This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.
Lead Engineer
Project Manager:
Client Approval:
RECORD OF REVISIONS
TABLE OF CONTENTS
11.0 COORDINATION........................................................................................................... 14
12.0 TESTING ....................................................................................................................... 14
12.1 Functional Testing: .............................................................................................. 14
12.2 Field Testing and Acceptance............................................................................. 15
12.3 Discharge Test...................................................................................................... 15
13.0 CERTIFICATION ........................................................................................................... 15
14.0 TRAINING ..................................................................................................................... 15
15.0 DELIVERY, HANDLING AND STORAGE .................................................................... 16
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-B-4914
Project Name: Date: 28 Nov 2011
Contract Number: Page 5 of 16
Revision 3
1.0 GENERAL
This specification contains the minimum design, installation, testing and commissioning
requirements for a High-Pressure Carbon Dioxide Fire System. The High-Pressure Carbon
Dioxide Fire System is to assure the safety of the occupants in the building during a fire. The
design of the High-Pressure Carbon Dioxide Fire System shall conform to this specification
and the complete High-Pressure Carbon Dioxide Fire System shall be fully compatible to all
components supplied.
2.0 REFERENCE
The referenced codes and standards are intended to provide an acceptable level of quality for
materials, products and workmanship. In case of conflict between these standards and the
text of this Specification, the Specification text shall govern.
The latest revision of the referenced codes and standards shall be used as a minimum guide.
In case of conflict, the Contractor shall propose equipment, materials and processes
conforming to one group of codes and standards.
2.1 MARAFIQ
MQ-SP-P-4915 – LOW-PRESSURE CARBON DIOXIDE-CO2 FIRE
SUPPRESSION SYSTEMS
3.0 DEFINITIONS
Refer to NFPA 12.
5.0 SUBMITTALS
The Contractor shall submit the following items for review and approval before commencing
the work:
Product Data
Product data shall include principal dimensions, general construction and material for
each item intended to be furnished and installed.
Manufacturer's catalog data sheets shall be submitted for all nozzles, valves, controls and
all other accessories and system components.
Installation Instructions
Submit copies of the manufacturer's installation and maintenance instructions for all
equipment. Include valve data and servicing instructions.
Shop Drawings
Working plans, prepared according to NFPA 12.
Submit Coordination Drawings
Superimposed drawings showing location of each sprinkler and all other activities
simultaneously.
Hydraulic Calculations
The hydraulic calculations for the entire High-Pressure Carbon Dioxide Fire System
shall be by a computer generated hydraulic calculation program. The calculations
shall meet the requirements of NFPA 12.
Hydraulic calculations shall be furnished when extending existing High-Pressure
Carbon Dioxide Fire System.
As-Built Drawings
Clearly indicate nozzles, cylinders, and piping on the Shop Drawings and As-built
plans.
Clearly indicate valves, alarms and controls locations.
Identify any variation from Contract Drawings.
Maintenance and Operating Instructions
Submit data conforming to NFPA 12 for maintenance of the system.
Equipment manufacturer recommended spare parts and tools list.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-B-4914
Project Name: Date: 28 Nov 2011
Contract Number: Page 8 of 16
Revision 3
8.0 PRODUCTS
All goods and products covered by these Specifications shall be procured, when available,
from an in-Kingdom manufacturer. Procurement of all goods and products manufactured out-
of-Kingdom must be approved. All products, system components and hardware shall be in
compliance with NFPA 12. Only listed materials and devices shall be used in the installation
of the High-Pressure Carbon Dioxide Fire System.
All products, system components and hardware shall be in compliance with the applicable
NFPA standards and the Project Specifications.
All valves, nozzles, alarms and any additional fire fighting equipment shall be UL listed and/or
FM approved.
8.3 Valves
All valves used in the fire suppression system shall be suitable for the intended use,
particularly regarding the flow capacity and operation, and shall be in accordance with
NFPA 12. All valves shall be UL listed/ FM Approved.
Valves for high-pressure systems which are constantly under pressure shall have a
minimum bursting pressure of 41,369 kPa. Valves that are not under constant
pressure shall have a minimum bursting pressure of at least 34,474 kPa.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-B-4914
Project Name: Date: 28 Nov 2011
Contract Number: Page 11 of 16
Revision 3
9.0 EXECUTION
All products and equipment shall be installed in accordance with MARAFIQ regulations,
applicable local codes and standards, the manufacturer's written installation instructions and
Project Specifications.
The High-Pressure Carbon Dioxide Fire System shall be installed in accordance the
applicable NFPA standards.
Provisions shall be made to facilitate frequent inspection, testing and maintenance as
described in NFPA 12.
Protect all equipment and materials at all times.
Cover and protect equipment and materials from dirt, water, chemical or mechanical damage.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-B-4914
Project Name: Date: 28 Nov 2011
Contract Number: Page 12 of 16
Revision 3
10.0 INSTALLATION
All materials and equipment used in the installation of the High-Pressure Carbon Dioxide Fire
System shall be new and the latest design by the manufacturer.
All materials, valves and devices essential to successful system operation shall be UL Listed
and/or FM approved.
All openings in the room walls and slab made either for present or future equipment, cables
and HVAC ducts shall be properly sealed using approved fire stops.
10.7 Piping
Installed pipe and fittings shall meet the requirements of NFPA 12 and Project
Specifications.
All pipe and fittings shall be installed aboveground.
Close pipe openings with caps or plugs during installation.
11.0 COORDINATION
Coordinate location of all nozzles, pipe, gas cylinders, control panels and all necessary
accessories for proper operation of the system.
12.0 TESTING
The completed installation shall be inspected, tested and commissioned by an approved fire
suppression system specialist Engineer of the Fire Suppression System designer/supplier, in
the presence of Company’s representatives.
All mechanical and electrical components including detection and actuation devices shall be
tested as per NFPA 12, 72 and according to the manufacturer’s recommended procedure.
Standard tests shall be carried out for checking the various instruments, instrument loops,
insulation and continuity for cables.
All piping and fittings shall be pneumatically tested as per NFPA 12. Under no conditions shall
water be used to test piping or other equipment, dry gas shall be used for testing.
Concealed pipe joints such as those in walls, ceilings and the like shall be pressure tested
before the joint is concealed.
13.0 CERTIFICATION
The Contractor shall prepare and submit a set of As-built Drawings and hydraulic calculations
of the system, maintenance and instruction bulletins, and the applicable parts of the
Contractor’s material and test certificates covering material and tests certifying that the work
has been completed and tested in accordance with plans and specifications.
14.0 TRAINING
Prior to acceptance of the installed system, Contractor shall provide on site training by an
approved fire suppression system specialist Engineer of the Fire suppression system
designer/supplier, for operation, maintenance and trouble shooting of the system. Training
shall consist of:
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-B-4914
Project Name: Date: 28 Nov 2011
Contract Number: Page 16 of 16
Revision 3
System Operation
Control system operation
Trouble shooting procedures
Emergency procedures
Safety requirements
Demonstration of the system excluding gas release
Periodical Inspection