Table of contents:
1‐Space Required
2‐List of Machines
3‐Plant requirement
4‐Electricity / Pluming requirement
5‐Safety Equipment
1
Space Required
To manufacture one cubic meter of solid core requires double the
space.
Therefore one cubic meter requires 9 square meter of free space.
Adding to that the machine space required therefore the equation will
be as follows:
1x1x1 M3 = (1+1+1) * 3 SQM
2
List of Machines
The new factory will have two manufacturing cells (double the load):
ﺷﺎرﻳﻮ -1
ﻓﺮﻳﺰا -2
راﺑﻮخ -3
ﻓﺎرة -4
ﺣﻔﺎﻓﺔ -5
ﻣﻨﺸﺎر ﻻﻣﻴﻜﺎ وﺗﻘﺸﻴﻂ -6
ﻣﻨﺸﺎر ﺷﻠﺔ -7
(CNC) ﻣﻨﻘﺮة و روﺗﺮ -8
However, this list is able to be updated depending on our manufacturing needs
3
Plant Requirement
The plant requirements:
1‐ New Electricity generator
2‐ Independent Electrical Post
3‐ Industrial Elevator
4‐ New Transportation Vehicle
5‐ Water Tanks
6‐ Hot Water Tanks
7‐ Sleeping areas
8‐ Mezzanine
9‐ Dust Collector
4
Electricity / Pluming requirements
The factory should be equipped with the following:
On each Story Level:
1‐ Independent Electricity breaker
2‐ Independent Water Breaker
3‐ Toilets
4‐ Labors room
5‐ T5 or equivalent lighting systems
5
Safety Equipment
The Factory should be equipped with the following safety equipment:
1‐ Manual Fire Extinguisher
2‐ Automatic Fire Extinguisher system
3‐ First Aid Kit
4‐ Phone Systems Alerts