addnl :
payroll reimb. (nov. 1-7) 48,822.00
payroll reimb. (nov. 15-21)) 25,737.75
bong reimb. - materials 8,000.00
material reimb. (switches & wire) 17,822.00
labor : addnl
14 sets 3-way switch (200/set) 2,800.00
4 sets 4-way switch (200/set) 800.00
20 mts 50mm wire (283.92/mts) 7,950.00
12 mts 2inc x 10ft pvc/rcp (108/mts) 1,296.00
135 mts 1/2 inc x 10ft pvc (22/mts) 2,970.00
450mts 3.5sqm. Thghn (15/mts) 6,750.00
sub-total 422,947.75
deduction:
panel board 41,390.00
wire 50mm 30mts @ 289.00 8,670.00
elec. Pipe 530 pcs @55.00 29,150.00
125amp. Breaker with box 4,057.00
sub-total 83,267.00