Kingdom of Morocco
OWNER’S ENGINEER
TABLE OF CONTENTS
1.0 OBJECTIVE ................................................................................................................... 4
2.0 SCOPE ........................................................................................................................... 4
Rev 1, Page 3 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
1.0 OBJECTIVE
This document is intended to establish requisition of the dust suppression dust
suppression equipment materials of the SAFI INDEPENDENT POWER PROJECT in
MOROCCO.
2.0 SCOPE
Vendor shall perform scope of work but not be limited to the followings to provide
completed operational unit according to the requirements specified in the requisition .
- Basic & detail design and engineering for dust suppression equipment.
Vendor shall be responsible for supply of the equipment listed in this requisition.
- Solenoid Valve
- RIO panel
- Sump pump
- Level Switch
- Flow meter
Rev 1, Page 4 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
3.0 REFERENCES
3.1 General
Dust suppression systems shall comply with all the applicable regulations, industry
codes, and relevant project standards.
- Contract Document
SIPP-VM-CH-71-0301 Attachment #A / B
3.4 Drawing
Rev 1, Page 5 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
The main codes and standards to be used for the design of dust suppression systems
are listed below:
a. Piping material specification (Doc. No.: SIPP-CP-PG-20-0001)
Rev 1, Page 6 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
4.0 DEFINITIONS
Throughout this document the following definitions shall apply:
SUPPLIER/VENDOR: Hyundai Samho Heavy Industries Co., Ltd for provide dust
suppression system for the coal handling system.
Dust suppression system for out-side area controls the falling coal dust in the chute and
skirt point in UTT-01/02, NTT-01/02. Similarly dust suppression system for in-side area
controls the falling coal dust in the chute and skirt in NTT-03/04, TT-01/02. Dust
suppression system for coal stock pile area controls the growing fly coal dust in dry and
windy weather condition.
Rev 1, Page 7 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
The sump pump is installed in sump pit of transfer tower TT-01, SCB and the waste
water inside pit is transferred to trench close to the tower accordingly. The sump pump
can be automatically operated by level switch and can be manually operated by local
control panel close to sump pit.
The piping for dust suppression system will be satisfied with piping material class(PMC).
1) Out-side area
2) In-side area
Rev 1, Page 8 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Dust suppression system for in-side area & out-side area will spray chute or skirt in the
transfer tower and will be actuated by the stream of coal being conveyed and also inter-
locked with the corresponding conveyor. Unless the solenoid valve shall be actuated, the
spray nozzle shall be not discharged.
The flow rate for water spray nozzle is 3 liter per minutes and the spray angle of full cone
type water spray nozzle is 60 degree. That value of flow rate is suitable for dust
suppression in chute and skirt on experience. The insert hole for water spray nozzle
manifold will be considered and designed according to circumstances.
Dust suppression system for coal stock pile will cover entire surface of coal piles and will
spray water at a rate of two(2) liters per sq meter of pile surface per hour and have
automatic time-sequence control system. Low point drains will be provided.
Water spray guns, the rotation angle of which is about ±90°, are arranged along side of
coal stock pile and coverage area of each gun is overlapped adjacent gun spray area to
give full wetting. Water spray will be done using guns and continue for few minutes. Then
next guns will be used to spray next area. In the same manner, each gun will be used
one after another. And the shift of water spray from two(2) gun to another will be done by
manual and auto operation.
8.1 General
Quality assurance system shall be met in accordance with the ISO 9001: 2008 Edition,
connect a copy of supplier quality assurance program shall be submitted to the
purchases review prior to award.
SUPPLIER shall conduct tests and / or inspections and provide all the related
documentation in accordance with the requirements specified in specification / code.
SUPPLIER shall submit inspection and test plan and inspection and test procedure.
SUPPLIER shall perform the test and inspection as per test and inspection procedure,
which developed by vendor with COMPANY’s approval.
Rev 1, Page 9 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
SUPPLIER shall be responsible for arranging all types of inspection, which specified in
the approved inspection plan and procedure. The COMPANY and his representatives
reserve the right to attend at the inspection of any equipment or materials and to visit a
SUPPLIER’s or sub-supplier’s works at any time.
9.0 GUARANTEE
9.1 General
The supplier shall guarantee that the equipment will meet all the performance and
service requirements under all design conditions identified in this specification.
The supplier shall guarantee that the equipment and materials will comply with all
applicable code.
10.0 PAINTING
The complete equipment shall be painted in accordance with project specification.
- All instrument and delicate components shall be dismounted and separately packed.
Rev 1, Page 10 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
- Exposed machined surfaces shall be thoroughly cleaned and coated with rust
preventive.
- Vendor shall advise in regard to any special storage, inspection, re- application of
preservation etc., required.
- Preparation for shipment and packing shall be in accordance with the supplier's
procedure with purchaser approval, and it shall be subject to inspection by
purchasers inspector or designed inspector
Spare parts shall be preserved from environmental corrosion, and preservation methods
shall be suitable for long term storage (in a marine atmosphere).
Detailed documentation for spare parts (sectional drawings with parts list) shall be
submitted with spare parts list.
13.0 ATTACHMENTS
The following document/drawings and those referenced shall form a part of this
requisition.
Rev 1, Page 11 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
ATTACHMENTS
Rev 1, Page 12 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
ATTACHMENT A
Vendor Data Requirements
Rev 1, Page 13 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
CERTIFIED
FOR APPROVAL AS-BUILT
FINAL
No. DOCUMENTS & DRAWINGS BID (DATA
AFTER
(RELEASED) BOOKS)
P.O.
1. SUB-VENDOR and/or Collaborators list Yes 1M Yes 2M Yes Yes
with certificate of collaboration
2. VENDOR’s organization chart Yes 1M Yes 2M Yes Yes
3. Spare parts list Yes 1M Yes 2M Yes Yes
4. Packing list Yes 1M Yes 2M Yes Yes
5. Minutes of meeting Yes 1M Yes 2M Yes Yes
6. Painting specification Yes 1M Yes 2M Yes Yes
7. System diagram Yes 1M Yes 2M Yes Yes
8. Data sheet, specification Yes 1M Yes 2M Yes Yes
9. Dimensioned outline drawing Yes 1M Yes 2M Yes Yes
10. Assembly and detail drawing 1M Yes 2M Yes Yes
11. Dimensional system piping, nozzle and 1M Yes 2M Yes Yes
layout plan drawing
12. Piping isometric drawing with support 1M Yes 2M Yes Yes
marking for construction
13. Cause & Effect Chart 1M Yes 2M Yes Yes
14. Technical catalogues Yes 1M Yes 2M Yes Yes
15. Unit shipping weight and dimension 1M Yes 2M Yes Yes
16. Inspection and test procedure at shop Yes 1M Yes 2M Yes Yes
17. Inspection and test schedule Yes 1M Yes 2M Yes Yes
18. Inspection and test report 2M Yes Yes
19. Field construction and supervision Yes 1M Yes 2M Yes Yes
procedure/schedule
20. Field inspection and acceptance test Yes 1M Yes 2M Yes Yes
procedure/schedule
21. Field inspection and acceptance test 2M Yes Yes
report
22. Installation, operation and maintenance 1M Yes 2M Yes Yes
manual
Rev 1, Page 14 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
NOTES:
(1) Definitions:
W = Week, M = Month
(2) Vendor shall submit the vendor prints marked with “Yes”(Native file shall be submitted)
(3) Vendor will be responsible for paying all charges for submitting documents when mailing.
In addition to the status reports for the previous month's status, Vendor shall submit
"unpriced sub-orders" after placing of sub-orders with sub-vendors.
(4) The vendor shall submit the revised vendor prints within two(2) weeks after receipt of the
purchaser's commented data & drawings, up to the Certified Final.
(5) The Vendor shall submit the Vendor Data Book within 2 months after shipment.
(6) If special tests other than those listed above are required, the test method shall be
subject to agreement between the manufacturer and the COMPANY.
(7) Vendor shall submit documentation (3C+1CD) for final and Data Book, or documentation
as per specifications.
(8) Electronic files for all drawings and documents shall be submitted together with the
Manufacturing Record Book. The standard document format shall be Portable
Document Format (PDF), but Vendor shall provide with native source files upon the
Purchaser’s request for his convenience.
(9) All drawings shall be generated in DWG format of AUTO CAD System, of which native
files (DWG) shall be submitted to Purchaser for Final.
(10) All documents and drawings shall be furnished and arrive at Purchaser’s office within
the document schedule which are counted from Date of Purchasing Order.
(11) Approval of Vendor’s documents shall not relieve the Vendor form responsibility with
regard to performance of the equipment specified herein.
Rev 1, Page 15 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
(13) The responsibility for ensuring Purchaser receives all relevant documents rests with
Vendor. Vendor shall be responsible for replacing documents lost or damaged in
transit without extra cost to Purchaser.
(14) Language
Rev 1, Page 16 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
ATTACHMENT B
Data Sheet for Dust Suppression Equipment
Rev 1, Page 17 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 18 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 19 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 20 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 21 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 22 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 23 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
4. GLOBE VALVE
■ DIMENSION
Rev 1, Page 24 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
5. FLOW METER
- Quantity : 1 EA
Rev 1, Page 25 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 26 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 27 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 28 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 29 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 30 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 31 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 32 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 33 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
8. GATE VALVE
■ DIMENSION
Rev 1, Page 34 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
ATTACHMENT C
Data Sheet for Sump Pump Equipment
Rev 1, Page 35 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 36 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 37 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 38 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 39 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2
Rev 1, Page 40 of 40