Professional Documents
Culture Documents
Electricity Regulations Amendments 2013 PDF
Electricity Regulations Amendments 2013 PDF
FEDERAL GOVERNMENT
3 Mei 2013 GAZETTE
3 May 2013
P.U. (A) 151
DISIARKAN OLEH/
PUBLISHED BY
JABATAN PEGUAM NEGARA/
ATTORNEY GENERAL’S CHAMBERS
P.U. (A) 151
PADA menjalankan kuasa yang diberikan oleh seksyen 53 Akta Bekalan Elektrik 1990
[Akta 447], Menteri membuat Peraturan-Peraturan yang berikut:
Pindaan Peraturan 2
2. Peraturan-Peraturan Elektrik 1994 [P.U. (A) 38/1994], yang disebut “Peraturan-
Peraturan ibu” dalam Peraturan-Peraturan ini, dipinda dalam peraturan 2–
2
P.U. (A) 151
(d) dengan memasukkan selepas takrif “peranti arus baki” takrif yang
berikut:
Pindaan peraturan 47
3. Subperaturan 47(1) Peraturan-Peraturan ibu dipinda–
Pindaan peraturan 97
4. Peraturan 97 Peraturan-Peraturan ibu dipinda dengan menggantikan
subperaturan (1) dengan subperaturan yang berikut–
“(1) Tertakluk kepada peraturan 97C, 97D, 97E dan 101A, tiada
seorang pun boleh mengilang, mengimport, mempamer, menjual atau
mengiklan–
4
P.U. (A) 151
9
P.U. (A) 151
Laporan ujian 101B. (1) Suatu laporan ujian prestasi tenaga di bawah
prestasi
subperaturan 101A(2) hendaklah dikemukakan kepada
tenaga.
Suruhanjaya, mengikut cara yang boleh ditentukan oleh
Suruhanjaya.
10
P.U. (A) 151
Pengemukaan 101C. (1) Suruhanjaya boleh, pada bila-bila masa, melalui notis
untuk ujian secara bertulis, menghendaki mana-mana orang yang mengilang,
dan
mengimport, menjual atau membuat tawaran untuk jualan atau
penyitaan
bagi maksud pajakan kelengkapan yang disebut dalam peraturan 101A, untuk
penggunaan menghantar, dalam tempoh sebagaimana yang dinyatakan dalam
elektrik
notis itu, sampel kelengkapan itu untuk suatu pemeriksaan dan
dengan
cekap. ujian.
11
P.U. (A) 151
12
P.U. (A) 151
13
P.U. (A) 151
(3) Apa-apa kelengkapan sedia ada yang telah dikilangkan, diimport, dijual
atau ditawarkan untuk jualan atau pajakan sebelum berkuatkuasanya Peraturan-
Peraturan ini hendaklah dikehendaki untuk mematuhi peraturan 101A, dalam tempoh
satu tahun dari tarikh bermulanya kuat kuasa Peraturan-Peraturan ini.
“BORANG U1
(Peraturan 97B)
_____________________________________________________________________________________________
* Tidak kurang daripada satu tahun dan tidak melebihi tiga tahun.”;
“BORANG V1
(Peraturan 97C)
.........................…………….
Suruhanjaya Tenaga
___________________________________________________________________________________________
* Potong mana-mana yang tidak berkenaan
** Tidak kurang daripada satu tahun dan tidak melebihi lima tahun.”.
15
P.U. (A) 151
“JADUAL KEEMPAT
Peti sejuk (a) satu pintu MS IEC Nilai SPTM = 2 Penarafan Nilai Indeks
62552:2011 Bintang Bintang Bintang
2 -25%≤ Indeks
Bintang <-0%
1 -35%≤ Indeks
Bintang < -25%
16
P.U. (A) 151
17
P.U. (A) 151
1 2.50– 2.57
18
P.U. (A) 151
5 1.20
4 1.12 – 1.19
3 1.08 – 1.11
2 1.01 – 1.07
1 0.93 – 1.00
(Kaedah yang
diluluskan oleh
IESNA bagi
ukuran elektrik
dan fotometri
produk lampu
keadaan
pepejal) bagi
lampu LED
19
P.U. (A) 151
≤0W 60
11-26 W 65
27 W 85
Lampu LED 55
Lampu pijar* 20
*Nilai standard prestasi tenaga minimum (SPTM) bagi lampu pijar yang disebut diatas
hendaklah tidak terpakai bagi penggunaan seperti berikut:
20
P.U. (A) 151
(i) lampu yang tidak boleh diganti terus dengan lampu jenis lain; dan
(j) lampu pijar untuk tujuan lain seperti difikirkan sesuai oleh Suruhanjaya
untuk dikecualikan.”.
21
P.U. (A) 151
In exercise of the powers conferred by section 53 of the Electricity Supply Act 1990 [Act
447], the Minister makes the following regulations:
Amendment of regulation 2
2. The Electricity Regulations 1994 [P.U. (A) 38/1994], which are referred to as the
“principal Regulations” in these Regulations, are amended in regulation 2─
(e) by inserting after the definition of “final circuit” the following definition:
23
P.U. (A) 151
Amendment of regulation 47
3. Subregulation 47(1) of the principal Regulations is amended–
(a) in paragraph (b) by inserting after the words “electrical engineering” the
words “or electrical and electronic engineering”;
(b) in paragraph (c) by inserting after the words “electrical engineering” the
words “or electronic engineering”;
Amendment of regulation 97
4. Regulation 97 of the principal Regulations is amended by substituting for
subregulation (1) the following subregulation:
“(1) Subject to regulations 97C, 97D, 97E and 101A, no person shall
manufacture, import, display, sell or advertise—
24
P.U. (A) 151
(c) any low voltage equipment which does not require special
skills in its operation,
“Recognition of 97A. (1) For the purposes of certifying any equipment under
foreign regulation 97, the Commission shall give a recognition to a foreign
conformity
conformity assessment body, in a manner that may be determined by
assessment body.
the Commission.
25
P.U. (A) 151
Registration of 97B. (1) For the purposes of certifying any equipment under
local conformity
regulation 97, a local conformity assessment body shall apply to be
assessment body.
registered with the Commission, in a manner that may be determined
by the Commission.
26
P.U. (A) 151
27
P.U. (A) 151
28
P.U. (A) 151
“Efficient use of 101A. (1) For the purpose of efficient use of electricity, prior to
electricity by
an application for a Certificate of Approval under regulation 97, any
equipment.
person who manufactures, imports, sells or offers for sale or lease any
equipment under that regulation, shall ensure that such equipment
meets the energy performance testing standards, the minimum energy
performance standards and the efficiency ratings as set out in the
Fourth Schedule.
29
P.U. (A) 151
Energy
performance
101B. (1) An energy performance testing report under
testing report. subregulation 101A(2) shall be submitted to the Commission, in a
manner that may be determined by the Commission.
Submission for
101C. (1) The Commission may, at any time, by notice in writing,
test and
seizure for the require any person who manufactures, imports, sells or offers for sale
purpose of or lease such equipment as referred to in regulation 101A, to deliver,
efficient use of
within such period as may be specified in the notice, samples of the
electricity.
equipment for an examination and a test.
(3) The Commission shall not be liable for any loss or damage
caused in the delivery or seizure and removal of equipment under
subregulation (1) or (2), as the case may be.”.
“Market 109A. (1) The Commission may, from time to time, carry out
surveillance. market surveillance to determine if any equipment referred to in
31
P.U. (A) 151
commits an offence.”.
(3) Any existing equipment which had been manufactured, imported, sold or
offered for sale or lease before the coming into operation of these Regulations shall be
required to comply with regulation 101A, within one year from the date of coming into
operation of these Regulations.
“FORM U1
(Regulation 97B)
33
P.U. (A) 151
“FORM V1
(regulation 97C)
….........................…………….
Energy Commission
___________________________________________________________________
* Delete wherever appropriate
** Not less than one year and not more than five years.”.
34
P.U. (A) 151
“FOURTH SCHEDULE
35
P.U. (A) 151
Air Single split wall MS ISO 5151:2004 MEPS’s value = 2 (a) Cooling capacity <
conditioner mounted air Star 4.5kW:
conditioner (Non-ducted air
Star Star Index
capacity up to conditioners and
Rating Value
25, 000 Btu/h heat pumps:
5 ≥11.94
Testing and rating
for performance) 4 11.16 -11.93
3 10.37 - 11.15
2 9.56 - 10.36
1 9.00- 9.55
36
P.U. (A) 151
Domestic fan (a) wall MS 1220:2001 MEPS’s value = 2 (a) Ceiling fan:
Star
(b) desk (performance and Star Star Index
construction of Rating Value
1 2.50– 2.57
5 1.20
4 1.12 – 1.19
3 1.08 – 1.11
2 1.01 – 1.07
1 0.93 – 1.00
*The Minimum Energy Performance Standards (MEPS) value for incandescent lamp shall not
apply for the following use:
38
P.U. (A) 151
(i) lamps that cannot be directly replaced with other type of lamp; and
(j) incandescent lamp for other purposes deemed suitable by the Commission to
be excluded.”.
39