You are on page 1of 3

MIGUEL ANGEL TORRES ESPINO

Address: Mz. B1 Lt. 9 Lurigancho – Chosica


Lima – Perú
DNI: 40383118
Date of Birth: 30.08.1978
Phone: +051-922442710
E-mail: mkiangh@gmail.com

PROFESSIONAL SUMMARY

CAREER OBJECTIVE:
Graduated from the Production mechanics career at the National
Polytechnic “Jose Pardo”. Prepared and trained for the development of
activities in risk identification and security. Experience in managing and
coordinating projects, performed optimally. With the ability to coordinate
with people of different hierarchical levels.
Graduated from the Maintenance mechanic career at the NATIONAL
INDUSTRIAL WORK TRAINING SERVICE “SENATI”. (Hydraulic system
maintenance, Preventive Maintenance, Corrective Maintenance, General
maintenance of machinery).
Other skills:
- Welding approval 3g 4g.
- Reports
- Electric threading machine
- Driving of Man lift and Scissor lift

EDUCATION
SENATI - NATIONAL INDUSTRIAL WORK TRAINING SERVICE
MAINTENANCE MECHANIC
Lima - Perú

JOSE PARDO TECHNOLOGICAL SUPERIOR INSTITUTE

GRADUATE IN PRODUCTION MECHANICS

Lima – Perú
TECHNICAL SKILLS
LANGUAGES SOFTWARES
 English – Intermediate  MS Office, MS Project
(EXCEL,WORD,PPT)

TRAINING
 HOMOLOGATION 3G Y 4G
GL INGENIEROS 25 10 2018

 MANITENANCE OF MILLS, ASSEMBLY LINNERS


FLSMIDTH 2018

 FRONT LOAD OPERATOR AND RETROEXCAVATOR


NATIONAL UNIVERSITY OF ENGINEERING 2015

 INDUTION AND BASIC ORIENTATION IN SECURITY, OCCUPATIONAL HEALTH IN


MINNING
ISEM (MINING SECURITY INSTITUTE) 2014

 PAINTING HOMOLOGATION
ESAR – CPPQ

 EDUCATION IT
COMPUTACION Y SISTEMAS (ARGENTINA) 2008-2009

WORK EXPERIENCE

POSITION: WELDER
AREA: CONCENTRATOR PLANT
COMPANY: MINING COMPANIES (CERRO LINDO, JCG SERVICIOS INDUSTRIALES).
DATE: 2019

POSITION: MECANICAL LINEAR


AREA: CONCENTRATOR PLANT
COMPANY: MINING COMPANIES (LAS BAMBAS, CHINALCO HUDBAY
CONSTANCIA, INMACULADA (METSO)).
DATE: 2018

POSITION: MECANICAL I
AREA: CONCENTRATOR PLANT
COMPANY: MINING COMPANIES (ANTAMINA, CHINALCO (FLSMIDTH))
DATE: 2014-2015

POSITION: MECANICAL I
AREA: CONCENTRATOR PLANT
COMPANY: MINE COMPANY ANTAMINA
DATE: 2014-2015
POSITION: MECHANICAL WELDER 3G
AREA: CONCENTRATOR PLANT
COMPANY: MINE COMPANY ANTAMINA, CHINALCO (CAMESA)
DATE: 2013-2015

POSITION: ASSEMBLY, MANEUVER AND WELDER 3G


AREA: PROJECT
COMPANY: HYDROELECTRIC MANTARO (METALLIKAS)
DATE: 2013

POSITION: MECHANICAL, WELDER AND ASSEMBLY


AREA: PLANT
COMPANY: ALICORP
DATE: 2012

POSITION: WELDER 3G
AREA: PROJECT
COMPANY: CONSORTIUM ELECTRIC TRAIN
DATE: 2011

You might also like