Planning Checklist: NODIN, GCell and Master Site
1. Preparation Phase
2. Execution Phase
3. Post Execution
Drive Test Acceptance
Performance Report
Analysis and Troubleshooting
PREPARATION-EXECUTION-POST
EXECUTION
Preparation Phase
DT Cluster Before
Execution Phase
KPI Formula Mapping
BTS OA
KPI BaseLine Cluster Post Execution
Final Adjx Concheck
JDSU Test Cross Feeder verification
Alarm Clearance
LAC-CI Core Lock Value
Functionality test
Vlan Tagging &
Connectivity Lacima Netact Update
Feature Mapping Declare swap Finish
Parameter Mapping
Datafill PES & Transmisi
Database Downloading
Database Concheck
CONSISTENCY CHECK
BSC BSCN_BJM1
Regional KALIMANTAN
Cluster :
Cluster_06
Name
Start date : 23-Apr-2017
Finish date : 23-Apr-2017
Configuration:
Cluster Name : SWAP Cluster_06 EXISTING Cluster_06 Total
Macro Sites : 12 0 12
IBS Site : 0 0 0
Total Sites : 12 0 12
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Network Kalimantan Cluster Overview
Cluster_06 Overview as below Map:
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Clustering Implementation site list
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
4G Modernization Sites Map
Route and Coverage Prediction shows sites for BSS Network 4G Modernization Implementation
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Cluster Drive Test Verification Plot – Cluster_06
RSRP – Idle Mode
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Cluster Drive Test Verification Plot – Cluster_06
SNR – Dedicated Mode
Dedicated SNR Measurement (Before) Dedicated By SNR Measurement (After)
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Cluster Drive Test Verification Plot – Cluster_06
RSRQ – Idle Mode
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Cluster Drive Test Verification Plot – Cluster_06
PDCP DL – Dedicated Mode
South Kalimantan Swap Modernization Project © 2017 Nokia . All rights reserved.
Implementation Report
Implementation Chronology
1. Total xx sites (xx NE) already executed successfully on 20 April 2017, 14.00 WITA
2. Functionality test call Drive test verification started parallel in all sites swapped no issues
observed.
3. Database after upload completed by 02.00 WITA
4. Database consistency & discrepancy checking done for eNode-B Objects 04.00 WITA
5. Update adjacencies by 03.30 WITA and still continue monitoring
6. Check Alarm : done
7. Check zero payload : done and continue monitoring
8. Initial tuning, solving worst performance contributor site on progress (discrepancies for LNREL &
LNRELW are completed)
Sites Implementation Data & Map Location - sample
Total site swapped 4G (Plan/OA/Not Yet OA) : 10/9/1
- Site OA :
1. N_BJM129ML1_MT_BANJARINDAHPERMAI
2. N_BJM265ML1_MT_KUINSELATAN2
3. N_BJM297ML1_MC_CEMPAKABESAR
4. N_BJM300ML1_MC_VETERAN3BANJARMASIN
5. N_BJM320ML1_MC_RUKOAYANIKM1
6. N_BJM321ML1_TB_BULANMAS
7. N_BJM327ML1_MT_SKPERMAIANTASAN
8. N_BJM426ML1_PT_GANGMANUNGGAL
9. N_BJM981ML1_PT_HKSNPERDAGANGAN
• Radio Network Availability degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance
already improve
• RRC Setup SR degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already
improve
• E-RAB Setup SR degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already
improve
• Call Setup SR degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already
Retainability
• Service Drop degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already
improve
Mobility
• IFHO SR degradation contribute by MTP101 due to transmission problem (unproper transmission port), now the performance already improve
• CSFB Prep SR degradation contribute by MTP101 due to transmission problem (unproper transmission port), now the performance already
improve
Payload
• DL Payload degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already improve
• UL Payload degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already improve
Throughput
Average Throughput shown slight improvement, Maximum Throughput shown maintain performance
PRB Utilization
• Service Drop degradation contribute by MTP101 due to transmission problem (inproper transmission port), now the performance already
improve
X2 Performance
TCH BLOCK degraded if comparing with the same day on last week,
contributed by worst cells in BSCN_FBGNISLAM2, BSCN_FBTUBAN2,
BSCN_FBTJBENOA2, and BSCN_FBTABANAN2 due to availability
degradation/alarm, need to check onsite
WPC Service Drop Rate - sample
TCH BLOCK degraded if comparing with the same day on last week,
contributed by worst cells in BSCN_FBGNISLAM2, BSCN_FBTUBAN2,
BSCN_FBTJBENOA2, and BSCN_FBTABANAN2 due to availability
degradation/alarm, need to check onsite
WPC CSFB Preparation SR - sample
TCH BLOCK degraded if comparing with the same day on last week,
contributed by worst cells in BSCN_FBGNISLAM2, BSCN_FBTUBAN2,
BSCN_FBTJBENOA2, and BSCN_FBTABANAN2 due to availability
degradation/alarm, need to check onsite