Professional Documents
Culture Documents
Site verification is used to check the status of a site during the site deployment. The check
items include the software and hardware running status, optical power, board status, GPS,
clock, alarms, bar code information, version information, and cell running status, S1 interface
status, and license status. The site verification phase is optional. If you select it when starting
an NE commissioning task, the U2020 automatically starts site verification and includes the
verification result in the NE commissioning report.
Prerequisites
You have selected Site Verification when starting the commissioning task on the U2020.
Context
The execution results of the check items of site verification are recorded in the site
verification report and included in the commissioning report.
NOTICE:
Do not modify NE configuration during the site verification phase. Otherwise, site
verification may fail or the result may be incorrect.
Procedure
1. During the site verification phase, the U2020 automatically executes the following
check items and notifies you of the current check item.
GSM Cell State Check To query the running status of the GSM
cell
UMTS Cell State Check To query the running status of the UMTS
cell
LTE Cell State Check To query the running status of the LTE
cell
Base Station Status Check To query the operating status of the base
station software and the RF channel
status
DFU Management Link State Check To query the DFU management link
status
Site Verification Check Item Action
LTE Cell State Check To query the running status of LTE cells
NOTE:
The site verification process takes less than or equal to 30 minutes. In addition,
the site verification result does not affect the final commissioning result.