FDN BEAM-2 (900X900-M25)

Loading Diagram
12.61 T/m 34.07 T/m
Design for Max. Moment:-

M Factored M Fe fck b d r=Mu/bd2 pt Ast

194.26 291.39 500 25 1000 700 5.966 1.616 11312


0.000 0.729 5103

Design for Max. Shear:-

Fe 500
T Tu τv τc Vu No of legs Bar Asv Sv
153.38 230.07 3.29 0.762 176.76 8 10 628.00 90
AJC Bose Road (Sub-Station)
Loading Diagram 22.5T 22.5T
9.3 T/m (From Slab-6.8T/m+Self Wt. of Beam-2.5T/m)

(20MVA Transformer Load- 45T)

2.78m 2.34m 1.43m

SBY-1(800X1250)
Design for Moment:-

M Factored M Fe fck b d r=Mu/bd2 pt Ast Ast(Prov.)

Span
87.36 131.04 500 25 800 1210 1.12 0.27 2634 3-25T+2-20T(1st layer)
(Bottom)
+3-20T(2nd layer)ext.

Support
9.45 14 500 25 800 1210 0.12 0.17 1646 3-20T+2-25T (1st
(Top)
layer)

Design for Shear:-


Fe 415
T Tu τv τc Vu No of legs Bar Asv Sv
Mid Span 4.68 7.02 0.07 0.33 -24.92 4 10 314 300
Support 57.31 85.97 0.89 0.33 54.02 4 10 314 150