You are on page 1of 1

PRODUCED BY AN AUTODESK STUDENT VERSION

1 2 3 4 5 6 7 8

A A

B B

TOP VIEW

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

C C

SECTION -B-B
A

PILE DETAIL-X

PILE REINFORCEMENT DETAIL X


EARTH FILL EARTH FILL
D D

E B B E

A PLAN

NOTES:-
F F

X
G G

SECTION- A-A

CLIENT: EPC CONTRACTOR: DESIGN CONSULTANT: PROJECT:


APPROVED BY: AA CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO
CIVILMANTRA INFRACON PRIVATE 2-LANE / WITH PAVED SHOULDERS FROM EXISTING CHAINAGE
ABCI INFRA
BORDER ROADS ORGANIZATIONS LIMITED CHECKED BY: AK KM.65.000 TO KM. 76.000 (DESIGN CHAINAGE FROM KM 63.950 TO
STRUCTURES PVT.LTD KM 74.733) OF NH 94 (NEW NH-34) ON EPC MODE IN THE STATE OF
H
UTTRAKHAND.
H DESIGNED BY: SR
AUTHORITY ENGINEER: SAFETY CONSULTANT. PROOF CONSULTANT. TITLE:
MICROPILE GAD DRAWING
DRAWN BY: AK
M A SOLUTIONS PVT.LTD. G-ENG ADVISORY SERVICE DRG NO.: DRG NO.: CIPL/D1028/STR/DWG/SN-001 REV.
APRIL R0 SCALE: DATE: R0
PVT.LTD.
DATE REV DESCRIPTION OF REVISIONS BY AS SHOWN APRIL. 2020