1. The technic for selecting a new point depends upon?
A. Scope of the problem
B. Nature of the problem C. Range of the problem D. Analysis of the problem Answer: B Explanation: In using the mathematical programming methods the process of optimization begins with an acceptable design point and new point is selected suitability so as to minimize the objective function and the search for another new point is continued is continued from the previous point until the optimum point is reached and there are several well established techniques for selecting a new point and to proceed towards the optimum point, depending upon the nature of the problem, such as linear and non linear programming.
2. The method of feasible direction can be grouped under the:
A. Direct method of approach B. Sequential method of approach C. Terminate method of approach D. Laminar method of approach Answer:A Explanation: In non linear programming the method of feasible direction can be grouped under the direct methods of approach on general non linear inequality constrained optimization problems and two well known procedures which embody the philosophy of the method of feasible directions are Rosens gradient projection algorithum and Zountendijks procedure.
3. One of the considered in the economy of prestressed concrete structural system:
A. Structural optimization B. Beam optimization C. Slab optimization D. Transverse optimization Answer:A Explanation: Structural optimization together with the efficient management of labour, materials and the use of new construction techniques, development and use of indigenous and new materials of construction would result in considerable economy in the overall cost of prestressed concrete structural systems.