PERMIT TO DIG (for Trial Trench work)

(This form shall be duly completed and sent to PUB Project Officer prior to commencement of the Trial
Trench work)

Contract Title & No.

Contractor

Consultant

Location of Work

I – Application by Contractor’s Site Supervisor / Project Engineer

1. I confirm that cable detection has been carried out by licensed LCDW/TCDW at the above stated trial
trench location. The following documents are attached for your information and verification:
- LCDW/TCDW’s service detection plans; and
- LCDW/TCDW’s markings on the trial trench area to show the various services detected.

2. The trial trench shall extend at least 2m beyond the edge of the proposed earthworks.

3. GPR (Ground Penetration Radar) scan carried out at Trial Trench locations to confirm any potential
services within the road pavement structure. If GPR results indicate possible services in road structure
where the depth is less than or equal to 0.5m below road level, the road premix will be cut into smaller
pieces and use handheld road breaker method to prevent damage to the shallow services.

Any potential services within the road pavement structure from the GPR scan? NA / Yes / No

4. I have obtained all services drawings and necessary approvals from the service providers, agencies and
authorities to carry out the trial trench work as listed below and I will comply with their requirements.
S/N Services drawings and approvals (Eg. NCE, WAP, ROA, etc.) Date of submission to
obtained Consultant and PUB Project Officer
1

Name: Designation:

Signature & Date:

Permit to Dig (for Trial Trench work) PUB WRN (Dec 2019) Page 1 of 2
PERMIT TO DIG (for Trial Trench work)
(This form shall be duly completed and sent to PUB Project Officer prior to commencement of the Trial
Trench work)

II - Approval by Contractor’s Project Manager

1. I have checked and confirmed that all information in this application is in order, and hereby approve the
application to carry out the trial trench work.

2. I understand that I shall be fully responsible for the work and endorsement of this application by Consultant
does not absolve me of my responsibilities.

Name of Project Manager: HP:

Signature & Date:

III – Verification by RE / RTO


1. I have verified that all information in this application is in order.

Name of RE / RTO: HP:

Signature & Date:

IV – Endorsement by S.O. / S.O.R


1. I am satisfied with the information provided in this application and agree that the work can commence.

2. A copy of this duly completed form has been sent to PUB Project Officer.

Mr. / Ms. , on date .

Name of S.O. / S.O.R: HP:

Signature & Date:

Permit to Dig (for Trial Trench work) PUB WRN (Dec 2019) Page 2 of 2