can come in many shapes and sizes.
The developed recommendations should be focused on further improving the proactive tasks
and spare parts inventory, thus providing closed-loop continuous improvement.
With an RBM system in place to help you manage assets, understand the risks and set
priorities for preventive maintenance, it will be possible to achieve the organizational
objectives for the asset pool you serve.