You are on page 1of 1

14-07 14-08a N

0 6000 12000 18000 24000 30000mm


06-01 06-02 06-03 06-04 06-05 14-N
17-07a17-08a
06-A 17-AP1 17-AP3
14-M PRESSING PILE DRIVING PILE
REFER No 06-S_PLN17_20-S01 FOR DETAIL 06-AP3 06-AP1 17-B1 REFER No 05-S_PLN17_20-S01 FOR DETAIL

17-AP2
17-C1 05-G 05-H 05-H1 05-J 05-J105-J2 05-K 05-K1 05-L 05-L1 05-M
06-AP2 EXISTING G EXISTING BENCH MARK COORDINATE SCHEDULE
14-L
06-B
COORDINATE (M) (ACCORDING TO ASSUMPTION COORDINATE) R1
R1
7
0
4
.5
3
7
0
4
.5
3

14-K BENCH MARK X Y


05-AP1
05-AP2 TBM.01 0,0000 0,0000
05-12 TBM.02 145999,6424 89939,1616
14-J
14-29e 14-29d 14-29c 14-29b 14-29a WALKWAY

NOTE:
Y DIRECTION IS EQUIVALENT TO TRUE NORTH TBM 02

14-07b 14-07a
05-11
REFER No 01-S_PLN17_20-S01 FOR DETAIL REFER No 02-S_PLN17_20-S01 FOR DETAIL BORE HOLE COORDINATE SCHEDULE
14-18 14-19 14-20 14-21 14-23 14-24 14-25 14-26 14-27 14-30 14-31 14-32 14-32a 14-32b
14-I
COORDINATE (M) (ACCORDING TO ASSUMPTION COORDINATE)
BORE HOLE X Y
02-A2 02-A1 02-A 02-B 02-C 02-D 02-E 02-F 02-G 02-AP1 03-A 03-B 03-B1 03-FFF
03-C 03-D 03-F1 03-F 03-F2 BH1 -152389,4525 185299,8994
01-A 01-B 01-C 01-D 01-D' 01-E 05-10 14-I' BH2 -112170,0920 185675,4116
02-06
01-AP1 01-AP2 BH3 -158948,9698 131279,7162
03-AP1 BH4 -114479,4216 129731,7748 Keyplan
14-Q 05-09 BH5 -32770,0429 98455,6457
01-07 02-05 03-31 08-04 08-AP3 14-R
14-H 08-AP1 BH6 28863,8568 189608,2910
BH7 88771,6259 186421,2495
08-03 BH8 25148,5508 123639,0828
03-30 BH9 91102,2608 119689,4831
01-06 14-O
02-04 03-AP2 BH6
BH10 20723,9291 39105,7135
BH7 REFER No 08-S_PLN17_20-S01 FOR DETAIL BH11 83189,1483 36565,1988
01-05a 08-02
03-29
01-05

02-03 03-28 08-01


01-04a 08-AP2 00-AP 1
01-04 REFER No 03-S_PLN17_20-S01 FOR DETAIL 08-1a
BH2
03-27
BH1 01-03a 02-02 08-A 08-B 08-C 08-D 08-E 08-F REFER No 00-C_DEN00_00-S21 FOR DETAIL
01-03 02-AP3 14-P1
02-AP2 E
01-02a EXISTING 00-AP 2 00-AP 3
02-01 14-F 05-08 E
07-A 07-B 07-C
01-02
14-E
EXISTING
01-01 01-AP3 ASSUMPTION POINT COORDINATE SCHEDULE
03-24 07-AP1
01-01a 14-P2 07-AP2
14-14 14-13 07-01 COORDINATE (MM) (ACCORDING TO ASSUMPTION COORDINATE)
ASSUMPTION POINT X Y
04-A3 03-23 00-AP 1 240614,9834 168955,0008
00-AP 2 240114,9754 158967,5091
14-D 00-AP 3 255095,9921 158217,5082
00-AP 4 249297,0000 49658,0000
03-22 00-AP 5 249165,8973 47051,9593
00-AP 6 231536,0000 47940,0000
07-02
EXISTING 14-C' 01-AP1
01-AP2
-166122,8600
-148145,4052
208553,1900
207652,5681
04-A2 03-21
01-AP3 -167723,9656 176593,2704
02-AP1 -92178,2288 208593,4103
04-11 02-AP2 -93774,3309 176733,3654
03-20 02-AP3 -125734,2505 178334,4710
14-C 05-07 03-AP1 -76378,5123 204197,3279
03-AP2 -76878,8578 194209,8530
07-03
04-01 04-02 04-03 04-04 04-05 04-06 04-07 04-08 04-09 04-10 04-AP1 -105234,3879 137507,6391
03-19
04-AP2 -106375,1892 114736,1971
04-A1 04-AP3 -166075,0837 140555,6297
14-B 04-AP4 -167215,8881 117784,1876
REFER No 07-S_PLN17_20-S01 FOR DETAIL
04-AP3 03-18 05-AP1 103372,9785 214716,7187

04-A
14-A EXISTING 07-04
05-AP2
05-AP3
28466,9169
21822,3288
218469,3099
85835,6435
05-AP4 -23956,8852 71408,1152
04-AP1 03-17
REFER No 09-S_PLN17_20-S01 FOR DETAIL 05-AP5 -25708,0944 36451,9532
04-B 07-05 05-AP6 95892,8133 65403,9693

14-A" BH8 BH9 07-B2 07-B5 05-AP7 -42438,5809 22271,3036


BH4 03-16 05-AP8 -41688,0626 37252,5159
BH3 14-33 14-33a 14-34 14-35
07-06 06-AP1 -100849,2904 240367,0637
06-AP2 -101349,6417 230379,5913
04-C 14-A' 14-S 06-AP3 -132809,2099 241968,1704
03-15 07-AP1 205064,1076 152840,8718
14-T 07-06a
07-AP2 227535,9261 151715,0944
07-AP3 201118,8606 74089,6335
07-B4
03-14 09-A 09-AP1 09-AP2 05-06 08-AP1 146017,8409 194557,6569
07-06b 08-AP2 145192,2611 178078,3238
04-D
08-AP3 165992,7907 193556,9659
14-Q8 07-06c
09-AP1 -26601,9257 118599,5647
04-E 09-B 09-AP2 -11620,7134 117849,0465
07-06d 09-AP3 -12821,5563 93879,1173
04-AP4 04-AP2 10-AP1 252851,8367 40669,4501
07-06e 10-AP2 252351,4853 30681,9755
10-AP3 259342,7175 30331,7295
REFER No 04-S_PLN17_20-S01 FOR DETAIL 14-07 14-08 14-09 14-9a Y
14-Q9 145999,6424 12-AP1 -154650,0631 107993,1128
12-AP1 09-C 89939,1616 07-07a 12-AP2 -171129,3966 108818,6828
12-A 13-A 07-07 12-AP3 -171629,7082 98831,2946
12-AP2 13-AP1 X 13-AP1 -130819,9480 106799,2884
BH5 13-AP2 -131320,2935 96811,8135
12-B 13-C EXISTING 09-AP3 07-07b 17-AP1 -37094,5258 235077,1603
17-AP2 -37228,9703 232393,5247
13-AP2 09-D 14-Q10 17-AP3 -34545,3299 232259,0816
12-AP3 TMB.02 sss 255595,9992 168205,0321
12-C 13-E 09-01 09-02 09-03 09-04 07-07c
05-AP3
12-01 12-02 12-03 12-04 SIGN OF TEST PILE
05-05 07-08
13-01 13-02b 13-02 SIGN TEST TYPE
REFER No 12-S_PLN17_20-S01 FOR DETAIL 07-09

REFER No 13-S_PLN17_20-S01 FOR DETAIL PDA


07-AP3
STATIC LOAD

EXISTING 07-B1 07-B3 07-C


consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any purpose other than
© 2013 HaskoningDHV Nederland B.V. All intellectual property rights among which the copyright related to this drawing shall vest in
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior written

05-04
05-AP4
05-AP6
00-AP 4
REFER No 00-C_DEN00_00-S27 FOR DETAIL

00-AP 5

00-AP 6 10-01 10-03


10-AP1
EXISTING
10-A
05-03
NOTES:
- THE LENGTH OF PILES IS ESTIMATED. THE FINAL LENGTH WILL BE
DECIDED AFTER HAVING TESTING RESULT.
REFER No 10-S_PLN17_20-S01 FOR DETAIL - THE LOCATION OF PILE FOLLOWS COORDINATE AS SHOWED ON DRAWING HOWEVER,
PLEASE CHECK AND COMPARE WITH EXISTING BUILDINGS BEFORE INSTALLING PILE.
10-AP2 10-AP3
Standard Remarks:
for which it is supplied.

10-D - All Dimensions are in millimeters (mm) and indicated levels in millimeters (mm).
BH11 - All drawings to be read in conjuntion with the Architectural, Structural, -Civil, -and Mechanical & Electrical drawings.
- Drawings are not to be scaled; written dimensions should be followed and verified with the details.
BH10 - Indicated Finished Floor Level of the buildings is 0.00 = +10.000 National level.
- Building locations (corners) are fixed with the relevant UMT coordinates and related to the coordinates of Bench mark 1 (TBM 01)
and Bench mark 2 (TBM 02).
- Pre Engineered Building Systems:
a) Steel superstructure of the Parkaging and Full Product Store Building (05), FST & BBT Tanks (04), Malt intake building (01),
Brewhouse (02) and Water treatment plant (06), Car & bike parking (15) will be desinged, fabricated and delivered by the Pre
05-02 Engineered Building supplier.
b) Steel rigid roof beams of, Service Block extension (03), Chemical Store Building (09) will be designed, fabricated and delivered by
the Pre Engineered Building supplier.
en zijn eigendom van HaskoningDHV Nederland B.V.. Niets van deze tekening mag zonder voorafgaande schriftelijk toestemming van

- Pipe bridges: Pipe bridges as indicated on the drawings will designed, fabricated and delivered by the Pre Enginneered Building
© 2013 HaskoningDHV Nederland B.V. Alle intellectuele eigendomsrechten waaronder het auteursrecht op deze tekening berusten bij

05-AP5 supllier.
HaskoningDHV Nederland B.V. worden verveelvoudigd en/of openbaar gemaakt op welke wijze ook of worden gebruikt voor enig

05-AP8 - All equipment and equipment related building services are indicative. Exact dimensions and positions still to be determined.
05-01c
E 28.05.2015 N.Q.Tuyen N.Q.Tuyen Construction Final Update coordinate of storm collection pit
D 21.05.2015 N.Q.Tuyen N.Q.Tuyen Construction Final Add pile plans of storm collection pit and weight bridge.
C 19.05.2015 N.Q.Tuyen N.Q.Tuyen Construction Final Extend 2m wide in building 06
05-01b B 09.04.2015 N.Q.Tuyen N.Q.Tuyen Construction Final Revised piling layout & updated piling playout of building 07
A 12.03.2015 N.Q.Tuyen N.Q.Tuyen Construction Final Updated assumption point coordinate

05-AP7 Nr. Date Drawn by Checked by Stage Status Description

Architect: Structural engineer: Project Manager: CAD Coordinator:


05-01 N.T.Toan N.Q.Tuyen R. Philippa M. Verdaasdonk

05-A 05-B 05-C 05-D 05-E 05-F 05-G 05-H 05-H1 05-J 05-J105-J2 05-K 05-L 05-L1 05-M Client: Location:

Phnom Penh
Country:

Cambodia
PRESSING PILE DRIVING PILE
Project name: Subject:

Bordeaux 00 General / Site Layout


Piling master plan
ander werk dan waarvoor het is vervaardigd.

Y
PILING MASTER PLAN 0,0000 HaskoningDHV Vietnam CO., LTD. Size: A0 +3 Stage: Construction Design
0,0000 a company of: 236 / 26C Dien Bien Phu Street
As

Industry, Energy &


1 : 300 Ward 17, Binh Thanh District
Ho Chi Minh City Scale:
indicated
Status: Final
X Vietnam
C. of C. nr. 56515154 Proj.Nr.: 1784
T: +84 8 3899 2505

Mining
E: info@vn.rhdhv.com
TMB.01 I:www.royalhaskoningdhv.com
Drw.Nr.: 00_PLN17_20-S01

You might also like