Student Eridtk Sebastian Puentes Arias Program PSP-1
Instructor Nestor Montaño Grading Data Entry Date Legend Start - O.K. End X - resubmit Interrupt Total
Assignment Package Comments
Ok PSP0 Project Planning Summary Ok Time Recording Log Or Defect Recording Log pre nd e Ok Ok Source Program Listing Ok Test Results
Program and Test Results Comments
Ok The program appears to be workable. Ok All required tests have been run. Ok The actual output is correct for each test.
Time Log Comments
Ok Time data are entered for all process steps. Ok Process steps are sequenced appropriately. Ok Time data are entered against the appropriate process step. Ok Interrupt time is tracked appropriately. Ok Time data are complete and reasonable. Ok Times were recorded as the work was done.
Defect Log Comments
Ok Every defect has all required data. Ok Defects were injected before removed. Ok Every defect has a fix time. Ok Defects injected in compile and test have fix numbers. Ok Defects are adequately described. Ok Defect types are consistent with description. Ok Defect types are consistent with phase injected. Ok Defect types are assigned consistently.
Ok Defects removed are consistent with compile and test phase time and program size. Ok Total compile defect fix times are less than compile time. Ok Total test defect fix times are less than test time. Ok Defect dates & phases are consistent with the time log. Ok Planning summary is consistent with the time log. Ok Planning summary is consistent with the defect log.
General Comments Ok Followed the defined process. Ok Complete, consistent and accurate process data collected. Ok The student did his or her own work.