Prepared by:
Submitted to:
University of Djibouti
Faculty of engineers
Quantity Surveying is a profession that dates back to the 18th century in the United Kingdom when
construction projects were measured and valued after they were designed and built. The “measurers” would
quantify and assign a value to the work after the building was constructed and then negotiate with the client
and architect on behalf of the tradesmen. The quantity surveying profession today has greatly evolved.
Today’s Quantity Surveyors are a key part of the construction, and financial management process,
including cost estimating and forecasting, cost management, construction techniques, and management,
procurement processes and contractual matters. Seeley (1997) stated that Quantity Surveyor is fully
professionally trained, qualified and experienced in dealing with the basic problems on behalf of the
employer.
Furthermore, Estimating is the most essential of the practical aspects of construction management,
anyone who is willing to insert on construction project, will be definitely disturb about the quantity and
cost. To fell release from them, a solution called estimate/estimation was delivered. Each phase of an
estimate may require different estimating input, methods, and techniques tools. As well as a though
knowledge of the construction procedures, cost of materials and labor.in addition to the skills, experiences,
Moreover, in preparing an estimate, the quantities of different items of work are computed by
simple mensuration method and from these quantities the cost is calculated. If the estimated is greater than
the money available, then attempts are made to decrease the cost by reducing the work or by changing the
specification. For a good estimate, the actual cost of the proposed work after completion should not exceed
As previously defined, an estimate is a calculation of the quantities of various items of work, and
the expenses likely to be incurred thereon. The total of these probable expenses to be incurred on the work
is known as an estimated cost of the work, thus the awareness of the quantity and cost estimation is needed,
and has been seen crucial to project owner. Since building construction estimating is the determination of
probable construction costs of any given project. Numerous things impact and add to cost assessment. In
outline, there is a requirement for a superior comprehension of the reasons why amount and cost assessing
has been seen critical for the venture proprietor and how to decide precisely agreeing the crucial conditions
which impact the estimation as per the confinement place where the structure will yield on (impacts: for
example, climate, accessibility of laborers, and so on.). In that case, the following research questions need
to be addressed:
Why amount and cost estimation is significant for the undertaking proprietor?
Objectives
This project involves the quantity and cost estimation of a G+2 residential building located in
Djibouti. The long long-term of this research paper is to provide the most accurate prediction possible of
the total required cost that will be necessary to complete the project. It points additionally to consider the
various sorts, and techniques and demonstrating which is appropriate in Djibouti. Then, a comparison
between the theoretical calculations and the practical values applied in the construction site would be
carried out. Finally, we tend to finalize this research by providing an estimated final cost summary for the
Methodology
Obtaining the objective of the project is related to going through different aspects. At first finding
the plan (electricity, plumbing, slab, column, etc…) of a G+2 building (ground +2 floors) which are
necessary to acquire all the calculations. Researches were divided into two types which are theoretical
researches and practical researches. Among the theoretical research are: visiting many sources on the
internet and navigating all around the keywords (estimation, cost, quantity) then researches performed in
the library which led to reading and consults plenty of books about quantity and cost estimation. Whereas
the practical researches were: visiting many playgrounds (construction field, hardware dealer) is required to
reveal labor cost and the cost of different equipment. Different engineers were visited to profit extra
information about cost and quantity estimation, questions like: “which method is used in Djibouti to
estimate the quantity and cost?” were asked to be a guideline for the project. After going throughout all of
this, an appointment was performed for collecting information and analyzing the data by checking for
missing information, removing outliers as well as categorizing and discussing the meanings of words,
phrases, sentences. Codes and deep supervision of data were considered to identify broad terms and
patterns.
Limitation
Each investigation, regardless of to what extent it takes to be led, has its restrictions. Right now,
impediments are enormous, because it is not quite easy to find the information on internet either on books.
In addition, knowledge on construction management is required to perform this project, which has not been
lectured in class. However, not only absence of data, poor records assortment and net association were the
encountered restrictions. Also debilitation, powerless mate connection as well as lethargy have also
A preliminary literature review of this study shows that the cost estimate for the project will be
determined to utilize the centerline strategy which is the fitting technique in Djibouti. For completing the
project, very popular Civil Engineering software such as AutoCAD, WinEst pro, and Excel has been used,
According to Frank R. Dagostino (2010), during the last 20 years, computers have revolutionized
estimating. With the advent of cheap personal computers simple to use AutoCAD for drawing and
conceptualized the plan of our building, simple to use a spreadsheet in Excel for a basic and accurate
calculation of estimating. Notwithstanding that, specific assessing programming, which plays a central job
in the evaluating procedure, is WinEst star programming (otherwise called the name of take-off software).
Conclusion
Cost and amount estimation has become a significant piece of development of designing these
estimations require the suggestion of strategy for figuring and information dependent on development
system. This archive has proposed assessment of the strategies and their utilization in the field of
development. The proposed research will accomplish the accompanying objectives: disclosing the criteria
important to settle on the choice on the pre-owned strategy for count, and decide cost and amount
estimation. The impacting component, for example, the climate, accessibility of laborers, exhausting,
Objective and preliminary literature review were done by Hassan Abdi Elmi
[1] Frank R. Dagostino, Steven J. Peterson, Leslie Feigenbaum - Estimating in Building Construction,
7th Edition-Prentice Hall (2010). -- Retrieved from
http://libtips.org/main/50EC39B3D04104B912A1A92154770B19
[4] How to Calculate Steel Quantity for Slab, Footing and Column? -- Retrieved from
https://theconstructor.org/practical-guide/calculate-steel-quantity-slab-footing-column/25533/
[6] Cost calculation of building structure and building works in polish conditions. -- Retrieved from
https://www.researchgate.net/publication/271336238_Cost_Calculation_of_Building_Structures_and_Building
Works_in_Polish_Conditions