1. EC5-FLOOR-001
L.C. Load combination Ved Med Duration class kmod V/Kmod M/Kmod
1 γg.G 3.515 3.515 Permanent 0.60 5.859 5.859
2 γg.G + γq.Qf 6.665 6.665 Medium-term 0.80 8.332 8.332
Maximum values 8.332 8.332
Concrete side
σc1d= γ1·E1·α1·M/(EI)ef=0.98 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3a)
σm1d= 0.5E1·h1·Md/(EI)ef=2.05 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3b)
Timber side
σc2d= γ2·E2·α2·M/(EI)ef=1.38 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3a)
σm2d= 0.5E2·h2·Md/(EI)ef=3.64 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3b)
τ2max= 1.50 Vd/(b·h)= 0.50 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.4)
6. Final state
L.C. Load combination Ved Med Duration class kmod V/Kmod M/Kmod
1 γg.G 3.515 3.515 Permanent 0.60 5.859 5.859
2 γg.G + γq.Qf 6.665 6.665 Medium-term 0.80 8.332 8.332
Maximum values 8.332 8.332
Concrete side
σc1d= γ1·E1·α1·M/(EI)ef=0.99 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3a)
σm1d= 0.5E1·h1·Md/(EI)ef=1.39 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3b)
Timber side
σc2d= γ2·E2·α2·M/(EI)ef=1.39 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3a)
σm2d= 0.5E2·h2·Md/(EI)ef=3.79 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.3b)
τ2max= 1.50 Vd/(b·h)= 0.50 N/mm2 (EC5 EN1995-1-1:2009, Eq.B.4)