1. The technic for selecting a new point depends upon?

A. Scope of the problem


B. Nature of the problem
C. Range of the problem
D. Analysis of the problem
Answer: B
Explanation: In using the mathematical programming methods the process of
optimization begins with an acceptable design point and new point is selected
suitability so as to minimize the objective function and the search for another new
point is continued is continued from the previous point until the optimum point is
reached and there are several well established techniques for selecting a new point
and to proceed towards the optimum point, depending upon the nature of the
problem, such as linear and non linear programming.

2. The method of feasible direction can be grouped under the:


A. Direct method of approach
B. Sequential method of approach
C. Terminate method of approach
D. Laminar method of approach
Answer:A
Explanation: In non linear programming the method of feasible direction can be
grouped under the direct methods of approach on general non linear inequality
constrained optimization problems and two well known procedures which embody
the philosophy of the method of feasible directions are Rosens gradient projection
algorithum and Zountendijks procedure.

3. One of the considered in the economy of prestressed concrete structural system:


A. Structural optimization
B. Beam optimization
C. Slab optimization
D. Transverse optimization
Answer:A
Explanation: Structural optimization together with the efficient management of
labour, materials and the use of new construction techniques, development and use
of indigenous and new materials of construction would result in considerable
economy in the overall cost of prestressed concrete structural systems.