You are on page 1of 39

PROJECT NAME : Safi Independent Power Project (Morocco)

PO DESCRIPTION : COAL HANDLING SYSTEM

PO NO :

SUBJECT :
DUST SUPPRESSION SYSTEM
SPECIFICATION

DOCUMENT NO. : SIPP-VM-CH-71-0301

For Reference

Kingdom of Morocco

OWNER SAFI ENERGY COMPANY

OWNER’S ENGINEER

CONTRACTOR DAEWOO E&C

SUB. CONTRACTOR HYUNDAI SAMHO HEAVY INDUSTRIES CO., LTD

3 31 Dec 2015 For Reference K.M.JUNG H.K. KIM S.D. LIM

1 5 Nov 2015 For Reference K.M.JUNG H.K. KIM S.D. LIM

0 1 Sep 2015 For Reference K.M.JUNG H.K. KIM S.D. LIM


Rev. Prepared Reviewed Approved
Date Description
No. by by by
It may NOT be used, disclosed or reproduced for other purpose pertaining to this document or its contents without specific,
written prior permission of Daewoo E&C Co., Ltd.
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

TABLE OF CONTENTS
1.0 OBJECTIVE ................................................................................................................... 4
2.0 SCOPE ........................................................................................................................... 4

2.1 Scope of Work ................................................................................................................ 4


2.2 Scope of supply .............................................................................................................. 4
3.0 REFERENCES ............................................................................................................... 5
3.1 General ........................................................................................................................... 5
3.2 Project Specifications ...................................................................................................... 5
3.3 Data Sheet ...................................................................................................................... 5
3.4 Drawing .......................................................................................................................... 5
3.5 Codes & Standards ......................................................................................................... 6
4.0 DEFINITIONS ................................................................................................................. 7
5.0 ENVIRONMENT CONDITIONS ...................................................................................... 7
6.0 GENERAL REQUIREMENTS ......................................................................................... 7
7.0 OPERATION METHOD .................................................................................................. 9
7.1 IN-SIDE AND OUT-SIDE AREA DUST SUPPRESSION SYSTEM .................................. 9
7.2 COAL STOCK PILE DUST SUPPRESSION SYSTEM .................................................... 9
8.0 QUALITY ASSURANCE INSPECTION AND TEST ........................................................ 9
8.1 General ........................................................................................................................... 9
9.0 GUARANTEE ............................................................................................................... 10
9.1 General ......................................................................................................................... 10
9.2 Guarantee Items ........................................................................................................... 10
10.0 PAINTING ..................................................................................................................... 10
11.0 PACKING, MARKING AND SHIPPING......................................................................... 10
12.0 SPARE PARTS AND CONSUMABLES ........................................................................ 11

13.0 ATTACHMENTS ........................................................................................................... 11

Rev 1, Page 3 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

1.0 OBJECTIVE
This document is intended to establish requisition of the dust suppression dust
suppression equipment materials of the SAFI INDEPENDENT POWER PROJECT in
MOROCCO.

2.0 SCOPE

2.1 Scope of Work

Vendor shall perform scope of work but not be limited to the followings to provide
completed operational unit according to the requirements specified in the requisition .

Scope of work are shown by marking

- Basic & detail design and engineering for dust suppression equipment.

- Manufacturing and material procurement.

- Inspection and test in accordance with codes, datasheets & specifications,


requirement in this requisition.

- Surface preparation and painting

- Export packing and FOB.

- Others specified in this requisition

2.2 Scope of supply

Vendor shall be responsible for supply of the equipment listed in this requisition.

a. Equipment / Materials proper as required data sheets

- Water Spray Gun

- Water Control Valve

- Water Spray Nozzle

- Solenoid Valve

- RIO panel

- Sump pump

- Level Switch

- Flow meter
Rev 1, Page 4 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

3.0 REFERENCES

3.1 General

Dust suppression systems shall comply with all the applicable regulations, industry
codes, and relevant project standards.

In case of conflict, priority shall be given to the following in order of precedence:

- Contract Document

- International Codes & Standards

3.2 Project Specifications

SIPP-VM-CH-71-0301 Dust Suppression System Technical Specification

3.3 Data Sheet

SIPP-VM-CH-71-0301 Attachment #A / B

3.4 Drawing

SIPP-VM-CH-12-D004 Dust Suppression System Flow Diagram

SIPP-VM-CH-13-D301 Dust Suppression System P&ID (1/3)

SIPP-VM-CH-13-D302 Dust Suppression System P&ID (2/3)

SIPP-VM-CH-13-D303 Dust Suppression System P&ID (3/3)

SIPP-VM-CH-13-D401 CHS-Sump Pump System P&ID

SIPP-VM-CH-17-D301 Dust Suppression System Terminal Point Detail

SIPP-VM-CH-17-D311 Dust Suppression System Name Plate Detail

SIPP-VM-CH-17-D321 Dust Suppression System Color Code Sketch Typ.

SIPP-VM-CH-22-D301 Dust Suppression System Piping Plan (A/G)

SIPP-VM-CH-23-D301 Dust Suppression System Isometric (A/G)

SIPP-VM-CH-24-D301 Dust Suppression System Support Detail (A/G)

SIPP-VM-CH-22-D401 Dust Suppression System Piping Plan (U/G)

Rev 1, Page 5 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

SIPP-VM-CH-23-D401 Dust Suppression System Isometric (U/G)

SIPP-VM-CH-24-D401 Dust Suppression System Support Detail (U/G)

SIPP-VM-CH-46-D301 Dust Suppression System Instrument Detail

SIPP-VE-CH-30-D151 Dust Suppression System (Electric Part)

3.5 Codes & Standards

The main codes and standards to be used for the design of dust suppression systems
are listed below:
a. Piping material specification (Doc. No.: SIPP-CP-PG-20-0001)

- HBY1 : Service Water System (A/G)

- HBF6 : Fire Fighting System (U/G)

b. I&C Design Criteria (Doc. No.: SIPP-CJ-JG-71-0001)

c. Basic engineering Design Data (Doc. No.: SIPP-CM-MG-71-0003)

d. Technical Specification for Coal Handling System (Doc. No.: SIPP-CM-MG-74-0001)

e. Overall Inspection and Test Plan (Doc. No.: SIPP-VM-CH-90-0901)

Rev 1, Page 6 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

4.0 DEFINITIONS
Throughout this document the following definitions shall apply:

CLIENT: means SAFI ENERGY COMPANY

CONTRACTOR: means Daewoo E&C

SUPPLIER/VENDOR: Hyundai Samho Heavy Industries Co., Ltd for provide dust
suppression system for the coal handling system.

PROJECT: means SAFI INDEPENDENT POWER PROJECT (MOROCCO)

WORK: means the works and/or services entrusted by the contractor


under the contract with the company.

EPC: Engineering, Procurement and (Construction.)

INSPECTOR: The representative of COMPANY and Purchaser, located in the


site of work or in the facilities of supplier, in charge of reviewing,
approving and authorizing an inspection work to be excluded by
the supplier.

5.0 ENVIRONMENT CONDITIONS

- Ambient air temperature range : 0 ~ 50℃


- Relative humidity range : 0~100%
- Sea water temperature range : 12~25℃

6.0 GENERAL REQUIREMENTS


Dust suppression systems comprise water spray gun system for coal yard and spray
nozzle system for transfer tower and incorporate both manual and automatic mode of
operation from the control house.

Dust suppression system for out-side area controls the falling coal dust in the chute and
skirt point in UTT-01/02, NTT-01/02. Similarly dust suppression system for in-side area
controls the falling coal dust in the chute and skirt in NTT-03/04, TT-01/02. Dust
suppression system for coal stock pile area controls the growing fly coal dust in dry and
windy weather condition.

Floor washing system for transfer tower UTT-01/02, NTT-01/02/03/04/05/06, TT-01/02,


SCB, TTT and gallery washing system for belt conveyor CV-03A/B, CV-04A/B and
manual mode of operation from each protection area.

Rev 1, Page 7 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

The sump pump is installed in sump pit of transfer tower TT-01, SCB and the waste
water inside pit is transferred to trench close to the tower accordingly. The sump pump
can be automatically operated by level switch and can be manually operated by local
control panel close to sump pit.

The piping for dust suppression system will be satisfied with piping material class(PMC).

This system is divided into three (3) zones as a matter of convenience

1) Out-side area

1-1 ) Chute spray system

a. UTT-01 : NCV-01A Discharge / NCV-01B Load

b. UTT-02 : NCV-01B Discharge / NCV-01C Load

c. NTT-01 : NCV-01C Discharge / NCV-02 Load

d. NTT-02 : NCV-02 Discharge / NCV-03 Load

1-2 ) Floor Washing system : UTT-01/02, NTT-01/02

2) In-side area

2-1 ) Chute spray system

a. NTT-03 : NCV-03 Discharge / NCV-04 Load

b. NTT-04 : NCV-04 Discharge / NCV-05 Load

c. TT-01 : CV-01A Discharge / CV-02A Load / CV-02B Load

d. TT-02 : CV-01B Discharge / CV-02A Load / CV-02B Load

2-2 ) Floor Washing system : NTT-03/04/05/06, TT-01/02, SCB, TTT

2-3 ) Gallery Washing system : CV-03A/B, CV-04 A/B

2-4 ) Waste Water system

a. TT-01 : One(1) Sump pump

b. SCB : One(1) Sump pump

3) Coal stock pile.

Rev 1, Page 8 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

7.0 OPERATION METHOD

7.1 IN-SIDE AND OUT-SIDE AREA DUST SUPPRESSION SYSTEM

Dust suppression system for in-side area & out-side area will spray chute or skirt in the
transfer tower and will be actuated by the stream of coal being conveyed and also inter-
locked with the corresponding conveyor. Unless the solenoid valve shall be actuated, the
spray nozzle shall be not discharged.

The flow rate for water spray nozzle is 3 liter per minutes and the spray angle of full cone
type water spray nozzle is 60 degree. That value of flow rate is suitable for dust
suppression in chute and skirt on experience. The insert hole for water spray nozzle
manifold will be considered and designed according to circumstances.

7.2 COAL STOCK PILE DUST SUPPRESSION SYSTEM

Dust suppression system for coal stock pile will cover entire surface of coal piles and will
spray water at a rate of two(2) liters per sq meter of pile surface per hour and have
automatic time-sequence control system. Low point drains will be provided.

Water spray guns, the rotation angle of which is about ±90°, are arranged along side of
coal stock pile and coverage area of each gun is overlapped adjacent gun spray area to
give full wetting. Water spray will be done using guns and continue for few minutes. Then
next guns will be used to spray next area. In the same manner, each gun will be used
one after another. And the shift of water spray from two(2) gun to another will be done by
manual and auto operation.

8.0 QUALITY ASSURANCE INSPECTION AND TEST

8.1 General

Quality assurance system shall be met in accordance with the ISO 9001: 2008 Edition,
connect a copy of supplier quality assurance program shall be submitted to the
purchases review prior to award.

SUPPLIER shall conduct tests and / or inspections and provide all the related
documentation in accordance with the requirements specified in specification / code.
SUPPLIER shall submit inspection and test plan and inspection and test procedure.

SUPPLIER shall perform the test and inspection as per test and inspection procedure,
which developed by vendor with COMPANY’s approval.

Rev 1, Page 9 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

SUPPLIER shall be responsible for arranging all types of inspection, which specified in
the approved inspection plan and procedure. The COMPANY and his representatives
reserve the right to attend at the inspection of any equipment or materials and to visit a
SUPPLIER’s or sub-supplier’s works at any time.

Witnessed test and / or inspections are required in the presence of

[x] Required; COMPANY

[x] Third Party

Pre-inspection meeting at SUPPLIER’s shop is required in the presence of

[x] Required; COMPANY

9.0 GUARANTEE

9.1 General

Complete equipment and auxiliaries furnished by the supplier shall be guaranteed to be


suitable for the services described herein, shall conform to all applicable codes and
standards and shall safely meet all conditions of performance and design specified in the
specification.

The supplier shall guarantee that the equipment will meet all the performance and
service requirements under all design conditions identified in this specification.

9.2 Guarantee Items

The supplier shall guarantee that the equipment and materials will comply with all
applicable code.

10.0 PAINTING
The complete equipment shall be painted in accordance with project specification.

The Vendor’s standard painting systems may be acceptable, subject to a review /


approval by COMPANY / EPC contractor.

11.0 PACKING, MARKING AND SHIPPING


All packing and preservation shall be suitable for storage on-site without any further
protection under the ambient conditions specified for a period of twelve months.

- All instrument and delicate components shall be dismounted and separately packed.
Rev 1, Page 10 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

- Exposed machined surfaces shall be thoroughly cleaned and coated with rust
preventive.

- Vendor shall advise in regard to any special storage, inspection, re- application of
preservation etc., required.

- Preparation for shipment and packing shall be in accordance with the supplier's
procedure with purchaser approval, and it shall be subject to inspection by
purchasers inspector or designed inspector

12.0 SPARE PARTS AND CONSUMABLES


Spare part kits shall be detailed to identify each individual item.

Spare parts shall be preserved from environmental corrosion, and preservation methods
shall be suitable for long term storage (in a marine atmosphere).

Detailed documentation for spare parts (sectional drawings with parts list) shall be
submitted with spare parts list.

13.0 ATTACHMENTS
The following document/drawings and those referenced shall form a part of this
requisition.

Attachment-A Vendor Data Requirements

Attachment-B Data Sheet for Dust Suppression Equipment

Attachment C Data Sheet for Sump Pump Equipment

Rev 1, Page 11 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

ATTACHMENTS

Rev 1, Page 12 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

ATTACHMENT A
Vendor Data Requirements

Rev 1, Page 13 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Vendor Data Requirements

CERTIFIED
FOR APPROVAL AS-BUILT
FINAL
No. DOCUMENTS & DRAWINGS BID (DATA
AFTER
(RELEASED) BOOKS)
P.O.
1. SUB-VENDOR and/or Collaborators list Yes 1M Yes 2M Yes Yes
with certificate of collaboration
2. VENDOR’s organization chart Yes 1M Yes 2M Yes Yes
3. Spare parts list Yes 1M Yes 2M Yes Yes
4. Packing list Yes 1M Yes 2M Yes Yes
5. Minutes of meeting Yes 1M Yes 2M Yes Yes
6. Painting specification Yes 1M Yes 2M Yes Yes
7. System diagram Yes 1M Yes 2M Yes Yes
8. Data sheet, specification Yes 1M Yes 2M Yes Yes
9. Dimensioned outline drawing Yes 1M Yes 2M Yes Yes
10. Assembly and detail drawing 1M Yes 2M Yes Yes
11. Dimensional system piping, nozzle and 1M Yes 2M Yes Yes
layout plan drawing
12. Piping isometric drawing with support 1M Yes 2M Yes Yes
marking for construction
13. Cause & Effect Chart 1M Yes 2M Yes Yes
14. Technical catalogues Yes 1M Yes 2M Yes Yes
15. Unit shipping weight and dimension 1M Yes 2M Yes Yes
16. Inspection and test procedure at shop Yes 1M Yes 2M Yes Yes
17. Inspection and test schedule Yes 1M Yes 2M Yes Yes
18. Inspection and test report 2M Yes Yes
19. Field construction and supervision Yes 1M Yes 2M Yes Yes
procedure/schedule
20. Field inspection and acceptance test Yes 1M Yes 2M Yes Yes
procedure/schedule
21. Field inspection and acceptance test 2M Yes Yes
report
22. Installation, operation and maintenance 1M Yes 2M Yes Yes
manual

Rev 1, Page 14 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

NOTES:

(1) Definitions:
W = Week, M = Month

(2) Vendor shall submit the vendor prints marked with “Yes”(Native file shall be submitted)

(3) Vendor will be responsible for paying all charges for submitting documents when mailing.

In addition to the status reports for the previous month's status, Vendor shall submit
"unpriced sub-orders" after placing of sub-orders with sub-vendors.

(4) The vendor shall submit the revised vendor prints within two(2) weeks after receipt of the
purchaser's commented data & drawings, up to the Certified Final.

(5) The Vendor shall submit the Vendor Data Book within 2 months after shipment.

(6) If special tests other than those listed above are required, the test method shall be
subject to agreement between the manufacturer and the COMPANY.

(7) Vendor shall submit documentation (3C+1CD) for final and Data Book, or documentation
as per specifications.

(8) Electronic files for all drawings and documents shall be submitted together with the
Manufacturing Record Book. The standard document format shall be Portable
Document Format (PDF), but Vendor shall provide with native source files upon the
Purchaser’s request for his convenience.

(9) All drawings shall be generated in DWG format of AUTO CAD System, of which native
files (DWG) shall be submitted to Purchaser for Final.

(10) All documents and drawings shall be furnished and arrive at Purchaser’s office within
the document schedule which are counted from Date of Purchasing Order.

(11) Approval of Vendor’s documents shall not relieve the Vendor form responsibility with
regard to performance of the equipment specified herein.

(12) Review Status Codes from Purchaser

1. No Comments : Work may proceed.

2. Comments as noted : Work may proceed subject to compliance with


and incorporation of comments.

3. Rejected : Revise and resubmit.

4. Information only : Accepted for information only.

Rev 1, Page 15 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

(13) The responsibility for ensuring Purchaser receives all relevant documents rests with
Vendor. Vendor shall be responsible for replacing documents lost or damaged in
transit without extra cost to Purchaser.

(14) Language

All technical documentations to be generated in the project shall be in English &


French.

Rev 1, Page 16 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

ATTACHMENT B
Data Sheet for Dust Suppression Equipment

Rev 1, Page 17 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

1. WATER SPRAY NOZZLE

< SPECIFICATION >


1) Maker : SOLMARO or Eq
2) Model : WL 3/4
3) Effective spray angle : 60˚
4) Flow rate : 3.00 LPM
5) Discharge pressure : 3 kg/cm2
6) Size and connection : 1/8” PT
7) Material : Brass

Rev 1, Page 18 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

2. CONTROL VALVE for WATER SPRAY NOZZLE

Rev 1, Page 19 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 20 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 21 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 22 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

3. PRESSURE REGULATING VALVE

< SPECIFICATION >


1) Maker : DONGKANG or Eq.
2) Size and connection : 1” - 600LB, SO/RF
: 2: - #150, SO/RF
3) Inlet pressure : Maximum 10kg/cm2
4) Outlet pressure range : 3 ~ 7kg/cm2
5) Maximum pressure regulating ratio : 10 : 1
6) Water temperature : Maximum 60℃
7) Material(Body) : Cast steel

Rev 1, Page 23 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

4. GLOBE VALVE

■ DIMENSION

< SPECIFICATION >


1) Maker : DONG KANG or Eq.
2) Model : GLOBE VALVE
3) Size and connection : 1”
4) Material(Body) : Cast steel

Rev 1, Page 24 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

5. FLOW METER

- Quantity : 1 EA

Rev 1, Page 25 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 26 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 27 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

6 WATER SPRAY GUN

Rev 1, Page 28 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 29 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

< SPECIFICATION >


1) Maker : Nelson
2) Model : SR150DS
3) Size : 80mm
4) Flow rate : 66.3 m3/hr
5) Pressure at nozzle : 7 kg/cm2
6) Diameter of nozzle : 25.4 mm
7) Spray performance
a. Body trajectory : 43 degree
b. Rotating angle, Deg : -90 ~ +90
c. Maximum spray height, m : 21
d. Spray distance at max. height : 32
e. Maximum spray distance, m : 48

Rev 1, Page 30 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

7. AUTO CONTROL VALVE

Rev 1, Page 31 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 32 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 33 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

8. GATE VALVE

■ DIMENSION

< SPECIFICATION >


1) Maker : HAN KOOK or Eq.
2) Type : OS & Y
3) Size : 80mm
4) Connection type : 150LB RF flanged
5) Valve material : Cast steel

Rev 1, Page 34 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

ATTACHMENT C
Data Sheet for Sump Pump Equipment

Rev 1, Page 35 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

1. SUMP PUMP DATA SHEET for TT-01

Rev 1, Page 36 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

2. SUMP PUMP DATA SHEET for SCB

Rev 1, Page 37 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

3. SUMP PUMP PERFORMANCE CURVE for TT-01 & SCB

Rev 1, Page 38 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

4. SUMP PUMP OUTLINE DRAWING for TT-01 & SCB

Rev 1, Page 39 of 40
SAFI INDEPENDENT POWER PROJECT (MOROCCO) DAEWOO E&C
DUST SUPPRESSION SYSTEM SPECIFICATION SIPP-VM-CH-71-0301 Rev. 2

Rev 1, Page 40 of 40