Professional Documents
Culture Documents
M1606B
3. Repeat process until all pre-filters 2. Once door is opened, carefully slide
have been installed in housing. panel(s) into the track until panel
rests against foam pad at back of
housing. Panel should also be flush
with door opening to allow the door
to close.
Flanders Filters, Inc. 531 Flanders Filters Road, Washington, NC 27889 (252) 946-8081