DAILY WORKING REPORT Date 08.06.

2020

INSPECTION INSPECTION STATUS
INSPECTOR
PART NO REMARKS
NAME
INCOMING FIT UP STAGE FINAL TOTAL QTY ACCEPTED REWORK REJECTED

Observed 3 to 9mm bend. Rework given
VIJAY VT20030092  61 27 34 ‐
1 to 2mm bend accepted @ Yessat Tech

29111041  122 122 ‐ ‐ OK @ inhouse

29111049  277 277 ‐ ‐ OK @ inhouse

29111041  92 92 ‐ ‐ OK @ Sabari

29111049  230 210 20 ‐ 20 Nos not Cured @ Sabari

782269  723 723 ‐ ‐ Sample Inspection ok @ Balaji Ind.

100x80x4  12 12 ‐ ‐ OK @ incoming

PRAVEEN 50x50x5  4 4 ‐ ‐ OK @ incoming

30x2 pipe  27 27 ‐ ‐ OK @ incoming

GP343620  10 10 ‐ ‐ OK @ metal parts

GP311005  5 5 ‐ ‐ OK @ metal parts

GP348394  5 5 ‐ ‐ OK @ metal parts

GP095377  10 10 ‐ ‐ OK @ metal parts

GP286039  10 10 ‐ ‐ OK @ gamesa

INCOMING INSPECTION STAGE INSPECTION FINAL INSPECTION


OFFERED COMPONENTS 3 OFFERED COMPONENTS 3 OFFERED COMPONENTS 8
INSPECTED COMPONENTS 3 INSPECTED COMPONENTS 3 INSPECTED COMPONENTS 8
BACKLOGGED COMPONENTS ‐ BACKLOGGED COMPONENTS ‐ BACKLOGGED COMPONENTS ‐
OTHER ACTIVITY
NAME                                                                DESCRIPTION OF WORK
CAD checked ( SVJ Laser )
VIJAY
Calibration list ( Unit 1 & Unit 3 ) sent to North Lab and requested for collection and Calibration
PRAVEEN Associated with Mr.Srinivasan on his reviewing of  ISO documents and further updations.
Visited Yessar Tech as an observer
MOHAN PRASHANTH
Introduced to Part drawings and technical specification
ABSENTIES ‐