Professional Documents
Culture Documents
A4-JGS1EP-EPC1-MS-55-009 Method Statement For Refractory Installation - RA PDF
A4-JGS1EP-EPC1-MS-55-009 Method Statement For Refractory Installation - RA PDF
. Matai 2 Layer ‘Somnm THK Layer CEB © No Layer 2 ‘Motel Quay servi Lining 17288 pes i elayer ‘344 bO« 600m x 600m 8.41.2 Tho Upper Sido Wal willbe tned fst so that ether preeauste wrk ean 8.1.3 natn shal tart at he second level of pyro ck modules rom the bottom. ‘lockout sippont shall be Insialed frst since the bcwal tal supports (he Pyro lock modules ae 1 be stale tor 8.414 Pro to ntaiaon of the fest ayer, Ikewee inepectin parametars must be ‘ssid sich as ste! surface tied, layout and welding quay of ti, anche ‘nd supers ‘Ropicaen of mastic coating on the steal sha wil folow after the surtaco ‘reparation and instalation of stdfanchors are compas. Shou hae be ita ‘Mastic Coating on he see shel, mast coaing sal ony be apled as nacded Intalio of rt layer, 80 mm Coramie Fiber Banket,ahal bein accordance wih th Wstalaten procedures as approves, ‘Once the backup tng (fst layer) fn place, th service tning Caramle Fiber Module Pyro tole i tat. Ingato pred fo the Modo shall bo in accordance wih the approved procedure desig ant dotaled drawings Fightanc ‘tse wals wile done sinukancousl unt he ig is competes ‘isn th sis af the Enda can be one sultant wit ho Uppar se ‘rae ‘ter the walls are done the Radiant Arch pornete ctw low Pyto Blo Modo instalation cvinlaton shat be rolered 10 the approved rowingsIg sua METHOD STATEMENT FOR > ShaesMEMCAS | REFRACTORY INSTALLATION S JG Summit Stage 4 MIGSIEP-EPCI-MS-55-000 Expansion Project evi [Page 9 of 15 8.1.18. The PyroBloe modulo mato shal ont be Insta ater he Radin Cols re in pace. 84.44_ Plenum yal can be installed ako simutanoously with the Radant Ach 421.18 Fotow te procedure forthe esto tho acant secon, {42 RADIANT LOWER SIDE WALLS 521 Tho LOWER SIDEWALLS thing coniguraton a folows : (Figures are taken ‘rom SP computation based on tectcal drawing gon oy PCI ‘Matra Senics Ling. ‘Vim ayer THC. 28 Matsa 2 ayer 2 Vian tyer THICAM-23 © Matra 9 Layer 2 Pom ayer HC TR19 Matra 2 Lager 5 deme ayer TH CFB ® NoolLayee fa 1 Matra Quantity Service lining = 7.596 pes 2 layer 21538 pes i Stayer o 736 pes ha Layer © 28 ot x Goon x7200nm 142.2 Applian of mate coating on to steal shall wil folow once te suace Deparaen snd installation of sudanchors are competed. Same condi mmentone above, 8.23 The lover fet and Right sie wals wil be simutaneousy ned Beghnag a the bation 18.24 When all inpecton report on th slel shell re submited and approved the Insatin ofthe 4 ayor wi sa 182.5 Upon completing tne th ayer (25m THK CEE), station of yer (5mm ‘THKCTR9) wa flow The sequence wil be flowed heres per Compton ‘fever ining ayer. Aer compton of ning, again nspecon wil be conducted ‘nda cantons are satisfied, PC! sal neue approval ofthe completed ining. Uy out of guide thes to he frishod wa as efeance fr cutng of peep holes. {Gutthe peop tois and careful montring the dimensions to a errs. ‘Al insaabon procedures shall conor 1 the approved instalation procedures and design 183 PLENUM FLOOR 83.4 The Plenum ining coniguration a olows: >. Matrl Serve ning ‘oie x ayer THK Kacerete 2600 © Material 2 Layer ‘omnm x ayer THK Kael 2500 HS, ‘4 Material 2° Layer 226mm xf tye THK Kaolte 2200 HS Mail 4 Layer 2 Togmm4ayer THC TEAS £ Now tayer 4 Meter Qvartty if Saving = 8047049 i Laer Aaea7Sks fe a™Layer 2 2260.38 pes 83.2 fr curing of mast coating the 4" aye wl alow whic is he instalation of 400 mm tk insfaton TR:10, cau sicate baraJG sunny METHOD STATEMENT FOR i HEgeeEincats | erRACTORY INSTALLATION S 36 Summitstage 1 | AIGSYEP-EPCH-AS-65:009 reseroeel Expansion Projet ew fe 83.3 Onco tho 4 layer le camplted plate cover hat bo ait over the fies lng (0 serve war barr prot to cas ofthe net layers Casing of 9 ‘ayer wi start wth he follwing sequence => Fat Sid obo casted ret (1) = carting Dcton Lastiobe casted (3) — ‘Second Site tbe casted (2) FLAN VIEW - CASTING SEQUENCE 2 LAYER {83.4 After comeing the 2 layer The second layer wal bo casts B38 Aspan: ole casing procedu, the second ayer al otter 72 curing of the 9 yer, 36 Paatic ees covering on the 9Y layer shal Ho id over te fished ing 10 5 water baie prior to casting of the net layers. Detaled staaion procedire for mull ayer ting i explaed nthe given procs. 183.7 Inexaer asl constuction ont, we recommend that casting sequence of he and "st layor bo insted Ina crossusedrocton a shown he sketch d1@/©@|©}]@]@|© PLAN VIEW - CASTING SEQUENCE 28 LAYER 83.8 The Formwork wil abo sore tho template to maintain the hcknoss ofthe 183.9 Likewise ing Ime shall be folowod as recommended on the succeeding es. 183.10 Exyasion joins wil be folowed in accodance wih the drawings and recommendation of manta fy.phasecvEMcAtS | REFRACTORY INSTALLATION 22 turmk wage 1 AA-JGSHEP-EPCA-MS.65:009 Expansion Project METHOD STATEMENT FOR evi ease Minimal van or ring rogue to stall th insulating mate (9 and ining) while dense materia wl have vbraton 8 eared. Casting euence dolaled above shallow he tame on succeeding modus, 104 RADIANT FLOOR 31 lang Coowaton 2 tr Saree Tom TK Kart 28 © Matt 2 ayn ‘en TH Rohe 2000 toa gor {Pam Tr Kote 2001S Meat 4 apr ‘amen Ta Te © Nesttaye ! Motor ony i Seve tring 175983430 i Bete Habeas Stor 4498.89 Maser 16a042 pee 8.42 Flo tg istalton vl ow afer campleng athe sdewals and arch tra 443 Genial the crate ting (Src, 2 and 9°) wl be salle by casing shee he sla ses rhs aoicaton 8.44 Ae sae bore pectin parr ad ten requted pro instaton | ‘st be sated fat por © aan ane sata opr Cay ‘eaten | 1145 Upon apa ofthe inspecton ar tesa rept, stain of th 4 yar | ain bord il at 4.48 PGI rope rtecry mers wh a contin cape of 00k, Casting | shall be don conrunis nt fe pane ae compte have on | stra alg Sl ae a onpnte or guise fo mantan to tek fe ig 4148 Gating sf one on ft san Poe son ant toa Sher endmarianing to wih nm ome ute eng ote | ‘oor Is: completed as shown in the sketch below. | 140 AS otomin best tor, sonnet and 2 can be cise teat aflor Comping very ater? meter engi 8.410 Gating lbs by mpeg eno vivaton or minal equa fr te ‘ung ssn toa => Fist Sido tobe casted frst (1) =D Costing Beeston Lastiobe castes (3) — Second Sioa bcasted (2) PLAN VIEW -CASTING SEQUENCE 3 LAYER.JS sunanarr METHOD STATEMENT FOR i fBBcas |g ARANETOR TALON S AA SOSHEP-EPCA-MS-85.009 Page 12 of Rev: A ae JG Summit Se Expansion Project ‘84.44 After completing th 4 layer aplastic cover shal be li over the ished ing {to serve a8 water barr pro casing ofthe next ayers. Succeeding layers Shall commence fer the oer layer re completed folowing te 72 Now Coin player prt cating ho next {84.42 In oder offset constuction on, we rocarmend that casting Sequence ofthe ‘and ayer be installed i crosswise recon a Shown th sketch, OMONLONONIONIC PLAN VIEW -CASTING SEQUENCE 2° LAYER 184.49 Plate shoot covering onthe 9 layer shall be lid o apples fs o prevent premature toss of water ram the nowy poured 2 ayer Detaled neaation rotodur for mut aye ning explained nto given procedure {84.44 The Fomor will so sere os the template to mantin the thickness ofthe Seng dng instalation, {8448 Expansion os wil be insted according to dawings nd Yecommendaton of ‘manuf {44.18 Casting stquonce etaled above shal flow the same on sceeding modules {45 RADIANT TROUGH 15.4 Tho RADISNT THROUGH ining coniguraton 2 flows 14" Foor Matera 1 Layer = 25mm ayer CFB 1 Matoral 2 Layer 2 Somme ajer FB © Maral 9 Layer © Somme ayer CF 4 Matoral a Layer mm x ayer CF, © Materal 9 Layer mn x ayer CFB | P Novottayer 5 | ‘9. Materal Quantity | Matera Layer + 48 box 800mm x 7200" | Matra 2.9" 4 Layer = 27-4 box x 600mm x 300K | Mato 5 Layer 5 Stee soommx 9800, | 8.5.4.2 Wats: | a Motoral 1 Layer 26mm xt ayer CF 1B Materal 2 Layer 25m x ayer CFB Materal 3" Layer + Bom ayer CFB toral 4a Soran x ayer CF Matera Layer Tein x ayer CFB 4ie me METHOD STATEMENT FOR Re egagoeteicats: | REFRACTORY INSTALLATION S ‘JG Summit Stage 4 ‘AA-JGSAEP-EPC1-MS-65-009 Page 13 of Expanaion Project ai "8 No. tLayer 5 Malet Quantity 1 Matta and 2 Layer 21.3 boxx600nm x7200ne iMate and a Layer ‘2.6 box x 800mm x6 i Nato Layer 313m Boom x a0 5.52 Afr the station, inspection and accptanc of anchoring systems pin by PCL. Turnover crtcatos should be sued pir to stat. 4.6.3 Insaoton of CF wa starts upon mast costing apo and cured. 854. The radiant tough for sacton wil be ined ist The sequence of ning instalation shall start onthe 3 ayer down tote 1 layer Each layer should De complete ral pir o sat of succeeding lye, 185.5 Upon completion ofthe tng on radiant gh Noor, SPS1 QALQC inspector shat ‘equest f an inspecton, bob SPSL EEL and Third Paty Representaves al do the inspeeton, Once approve, instalation o sie wal bing wil stad shal {oltre samo aequence ae he foe. 56 The Ratlant Lower Side Walls wi folow ater completion and approval of the Rowan Tough ing. © REPAIR OF REFRACTORY LING. 84 With the excopion of suface bubble defects, unaccoptable retract ring shall be ‘aang angle 6 he shel and aoa to aocplate ng and eve 82. Theshel salma be damaged 83 The sound metal acjacent to th repair area shall be completely pre-weted with ‘tale water oro th appicaton a he eptacament ting ‘24 The minmum area removed shall be 6 Inches x 8 inches (150 X 150 mm). no anchors found ints area a new anchr shal be added before rapes are made 95 The mnimum recommended trea removed shal be eufilent to expose at lest 3 non contnuous anchors, 96 Cuts can ue ae midway between anchors, 87 Al-comrs she be rounded to smodth. generous conto Byoughout the depth ot tho vetractor, 98 The anchors and shot shal te cleared of rfactor oer debris and new caps instaled onthe anchor tps wore appicable. the anchors orth sachet Weld ‘fe damege, he anchor shale replaced, 99° _Adful tctness rplacament ring ropa sal be performed in tho same manner as ‘he crgial ng isan, incu cung and dying, 940 For bubble dels that rue ropa, toreughy wot te relacary malin and ‘ound the buble with poable water pice othe appt of te Ing repa 98.41 Pack'ne Bubb witha ine castle. 9.12, Mix per manufocturors procedures and screen the surface fis wit the adjacent ‘efector surface. Mota ere ehoud not be used th ype of ropa 10 REERACTORY LININS INSPECTION ‘1041 Refractory tiny cracks with 9 wilh of 1.6mm (16°) and spaced at approximately o0nm (1) apart Is: normal Area containing erack wider than Sit (IP) are ‘considered defect and shal be repaired per procedure 9. 10:2 Expansion jon wl que on some area, bse onthe dain,se summare AG Summit Stage 4 Expansion Project METHOD STATEMENT FOR [REFRACTORY INSTALLATION AAIGSIEP-EPC1.MS-56.000 $ vel Page 14 of 6 ‘1 SAFETY MANAGEMENT SYSTEM, 11:1 Relertothe atached SPS Safely Plan, ‘® QUALITY CONTROL MANAGEMENT SYSTEM 124_Lining thickness wierances shal bea fll 12.2 Rotor to below lespecion Tet Pian (TP), NP AND INSPECTION AND TEST PROCEDURE (eS | tn =] Perey =f *ag guna METHOD STATEMENT FOR REFRACTORY INSTALLATION AAIGSAEP-EPC1.MS.-55.009 "6 19 MATERIAL STORAGE ecole vane ¥ e1-o1a? cletisvie 12mg vara se 92 oR, 2 fectny HA BH EIKO} BONE ye Rayo #1 RE Conta 8 Noms £48 AR 924 8e oe CRUE, 2 Reactory Conte (22 2 1) #18 8 HA WERE Page 19 of