Project Name : Rehabilitation and upgradation of existing carriageway to two lanes with paved shoulder standards from Kundral

Kundral to Wazar section of NH -161A from km 52.730 to km 99.250 in the State of Maharashtra

Date : 21-03-2020
STATEMENT OF AVAILABLE SCOPE OF WORK ( Weekly Report)

Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
Widening and Strengthening of existing
A Note: Expected date should be mention
road
(1) Earthwork up to top of Sub-grade KM 54580 54600 0.020 0.020 19.12.2019 19.12.2019
KM 54607 54675 0.068 0.068 17.12.2019 25.08.2020 Structure approch
KM 54705 54720 0.015 0.015 17.12.2019 25.08.2020 Structure approch
KM 56200 56800 0.600 0.600 15.12.2019 15.06.2020 Overlay of Flexiable Pavement
KM 61915 61950 0.000 0.035 2.12.2019 12.11.2019 12.11.2019
KM 66955 67000 0.045 0.045 2.12.2019 12.11.2019 12.11.2019
KM 70009 70010 0.000 0.001 29.11.2019 07.09.2020 Structure Approch
KM 70254 70260 0.000 0.006 25.11.2019 12.11.2019 12.11.2019
KM 73030 73100 0.070 0.070 25.11.2019 18.12.2019
KM 84530 84540 0.000 0.010 15.11.2019 12.11.2019 12.11.2019
KM 89200 89420 0.000 0.220 15.11.2019 13.11.2019 13.11.2019
KM 91120 91122 0.000 0.002 13.11.2019 12.11.2019 12.11.2019
KM 91129 91140 0.000 0.011 13.11.2019 12.11.2019 12.11.2019
KM 0.818 1.103
(2) Sub Base Course - GSB KM 54400 54600 0.140 0.200 20.12.2019 25.12.2019
KM 54607 54675 0.068 0.068 18.12.2019 15.4.2020 Structure approch
KM 54705 55010 0.095 0.305 18.12.2019 30.3.2020 Structure approch
KM 56200 56880 0.680 0.680 16.12.2019 12.4.2020 Overlay of Flexiable Pavement
KM 57000 57060 0.060 0.060 16.12.2019 25.3.2020 Structure approch
KM 57060 57160 0.100 0.100 16.12.2019 15.2.2020
KM 57160 57275 0.115 0.115 14.12.2019 25.3.2020 Structure approch
KM 57295 57360 0.065 0.065 14.12.2019 26.3.2020 Structure approch
KM 57360 57500 0.140 0.140 14.12.2019 19.2.2020
KM 57500 57600 0.100 0.100 13.12.2019 26.3.2020 Structure approch
KM 57600 58000 0.400 0.000 13.12.2020 21.11.2019 21.11.2019 26.3.2020
KM 58500 58580 0.080 0.030 12.12.2019 27.3.2020 Structure approch
KM 58640 58700 0.060 0.060 12.12.2019 27.3.2020 Structure approch
KM 60720 60810 0.090 0.090 10.12.2019 30.3.2020 Structure approch
KM 63980 64200 0.150 0.120 8.12.2019 22.3.3020 H T Line shifting balance
KM 64990 65000 0.010 0.000 5.12.2019 30.3.2020 Structure approach
KM 66360 66365 0.000 0.005 5.12.2019 20.3.2020 Structure approach
KM 69970 69991 0.021 0.021 3.12.2019 21.3.2020 Structure approach
KM 70009 70050 0.041 0.011 3.12.2019 24.3.2020 Structure approach
KM 71800 71810 0.010 0.010 2.12.2019 24.3.2020 Structure approach
VUP Praposal & HT Line crossing
KM 73030 73100 0.010 0.070 29.11.2019 25.4.2020 balance
KM 77850 77900 0.030 0.050 17.11.2019 13.11.2019 13.11.2019
KM 78180 78200 0.020 0.020 17.11.2019 13.11.2019 13.11.2019
KM 87750 87796 0.046 0.000 25.11.2019 26.3.2020 Structure approach
KM 87804 87830 0.026 0.000 25.11.2019 26.3.2020 Structure approach
KM 91000 91040 0.040 0.040 15.11.2019 13.11.2019 13.11.2019
KM 91070 91122 0.052 0.052 15.11.2019 13.11.2019 13.11.2019
KM 91129 91160 0.031 0.031 14.11.2019 13.11.2019 13.11.2019
KM 2.680 2.443
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 54400 54600 0.140 0.200 21.12.2019 4.1.2020
KM 54607 54675 0.068 0.068 21.12.2019 17.4.2020 Structure approch
KM 54705 54800 0.095 0.095 19.12.2019 2.4.2020 Structure approch
KM 54800 55010 0.000 0.210 19.12.2019 15.2.2020 2.4.2020
KM 56800 56880 0.080 0.080 17.12.2019 13.4.2020 Structure approch
KM 57000 57060 0.060 0.060 16.12.2019 25.3.2020 Structure approch
KM 57060 57160 0.100 0.100 16.12.2019 27.2.2020 27.3.2020
KM 57160 57275 0.115 0.115 14.12.2019 27.3.2020 Structure approch
KM 57295 57360 0.065 0.065 14.12.2019 27.3.2020 Structure approch & HT line
KM 57360 57500 0.140 0.140 14.12.2019 21.2.2020 28.3.2020
KM 57500 57650 0.150 0.150 13.12.2019 28.3.2020 Structure approch
KM 57650 58000 0.350 0.000 15.12.2019 26.11.2019
KM 58520 58580 0.000 0.060 13.12.2019 29.3.2020 Structure approch
KM 58640 58720 0.060 0.080 13.12.2019 29.3.2020 Structure approch
KM 60700 60810 0.110 0.110 11.12.2019 2.4.2020 Structure approch
KM 63980 64250 0.270 0.170 9.12.2019 24.3.2020 H T Line shifting balance
KM 66350 66365 0.000 0.015 7.12.2019 22.3.2020 Structure approch
KM 69950 69991 0.041 0.021 5.12.2019 23.3.2020 Structure approch
KM 70009 70070 0.061 0.011 5.12.2019 26.3.2020 Structure approch
KM 71780 71810 0.030 0.030 4.12.2019 26.3.2020 Structure approch
VUP Praposal & HT Line crossing
KM 73030 73230 0.020 0.200 1.12.2019 27.4.2020 balance
KM 87750 87796 0.046 0.046 27.11.2019 28.3.2020 Structure approch
KM 88180 88700 0.520 0.000 27.11.2019 24.11.2019
KM 91000 91040 0.040 0.040 16.11.2019 14.11.2019 ® 14.11.2019 ® 24.11.2019 (L) 23.11.2019 LHS complete
KM 91070 91122 0.052 0.052 16.11.2019 14.11.2019 ® 14.11.2019 ® 24.11.2019 (L) 23.11.2019 LHS complete
KM 91129 91180 0.051 0.051 16.11.2019 14.11.2019 ® 14.11.2019 ® 24.11.2019 (L) 23.11.2019 LHS complete
KM 2.664 2.169
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
(b) Pavement Quality Concrete KM 54400 54600 0.200 0.200 30.12.2019 8.2.2020 20.1.2020
KM 54607 54675 0.068 0.068 30.12.2019 24.4.2020 Structure approch
KM 54705 55030 0.125 0.125 29.12.2019 10.4.2020 Structure approch
KM 54830 55030 0.200 0.190 29.12.2019 5.3.2020 10.4.2020
KM 56800 56880 0.080 0.080 26.12.2019 19.4.2020 Structure approch
KM 57000 57275 0.275 0.275 25.12.2019 4.4.2020 Structure approch
KM 57295 57650 0.355 0.355 25.12.2019 5.4.2020 Structure approch
KM 57650 58090 0.440 0.070 24.12.2019 22.12.2019
KM 58520 58580 0.040 0.060 22.12.2019 6.4.2020 Structure approch
KM 58640 58720 0.080 0.080 22.12.2019 6.4.2020 Structure approch
KM 60690 60810 0.110 0.120 20.12.2019 9.4.2020 Structure approch
KM 63960 64250 0.280 0.140 17.12.2019 1.4.2020 H T Line shifting balance
KM 66340 66365 0.015 0.025 15.12.2019 29.3.2020 Structure approch
KM 69942 69991 0.049 0.021 13.12.2019 30.3.2020 Structure approch
KM 70009 70080 0.071 0.011 13.12.2019 2.4.2020 Structure approch
KM 71770 71810 0.040 0.030 12.12.2019 2.4.2020 Structure approch
VUP Praposal & HT Line crossing
KM 73030 73230 0.030 0.200 9.12.2019 3.4.2020 balance
KM 87750 87796 0.046 0.046 6.12.6019 7.4.2020 Structure approch
KM 88180 88700 0.520 0.000 5.12.2019 12.12.2019 8.4.2020
KM 90460 90500 0.000 0.040 25.11.2019 7.12.2019
KM 91000 91040 0.040 0.040 25.11.2019 25.11.2019 ® 7.12.2019 LHS complete
KM 91070 91122 0.052 0.052 24.11.2019 25.11.2019 ® 7.12.2019 LHS complete
KM 91129 91200 0.071 0.071 24.11.2019 25.11.2019 ® 7.12.2019 LHS complete
KM 3.187 2.299
MOM with SE Sir istructed to
(4) Bituminous Base Course KM 56200 56800 0.600 0.600 19.12.2019 15.4.2020 extend width upto 7 m instead of
5.5 m
(5) Wearing Course KM 56200 56800 0.600 0.600 23.12.2019 17.4.2020
B2 Realignment (Rigid pavement)
(1) Earthwork up to top of Sub-grade KM 58100 58200 0.100 0.100 25.11.2019 12.11.2019 12.11.2019
KM 71820 71875 0.055 0.055 1.12.2019 24.3.2020 Structure approch
KM 72125 72250 0.125 0.125 30.11.2019 20.1.2020 14.2.2020 MJB Structure approch
KM 72250 72480 0.230 0.230 30.11.2019 5.1.2020 20.4.2020
KM 72480 72765 0.285 0.285 30.11.2019 4.3.2020 20.4.2020 Structure approch
KM 72765 72900 0.135 0.135 28.11.2019 20.4.2020 Structure approch
KM 73000 73030 0.030 0.030 27.11.2019 20.4.2020 VUP Praposal
KM 0.960 0.960
(2) Sub Base Course - GSB KM 71810 71875 0.065 0.065 2.12.2019 24.3.2020 Structure approch
KM 72125 72680 0.555 0.125 2.12.2019 13.2.2020 16.2.2020 MJB Structure approch
KM 72680 72765 0.000 0.085 1.12.2019 16.2.2020 Structure approch
KM 72765 72900 0.135 0.135 30.11.2019 21.4.2020 Structure approch
KM 73000 73030 0.030 0.030 29.11.2019 21.4.2020 VUP Praposal
KM 0.785 0.440
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 58720 58730 0.000 0.010 13.12.2019 29.3.2020 Structure approch
KM 71810 71875 0.065 0.065 4.12.2019 26.3.2020 Structure approch
KM 72125 72510 0.385 0.125 3.12.2019 2.3.2020 18.2.2020 MJB Structure approch
KM 72510 72765 0.255 0.125 3.12.2019 13.3.2020 18.2.2020 MJB Structure approch
KM 72765 72900 0.135 0.135 2.12.2019 27.4.2020 Structure approch
KM 73000 73030 0.030 0.030 1.12.2019 27.4.2020 VUP Praposal
KM 0.870 0.490
(b) Pavement Quality Concrete KM 58720 58750 0.030 0.020 21.12.2019 6.4.2020 Structure approch
KM 71810 71875 0.065 0.065 12.12.2019 2.4.2020 Structure approch
KM 72125 72280 0.155 0.155 11.12.2019 27.2.2019 MJB Structure approch
KM 72650 72765 0.115 0.115 11.12.2019 19.3.2020 (RHS) 28.2.2019
KM 72765 72900 0.135 0.135 10.12.2019 3.4.2020 Structure approch
KM 73000 73030 0.030 0.030 9.12.2019 3.4.2020 VUP Praposal
KM 0.530 0.520
C1 New Service Road ( Rigid pavement )
(1) Earthwork up to top of sub-grade KM 0 0 0 0
(2) Sub Base Course KM 0 0 0 0
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 91260 92020 0.760 0.760 10.11.2019 SR Balance
KM 0.760 0.760
(b) Pavement Quality Concrete KM 91260 92020 0.760 0.760 30.11.2019 2.12.2019 SR Balance
KM 0.760 0.760
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9

D Reconstruction Culverts Nos 56820, 56920 & 57560 3.00 31.12.2019 20.3.2020

2 Minor Bridges / Underpasses / Overpasses


A1 Widening and repairs of Minor Bridges
Substructure completed and
15.3.2020 Sub-
1) CH 70000 Rmt 18 15.1.2020 30.08.2020 superstructure start after
strucrure complete
complition of MJB.
2) CH 58610 Rmt 60 20.1.2020 30.08.2020 Yet to start
Reconstruction of Minor Bridges (Length
A2
>6m and <60m)
1) CH 87800
Foundation + Sub Structure: On completion of
the foundation work including foundation for
(1) Rmt 8 .-. Completed
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 8 10.12.2019 4.12.2019 Completed
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


Out of 4 wall 2 is
including Retaining walls, stone pitching,
(3) Rmt 7 30.12.2019 completed.Resume work after
protection works complete in all respect and fit
complition of MNB
for use
2) CH 66424
Foundation + Sub Structure: On completion of
the foundation work including foundation for 9.3.2020 Sub -
(1) Rmt 17 10.12.2019 12.12.2019(F)
wing wa and return walls, abutments, piers structure complete
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 17 10.1.2020 17.05.2020
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 20.1.2020 27.05.2020
protection works complete in all respect and fit
for use
3) CH 54690
Foundation + Sub Structure: On completion of
the foundation work including foundation for
(1) Rmt 30 20.12.2019 16.12.2019(F) 18.03.2020
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 30 22.1.2020 25.08.2020
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 30.1.2020 15.10.2020
protection works complete in all respect and fit
for use
4) CH 57285

Foundation + Sub Structure: On completion of


the foundation work including foundation for
(1) Rmt 20 15.12.2019 8.1.2020 ( F) 27.04.2020
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 20 17.1.2020 15.05.2020
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 25.1.2020 15.06.2020
protection works complete in all respect and fit
for use
3 Major Bridges
A2 New Majar Bridge @ CH 72000
1 Foundation Rmt 250 .-.
2 Sub-Structure Rmt 250 30.12.2019 30.12.2019
A) Piers 1) Pier no 7 no 10.2.2020 12.2.2020 10.2.2020
2) Pier no 8 no 25.2.2020 10.1.2020 25.2.2020
B) Pirecaps 1) Pier no 6 no 2.1.2020 5.1.2020 2.1.2020
2) Pier no 7 no 17.2.2020 17.2.2020
3) Pier no 8 no 1.3.2020 17.2.2020 1.3.2020
4) Pier no 9 no 11.1.2020 1.3.2020 11.1.2020
5) Pier no 10 no 24.12.2019 22.12.2019 24.12.2019
3 Super-Structure (including bearing) Rmt 250 30.4.2020 30.4.2020
Slab 1) Span no 1 no 1.2.2020 1.2.2020
2) Span no 2 no 17.1.2020 14.1.2020 17.1.2020
3) Span no 3 no 4.1.2020 4.1.2020 4.1.2020
4) Span no 4 no 21.12.2019 20.12.2019 28.1.2020 21.12.2019
5) Span no 5 no 14.2.2020 12.2.2020 14.2.2020
Sequence & date will change
as per site conditions.
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
Sequence & date will change
6) Span no 6 no 27.2.2020 26.2.2020 27.2.2020
as per site conditions.
7) Span no 7 no 10.3.2020 11.3.2020 10.3.2020
8) Span no 8 no 23.3.2020 23.3.2020
9) Span no 9 no 4.4.2020 4.4.2020
10) Span no 10 no 17.4.2020 17.4.2020
Sequence & date will change
as per site conditions.
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
11) Span no 11 no 30.4.2020 30.4.2020
4 Wearing Coat including expansion joints Rmt 250 10.05.2020 10.05.2020
5 Approaches Rmt 250 15.05.2020 15.05.2020
B2 Widening of ROB / RUB -
b) ROB -
Foundation, Sub-Structure, Super-Structure
1 (including bearing),Wearing Coat including Rmt 0.00
expansion joints
Approaches (including Retaining wall, stone
2 Rmt 0.00
pitching and protection works)
3 Other works
(i) Toll Plaza Nos
(ii) Road side drains Covered & Surface Drain Km 0 0 0
(iii) Road signs Km 99250 85000 14.250 20.01.2020 20.1.2020 30.1.2020
77240 84540 7.300 20.01.2020 30.1.2020 15.2.2020
61900 67400 5.500 20.01.2020 5.2.2020 28.2.2020
52730 60700 7.970 20.01.2020 3.2.2020 15.3.2020
72125 73800 1.675 20.01.2020 30.3.2020
69400 71800 2.400 20.01.2020 5.2.2020 15.4.2020
Road Markings Km 99250 92300 6.950 20.01.2020 16.01.2020 30.1.2020
92300 90300 2.000 20.01.2020 30.1.2020
90300 88600 1.700 20.01.2020 14.01.2020(S) 30.1.2020
88600 85000 3.600 20.01.2020 20.1.2020 (S) 30.1.2020
77240 84540 7.300 20.01.2020 5.3.2020 15.2.2020
61900 67400 5.500 20.01.2020 28.2.2020
52730 60700 7.970 20.01.2020 15.3.2020
72125 73800 1.675 20.01.2020 30.3.2020
69400 71800 2.400 20.01.2020 15.4.2020
Km Stones fixing Km 99250 85000 14.250 31.12.2019 10.01.2020 30.1.2020
84540 82000 2.540 31.12.2019 10.01.2020 15.2.2020
82000 77240 4.760 31.12.2019 15.2.2020
61900 67400 5.500 31.12.2019 28.2.2020
52730 60700 7.970 31.12.2019 15.3.2020
72125 73800 1.675 31.12.2019 30.3.2020
69400 71800 2.400 31.12.2019 15.4.2020
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
(iv) Project facilities
a Bus Shelter Nos 11.000 31.12.2019 4 No. (12.2.2020) 2 No. (27.2.2020) 31.3.2020
c Median Work Km
d Gantry Nos 1.000 20.01.2020 25.1.2020 20.1.2020
e Utility Pipe ducts Nos
f Junction Improvement Nos 22.000 20.01.2020 16.3.2020 (1 no) 15.4.2020

g Street Lighting / High mast Lighting / Blinkers Km 0 0 0.000

h MS Railing Km
Site Clearance and dismantling (Dismantling
v) of Flexible Pavement and drain and Scarifying Km 68430 70000 1.57 1.570 15.12.2019 20.2.2020 Doranali Hindrences
Existing BT surface)
ix) Dismantling of existing structures Km 0.000 10.2.2020
vi) Plantation Work Km 99250 85000 3.250 31.12.2019 5.3.2020 15.2.2020
96000 85000 11.000 31.12.2019
77240 84540 7.300 31.12.2019 28.2.2020
61900 67400 5.500 31.12.2019 15.3.2020
52730 60700 7.970 31.12.2019 30.3.2020
72125 73800 1.675 31.12.2019 15.4.2020
69400 71800 2.400 31.12.2019

Construction of protection works other than


approaches to the bridges/evated sections /
vii) Km 0.870 20.12.2019 25.3.2020
flyovers / grade separators and ROBS /
RUBS.

x) Interlocking Paver Block Km 91260 92020 0.760 0.760 31.12.2019 15.3.2020

STATEMENT OF EXPECTED TO BE AVAILABLE SCOPE OF WORK (Weekly Report)


Balance Length / No
Sr.No Probable Date
Description Unit Remarks if any
. LHS RHS of Completion

1 2 3 4 5 6 7
Widening and Strengthening of existing
A
road
(1) Earthwork up to top of Sub-grade KM 77100 77300 0.200 0.000 15.1.2020 6.12.2019 Hindrences by Farmar
KM 74120 74700 0.580 0.580 18.1.2020 Hindrences by Farmar
KM 76540 76610 0.070 0.070 18.1.2020 31.1.2020
KM 76950 77100 0.150 0.150 20.1.2020 6.12.2019
KM 1.000 0.800
(2) Sub Base Course - GSB KM 64100 64847 0.000 0.747 10.3.2020 Hindrences by Farmar
KM 64854 64913 0.043 0.059 6.3.2020 Hindrences by Farmar
KM 64928 64990 0.062 0.052 6.3.2020 Hindrences by Farmar
KM 67420 69700 1.960 1.950 3.3.2020 Hindrences by Farmar
KM 73840 76010 2.160 1.050 21.1.2020 Hindrences by Farmar
KM 76000 76340 0.340 0.340 21.1.2020 7.1.2020( R) 14.01.2020
KM 76340 76610 0.270 0.270 21.1.2020 16.01.2020
KM 76950 77240 0.290 0.290 24.1.2020 17.12.2019® 5.1.2020 RHS complete
KM 5.125 4.758
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 64100 64847 0.000 0.747 12.3.2020 Hindrences by Farmar
KM 64854 64913 0.043 0.059 9.3.2020 Hindrences by Farmar
KM 64928 64990 0.052 0.062 9.3.2020 Hindrences by Farmar
KM 67400 69420 2.000 2.000 6.3.2020 Hindrences by Farmar
KM 73820 76010 2.180 1.900 23.1.02020 Hindrences by Farmar
KM 76000 76340 0.340 0.340 23.1.02020 8.1.2020 ( R) 15.01.2020
KM 76340 76510 0.170 0.170 23.1.02020 19.1.2020
KM 76510 76610 0.100 0.100 20.4.2020 Structure approch
KM 76950 77250 0.300 0.290 26.1.2020 20.12.2019® 7.1.2020 ( R)
KM 87804 87830 0.026 0.026 16.3.2020 L A Problem
KM 5.211 5.694
(b) Pavement Quality Concrete KM 64100 64847 0.000 0.747 20.3.2020 Hindrences by Farmar
KM 64854 64913 0.059 0.059 18.3.3020 Hindrences by Farmar
KM 64928 65000 0.062 0.072 18.3.2020 Hindrences by Farmar
KM 67390 69430 2.000 2.010 15.3.2020 Hindrences by Farmar
KM 73810 75950 2.140 2.140 1.2.2020 Hindrences by Farmar
KM 75950 76510 0.560 0.560 7.2.2020 28.1.2020
KM 76510 76610 0.100 0.100 15.3.2020 Structure approch
KM 76950 77250 0.300 0.300 15.3.2020 31.1.2020
KM 87804 87830 0.026 0.026 25.3.2020 L A Problem
KM 5.247 6.014
B2 Realignment (Rigid pavement)
(1) Earthwork up to top of Sub-grade KM 56880 57000 0.120 0.120 28.1.2020
KM 72900 73000 0.100 0.100 20.3.2020
KM 77900 78180 0.280 0.280 10.2.2020 18.10.2019
KM 84540 84795 0.255 0.255 13.3.2020 Subject to Land Aquisation
KM 84845 84900 0.055 0.055 13.3.2020 expected upto 20.12.2019
KM 84900 84980 0.080 0.080 13.3.2020 20.5.2019
KM 87830 87850 0.020 0.020 12.3.2020
KM 0.910 0.910
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
(2) Sub Base Course - GSB KM 56880 57000 0.120 0.120 31.01.2019
KM 72900 73000 0.100 0.100 23.3.2020
KM 77900 78180 0.280 0.280 15.2.2020 14.11.2019
KM 84620 84795 0.175 0.175 15.3.2020
KM 84845 84890 0.035 0.045 15.3.2020
KM 87830 87850 0.020 0.000 14.3.2020
KM 0.730 0.720
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 56880 57000 0.120 0.120 7.2.2020
KM 72900 73000 0.100 0.100 25.3.2020 Subject to Land Aquisation
KM 84550 84795 0.245 0.245 20.3.2020 expected upto 20.12.2019
KM 84845 84890 0.045 0.045 19.3.2020
KM 87830 88180 0.350 0.320 16.3.2020 23.11.2019
KM 0.860 0.830
(b) Pavement Quality Concrete KM 56880 57000 0.120 0.120 15.02.2019
KM 72900 73000 0.100 0.100 4.2.2020
KM 84540 84795 0.255 0.255 28.3.2020
KM 84845 84900 0.055 0.055 28.3.2020
KM 87830 88180 0.350 0.320 25.3.2020 12.12.2019
KM 0.880 0.850
C1 New Service Road ( Rigid pavement )
(1) Earthwork up to top of sub-grade KM 60810 60980 0.170 0.170 2.4.2020
KM 61000 61915 0.915 0.915 1.4.2020 25.11.2019 Main Carrage way complete
KM 66380 66422 0.042 0.042 23.3.2020
66439 66560 0.121 0.121 23.3.2020
KM 66560 66955 0.395 0.395 23.3.2020 17.7.2019 Main Carrage way complete
KM 76610 76950 0.340 0.340 19.3.2020 15.01.2020(CW)
KM 1.983 1.983
(2) Sub Base Course KM 60810 60980 0.170 0.170 4.4.2020 CW & SR Balance
KM 61000 61080 0.080 0.080 4.4.2020 CW & SR Balance
KM 61080 61900 0.820 0.820 3.4.2020 14.12.2019 (CW) CW & SR Balance
KM 66365 66422 0.057 0.057 25.3.2020 CW & SR Balance
KM 66439 66540 0.101 0.101 25.3.2020 CW & SR Balance
KM 66540 66955 0.415 0.415 25.3.2020 SR Balance
KM 76610 76950 0.340 0.340 21.3.2020 16.01.2020(L)(CW) CW & SR Balance
KM 1.983 1.983
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 60810 60980 0.170 0.170 6.4.2020 CW & SR Balance
KM 61000 61080 0.080 0.080 4.4.2020 CW & SR Balance
KM 61080 61900 0.820 0.820 3.4.2020 16.12.2019 (CW) CW & SR Balance
KM 61880 61915 0.035 0.035 6.4.2020 SR Balance
KM 66365 66422 0.057 0.057 27.3.2020 CW & SR Balance
KM 66439 66560 0.121 0.121 27.3.2020 CW & SR Balance
KM 66560 66955 0.395 0.395 27.3.2020 SR Balance
KM 76610 76700 0.090 0.090 27.3.2020 21.1.2020 CW & SR Balance
KM 76700 76750 0.050 0.050 27.3.2020 CW & SR Balance
KM 76750 76950 0.200 0.200 23.3.2020 21.1.2020 CW & SR Balance
KM 2.018 2.018
(b) Pavement Quality Concrete KM 60810 60980 0.170 0.170 15.4.2020 CW & SR Balance
KM 61000 61080 0.080 0.080 4.4.2020 CW & SR Balance
KM 61080 61900 0.820 0.820 3.4.2020 18.12.2019 (CW) CW & SR Balance
KM 61900 61915 0.015 0.015 6.4.2020 SR Balance
KM 66365 66422 0.057 0.057 6.4.2020 CW & SR Balance
KM 66439 66570 0.131 0.131 6.4.2020 CW & SR Balance
KM 66570 66955 0.385 0.385 6.4.2020 SR Balance
KM 76610 76700 0.090 0.090 6.4.2020 23.1.2020 ( CW)
KM 76700 76750 0.050 0.050 6.4.2020
KM 76750 76950 0.200 0.200 2.4.2020 31.1.2020 (CW) CW & SR Balance
KM 68690, 74235, 1.998 1.998
D Reconstruction Culverts Nos 74485, 76555, 9.00 31.3.2020
2 Minor Bridges / Underpasses / Overpasses 77000, 69225 &

Reconstruction of Minor Bridges (Length


A2
>6m and <60m)

Foundation + Sub Structure: On completion of


the foundation work including foundation for
(1) Rmt 49 05.2.2020
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including
Subject to Land Aquisation
(2) wearing coat, bearings, road signs & Rmt 84820 49 15.3.2020 expected upto 20.12.2019
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 25.3.2019
protection works complete in all respect and fit
for use

Foundation + Sub Structure: On completion of


the foundation work including foundation for
(1) Rmt 49 05.2.2020
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Subject to Land Aquisation


60990 expected upto 20.12.2019
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work)

1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9
Super-structure: On completion of
superstructure in all respects including Subject to Land Aquisation
(2) wearing coat, bearings, road signs & Rmt 60990 49 10.3.2020 expected upto 20.12.2019
markings, tests on completion etc. complete in
all respect.
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement (As Achivement (As Achivement (As Achivement (As Achivement (As Expected date Remarks
Subject to LandifAquisation
any
No.
From60990 To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) per work) per work) per work) per work) per work) expected upto 20.12.2019
1 2 3 4 5 6 7 8 22.11.2019 19.12.2019 26.12.2019 02.01.2020 09.01.2020 16.01.2020 13.2.2020 27.2.2020 5.3.2020 19.3.2020 9

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 20.3.2020
protection works complete in all respect and fit
for use

Foundation + Sub Structure: On completion of


the foundation work including foundation for
(1) Rmt 49 1.2.2020
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including Subject to Land Aquisation
(2) wearing coat, bearings, road signs & Rmt 64920 49 10.3.2020 expected upto 20.12.2019
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 25.3.2020
protection works complete in all respect and fit
for use

A1 Widening and repairs of Major Bridges


1 Super-Structure (including bearing) Rmt
2 Wearing Coat including expansion joints Rmt
B2 Widening of ROB / RUB
b) ROB
Foundation, Sub-Structure, Super-Structure
1 (including bearing),Wearing Coat including
expansion joints
Approaches (including Retaining wall, stone
2
pitching and protection works)

3 Other works
Required 6 Month after Land
(i) Toll Plaza Nos 93325 93775 450 20.05.2020
aquesation
(ii) Road side drains Covered & Surface Drain Km 60810 61915 1.105 1.105 30.04.2020
76610 76950 0.340 0.340 15.03.2020
79500 79990 0.490 0.490 10.03.2020
(iii) Road signs Km 85000 84540 0.460 31.03.2020
77240 73800 3.440 31.03.2020
61900 60700 1.200 31.03.2020 Subject to Land Aquisation
69400 67400 2.000 31.03.2020 expected upto 20.12.2019
72125 71800 0.325 31.03.2020
Road Markings Km 85000 84540 0.460 30.03.2020
77240 73800 3.440 30.03.2020
61900 60700 1.200 30.03.2020
69400 67400 2.000 30.03.2020
72125 71800 0.325 30.03.2020
Subject to Land Aquisation
Km Stones fixing Km 85000 84540 0.460 30.03.2020
expected upto 20.12.2019
77240 73800 3.440 30.03.2020
61900 60700 1.200 30.03.2020
69400 67400 2.000 30.03.2020
72125 71800 0.325 30.03.2020
(iv) Project facilities
a Bus Shelter Nos
c Median Work Km
d Gantry Nos
e Utility Pipe ducts Nos
f Junction Improvement Nos
Subject to Land Aquisation
g Street Lighting / High mast Lighting / Blinkers Km 93325 93775 450 20.05.2020
expected upto 20.12.2019
h MS Railing Km
Site Clearance and dismantling (Dismantling
Subject to Land Aquisation
v) of Flexible Pavement and drain and Scarifying Km 4.383 4.183 31.01.2019
expected upto 20.12.2019
Existing BT surface)
ix) Dismantling of existing structures Km
vi) Plantation Work Km 85000 84540 0.460 30.04.2020
77240 73800 3.440 30.04.2020
Subject to Land Aquisation
61900 60700 1.200 30.04.2020
expected upto 20.12.2019
69400 67400 2.000 30.04.2020
72125 71800 0.325 30.04.2020
Construction of protection works other than
approaches to the bridges/evated sections /
vii) Km
flyovers / grade separators and ROBS /
RUBS.
x) Interlocking Paver Block Km 60810 61915 1.105 1.105 30.04.2020
76610 76950 0.34 0.34 15.03.2020
79500 79990 0.49 0.49 10.03.2020
Project Name : Rehabilitation and upgradation of existing carriageway to two lanes with paved shoulder standards from Kundral to Wazar section of NH -161A from km 52.730 to km 99.250 in the State of Maharashtra

Date : 15.06.2020
STATEMENT OF AVAILABLE SCOPE OF WORK ( Weekly Report)

Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work)

1 2 3 4 5 6 7 8 5/11/2020 5/18/2020 5/25/2020 6/1/2020 6/8/2020 6/15/2020 6/22/2020 6/29/2020 7/6/2020 7/13/2020 7/20/2020 7/27/2020 8/3/2020 9
Widening and Strengthening of existing
A
road
(1) Earthwork up to top of Sub-grade KM 54607 54675 0.068 0.068 10/25/2020 Structure approch
KM 54705 54720 0.015 0.015 10/25/2020 Structure approch
KM 56200 56800 0.600 0.600 6/15/2020 23.05.2020 Overlay of Flexiable Pavement
KM 70009 70010 0.001 0.001 9/7/2020 Structure Approch
KM 0.684 0.684
(2) Sub Base Course - GSB KM 54607 54675 0.068 0.068 10/30/2020 Structure approch
KM 54705 55010 0.095 0.305 10/30/2020 Structure approch
KM 56200 56880 0.680 0.680 6/20/2020 25.05.2020 Overlay of Flexiable Pavement
KM 57000 57060 0.060 0.060 6/25/2020 Structure approch
KM 57160 57275 0.115 0.115 6/27/2020 Structure approch
KM 57295 57360 0.065 0.065 6/29/2020 Structure approch
KM 57500 57600 0.100 0.100 7/1/2020 Structure approch
KM 58500 58580 0.080 0.030 7/3/2020 Structure approch
KM 58640 58700 0.060 0.060 7/5/2020 Structure approch
KM 60720 60810 0.090 0.090 7/7/2020 Structure approch
KM 63980 64200 0.150 0.120 7/15/2020 H T Line shifting balance
KM 64990 65000 0.010 0.000 9/10/2020 Structure approach
KM 66360 66365 0.000 0.005 6/6/2020 Structure approach
KM 69970 69991 0.021 0.021 9/9/2020 Structure approach
KM 70009 70050 0.041 0.011 9/14/2020 Structure approach
KM 71800 71810 0.010 0.010 8/30/2020 04.06.2020 Structure approach
KM 73030 73100 0.010 0.070 9/5/2020 HT Line crossing balance
KM 87750 87796 0.046 0.000 9/20/2020 15.06.2020 Structure approach
KM 87804 87830 0.026 0.000 10/5/2020 Structure approach
KM 1.727 1.810
(3) Cement Concrete Pavement (DLC)
KM 54607 54675 0.068 0.068 11/6/2020 Structure approch
KM 54705 54800 0.095 0.095 11/6/2020 Structure approch
KM 56800 56880 0.080 0.080 6/27/2020 Structure approch
KM 57000 57060 0.060 0.060 7/2/2020 Structure approch
KM 57160 57275 0.115 0.115 7/4/2020 Structure approch
KM 57295 57360 0.065 0.065 7/6/2020 Structure approch & HT line
KM 57500 57650 0.150 0.150 7/8/2020 Structure approch
KM 58520 58580 0.000 0.060 7/10/2020 Structure approch
KM 58640 58720 0.060 0.080 7/12/2020 Structure approch
KM 60700 60810 0.110 0.110 7/14/2020 Structure approch
KM 63980 64250 0.270 0.170 7/22/2020 H T Line shifting balance
KM 66350 66365 0.000 0.015 6/13/2020 Structure approch
KM 69950 69991 0.041 0.021 9/16/2020 Structure approch
KM 70009 70070 0.061 0.011 9/21/2020 Structure approch
KM 71780 71810 0.030 0.030 9/6/2020 6.60202 Structure approch
KM 73030 73230 0.020 0.200 9/12/2020 29.05.2020 (100m) HT Line crossing balance
KM 87750 87796 0.046 0.046 9/27/2020 Structure approch
KM 1.271 1.376
(b) Pavement Quality Concrete (PQC) KM 54607 54675 0.068 0.068 11/9/2020 Structure approch
KM 54705 55030 0.125 0.125 11/9/2020 Structure approch
KM 56800 56880 0.080 0.080 6/30/2020 Structure approch
KM 57000 57275 0.275 0.275 7/5/2020 Structure approch
KM 57295 57650 0.355 0.355 7/9/2020 Structure approch
KM 58520 58580 0.040 0.060 7/13/2020 Structure approch
KM 58640 58720 0.080 0.080 7/15/2020 Structure approch
KM 60690 60810 0.110 0.120 7/17/2020 Structure approch
KM 63960 64250 0.280 0.140 7/25/2020 H T Line shifting balance
KM 66340 66365 0.015 0.025 6/16/2020 Structure approch
KM 69942 69991 0.049 0.021 9/19/2020 Structure approch
KM 70009 70080 0.071 0.011 9/24/2020 Structure approch
KM 71770 71810 0.040 0.030 9/9/2020 Structure approch
KM 73030 73230 0.030 0.200 9/15/2020 HT Line crossing balance
KM 87750 87796 0.046 0.046 9/30/2020 Structure approch
KM 1.664 1.636
(4) Bituminous Base Course KM 56200 56800 0.600 0.600 6/22/2020 28.05.2020
MOM with SE Sir istructed to extend width
upto 7 m instead of 5.5 m
(5) Wearing Course KM 56200 56800 0.600 0.600 6/24/2020 31.05.2020
B2 Realignment (Rigid pavement)
(1) Earthwork up to top of Sub-grade KM 71820 71875 0.055 0.055 9/15/2020 03.06.2020 Structure approch
KM 72765 72900 0.135 0.135 6/7/2020 06.06.2020 Structure approch
KM 73000 73030 0.030 0.030 6/15/2020
KM 0.220 0.220
(2) Sub Base Course - GSB KM 71810 71875 0.065 0.065 9/19/2020 04.06.2020 Structure approch
KM 72680 72765 0.000 0.085 6/11/2020 12.03.2020 Structure approch
KM 72765 72900 0.135 0.135 6/11/2020 07.06.2020 Structure approch
KM 73000 73030 0.030 0.030 6/19/2020 VUP Praposal
KM 0.230 0.315
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work)

1 2 3 4 5 6 7 8 5/11/2020 5/18/2020 5/25/2020 6/1/2020 6/8/2020 6/15/2020 6/22/2020 6/29/2020 7/6/2020 7/13/2020 7/20/2020 7/27/2020 8/3/2020 9
(3) Cement Concrete Pavement
(a) Dry Lean Concrete KM 58720 58730 0.000 0.010 7/12/2020 Structure approch
KM 71810 71875 0.065 0.065 9/22/2020 06.06.2020 Structure approch
KM 72765 72900 0.135 0.135 6/14/2020 Structure approch
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work)

1 2 3 4 5 6 7 8 5/11/2020 5/18/2020 5/25/2020 6/1/2020 6/8/2020 6/15/2020 6/22/2020 6/29/2020 7/6/2020 7/13/2020 7/20/2020 7/27/2020 8/3/2020 9
KM 73000 73030 0.030 0.030 6/22/2020 VUP Praposal
KM 0.230 0.240
(b) Pavement Quality Concrete KM 58720 58750 0.030 0.020 7/15/2020 Structure approch
KM 71810 71875 0.065 0.065 9/25/2020 Structure approch
KM 72125 72280 0.155 0.155 9/25/2020 17.05.2020 (L) 28.05.2020 MJB Structure approch
KM 72765 72900 0.135 0.135 6/17/2020 Structure approch
KM 73000 73030 0.030 0.030 6/25/2020
KM 0.415 0.405
2 Minor Bridges / Underpasses / Overpasses
A1 Widening and repairs of Minor Bridges
15.3.2020 Substructure completed and
1) CH 70000 Rmt 18 8/30/2020 Sub-strucrure superstructure start after
complete complition of MJB.
2) CH 58610 Rmt 60 8/30/2020 work in progress
Reconstruction of Minor Bridges (Length
A2
>6m and <60m)
1) CH 66424

Super-structure: On completion of
Two days delay due to less
superstructure in all respects including
manpower & two days delay due
(2) wearing coat, bearings, road signs & Rmt 17 5/17/2020 23.05.2020
to concrete pump gang left the
markings, tests on completion etc. complete in
site
all respect.

Approaches: On completion of approaches Delay due to Eletrical


including Retaining walls, stone pitching, transformer, pole & line shifting
(3) Rmt 7 5/27/2020
protection works complete in all respect and fit balance & shuttering team (6
for use no) left the site
2) CH 54690

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 30 8/25/2020
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 10/15/2020
protection works complete in all respect and fit
for use
3) CH 57285

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 20 5/15/2020 13.05.2020
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


Delay due to Eletrical
including Retaining walls, stone pitching,
(3) Rmt 7 6/15/2020 transformer, pole & line shifting
protection works complete in all respect and fit
balance.
for use
4) CH 64920
Foundation + Sub Structure: On completion of
the foundation work including foundation for
(1) Rmt 15 8/5/2020
wing wa and return walls, abutments, piers
upto the Abutment / Pier Cap.

Super-structure: On completion of
superstructure in all respects including
(2) wearing coat, bearings, road signs & Rmt 15 8/20/2020
markings, tests on completion etc. complete in
all respect.

Approaches: On completion of approaches


including Retaining walls, stone pitching,
(3) Rmt 7 8/31/2020
protection works complete in all respect and fit
for use
5) RCC RETAINING WALL
(1) Rmt 71825 71845 0.020 0.020 8/20/2020
(2) Rmt 72495 72735 0.240 0.240 9/29/2020
(5) Rmt 87750 87775 0.025 0.025 3/15/2020
(6) Rmt 87825 87850 0.025 0.025 7/15/2020
Rmt 0.310 0.310
3 Major Bridges
A2 New Majar Bridge @ CH 72000
B) Pirecaps 1) Pier no 7 no 5/15/2020 16.05.2020 Delay due to heavy rain
Slab 1) Span no 12 no 5/6/2020 5/6/2020
Less manpowr & disturbed due to
2) Span no 13 no 5/28/2020 30.05.2020
heavy cyclon at their native
3) Span no 14 no 6/20/2020
4) Span no 15 no 7/18/2020
4 Wearing Coat including expansion joints Rmt 250 7/31/2020
5 Approaches Rmt 250 7/31/2020
3 Other works
(iv) Project facilities
a Bus Shelter Nos 3.000 6/25/2020
f Junction Improvement Nos 22.000 8/16/2020 If relaxcation from lockdown.
vi) Plantation Work Km 61900 67400 5.500 5/15/2020 Work in progress
52730 60700 7.970 5/31/2020 Work in progress
72125 73800 1.675 6/15/2020
69400 71800 2.400 6/30/2020
Chainage Balance Length / No Probable Date Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of Date of
Sr.
Description Unit of Completion Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Achivement Expected date Remarks if any
No.
From To LHS RHS (Planing) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work) (As per work)

1 2 3 4 5 6 7 8 5/11/2020 5/18/2020 5/25/2020 6/1/2020 6/8/2020 6/15/2020 6/22/2020 6/29/2020 7/6/2020 7/13/2020 7/20/2020 7/27/2020 8/3/2020 9
x) Interlocking Paver Block Km 91260 92020 0.760 0.760 8/16/2020 If relaxcation from lockdown.
Note : Schedule completion date as per present availability of skilled man power, Sequence & date will be change as per site conditions.