NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM


RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
Variati f

Penyiap an B adan Jalan

UKURAN
UKURAN CCO
REALISASI VOLUME VOLUME
NO STATION POSISI PANJANG VOLUME CCO KETERANGAN
REALISASI TERBAYAR
LEBAR RATA2 LEBAR RATA2

1 0+000 L/R 11.8 11.8


12.5 12.5 50.00 625.00 625.00 625.00
2 0+050 L/R 13.2 13.2
12.4 12.4 50.00 620.00 620.00 620.00
3 0+100 L/R 11.6 11.6
11.0 11.0 50.00 550.00 550.00 550.00
4 0+150 L/R 10.4 10.4
10.0 10.0 50.00 500.00 500.00 500.00
5 0+200 L/R 9.6 9.6
11.0 11.0 50.00 547.50 547.50 547.50
6 0+250 L/R 12.3 12.3
12.1 12.1 50.00 605.00 605.00 605.00
7 0+300 L/R 11.9 11.9
12.4 12.4 50.00 620.00 620.00 620.00
8 0+350 L/R 12.9 12.9
12.0 12.0 50.00 597.50 597.50 597.50
9 0+400 L/R 11.0 11.0
11.0 11.0 50.00 550.00 550.00 550.00
10 0+450 L/R 11.0 11.0
11.5 11.5 50.00 575.00 575.00 575.00
11 0+500 L/R 12.0 12.0
11.5 11.5 50.00 575.00 575.00 575.00
12 0+550 L/R 11.0 11.0
10.9 10.9 50.00 545.00 545.00 545.00
13 0+600 L/R 10.8 10.8
10.8 10.8 50.00 537.50 537.50 537.50
14 0+650 L/R 10.7 10.7
10.5 10.5 50.00 522.50 522.50 522.50
15 0+700 L/R 10.2 10.2
10.4 10.4 50.00 520.00 520.00 520.00
16 0+750 L/R 10.6 10.6
10.6 10.6 50.00 527.50 527.50 527.50
17 0+800 L/R 10.5 10.5
10.7 10.7 50.00 532.50 532.50 532.50
18 0+850 L/R 10.8 10.8 SEGMEN I
11.2 11.2 50.00 557.50 557.50 557.50
19 0+900 L/R 11.5 11.5
12.0 12.0 50.00 600.00 600.00 600.00
20 0+950 L/R 12.5 12.5
11.1 11.1 50.00 555.00 555.00 555.00
21 1+000 L/R 9.7 9.7
9.0 9.0 50.00 447.50 447.50 447.50
22 1+050 L/R 8.2 8.2
7.9 7.9 50.00 392.50 392.50 392.50
23 1+100 L/R 7.5 7.5
8.0 8.0 50.00 400.00 400.00 400.00
24 1+150 L/R 8.5 8.5
8.2 8.2 50.00 407.50 407.50 407.50
25 1+200 L/R 7.8 7.8
8.1 8.1 50.00 402.50 402.50 402.50
26 1+250 L/R 8.3 8.3
8.7 8.7 50.00 432.50 432.50 432.50
27 1+300 L/R 9.0 9.0
8.6 8.6 50.00 427.50 427.50 427.50
28 1+350 L/R 8.1 8.1
7.9 7.9 50.00 395.00 395.00 395.00
29 1+400 L/R 7.7 7.7
8.2 8.2 50.00 407.50 407.50 407.50
30 1+450 L/R 8.6 8.6
8.4 8.4 50.00 420.00 420.00 420.00
31 1+500 L/R 8.2 8.2
7.9 7.9 50.00 395.00 395.00 395.00
32 1+550 L/R 7.6 7.6
8.7 8.7 50.00 435.00 435.00 435.00
33 1+600 L/R 9.8 9.8
12.3 12.3 50.00 615.00 615.00 615.00
34 1+650 L/R 14.8 14.8
15.2 15.2 25.00 380.00 380.00 380.00
35 1+675 L/R 15.6 15.6

JUMLAH 1,675 17,220.00 17,220.00 17,220.00 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Pejabat Pembuat Komitmen Konsultan Pengawas
Dinas Pekerjaan Umum & Penataan Ruang Kab. Luwu Timur PT. INOVASI KONSULINDO RAYA

IHSWAN APRIANTO, ST ABRAR, ST


NIP : 19840418 200902 1 003 Inspector
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ariati f

Penyiapan B adan Jalan

UKURAN
UKURAN CCO
REALISASI VOLUME VOLUME
NO STATION POSISI PANJANG VOLUME CCO KETERANGAN
REALISASI TERBAYAR
LEBAR RATA2 LEBAR RATA2

1 0+000 L/R 8.0 8.0


7.9 7.9 50.00 394.25 394.25 394.25
2 0+050 L/R 7.8 7.8
7.7 7.7 50.00 382.50 382.50 382.50
3 0+100 L/R 7.5 7.5
7.4 7.4 50.00 370.00 370.00 370.00
4 0+150 L/R 7.3 7.3
7.9 7.9 50.00 395.00 395.00 395.00
5 0+200 L/R 8.5 8.5
8.7 8.7 50.00 435.00 435.00 435.00
6 0+250 L/R 8.9 8.9
8.5 8.5 50.00 425.00 425.00 425.00
7 0+300 L/R 8.1 8.1
8.1 8.1 50.00 402.50 402.50 402.50
8 0+350 L/R 8.0 8.0
8.0 8.0 50.00 400.00 400.00 400.00
9 0+400 L/R 8.0 8.0
7.8 7.8 50.00 390.00 390.00 390.00
10 0+450 L/R 7.6 7.6
7.4 7.4 50.00 367.50 367.50 367.50
11 0+500 L/R 7.1 7.1
7.4 7.4 50.00 370.00 370.00 370.00
12 0+550 L/R 7.7 7.7
7.6 7.6 50.00 377.50 377.50 377.50
13 0+600 L/R 7.4 7.4
7.9 7.9 50.00 395.00 395.00 395.00
14 0+650 L/R 8.4 8.4
8.7 8.7 50.00 432.50 432.50 432.50
15 0+700 L/R 8.9 8.9
8.4 8.4 50.00 417.50 417.50 417.50
16 0+750 L/R 7.8 7.8
7.9 7.9 50.00 392.50 392.50 392.50
17 0+800 L/R 7.9 7.9
8.1 8.1 50.00 402.50 402.50 402.50
18 0+850 L/R 8.2 8.2
7.6 7.6 50.00 377.50 377.50 377.50
19 0+900 L/R 6.9 6.9
7.1 7.1 50.00 353.75 353.75 353.75
20 0+950 L/R 7.3 7.3
7.4 7.4 50.00 370.00 370.00 370.00
21 1+000 L/R 7.6 7.6
7.5 7.5 50.00 375.00 375.00 375.00
22 1+050 L/R 7.5 7.5
7.6 7.6 50.00 377.50 377.50 377.50
23 1+100 L/R 7.7 7.7
7.5 7.5 50.00 373.75 373.75 373.75
24 1+150 L/R 7.3 7.3
7.2 7.2 50.00 361.25 361.25 361.25
25 1+200 L/R 7.2 7.2
6.6 6.6 50.00 327.50 327.50 327.50
26 1+250 L/R 6.0 6.0
5.9 5.9 50.00 296.25 296.25 296.25
27 1+300 L/R 5.9 5.9
6.0 6.0 50.00 298.75 298.75 298.75
28 1+350 L/R 6.1 6.1
50.00
29 1+400 L/R 7.8 7.8
7.3 7.3 50.00 365.00 365.00 365.00
30 1+450 L/R 6.8 6.8
6.8 6.8 50.00 338.75 338.75 338.75
31 1+500 L/R 6.8 6.8
7.0 7.0 50.00 351.25 351.25 351.25
32 1+550 L/R 7.3 7.3
7.5 7.5 50.00 372.50 372.50 372.50
33 1+600 L/R 7.6 7.6
7.9 7.9 50.00 395.00 395.00 395.00
34 1+650 L/R 8.2 8.2
8.0 8.0 50.00 400.00 400.00 400.00
35 1+700 L/R 7.8 7.8

JUMLAH 1,700 12,483.00 12,483.00 12,483.00 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Pejabat Pembuat Komitmen Konsultan Pengawas
Dinas Pekerjaan Umum & Penataan Ruang Kab. Luwu Timur PT. INOVASI KONSULINDO RAYA

IHSWAN APRIANTO, ST ABRAR, ST


NIP : 19840418 200902 1 003 Inspector
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS

V ariati f

Penyiapan B adan Jalan

UKURAN UKURAN
RENCANA CCO VOLUME VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO TERBAYAR
LEBAR RATA2 LEBAR RATA2

1 1+700 L/R 7.8 7.8


8.1 8.1 50.00 402.50 402.50 402.50
2 1+750 L/R 8.3 8.3
7.1 7.1 50.00 356.25 356.25 356.25
3 1+800 L/R 6.0 6.0
6.8 6.8 50.00 341.25 341.25 341.25
4 1+850 L/R 7.7 7.7
7.4 7.4 50.00 371.25 371.25 371.25
5 1+900 L/R 7.2 7.2
7.6 7.6 50.00 378.75 378.75 378.75
6 1+950 L/R 8.0 8.0
7.7 7.7 50.00 382.50 382.50 382.50
7 2+000 L/R 7.3 7.3
7.3 7.3 50.00 363.75 363.75 363.75
8 2+050 L/R 7.3 7.3
7.7 7.7 50.00 383.75 383.75 383.75
9 2+100 L/R 8.1 8.1
7.8 7.8 50.00 387.50 387.50 387.50
10 2+150 L/R 7.4 7.4
7.2 7.2 50.00 360.00 360.00 360.00
11 2+200 L/R 7.0 7.0
7.1 7.1 50.00 356.25 356.25 356.25
12 2+250 L/R 7.3 7.3
7.2 7.2 50.00 358.75 358.75 358.75
13 2+300 L/R 7.1 7.1
7.6 7.6 50.00 377.50 377.50 377.50
14 2+350 L/R 8.0 8.0
7.6 7.6 50.00 380.00 380.00 380.00
15 2+400 L/R 7.2 7.2
6.9 6.9 50.00 342.50 342.50 342.50
16 2+450 L/R 6.5 6.5
6.8 6.8 50.00 340.00 340.00 340.00
17 2+500 L/R 7.1 7.1
7.1 7.1 50.00 355.00 355.00 355.00
18 2+550 L/R 7.1 7.1
7.2 7.2 50.00 360.00 360.00 360.00
19 2+600 L/R 7.3 7.3
7.2 7.2 50.00 360.00 360.00 360.00
20 2+650 L/R 7.1 7.1
7.1 7.1 50.00 355.00 355.00 355.00
21 2+700 L/R 7.1 7.1
7.1 7.1 50.00 355.00 355.00 355.00
22 2+750 L/R 7.1 7.1
50.00
23 2+800 L/R
50.00
24 2+850 L/R
50.00
25 2+900 L/R 6.8 6.8
7.1 7.1 50.00 352.50 352.50 352.50
26 2+950 L/R 7.3 7.3
7.5 7.5 50.00 376.25 376.25 376.25
27 3+000 L/R 7.8 7.8
8.7 8.7 50.00 435.50 435.50 435.50
28 3+050 L/R 9.7 9.7
9.6 9.6 50.00 481.75 481.75 481.75
29 3+100 L/R 9.6 9.6
9.1 9.1 50.00 362.00 362.00 362.00
30 3+150 L/R 8.5 8.5
7.9 7.9 50.00 395.00 395.00 395.00
31 3+200 L/R 7.3 7.3
7.3 7.3 50.00 365.00 365.00 365.00
32 3+250 L/R 7.3 7.3
7.4 7.4 50.00 370.00 370.00 370.00
29 3+300 L/R 7.5 7.5

JUMLAH TOTAL 1,600 10,805.50 10,805.50 10,805.50 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Pejabat Pembuat Komitmen Konsultan Pengawas
Dinas Pekerjaan Umum & Penataan Ruang Kab. Luwu Timur PT. INOVASI KONSULINDO RAYA

IHSWAN APRIANTO, ST ABRAR, ST


NIP : 19840418 200902 1 003 Inspector
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ar iatif

Pen yiapan Bad an Jalan

UKURAN
UKURAN CCO
REALISASI VOLUME VOLUME
NO STATION POSISI PANJANG VOLUME CCO KETERANGAN
REALISASI TERBAYAR
LEBAR RATA2 LEBAR RATA2

1 3+300 L/R 7.5 7.5


8.0 8.0 50.00 397.50 397.50 397.50
2 3+350 L/R 8.4 8.4
8.6 8.6 50.00 427.50 427.50 427.50
3 3+400 L/R 8.7 8.7
8.2 8.2 50.00 410.00 410.00 410.00
4 3+450 L/R 7.7 7.7
8.0 8.0 50.00 400.00 400.00 400.00
5 3+500 L/R 8.3 8.3
8.2 8.2 50.00 407.50 407.50 407.50
6 3+550 L/R 8.0 8.0
7.6 7.6 50.00 105.70 105.70 105.70
7 3+600 L/R 7.1 7.1
7.4 7.4 50.00 367.50 367.50 367.50
8 3+650 L/R 7.6 7.6
7.6 7.6 50.00 380.00 380.00 380.00
9 3+700 L/R 7.6 7.6
7.6 7.6 50.00 380.00 380.00 380.00
10 3+750 L/R 7.6 7.6
8.0 8.0 50.00 400.00 400.00 400.00
11 3+800 L/R 8.4 8.4
7.9 7.9 50.00 396.25 396.25 396.25
12 3+850 L/R 7.5 7.5
7.4 7.4 50.00 367.50 367.50 367.50
13 3+900 L/R 7.3 7.3
7.5 7.5 50.00 373.75 373.75 373.75
14 3+950 L/R 7.7 7.7
8.3 8.3 50.00 415.00 415.00 415.00
15 4+000 L/R 8.9 8.9
8.7 8.7 50.00 432.50 432.50 432.50
16 4+050 L/R 8.4 8.4
9.0 9.0 50.00 447.50 447.50 447.50
17 4+100 L/R 9.5 9.5
9.0 9.0 50.00 447.50 447.50 447.50
18 4+150 L/R 8.4 8.4
8.9 8.9 50.00 445.00 445.00 445.00
19 4+200 L/R 9.4 9.4
9.2 9.2 50.00 460.00 460.00 460.00
20 4+250 L/R 9.0 9.0
9.2 9.2 50.00 461.25 461.25 461.25
21 4+300 L/R 9.5 9.5
9.8 9.8 50.00 488.75 488.75 488.75
22 4+350 L/R 10.1 10.1
9.8 9.8 50.00 487.50 487.50 487.50
23 4+400 L/R 9.4 9.4
8.3 8.3 50.00 416.25 416.25 416.25
24 4+450 L/R 7.3 7.3
7.2 7.2 50.00 358.75 358.75 358.75
25 4+500 L/R 7.1 7.1
7.7 7.7 50.00 385.00 385.00 385.00
26 4+550 L/R 8.3 8.3
7.7 7.7 50.00 385.00 385.00 385.00
27 4+600 L/R 7.1 7.1
7.1 7.1 50.00 352.50 352.50 352.50
28 4+650 L/R 7.0 7.0
7.1 7.1 50.00 353.75 353.75 353.75
29 4+700 L/R 7.2 7.2
7.2 7.2 50.00 358.75 358.75 358.75
30 4+750 L/R 7.2 7.2
7.2 7.2 50.00 357.50 357.50 357.50
31 4+800 L/R 7.1 7.1
7.0 7.0 50.00 351.25 351.25 351.25
32 4+850 L/R 7.0 7.0
6.5 6.5 50.00 326.25 326.25 326.25
33 4+900 L/R 6.1 6.1
6.1 6.1 50.00 302.50 302.50 302.50
34 4+950 L/R 6.0 6.0
6.3 6.3 50.00 315.00 315.00 315.00
35 5+000 L/R 6.6 6.6

JUMLAH 1,700 13,160.70 13,160.70 13,160.70 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Pejabat Pembuat Komitmen Konsultan Pengawas
Dinas Pekerjaan Umum & Penataan Ruang Kab. Luwu Timur PT. INOVASI KONSULINDO RAYA

IHSWAN APRIANTO, ST ABRAR, ST


NIP : 19840418 200902 1 003 Inspector
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS

V ar iatif

Pen yiapan Bad an Jalan

UKURAN
UKURAN CCO
REALISASI VOLUME VOLUME
NO STATION POSISI PANJANG VOLUME CCO KETERANGAN
REALISASI TERBAYAR
LEBAR RATA2 LEBAR RATA2

1 5+000 L/R 6.6 6.6


7.0 7.0 50.00 350.00 350.00 350.00
2 5+050 L/R 7.4 7.4
7.2 7.2 50.00 360.00 360.00 360.00
3 5+100 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00 350.00
4 5+150 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00 350.00
5 5+200 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00 350.00
6 5+250 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00 350.00
7 5+300 L/R 7.0 7.0
7.1 7.1 50.00 353.75 353.75 353.75
8 5+350 L/R 7.2 7.2
7.2 7.2 50.00 357.50 357.50 357.50
9 5+400 L/R 7.2 7.2
7.1 7.1 50.00 356.25 356.25 356.25
10 5+450 L/R 7.1 7.1
7.1 7.1 50.00 355.00 355.00 355.00
11 5+500 L/R 7.1 7.1
6.6 6.6 50.00 327.50 327.50 327.50
12 5+550 L/R 6.0 6.0
6.4 6.4 50.00 317.50 317.50 317.50
13 5+600 L/R 6.7 6.7
6.7 6.7 50.00 336.25 336.25 336.25
14 5+650 L/R 6.8 6.8
6.6 6.6 50.00 331.25 331.25 331.25
15 5+700 L/R 6.5 6.5
7.3 7.3 50.00 362.50 362.50 362.50
16 5+750 L/R 8.0 8.0
7.9 7.9 50.00 393.75 393.75 393.75
17 5+800 L/R 7.8 7.8
7.7 7.7 50.00 386.25 386.25 386.25
18 5+850 L/R 7.7 7.7
7.9 7.9 50.00 396.25 396.25 396.25
19 5+900 L/R 8.2 8.2
8.4 8.4 50.00 417.50 417.50 417.50
20 5+950 L/R 8.6 8.6
9.1 9.1 50.00 456.25 456.25 456.25
21 6+000 L/R 9.7 9.7
8.5 8.5 50.00 426.25 426.25 426.25
22 6+050 L/R 7.4 7.4
7.8 7.8 50.00 387.50 387.50 387.50
23 6+100 L/R 8.2 8.2
8.5 8.5 50.00 425.00 425.00 425.00
24 6+150 L/R 8.9 8.9
8.1 8.1 50.00 405.00 405.00 405.00
25 6+200 L/R 7.4 7.4
7.9 7.9 50.00 396.25 396.25 396.25
26 6+250 L/R 8.5 8.5
8.3 8.3 50.00 412.50 412.50 412.50
27 6+300 L/R 8.0 8.0
8.2 8.2 50.00 407.50 407.50 407.50
28 6+350 L/R 8.3 8.3
8.2 8.2 50.00 410.00 410.00 410.00
29 6+400 L/R 8.1 8.1
8.0 8.0 50.00 398.75 398.75 398.75
30 6+450 L/R 7.9 7.9
8.0 8.0 50.00 398.75 398.75 398.75
31 6+500 L/R 8.1 8.1
8.2 8.2 50.00 407.50 407.50 407.50
32 6+550 L/R 8.2 8.2
7.9 7.9 50.00 395.00 395.00 395.00
29 6+600 L/R 7.6 7.6

JUMLAH TOTAL 1,600 12,127.50 12,127.50 12,127.50 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Pejabat Pembuat Komitmen Konsultan Pengawas
Dinas Pekerjaan Umum & Penataan Ruang Kab. Luwu Timur PT. INOVASI KONSULINDO RAYA

IHSWAN APRIANTO, ST ABRAR, ST


NIP : 19840418 200902 1 003 Inspector
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
Var iatif

Penyiapan Badan Jalan

UKURAN
UKURAN CCO
REALISASI VOLUME VOLUME
NO STATION POSISI PANJANG VOLUME CCO KETERANGAN
REALISASI TERBAYAR
LEBAR RATA2 LEBAR RATA2

1 6+600 L/R 7.6 7.6


7.8 7.8 50.00 387.50 387.50 387.50
2 6+650 L/R 7.9 7.9
7.7 7.7 50.00 382.50 382.50 382.50
3 6+700 L/R 7.4 7.4
7.6 7.6 50.00 380.00 380.00 380.00
4 6+750 L/R 7.8 7.8
7.8 7.8 50.00 390.00 390.00 390.00
5 6+800 L/R 7.8 7.8
7.9 7.9 50.00 395.00 395.00 395.00
6 6+850 L/R 8.0 8.0
8.0 8.0 50.00 400.00 400.00 400.00
7 6+900 L/R 8.0 8.0
7.7 7.7 50.00 385.00 385.00 385.00
8 6+950 L/R 7.4 7.4
7.6 7.6 50.00 381.25 381.25 381.25
9 7+000 L/R 7.9 7.9
7.4 7.4 50.00 371.25 371.25 371.25
10 7+050 L/R 7.0 7.0
7.2 7.2 50.00 361.25 361.25 361.25
11 7+100 L/R 7.5 7.5
7.3 7.3 50.00 366.25 366.25 366.25
12 7+150 L/R 7.2 7.2
7.4 7.4 50.00 367.50 367.50 367.50
13 7+200 L/R 7.5 7.5
7.0 7.0 50.00 350.00 350.00 350.00
14 7+250 L/R 6.5 6.5
7.1 7.1 50.00 355.00 355.00 355.00
15 7+300 L/R 7.7 7.7
8.3 8.3 50.00 416.25 416.25 416.25
16 7+350 L/R 9.0 9.0
8.4 8.4 50.00 418.75 418.75 418.75
17 7+400 L/R 7.8 7.8
8.2 8.2 50.00 410.00 410.00 410.00
18 7+450 L/R 8.6 8.6
10.3 10.3 50.00 512.50 512.50 512.50
19 7+500 L/R 11.9 11.9
10.3 10.3 50.00 512.50 512.50 512.50
20 7+550 L/R 8.6 8.6
8.4 8.4 50.00 420.00 420.00 420.00
21 7+600 L/R 8.2 8.2
8.5 8.5 50.00 423.75 423.75 423.75
22 7+650 L/R 8.8 8.8
9.1 9.1 50.00 453.75 453.75 453.75
23 7+700 L/R 9.4 9.4
9.1 9.1 50.00 452.50 452.50 452.50
24 7+750 L/R 8.7 8.7

JUMLAH 1,150 9,292.50 9,292.50 9,292.50


M2
JUMLAH TOTAL 75,089.20 75,089.20 75,089.20

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Pejabat Pembuat Komitmen Konsultan Pengawas
Dinas Pekerjaan Umum & Penataan Ruang Kab. Luwu Timur PT. INOVASI KONSULINDO RAYA

IHSWAN APRIANTO, ST ABRAR, ST


NIP : 19840418 200902 1 003 Inspector
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
Var iatif

P enyi apan Badan Jal an

UKURAN
UKURAN RENCANA
CCO VOLUME VOLUME
NO STATION PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 0+000 L/R 8.0 3.0


8.0 3.0 50.00 400.00 150.00
2 0+050 L/R 8.0 3.0
8.0 3.0 50.00 400.00 150.00
3 0+100 L/R 8.0 3.0
8.0 3.0 50.00 400.00 150.00
4 0+150 L/R 8.0 3.0
8.0 3.0 50.00 400.00 150.00
5 0+200 L/R 8.0 3.0
8.0 3.0 50.00 400.00 150.00
6 0+250 L/R 8.0 3.0
8.0 4.5 50.00 400.00 225.00
7 0+300 L/R 8.0 6.0
8.0 6.0 50.00 400.00 300.00
8 0+350 L/R 8.0 6.0

JUMLAH 350 2,800.00 1,275.00 M2

JUMLAH TOTAL #REF! #REF! #REF! 0

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAHAM, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
Var iatif

Penyi apan Bad an Jal an

UKURAN UKURAN
RENCANA CC0 VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 0+000 L/R 5.9 11.8


6.3 12.5 50.00 312.50 625.00
2 0+050 L/R 6.6 13.2
6.2 12.4 50.00 310.00 620.00
3 0+100 L/R 5.8 11.6
5.5 11.0 50.00 275.00 550.00
4 0+150 L/R 5.2 10.4
5.0 10.0 50.00 250.00 500.00
5 0+200 L/R 4.8 9.6
5.5 11.0 50.00 273.75 547.50
6 0+250 L/R 6.2 12.3
6.1 12.1 50.00 302.50 605.00
7 0+300 L/R 6.0 11.9
6.2 12.4 50.00 310.00 620.00
8 0+350 L/R 6.5 12.9
6.0 12.0 50.00 298.75 597.50
9 0+400 L/R 5.5 11.0
5.5 11.0 50.00 275.00 550.00
10 0+450 L/R 5.5 11.0
5.8 11.5 50.00 287.50 575.00
11 0+500 L/R 6.0 12.0
5.8 11.5 50.00 287.50 575.00
12 0+550 L/R 5.5 11.0
5.5 10.9 50.00 272.50 545.00
13 0+600 L/R 5.4 10.8
5.4 10.8 50.00 268.75 537.50
14 0+650 L/R 5.4 10.7
5.2 10.5 50.00 261.25 522.50
15 0+700 L/R 5.1 10.2
5.2 10.4 50.00 260.00 520.00
16 0+750 L/R 5.3 10.6
5.3 10.6 50.00 263.75 527.50
17 0+800 L/R 5.3 10.5
5.3 10.7 50.00 266.25 532.50
18 0+850 L/R 5.4 10.8 SEGMEN I
5.6 11.2 50.00 278.75 557.50
19 0+900 L/R 5.8 11.5
6.0 12.0 50.00 300.00 600.00
20 0+950 L/R 6.3 12.5
5.6 11.1 50.00 277.50 555.00
21 1+000 L/R 4.9 9.7
4.5 9.0 50.00 223.75 447.50
22 1+050 L/R 4.1 8.2
3.9 7.9 50.00 196.25 392.50
23 1+100 L/R 3.8 7.5
4.0 8.0 50.00 200.00 400.00
24 1+150 L/R 4.3 8.5
4.1 8.2 50.00 203.75 407.50
25 1+200 L/R 3.9 7.8
4.0 8.1 50.00 201.25 402.50
26 1+250 L/R 4.2 8.3
4.3 8.7 50.00 216.25 432.50
27 1+300 L/R 4.5 9.0
4.3 8.6 50.00 213.75 427.50
28 1+350 L/R 4.1 8.1
4.0 7.9 50.00 197.50 395.00
29 1+400 L/R 3.9 7.7
4.1 8.2 50.00 203.75 407.50
30 1+450 L/R 4.3 8.6
4.2 8.4 50.00 210.00 420.00
31 1+500 L/R 4.1 8.2
4.0 7.9 50.00 197.50 395.00
32 1+550 L/R 3.8 7.6
6.0 8.7 50.00 435.00
33 1+600 L/R 4.9 9.8
6.7 12.3 50.00 615.00
34 1+650 L/R 7.4 14.8
7.6 15.2 25.00 380.00
35 1+675 L/R 7.8 15.6

JUMLAH 1,675 7,895.00 17,220.00 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAR, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ar iatif

Pen yiap an Badan Jalan

UKURAN UKURAN
RENCANA CC0 VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 0+000 L/R 7.0 8.0


7.0 7.9 50.00 350.00 394.25
2 0+050 L/R 7.0 7.8
7.0 7.7 50.00 350.00 382.50
3 0+100 L/R 7.0 7.5
7.0 7.4 50.00 350.00 370.00
4 0+150 L/R 7.0 7.3
7.0 7.9 50.00 350.00 395.00
5 0+200 L/R 7.0 8.5
7.0 8.7 50.00 350.00 435.00
6 0+250 L/R 7.0 8.9
7.0 8.5 50.00 350.00 425.00
7 0+300 L/R 7.0 8.1
7.0 8.1 50.00 350.00 402.50
8 0+350 L/R 7.0 8.0
7.0 8.0 50.00 350.00 400.00
9 0+400 L/R 7.0 8.0
7.0 7.8 50.00 350.00 390.00
10 0+450 L/R 7.0 7.6
7.0 7.4 50.00 350.00 367.50
11 0+500 L/R 7.0 7.1
7.0 7.4 50.00 350.00 370.00
12 0+550 L/R 7.0 7.7
7.0 7.6 50.00 350.00 377.50
13 0+600 L/R 7.0 7.4
7.0 7.9 50.00 350.00 395.00
14 0+650 L/R 7.0 8.4
7.0 8.7 50.00 350.00 432.50
15 0+700 L/R 7.0 8.9
7.0 8.4 50.00 350.00 417.50
16 0+750 L/R 7.0 7.8
7.0 7.9 50.00 350.00 392.50
17 0+800 L/R 7.0 7.9
7.0 8.1 50.00 350.00 402.50
18 0+850 L/R 7.0 8.2
7.0 7.6 50.00 350.00 377.50
19 0+900 L/R 7.0 6.9
7.0 7.1 50.00 350.00 353.75
20 0+950 L/R 7.0 7.3
7.0 7.4 50.00 350.00 370.00
21 1+000 L/R 7.0 7.6
7.0 7.5 50.00 350.00 375.00
22 1+050 L/R 7.0 7.5
7.0 7.6 50.00 350.00 377.50
23 1+100 L/R 7.0 7.7
7.0 7.5 50.00 350.00 373.75
24 1+150 L/R 7.0 7.3
7.0 7.2 50.00 350.00 361.25
25 1+200 L/R 7.0 7.2
7.0 6.6 50.00 350.00 327.50
26 1+250 L/R 7.0 6.0
7.0 5.9 50.00 350.00 296.25
27 1+300 L/R 7.0 5.9
7.0 6.0 50.00 350.00 298.75
28 1+350 L/R 7.0 6.1
7.0 50.00 350.00
29 1+400 L/R 7.0 7.8
7.0 7.3 50.00 350.00 365.00
30 1+450 L/R 7.0 6.8
7.0 6.8 50.00 350.00 338.75
31 1+500 L/R 7.0 6.8
7.0 7.0 50.00 350.00 351.25
32 1+550 L/R 7.0 7.3
7.0 7.5 50.00 350.00 372.50
33 1+600 L/R 7.0 7.6
7.0 7.9 50.00 350.00 395.00
34 1+650 L/R 7.0 8.2
7.0 8.0 50.00 350.00 400.00
35 1+700 L/R 7.0 7.8

JUMLAH 1,700 11,900.00 12,483.00 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAR, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ar iatif

Pen yiap an Badan Jalan

UKURAN UKURAN
RENCANA CCO VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 1+700 L/R 7.0 7.8


7.0 8.1 50.00 350.00 402.50
2 1+750 L/R 7.0 8.3
7.0 7.1 50.00 350.00 356.25
3 1+800 L/R 7.0 6.0
7.0 6.8 50.00 350.00 341.25
4 1+850 L/R 7.0 7.7
7.0 7.4 50.00 350.00 371.25
5 1+900 L/R 7.0 7.2
7.0 7.6 50.00 350.00 378.75
6 1+950 L/R 7.0 8.0
7.0 7.7 50.00 350.00 382.50
7 2+000 L/R 7.0 7.3
7.0 7.3 50.00 350.00 363.75
8 2+050 L/R 7.0 7.3
7.0 7.7 50.00 350.00 383.75
9 2+100 L/R 7.0 8.1
7.0 7.8 50.00 350.00 387.50
10 2+150 L/R 7.0 7.4
7.0 7.2 50.00 350.00 360.00
11 2+200 L/R 7.0 7.0
7.0 7.1 50.00 350.00 356.25
12 2+250 L/R 7.0 7.3
7.0 7.2 50.00 350.00 358.75
13 2+300 L/R 7.0 7.1
7.0 7.6 50.00 350.00 377.50
14 2+350 L/R 7.0 8.0
7.0 7.6 50.00 350.00 380.00
15 2+400 L/R 7.0 7.2
7.0 6.9 50.00 350.00 342.50
16 2+450 L/R 7.0 6.5
7.0 6.8 50.00 350.00 340.00
17 2+500 L/R 7.0 7.1
7.0 7.1 50.00 350.00 355.00
18 2+550 L/R 7.0 7.1
7.0 7.2 50.00 350.00 360.00
19 2+600 L/R 7.0 7.3
7.0 7.2 50.00 350.00 360.00
20 2+650 L/R 7.0 7.1
7.0 7.1 50.00 350.00 355.00
21 2+700 L/R 7.0 7.1
7.0 7.1 50.00 350.00 355.00
22 2+750 L/R 7.0 7.1
7.0 50.00 350.00 0.00
23 2+800 L/R 7.0
7.0 50.00 350.00 0.00
24 2+850 L/R 7.0
7.0 50.00 350.00 0.00
25 2+900 L/R 7.0 6.8
7.0 7.1 50.00 350.00 352.50
26 2+950 L/R 7.0 7.3
7.0 7.5 50.00 350.00 376.25
27 3+000 L/R 7.0 7.8
7.0 8.7 50.00 350.00 435.50
28 3+050 L/R 7.0 9.7
7.0 9.6 50.00 350.00 481.75
29 3+100 L/R 7.0 9.6
7.0 9.1 50.00 350.00 362.00
30 3+150 L/R 7.0 8.5
7.0 7.9 50.00 350.00 395.00
31 3+200 L/R 7.0 7.3
7.0 7.3 50.00 350.00 365.00
32 3+250 L/R 7.0 7.3
7.0 7.4 50.00 350.00 370.00
29 3+300 L/R 7.0 7.5

JUMLAH TOTAL 1,600 11,200.00 10,805.50 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAR, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ariati f

Penyiapan Badan Jalan

UKURAN UKURAN
RENCANA CC0 VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 3+300 L/R 7.0 7.5


7.0 8.0 50.00 350.00 397.50
2 3+350 L/R 7.0 8.4
7.0 8.6 50.00 350.00 427.50
3 3+400 L/R 7.0 8.7
7.0 8.2 50.00 350.00 410.00
4 3+450 L/R 7.0 7.7
7.0 8.0 50.00 350.00 400.00
5 3+500 L/R 7.0 8.3
7.0 8.2 50.00 350.00 407.50
6 3+550 L/R 7.0 8.0
7.0 7.6 50.00 350.00 105.70
7 3+600 L/R 7.0 7.1
7.0 7.4 50.00 350.00 367.50
8 3+650 L/R 7.0 7.6
7.0 7.6 50.00 350.00 380.00
9 3+700 L/R 7.0 7.6
7.0 7.6 50.00 350.00 380.00
10 3+750 L/R 7.0 7.6
7.0 8.0 50.00 350.00 400.00
11 3+800 L/R 7.0 8.4
7.0 7.9 50.00 350.00 396.25
12 3+850 L/R 7.0 7.5
7.0 7.4 50.00 350.00 367.50
13 3+900 L/R 7.0 7.3
7.0 7.5 50.00 350.00 373.75
14 3+950 L/R 7.0 7.7
7.0 8.3 50.00 350.00 415.00
15 4+000 L/R 7.0 8.9
7.0 8.7 50.00 350.00 432.50
16 4+050 L/R 7.0 8.4
7.0 9.0 50.00 350.00 447.50
17 4+100 L/R 7.0 9.5
7.0 9.0 50.00 350.00 447.50
18 4+150 L/R 7.0 8.4
7.0 8.9 50.00 350.00 445.00
19 4+200 L/R 7.0 9.4
7.0 9.2 50.00 350.00 460.00
20 4+250 L/R 7.0 9.0
7.0 9.2 50.00 350.00 461.25
21 4+300 L/R 7.0 9.5
7.0 9.8 50.00 350.00 488.75
22 4+350 L/R 7.0 10.1
7.0 9.8 50.00 350.00 487.50
23 4+400 L/R 7.0 9.4
7.0 8.3 50.00 350.00 416.25
24 4+450 L/R 7.0 7.3
7.0 7.2 50.00 350.00 358.75
25 4+500 L/R 7.0 7.1
7.0 7.7 50.00 350.00 385.00
26 4+550 L/R 7.0 8.3
7.0 7.7 50.00 350.00 385.00
27 4+600 L/R 7.0 7.1
7.0 7.1 50.00 350.00 352.50
28 4+650 L/R 7.0 7.0
7.0 7.1 50.00 350.00 353.75
29 4+700 L/R 7.0 7.2
7.0 7.2 50.00 350.00 358.75
30 4+750 L/R 7.0 7.2
7.0 7.2 50.00 350.00 357.50
31 4+800 L/R 7.0 7.1
7.0 7.0 50.00 350.00 351.25
32 4+850 L/R 7.0 7.0
7.0 6.5 50.00 350.00 326.25
33 4+900 L/R 7.0 6.1
7.0 6.1 50.00 350.00 302.50
34 4+950 L/R 7.0 6.0
7.0 6.3 50.00 350.00 315.00
35 5+000 L/R 7.0 6.6

JUMLAH 1,700 11,900.00 13,160.70 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAR, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ariati f

Penyiapan Badan Jalan

UKURAN UKURAN
RENCANA CCO VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 5+000 L/R 7.0 6.6


7.0 7.0 50.00 350.00 350.00
2 5+050 L/R 7.0 7.4
7.0 7.2 50.00 350.00 360.00
3 5+100 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00
4 5+150 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00
5 5+200 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00
6 5+250 L/R 7.0 7.0
7.0 7.0 50.00 350.00 350.00
7 5+300 L/R 7.0 7.0
7.0 7.1 50.00 350.00 353.75
8 5+350 L/R 7.0 7.2
7.0 7.2 50.00 350.00 357.50
9 5+400 L/R 7.0 7.2
7.0 7.1 50.00 350.00 356.25
10 5+450 L/R 7.0 7.1
7.0 7.1 50.00 350.00 355.00
11 5+500 L/R 7.0 7.1
7.0 6.6 50.00 350.00 327.50
12 5+550 L/R 7.0 6.0
7.0 6.4 50.00 350.00 317.50
13 5+600 L/R 7.0 6.7
7.0 6.7 50.00 350.00 336.25
14 5+650 L/R 7.0 6.8
7.0 6.6 50.00 350.00 331.25
15 5+700 L/R 7.0 6.5
7.0 7.3 50.00 350.00 362.50
16 5+750 L/R 7.0 8.0
7.0 7.9 50.00 350.00 393.75
17 5+800 L/R 7.0 7.8
7.0 7.7 50.00 350.00 386.25
18 5+850 L/R 7.0 7.7
7.0 7.9 50.00 350.00 396.25
19 5+900 L/R 7.0 8.2
7.0 8.4 50.00 350.00 417.50
20 5+950 L/R 7.0 8.6
7.0 9.1 50.00 350.00 456.25
21 6+000 L/R 7.0 9.7
7.0 8.5 50.00 350.00 426.25
22 6+050 L/R 7.0 7.4
7.0 7.8 50.00 350.00 387.50
23 6+100 L/R 7.0 8.2
7.0 8.5 50.00 350.00 425.00
24 6+150 L/R 7.0 8.9
7.0 8.1 50.00 350.00 405.00
25 6+200 L/R 7.0 7.4
7.0 7.9 50.00 350.00 396.25
26 6+250 L/R 7.0 8.5
7.0 8.3 50.00 350.00 412.50
27 6+300 L/R 7.0 8.0
7.0 8.2 50.00 350.00 407.50
28 6+350 L/R 7.0 8.3
7.0 8.2 50.00 350.00 410.00
29 6+400 L/R 7.0 8.1
7.0 8.0 50.00 350.00 398.75
30 6+450 L/R 7.0 7.9
7.0 8.0 50.00 350.00 398.75
31 6+500 L/R 7.0 8.1
7.0 8.2 50.00 350.00 407.50
32 6+550 L/R 7.0 8.2
7.0 7.9 50.00 350.00 395.00
29 6+600 L/R 7.0 7.6

JUMLAH TOTAL 1,600 11,200.00 12,127.50 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAR, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
: KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ar iat if

Penyiapan Badan Jalan

UKURAN UKURAN
RENCANA CC0 VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 6+600 L/R 7.0 7.6


7.0 7.8 50.00 350.00 387.50
2 6+650 L/R 7.0 7.9
7.0 7.7 50.00 350.00 382.50
3 6+700 L/R 7.0 7.4
7.0 7.6 50.00 350.00 380.00
4 6+750 L/R 7.0 7.8
7.0 7.8 50.00 350.00 390.00
5 6+800 L/R 7.0 7.8
7.0 7.9 50.00 350.00 395.00
6 6+850 L/R 7.0 8.0
7.0 8.0 50.00 350.00 400.00
7 6+900 L/R 7.0 8.0
7.0 7.7 50.00 350.00 385.00
8 6+950 L/R 7.0 7.4
7.0 7.6 50.00 350.00 381.25
9 7+000 L/R 7.0 7.9
7.0 7.4 50.00 350.00 371.25
10 7+050 L/R 7.0 7.0
7.0 7.2 50.00 350.00 361.25
11 7+100 L/R 7.0 7.5
7.0 7.3 50.00 350.00 366.25
12 7+150 L/R 7.0 7.2
7.0 7.4 50.00 350.00 367.50
13 7+200 L/R 7.0 7.5
7.0 7.0 50.00 350.00 350.00
14 7+250 L/R 7.0 6.5
7.0 7.1 50.00 350.00 355.00
15 7+300 L/R 7.0 7.7
7.0 8.3 50.00 350.00 416.25
16 7+350 L/R 7.0 9.0
7.0 8.4 50.00 350.00 418.75
17 7+400 L/R 7.0 7.8
7.0 8.2 50.00 350.00 410.00
18 7+450 L/R 7.0 8.6
7.0 10.3 50.00 350.00 512.50
19 7+500 L/R 7.0 11.9
7.0 10.3 50.00 350.00 512.50
20 7+550 L/R 7.0 8.6
7.0 8.4 50.00 350.00 420.00
21 7+600 L/R 7.0 8.2
7.0 8.5 50.00 350.00 423.75
22 7+650 L/R 7.0 8.8
7.0 9.1 50.00 350.00 453.75
23 7+700 L/R 7.0 9.4
7.0 9.1 50.00 350.00 452.50
24 7+750 L/R 7.0 8.7
7.0 50.00 350.00
25 7+800 L/R 7.0
7.0 50.00 350.00
26 7+850 L/R 7.0
7.0 50.00 350.00
27 7+900 L/R 7.0
7.0 50.00 350.00
28 7+950 L/R 7.0
7.0 50.00 350.00
29 8+000 L/R 7.0
7.0 50.00 350.00
30 8+050 L/R 7.0
7.0 50.00 350.00
31 8+100 L/R 7.0
7.0 50.00 350.00
32 8+150 L/R 7.0
7.0 50.00 350.00
33 8+200 L/R 7.0
7.0 50.00 350.00
34 8+250 L/R 7.0
7.0 50.00 350.00
35 8+300 L/R 7.0

JUMLAH 1,700 11,900.00 9,292.50 M2

Diperiksa & Disetujui Oleh, Di Buat Oleh ,


Konsultan Pengawas Kontraktor Pelaksana
PT. INOVASI KONSULINDO RAYA PT. MACCA MULIA DINAMIS

ABRAR, ST NASRUDDIN
Inspector Pelaksana
BACK UP DATA QUANTITY
NAMA PAKET : PEMBANGUNAN JALAN PAKET 5 (LIMA) BM
RUAS : LANJUTAN PEMBANGUNAN DAN PENINGKATAN JALAN NON STATUS KEC.TOWUTI
KTM MAHALONA (DAK AFIRMASI)
KONTRAKTOR PELAKSANA : PT. MACCA MULIA DINAMIS
KONSULTAN PENGAWAS : PT. INOVASI KONSULINDO RAYA
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN : M2
SKETS
V ar iat if

Penyiapan Badan Jalan

UKURAN UKURAN
RENCANA CCO VOLUME VOLUME
NO STATION POSISI PANJANG KETERANGAN
RENCANA CCO
LEBAR RATA2 LEBAR RATA2

1 8+300 L/R 7.0


7.0 50.00 350.00 0.00
2 8+350 L/R 7.0
7.0 50.00 350.00 0.00
3 8+400 L/R 7.0
7.0 50.00 350.00 0.00
4 8+450 L/R 7.0
7.0 50.00 350.00 0.00
5 8+500 L/R 7.0
7.0 50.00 350.00 0.00
6 8+550 L/R 7.0
7.0 50.00 350.00 0.00
7 8+600 L/R 7.0
7.0 50.00 350.00 0.00
8 8+650 L/R 7.0
7.0 50.00 350.00 0.00
9 8+700 L/R 7.0
7.0 41.00 287.00 0.00
10 8+741 L/R 7.0

JUMLAH 441.00 3,087.00 0.00

JUMLAH TOTAL 8,741 61,187 75,089 M2