Facility location
Daily solar
Air Relative Atmospheric Earth Heating Cooling
Month temperature humidity
Precipitation - radiation
pressure
Wind speed
temperature degree-days degree-days
horizontal
C° % mm kWh/m²/d kPa m/s C° C-d° C-d°
January 7.7 %76.1 56.42 3.37 98.8 3.2 10.6 319 0
February 8.2 %73.4 49.28 4.20 98.6 3.5 11.6 274 0
March 10.4 %70.8 32.86 5.30 98.5 3.7 14.6 236 12
April 15.1 %58.6 11.70 6.81 98.3 3.4 19.0 87 153
May 19.1 %53.6 2.79 7.83 98.2 3.6 24.0 0 282
June 21.4 %56.0 0.30 8.57 98.0 4.2 27.9 0 342
July 23.1 %59.5 0.00 8.40 97.8 4.5 29.9 0 406
August 23.1 %64.4 0.62 7.85 97.8 4.1 30.1 0 406
September 21.8 %64.8 0.90 6.73 98.2 3.6 27.9 0 354
October 19.1 %63.5 11.16 5.28 98.4 2.8 24.0 0 282
November 14.1 %66.7 29.70 3.74 98.6 2.8 17.6 117 123
December 9.7 %73.5 45.26 3.05 98.8 2.7 12.5 257 0
Annual 16.1 %65.0 240.99 5.94 98.3 3.5 20.9 1,291 2,361
Photovoltaic
Capacity 36 kW
Electricity 59.4 MWh
(1) Photovoltaic
Capacity 10.6 kW
Electricity 17 MWh
(2) Photovoltaic
Capacity 10.6 kW
Electricity 18.9 MWh
GHG emission
GHG equivalence
GHG emission
Initial costs
Feasibility study %3 $ 1,000
Development %4.5 $ 1,500
Engineering %6.1 $ 2,000
Power system %86.4 $ 28,512
Annual
Cumulative
Impact
Distribution
Median yr 0.73
Level of risk % %10
Minimum within level of confidence yr 0.56
Maximum within level of confidence yr 0.95
Project life