OPERATING PROCEDURE
2. Emergency Gate valve, Gate valve before and after Deluge valve system shall be in close
position.
3. Open main Butterfly valve at tapping area slowly so that system do not get sudden hydraulic
shock.
4. After Butterfly valve is fully opened, open the gate valve which installed before deluge valve
slowly.
5. By opening that Quartz bulb detector line will be pressurized. After line is pressurized and
stabilize. Open Gate valve positioned after Deluge valve.
6. Drain water from Deluge valve outlet chamber so that diaphragm seat will fix properly without
draining Deluge valve chamber pressure.
7. Check control panel indication panel shall be in normal position. No fire signal, No DV operate
signal.
8. HVWS System is now in operation and commissioned.
HIGH VELOCITY WATER SPRAY SYSTEM STANDARD
OPERATING PROCEDURE
HD Deluge Valve is a quick release, hydraulically operated diaphragm valve. It has three chambers,
isolated from each other by the diaphragm operated clapper and seat seal. While in SET position, water
pressure is transmitted through an external bypass check valve and restriction orifice from the system
supply side to the top chamber, so that supply pressure in the top chamber act across the diaphragm
operated clapper which holds the seat against the inlet supply pressure, because of the differential
pressure design. On detection of fire, the top chamber is vented to atmosphere through the outlet port
via opened actuation devices. The top chamber pressure cannot be replenished through the restricted
inlet port, and the upward force of the supply pressure lifts the clapper allowing the water flow to the
system piping network and alarm devices.
• Actual Pressure at Deluge valve system from main line tapping: - 7 kg/cm2 to 8 kg/cm2
• Minimum pressure required at Deluge valve system as per design hydraulic calculation:-
•
5 kg/cm2
•
•
• Design hydraulic calculation and transformer coverage are mentioned on drawing.
Reference no: - DFS/BBL/BARC/FF/002. Kindly refer the same
• Pressure Switch settings shall be as per site suitable.
HIGH VELOCITY WATER SPRAY SYSTEM STANDARD
OPERATING PROCEDURE
.
.
• For calculating pressure at Spray Nozzle point. We need to removed spray nozzle and installed pressure
gauge assembly to determine spray nozzle inlet pressure from pipe.
• Pressure at inlet nozzle shall be between 3.5 kg/cm2 to 5 kg/cm2, as per hydraulic calculation.
• Deluge valve shall be operated and pumps shall be in auto position for continuous water supply.
• Spray nozzle at other points not necessary to remove depending upon respective pressure gauge assembly
installed. If required Nozzles at other points can be removed and replace with dummy fittings for temporary
amount of time.
• Once operation starts, pressure gauge will get reading. Note reading of pressure gauge will be in fluctuation
manner as water discharges through other nozzles dynamically.
• After checking and inspecting reading on pressure gauge. Remove pressure gauge assembly and reinstall
spray nozzles.
HIGH VELOCITY WATER SPRAY SYSTEM STANDARD
OPERATING PROCEDURE
A. HVWS system is designed in such a way that it should fulfill required Water discharge rate and pressure at
spray Nozzles.
B. As per Design standard IS 15325:2003 density of water discharge rate shall be not less the 10.2
lpm/min/m2 on entire transformer surface area.
C. Velocity of water in feed pipe shall not exceed than 10 m/s as per design hydraulic calculation.
D. System hydraulic calculation of HVWS system has been submitted to BARC.
E. For witnessing water discharge rate and water velocity in feed pipe. We required flow meter to be install on
system piping after deluge valve assembly.
F. As per current site situation Flow meter is not supply and install on HVWS system. Thus we cannot
observe real time discharge rate of water and velocity of water.
G. But as per hydraulic calculation, system should have minimum pressure at tapping 5 kg/cm2 including
pressure drop.
H. And also at end projector i.e. spray nozzles point pressure should be developed 3.5 kg/cm2. Then we can
conclude that above mentioned water discharge rate and water velocity would be justify as per hydraulic
calculation.
HIGH VELOCITY WATER SPRAY SYSTEM STANDARD
OPERATING PROCEDURE
K.
HIGH VELOCITY WATER SPRAY SYSTEM STANDARD
OPERATING PROCEDURE
HIGH VELOCITY WATER SPRAY SYSTEM STANDARD
OPERATING PROCEDURE
1. If HVWS system operated by Manual realease switch from control panel or remot location.
2. To stopping this operation operator need to press Emergency push button located at Control panel.
3. By pressing Emergency push button solenoid valve operation will be suspended, thus HVWS system
operation will be stopped.
4. Also, release manual release switch which will return control panel to normal position.
5. If HVWS is operated by Bursting of sprinkler, operator need to close incoming water supply by closing
Gate valve located before Deluge valve. And then replace burst Sprinkler.
6. Also, Press emergency push button to stop solenoid valve operation.
7. If HVWS system operated by Manual realease switch located at Deluge valve station. Then operator need
to close Manual release switch located at Deluge valve station.
8. Close incoming water supply from main line which will stop HVWS operation.