  NEW FACTORY REQUIREMENTS / CRITERIAS 

 
 
Table of contents: 
1‐Space Required 
2‐List of Machines 
3‐Plant requirement 
4‐Electricity / Pluming requirement 
5‐Safety Equipment 
 

 
  Space Required 
 
 
To manufacture one cubic meter of solid core requires double the 
space. 
Therefore one cubic meter requires 9 square meter of free space. 
Adding to that the machine space required therefore the equation will 
be as follows: 
1x1x1 M3 = (1+1+1) * 3 SQM 
 
 

 
List of Machines 
 
The new factory will have two manufacturing cells (double the load): 
  ‫ﺷﺎرﻳﻮ‬ -1
  ‫ﻓﺮﻳﺰا‬ -2
  ‫راﺑﻮخ‬ -3
  ‫ﻓﺎرة‬ -4
  ‫ﺣﻔﺎﻓﺔ‬ -5
  ‫ﻣﻨﺸﺎر ﻻﻣﻴﻜﺎ وﺗﻘﺸﻴﻂ‬ -6
  ‫ﻣﻨﺸﺎر ﺷﻠﺔ‬ -7
  (CNC) ‫ﻣﻨﻘﺮة و روﺗﺮ‬ -8
However, this list is able to be updated depending on our manufacturing needs 


Plant Requirement 
 

The plant requirements: 

1‐ New Electricity generator 
2‐ Independent Electrical Post 
3‐ Industrial Elevator 
4‐ New Transportation Vehicle 
5‐ Water Tanks 
6‐ Hot Water Tanks 
7‐ Sleeping areas 
8‐ Mezzanine 
9‐ Dust Collector 

 

  Electricity / Pluming requirements 
 
The factory should be equipped with the following: 
On each Story Level: 
 
 
1‐ Independent Electricity breaker 
2‐ Independent Water Breaker 
3‐ Toilets 
4‐ Labors room 
5‐ T5 or equivalent lighting systems 
 
 
 
 

 
Safety Equipment 
 
 
The Factory should be equipped with the following safety equipment: 
 
1‐ Manual Fire Extinguisher 
2‐ Automatic Fire Extinguisher system 
3‐ First Aid Kit 
4‐ Phone Systems Alerts 
 
 
   
 