River Bed

Elev. varies D
WING WALLS

250mm thk. Approach Slab


A C25
40 with 663 Mesh (T & B) RC BRIDGE DECK C30

4250
B B

54 HD 16Ø - 200

2400
C

6000
C W.L
3500

75 Ø PVC SLEEVED WEEPHOLES @ 1000 CTC

LEVUKA RIVER BED 12 HD 16Ø-200


BURESALA JETTY RC BRIDGE DECK C30

500
PIPE WRAPPED W/ GEOTEXTILE

APROACH APROACH 54 HD 16Ø 200

SLAB SLAB

1
500

1:
Excavation Limit

300

S
300 800 13 HD 16Ø 200 T& B
500 2500 50mm thk. Blinding
1400 on 100mm D85 Rock Layer

SECTION C - C
SCALE 1 : 75

5000 A
40 HD 12 - 110 43 HD 16-100 T & B
575 34 HD 16 - 100 T & B

200
R I V E R F L O W
14

1850 250

450
00

2 HD 32 - 100
0 3500
240 PLAN SECTION A - A
30

D
0

SCALE 1 : 75
80
0

3500 300
250mm thk. Approach Slab
C25
40 with 663 Mesh (T & B) RC BRIDGE DECK C30 APPROACH SLAB
5000
4250 5000

RIPRAP D85 T=0.8m

1600
A3

.5
1:1
3 HD 28Ø - 100 S
350

54 HD 16Ø - 200
2400

7 HD 12Ø-50
200

W.L BIDIM A49 GEOTEXTILE OR


RIVER BED
FRAMING REBAR 3 HD 24Ø-100
12 HD 16Ø-200
75 Ø PVC SLEEVED WEEPHOLES @ 1000 CTC
SIMILAR APPROVED
500

PIPE WRAPPED W/ GEOTEXTILE G.L

300
54 HD 16Ø 200
6000
1
1:

Excavation Limit
300

300 800 13 HD 16Ø 200 T& B


2500 50mm thk. Blinding MAINTAIN COVER OF 75MM
SECTION D - D
1400 SECTION B - B on 100mm D85 Rock Layer
ON ALL SIDES BASE SLAB SCALE 1 : 75
SCALE 1 : 75
GRADE OF CONCRETE C 30
GRADE OF STEEL G 500

MAINTAIN COVER OF 75MM


ON ALL SIDES
GRADE OF CONCRETE C 30
GRADE OF STEEL G 500

OPTION 2
OCT . 2018

Fiji Roads Authority