You are on page 1of 8
TEEACM Saaehcanner _ ACSET=- West Vista Project FOR REVIEW Reto OGO yee an mepiaLwy (xu 2017, Date Handed to PT, Harapen Gobel Niaga _ “Wc Widye Seno Ow Putran Re CABLE CAGE SYSTEM, Herewth we submit document as flow susvect ‘Thank you for your attention and cooperation amount Parse CE) repos 1 coment Ce) Revew Cm Submited by SY.-£C Sel. ponesn: Vibe et Beng. Senta tad [Reply /Comment NOT APPROVED Revi & RESUBMIT Ic REJECTED 0 WEST VISTA JCABLE CAGE SYSTEM [Pt BEVANANOA MUSTIA PROJECT West vista Project Packages / Works Maincont No [SFR - AM MEPIALWY 1X11 2017 MATERIAL DATA learwaory Hype IMatoil Code leevaNeESH [cL00H6, ci200H [Specification Dela as Contract Product = [cLi0o6, ci200H6 [To Fotow (indested as raving ) [Boor an oes 3 Jatachment Serie of Nate encoued Ly retoniesed brochure or Bookie By encones CH ntonceses [Test Result 1 enciosed not enclosed RESPONSE TART CONTR ir eR t0|base ot comply TD comp OT comay Evatsation ior comsy 11 Netcom |b rect Specitcaton | El comeiy D come 1 netcomoy 1 net comp 11 atv tty Good o O rir Ol Fai O rei 1 Poor 1 Poor 1 peor 12 [Evaluation Result OD Approved 1D Aeproves OO Approved 1 Aeeroawan note |] Appromd wih te |). Approved wth Note 11 Not Approves Not Approves O_ Not Approved 13]Foltow up CO tap test requires DD Lab test required tab Test required 1 cuwraise docreaured |] Guarantee decrequred |[] Guararee doc requred 1 Revco sResubmt |] Reveoaresumt —|[] Reve & Re-eutrit Cl mockupronied |] tockuprenirod |] eck Uprequred 77 fies Retorendas oi ‘5206 -Fom Maat gp se Proposeltby Main Contractor PT Acct indonusa TAA Project Manager {Checked by Mie eacM eager Concructon| Authorised Distributor PerkantoranTomang Tol Raya Telp. +6221 70030540, recH) Jl. Agave Raya Blok A1/7It2 Fax. 21 5687181 lasystechegmall Taman Kedoya Baru - Jakarta Em: PT. BEVANANDA MUSTIKA Various Kinds of Wire Products Morksig Ofie: Factory: 41. Give Agung No.I2A, Komplaks Gra I Sontoso _ Kewaon Indl Lipgo Ci Blok 1.12, Sckadoni ‘Sonter, Jakarta Ura 14950 Inde orong Selatan, Batt 1750 -ndoresio Tel (021 6411624, 58637247 To (021) 6973760 Fax: (021) 99907400 website: http://www. vm Email: sales Gs eae BEVAMESH CABLE CAGE Cy ou x. Lembaga Seritkas! 19 project in Jakarta which using Cable Cage System Longitudinal Wire Spacing: 50mm Standard Length: 3000mm Wire Diameter : 5.0mm with Heavy Galvanized min. 290gr/m? Melts in oe 200y “eLo0ne Ey 100 cLisoHG ams + 0g ~ ay 300 J 100 CL300HG 400 1 warmed 100 CLA00HG eee ay - 100 CL500HG Pare) 100 CLEO0HG SIMPLY MADE OUT OF STANDARD STRAIGHT TRAY LENGHTS CUTTING PATTERN TA. Horizontal Elbow 90° offer bending & clamping ter bending & clamping jamp, including Bold, Not, & Washer 2A. In-Side Riser (Vertical Elbow-In) 90° VAMESH CASLE CAGE SYSTEM ADVANTAGES SHOPPING CENTRES, POWER GENERATIONS Fatt and simple on-site assembly MINING ——- Light woight, strong and effective HOSPITALS + Ease of installation AGRICULTURE © Easy to uperado or ro-configure DEFENCE © Simple fxing systems DATACENTRES = Ceblo safe, fish smooth surfoces and edger MANUFACTURING PLANTS =” Adaptable - cables can exit cage tray at any point FOOD PROCESSING Easy to croat tes, crosses, reduces, risers and bends on-site LARGE SCALE COMMERCIAL BULDINGS 2° Strong with high load bearing porformance FIBRE OPTICS se Wil not break even when overloaded TELECOMMUNICATIONS —_e* Open cable cage trays allow air clrulation to Keep wiring coo! [RAISED ACCESS FLOORS ‘and makes fer easy dentition of cables. ScHOOLS ‘SECUTY MONITORING SYSTEMS CABLE TRAY Cross Wire Spacing: 100mm Longitudinal Wire Spacing: 50mm Standard Length: 3000mm 3.0mm with Heavy Galvani: Geos naesy (HEAVY GALVANISED} Wlath of Cable Cage Tray in mm Heights ia mm Code 100 LJ 50 cT100HG 150 1 50 cT1s0HG 200 5 50 cT200HG 300 f 50 cT300HG 400 L__. 50 cT400Ha 200 coast 50 cTS500HG 600 1. 50 CT600HG 7A. Straight Reducer LEB Requirement: Fitting Clamp, including Bold, Nut, & Washer fz Fitting Plate Clamp, incloding Bold, Nut, & Washer fi 7B. Left Reducor A EE ‘after joining & clamping | Requirement: Fitting Clamp, including Bold, Nut, & Washer Fitting Plote Clamp, including Bold, Nut, & Washer “INSTALLATION HOW TO CUT WIRE HOW TO CUT A CABLE CAGE TRAY The Cable Cage nays ate cut ltt and shupe on ste wo + CUT THE BOTTOM WIRES FIRST AS SHOWN 5 ke AG ‘equ SE; stoi wi ont cutest uns ang. Pointe jas. cos a8 poss th inersecfon of he ‘itl oder cl Ths ene he bes esl sly Andie ays CONTINUITY OF GALVANIZES PROTECTION 7 ee cn ces ese he inane fe prc yr = > Mpc Bcearsnondecocrorea, nen mre 4.CUTTINGPOSITION 2, CUTTING ORDER CUTTING THE SIDE WIREST YES g) {wo a 7 ~~ Side acton‘otsetcut’ Standard central cut jaws Core postoning of ot eto js 3.FIRSTWIREEDGE 4. SECOND WIRE EDGE LAY TRAY FLAT LAY TRAY ON SIDE, portant ve gop tomy 2p ge fo be ty, 2B. Long Radius In-Side Riser (Vertical Elbow-in) 90° ater bending No clamp required 3A. Out-Side Riser (Vertical Elbow-Out) 90° after bending t No clamp required i 98, Long Radius Out-Side Riser (Vertical Elbow-Out) 90° after bending No clamp required 4. External Risor ‘after bending No clamp required

You might also like