Professional Documents
Culture Documents
r i r !
2 174 ~~X ~ 7 6 6 i
268 267
171 1 17 3
23
51
LEGEND REFERENCE
PUDUCHERRY PLANNING AREA BOUNDARY
P U D U C H ER R Y
COMMUNE BOUNDARY
MUNICIPAL BOUNDARY
WARD BOUNDARY
VILLAGE BOUNDARY
CONURBATION BOUNDARY
BURIAL GROUND
COMMERCIAL
INDUSTRY
RECREATIONAL/TOURISM ZONE
AGRICULTURE
TH EN G A ITH ITTU
20/3A/1
NOTE :
The proposed Railway Alignment shown in the map is tentative.
It is subject to change as per Transport Department,
Railway Board & Govt. of Puducherry.
NOTE :
21/30/2
B/
Refer indicative text for detailed land use clarification of Level-II
21/3A/2 BURIAL 21/3F/2
GROUND
21/30/1 21/3F/1
21/3B/1
1/3E/1
Meters
SIGNATURE: DATE :
7/3/1/34C
7/3/1/40C
7/3/1/1
COMPREHENSIVE DEVELOPMENT PLAN
13/1A/3C
96
97
98
99 100 101
FOR PUDUCHERRY PLANNING AREA
95
102
90
94 89
13/1A/3A 92
93 91 88 87 PROPOSED LAND USE MAP - 2036
2/5A/2
PUDUCHERRY MUNICIPALITY
13/1A/3D
13/1A/3E
1/1J/3
1/1J/4
2/15/B
2/15/C
2/15/A
2/17/1 2/17/2
LEGEND REFERENCE
TH EN G A ITH ITTU
PUDUCHERRY PLANNING AREA BOUNDARY
COMMUNE BOUNDARY
MUNICIPAL BOUNDARY
WARD BOUNDARY
VILLAGE BOUNDARY
CONURBATION BOUNDARY
13/14
TSS WARD BOUNDARY
12/2A 13/13
TSS BLOCK BOUNDARY
13/15
13/10
WARD & BLOCK NUMBER
13/16 13/17 13/19
12/2D
12/10
13/18
SURVEY BOUNDARY/ NUMBER
12/3A
13/8A 13/12 TOWN SURVEY BOUNDARY / NUMBER
13/20
12/12
ROAD EXISTING ROAD
ROAD PROPOSED ROAD
11/12
RAILWAY LINE
11/13
PROPOSED RAILWAY LINE
11/10
14/10
HIGH TIDE LINE
11/16
16/2B
16/2C
LOW TIDE LINE
CRZ 200M LINE / 500M LINE
11/4D
14/27 15/10
ASI BUFFER 100M / 200M
14/28 14/29
14/13
EXISTING & PROPOSED LAND USE
[ LEVEL - I ]
14/14 14/26
11/19
14/12
15/16 & RESIDENTIAL
15/19
14/15
14 23 15/12 INFORMAL RESIDENTIAL ZONE
11/20
14/22
14/16 14/25 14/30 15/14
15/14 15/13
COMMERCIAL
19/14
19/7 19/13
14/31
15/15
PUBLIC & SEMI PUBLIC
19/18
MIXED RESIDENTIAL ZONE
19/12 19/19 —
19/10
MIXED COMMERCIAL ZONE
19/20
M U R U N G A PA K K A M 1 7 /3 MIXED INDUSTRIAL USE ZONE
,8/3 RECREATIONAL/TOURISM ZONE
AGRICULTURE
18/1C PROTECTIVE AND UNDEVELOPED USE ZONE
AUROBINDO
ASHRAM
LAND
5§§clJo_bej/vjcler) 15 I 111/
26/10
A R IA N K U P P A M
Comprehensive Development Plan
25/10A
for Puducherry - 2036 approved vide
G.O. Ms. No. 21/2019-Hg, dt. 31.10.2019
25/10B
26/1/1
PUDUCHERRY
TOURISM
DEVELOPMENT
PUDUCHERRY
TOURISM
DEVELOPMENT
ARIKKAMEDU
(ASI
SITE)
PUDUCHERRY
TOURISM
DEVELOPMENT
NOTE :
The proposed Railway Alignment shown in the map is tentative.
It is subject to change as per Transport Department,
Railway Board & Govt. of Puducherry.
NOTE :
Refer indicative text for detailed land use clarification of Level-II
GROUND
ARIYAN KUPPAM
RIVER
ODAI
POND Meters
SIGNATURE: DATE :
MUDALIYAR
POND
P. SANGARADASSE M. KANDAR SELVAN
JUNIOR TOWN PLANNER MEMBER SECRETARY
ADJ. SHEET -2
COMPREHENSIVE DEVELOPMENT PLAN
FOR PUDUCHERRY PLANNING AREA
LEGEND REFERENCE
----------- PUDUCHERRY PLANNING AREA BOUNDARY
---------- COMMUNE BOUNDARY
----------- MUNICIPAL BOUNDARY
----------- WARD BOUNDARY
............ VILLAGE BOUNDARY
----------- CONURBATION BOUNDARY
----------- TSS WARD BOUNDARY
----------- TSS BLOCK BOUNDARY
A1 WARD & BLOCK NUMBER
RESIDENTIAL
COMMERCIAL
BAY
OF INDUSTRY
BENGAL PUBLIC & SEMI PUBLIC
RECREATIONAL/TOURISM ZONE
AGRICULTURE
NOTE :
The proposed Railway Alignment shown in the map is tentative.
It is subject to change as per Transport Department,
Railway Board & Govt. of Puducherry.
NOTE :
Refer indicative text for detailed land use clarification of Level-II
N
1 Ha.
50 100 200
eters
1: 2,000
SIGNATURE: DATE :