You are on page 1of 1

SHEET NO:9/14 N

0.6000
W E
REVISED PLAN OF
0.6000 12.9500 0.6000 "M/S THE KRISHNA DISTRICT MILK PRODUCERS MUTUALLY AIDED CO.OPERATIVE UNION LIMITED" S
W/V W/V W/V MILK PRODUCT FACTORY IN R.S NO: 48/1, 134/1, 139/1, 139/2, 140/1, 140/2, 140/3, 140/4, 140/5, 141/1, 141/2, 141/3, 141/4, 141/5,
R.S/V
AT VIJAYAWADA, KRISHNA DISTRICT.

W/V W/V

MACHINARY DETAILS
BLUE SHEET ROOF
Parapet wall S.NO NAME H.P NO'S H.P

1.5002
W/V W/V
R.C.C. Roof Slab
R.C.C. Roof Beam NEW BOILER HOUSE

1.0000
1 VIBRATOR 2.50 2 5.00
W/V W/V
BLUE SHEET ROOF Brick wall
2 BELT CONVEYOR 3.00 1 3.00

6.0000

7.4998
2.00 3 COAL CRUSHER 15.00 1 15.00

W/V W/V 4 SCREW CONVEYOR 3.00 1 3.00

5 BUCKET ELEVATOR 3.00 1 3.00

1.0000
MECHANICAL SCRAP I SECTION

19.9500
SHEET CLADING GODOWN AREA FEEDING SCREW
W/V 12.15 X 19.15 W/V
FLOORING 6 3.00 1 3.00
(R.C.C ROOF) R.C.C PLINTH BEAM CONVEYOR

1.0000
7 AIR LOCKER 2.00 1 2.00
Foundation FLOORING
W/V W/V R.C.C PLINTH BEAM 8 STIRRER 2.00 1 2.00
BED FEEDING
SECTION "D-D1"
9 SCREW CONVEYOR 3.00 2 6.00
1& 2
D D1 SECTION "C-C1"
10 AIR BLOWER 0.75 2 1.50
13.00 W/V W/V
FORCED DRAFT
11 25.00 1 25.00
13.60 FAN
GRATE ASH SCREW
12 3.00 2 6.00
W/V W/V CONVEYOR
2.23 13 BUCKET ELEVATOR 3.00 1 3.00
3.66 M HT
BRICK WALL 9.20
MECHANICAL DUST
W/V W/V
14 COLLECTOR WITH 0.50 1 0.50
R.A.L.V-1
R.S/V
E.S.P BAG FILTER
FLOORING 15 0.50 1 0.50
W/V W/V WITH R.A.L.V-2
R.C.C PLINTH BEAM
ECONOMISER WITH
0.6000

16 0.50 1 0.50
SANDFILLING COAL STORAGE AREA R.A.L.V-3

4.97X 1.47
1.00

5.2000
TOILET
PILE FOUNDATION 17 I.D FAN 40.00 1 40.00
STORAGE AREA
SECTION AT " A-A1 " 4.52 X 4.97
(A.C SHEET ROOF) ELEVATION
14.48 18 AIR DRIER 2.00 1 2.00

D 19 FEED PUMP 10.00 2 20.00

D 20 AIR COMPRESSOR 21.50 1 21.50


6.6805
21 HYDRALIC MOTOR 5.00 1 5.00
MECHANICAL SCRAP GODOWN BUILDING PLAN C C1
22 WATER FEED PUMP 3.50 2 7.00

ROTARY AIR LOCK


23 1.00 1 1.00
VALVE

GRATE ASH SCREW


24 3.00 1 3.00
CONVEYOR

4.02
G.I SHEET ROOF
TOTAL
178.50
H.P
FIRE EXTINGUISHERS LIST

4.2700
4.8700
S NO FIRE EXTINGUISHER TYPE QTY
DN IRON PIPE
ABC-2 KG
FLOORING
1
C.C BED 2 ABC-4 KG
R.C.C. PLINTH
BEAM COAL STORAGE AREA ABC-6 KG

1.0000
3
SAND FILLING
TO ELEVATOR ABC-9 KG
6 HOPPER
G.L
4
FEEDING G.L
SCREW CONVEYOR 5 CO2-2 KG
PILES AS PER
DESIGN
SECTION "B-B1" 6 CO2-4.5 KG

43.60 CO2-9 KG
7

8 CO2-22.5 KG
DCHEATER

AREAS
NEW BOILER SHED AREA - 712.62 SQM
BOILER FEED WATER PUMPING SYSTEM
G.L G.L SHED - 40.04 SQM
ELEVATION DOSING UNIT COAL SHED AREA - 898.38 SQM
MECHANICAL SCRAP GODOWN
48.20 BUILDING AREA - 258.35 SQM
A1 31.35
G.L G.L STORAGE SHED AREA - 034.73 SQM
20.15 28.05 ELEVATION
W W W W W W W W +5.4M LEVEL
JOINERY
R.S 3.66 M HT WALL ABOVE SHEET 3.66M HT WALL ABOVE SHEET 3.66M HT WALL ABOVE SHEET OPEN
CLADING CLADING CLADING W - WINDOW - 1.50 X 2.00
8.40 D- DOOR - 1.00 X 2.40
R.S - ROLLING SHUTTER - 3.50 X 3.00 & 2.50 X 3.00
3.74 V - VENTILATOR - 1.50 X 0.60
3.66M HT WALL ABOVE SHEET

OPEN
up
W

TANK
R.S

15 KL CAPACITY
SCALE DETAILS
1M HT WALL 4 CRUSHER
CLADING

16 ABOVE PARTIOIN SCREW CONVEYOR 2 BELT CONVEYOR


PLANS, SECTION, ELEVATION 1:100
ABOVE PARTIOIN

ABOVE PARTIOIN
ABC -6KG

EECONOMISER
Fire extinguisher Fire extinguisher

3
ABC -6KG
1M HT WALL

1M HT WALL
FE-60

BED FEEDING Note:- All Dimensions are in Meters


Fire extinguisher

FE-58

SCREW CONVEYOR 1& 2


Fire extinguisher

5 1 1
COAL STORAGE AREA PROPOSED
I.D FAN 9 9
3.66M HT WALL ABOVE SHEET

OPEN
17 BUCKET ELEVATOR
7,8
CHIMMNY VIBRATOR AIR LOCKER
21 22 22
UP

DIVIDER
1M HT WALL D
CRUSHER
ABOVE PARTIOIN
CLADING

12.32
W

FEED PUMPS

14.88
19

1.57M HT WALL
STORAGE AREA
10.00

OPEN
19 13.01 X 18.70

STEAM CONTROL VALVE


GRADE ASH HOPPER B B1
OPEN

3.60
PANAL BOARD

15
BAG FILTERS
11 SIGNATURE OF THE APPLICANTS
SILO 5.8M HT
1.00M HT WALL ABOVE

FORCED BUCKET
10 M3 CAPACITY
AIR VERTICAL DRAFT FAN ELEVATOR
Ø2.50
TANK 13 4.23
PARTITION

GRADE ASH HOPPER 12 23 GREAT ASH SCREW


ABC -6KG

24

OPEN
GREAT ASH SCREW CONVEYOR 12 CONVEYOR
FE-59

AIR DUCT
+3.7M LEVEL
W

14 GREAT ASH SCREW


ABC -6KG

AIRCOMPRESSOR CONVEYOR STEAM HEADER


FE-57

Fire extinguisher Fire extinguisher

20 MECHANICAL DUST COLLECTOR 1.30 10 10 SYED RAFI AHMED


8.40 UP AIR BLOWER 1&2 3.25 LICENCED ENGINEER
BOILER FEED WATER LICENCED ENGINEER
18 3.66 M HT WALL ABOVE SHEET
+0.0 LEVEL
3.66M HT WALL ABOVE SHEET 1.10
Fire extinguisher Fire extinguisher

3.66M HT WALL ABOVE SHEET


+2.7M LEVEL V.M.C LICENCE NO: 15/08,
AIR DRIER CLADING CLADING CLADING
PUMPING SYSTEM SHED RAHAMAT PLANNERS,
OPEN
W W W W W W W W PLAN 18.78 OLD CHECK POST, MOSQUE COMPLEX,
NEW BOILER HOUSE SHED PLAN COAL STORAGE SHED PLAN VIJAYAWADA-7,
A
PH NO: 9246472977.

You might also like