No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Internal:
Weldment: Level 2
DOSH Blinding, Open Handhole/ nozzle, Boron Internal:
1 D-3104 PH PMT 80433 BF3 DRUM VESSEL G Shell wall: Level 2 YES
INSPECTION Cleaning, Inspection, Box up, Deblinding. Triflouride Sp3
Others: Water medium
prohibited
External:
DOSH Boron External:
2 D-3106 PH PMT 80432 NH3 DRUM VESSEL G External cleaning, Inspection, C-scanning Weldment: Level 3 YES EXTERNAL
INSPECTION Triflouride Sp3
Internal:
External: Weldment: Level 3
Blinding, Dismantling Equipment, Remove
Shell : steam Sp3, Hpwj Shell wall: Level 2
NITROGEN DOSH Channel head,open nozzle, Pull out tube
3 E-3101 PH PMT 80367 EXCHANGER 2ND Tube : 'Internal: Tube internal: Level 4 YES
HEATER INSPECTION bundle, cleaning, Inspection, Box up and
Nitrogen Sp3, HPWJ, Air Tube external: Level 4
Deblinding.
blow Dish head: Level 2
Others: Tube air blow
Internal:
Shell : Brine Internal:
ISOBUTENE DOSH Blinding, Remove Channel head, Tube Tube internal: Level 4
4 E-3103 PH PMT 80390 EXCHANGER 1ST Tube : Sp3, HPWJ, Air
COOLER INSPECTION Cleaning, Inspection, Box up, Deblinding. Dish head: Level 2
Isobutane blow
Others: air blow
'Internal:
Shelll: Internal:
Blinding, Remove Channel heads, Open Sp3, HPWJ, Air
DOSH Ammonia Tube internal: Level 4
7 R-3105 PH PMT 80435 REACTOR REACTOR G drain/vent, tube cleaning,Inspection, Box blow YES
INSPECTION Tube: Dish head: Level 2
up, Deblinding.
Isobutene
'Internal: Internal:
Blinding, Open Handhole, Open nozzle,
DOSH Air blow 'Weldment: Level 2
8 D-3110 PH PMT 80431 METHANOL DRUM VESSEL G Cleaning, Inspection, Box up and Methanol YES
INSPECTION Shell wall: Level 2
deblinding.
'Internal: Internal:
Blinding, Open Handhole, Open nozzle,
DOSH Air blow Weldment: Level 2
9 D-3113 PH PMT 80786 ACETONE DRUM VESSEL G Cleaning, Inspection, Box up and Acetone YES
INSPECTION Shell wall: Level 2
deblinding.
'Internal:
Shell: Internal:
Blinding, Remove Channel head, open Sp3, HPWJ, Air
DOSH Ammonia Tube internal: Level 4
10 E-3113 PH PMT 80436 CHILLER EXCHANGER G drain/vent, tube cleaning, Inspection, Box blow YES
INSPECTION Tube: Dish head: Level 2
up and Deblinding.
Iosbutene Others: air blow
Internal:
'Internal:
Blinding, Open manhole & nozzle, unload Weldment: Level 3
PHASE DOSH Sp3, Air blow
11 D-3202 PH PMT 80393 VESSEL G, 1ST packing (pall ring), Cleaning, Inspection, isobutane Shell wall: Level 2 YES YES
SEPARATOR INSPECTION
loading packing, Box up and Deblinding. Dish head: Level 2
Page 1
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Internal:
'Internal:
Blinding, Open manhole & nozzle, remove Weldment: Level 3
DOSH Sp3, Air blow
12 D-3204 PH PMT 80731 COALESCER VESSEL G,1ST perforated plate , Cleaning, Inspection, isobutane Shell wall: Level 2 YES YES
INSPECTION
Install filter, Box up and Deblinding. Dish head: Level 2
Internal:
'Internal:
Blinding, Open manhole & nozzle, unload Weldment: Level 3
PHASE DOSH Sp3, Air blow
13 D-3206 PH PMT 80392 VESSEL 1ST packing (pall ring), Cleaning, Inspection, isobutane Shell wall: Level 2 YES YES
SEPARATOR INSPECTION
loading packing, Box up and Deblinding. Dish head: Level 2
DOSH
15 F-3251A PH PMT 80378 PIB ABSORBER FILTER 3RD External inspection only PIB Isobutane YES EXTERNAL
INSPECTION
DOSH
16 F-3251B PH PMT 80379 PIB ABSORBER FILTER 3RD External inspection only PIB Isobutane YES EXTERNAL
INSPECTION
DOSH
17 F-3251C PH PMT 80380 PIB ABSORBER FILTER 3RD External inspection only PIB Isobutane YES EXTERNAL
INSPECTION
Internal:
Blinding, Open top channel head and Shell: LP Internal:
FALLING FILM DOSH Tube internal: Level 4
20 E-3301 PH PMT 80388 EXCHANGER 1ST, 2ND nozzle,Lifting, Tube cleaning, Inspection, steam Sp3, HPWJ, Air YES
EVAPORATOR INSPECTION Dish head: Level 2
Box up and Deblinding. Tube: Hexane blow
Shell: LP Internal:
Blinding, Remove both channel head and Internal:
DEGASSING DOSH steam Tube internal: Level 4
21 E-3305 PH PMT 80366 EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
PREHEATER INSPECTION Tube: Dish head: Level 2
and Deblinding. blow
Isobutane
Shell: Internal:
WATER Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
22 E-3306 PH PMT 80365 CONDENSER (2ND EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
INSPECTION Tube: LP Dish head: Level 2
DEGASSING) and Deblinding. blow
steam
Page 2
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Internal:
NH3 CONDENSER Blinding, Open top channel head and Shell: Internal:
DOSH Tube internal: Level 4
23 E-3308 PH PMT 80387 (VACUUM EXCHANGER G, 1ST nozzle, Tube cleaning, Inspection, C- Ammonia Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
DEGASSING) scanning, Box up and Deblinding. Tube: Product blow
Shell: MP Internal:
DEGASSING Blinding, Remove both channel head and Internal:
DOSH steam Tube internal: Level 4
25 E-3312 PH PMT 80364 FALLING FILM EXCHANGER 1ST, 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air YES
INSPECTION Tube: Dish head: Level 2
EVAPARATOR and Deblinding. blow
Polyisobutane
Internal:
Blinding, Remove both channel head, Shell: Internal:
DOSH Tube internal: Level 4
26 ZE-3310-2 PH PMT 80440 CONDENSER EXCHANGER 1ST Tube cleaning, Inspection, Box up and N2/Hexane Sp3, HPWJ, Air
INSPECTION Dish head: Level 2
Deblinding. Tube: water blow
Internal:
Blinding, Remove both channel head , Internal:
HEAT DOSH Shell: water Tube internal: Level 4
27 ZE-3310-4 PH PMT 80441 EXCHANGER 1ST Tube cleaning, Inspection, Box up and Sp3, HPWJ, Air
EXCHANGER INSPECTION Tube: water Dish head: Level 2
Deblinding. blow
Shell: Internal:
WATER Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
30 E-3323 PH PMT 80362 CONDENSER (2ND EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
INSPECTION Tube: Cooling Dish head: Level 2
DEGASSING) and Deblinding. blow
water
Internal:
Blinding, Open top cover, Shell:
DOSH Internal: Weldment: Level 3
33 F-3325 PH PMT 80385 PIB FILTER FILTER 1ST Cleaning,videoscope Inspection, install Polyisobutene YES
INSPECTION Sp3, Air blow Shell wall: Level 2
filter element, Box up and Deblinding. Jacket: Steam
Dish head: Level 2
Page 3
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Internal:
Blinding, Open both channel head and Shell: MP Internal:
DOSH Tube internal: Level 4
35 E-3401 PH PMT 80807 REBOILER EXCHANGER G, 1ST nozzle, Tube cleaning, Inspection, Box up steam Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube: Hexane blow
Shell: Internal:
Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
36 E-3402 PH PMT 80361 CONDENSER EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
INSPECTION Tube: Cooling Dish head: Level 2
and Deblinding. blow
water
Shell: Internal:
Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
37 E-3407 PH PMT 80360 COOLER EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air YES
INSPECTION Tube: Cooling Dish head: Level 2
and Deblinding. blow
water
MIXED-C4
DOSH
38 F-3408A PH PMT 80381 RETURN FILTER 1ST, 2ND External inspection only Isobutane YES EXTERNAL
INSPECTION
ADSORBER
MIXED-C4
DOSH
39 F-3408B PH PMT 80382 RETURN FILTER 1ST, 2ND External inspection only isobutane YES EXTERNAL
INSPECTION
ADSORBER
Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
41 E-3505 PH PMT 80369 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow
Internal:
Blinding, Remove both channel head, Shell : LP Internal:
PIB HEATER DOSH Tube internal: Level 4
42 E-3516 PH PMT 80370 EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
(TK3515) INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow
Internal:
Blinding, Remove both channel head, Shell : LP Internal:
PIB HEATER DOSH Tube internal: Level 4
43 E-3527 PH PMT 80371 EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
(TK3526) INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow
Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
44 E-3532 PH PMT 80372 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow
Page 4
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
45 E-3536 PH PMT 80373 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow
Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
46 E-3547 PH PMT 80374 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow
Internal:
Blinding, Open manhole, remove
PHASE DOSH Internal: Weldment: Level 3
47 D-3604 PH PMT 80427 VESSEL G perforated plate , Cleaning, Inspection, waste water YES YES
SEPARATOR INSPECTION Sp3, Air blow Shell wall: Level 2
Box up and Deblinding.
Dish head: Level 2
Internal:
Blinding, remove top side channel head, Shell: Internal:
DOSH Tube internal: Level 4
50 E-3609 PH PMT 80386 CONDENSER EXCHANGER G, 1ST Open nozzle , Inspection , Box up and Ammonia Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
Deblinding. Tube: Product blow
WASTE WATER
DOSH
51 T-3600 PH PMT 80384 STRIPPING TOWER G, 1ST, 2ND External Inspection only waste water YES EXTERNAL
INSPECTION
TOWER
Internal:
Blinding, Open manhole, Open nozzle,
CAUSTIC SODA DOSH Caustic soda Internal: Weldment: Level 3
52 D-3614 PH PMT 80375 VESSEL 2ND Cleaning, Inspection, Box up and YES
DRUM INSPECTION 25% Sp3, Air blow Shell wall: Level 2
Deblinding.
Dish head: Level 2
Internal:
Blinding, Open handhole H1,H2, Open
DOSH Internal: Weldment: Level 2
55 D-3724 PH PMT 80368 BRINE DRUM VESSEL 2ND nozzle R1,R2, Cleaning, Inspection, box Brine YES
INSPECTION Sp3, Air blow Shell wall: Level 2
up and Deblinding.
Dish head: Level 2
Page 5
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Internal:
Blinding, Open handhole H1,H2, Open
INSTRUMENT AIR DOSH Internal: Weldment: Level 2
56 D-3730 PH PMT 80466 VESSEL 1ST nozzle R1, Cleaning, Inspection, box up Instrument air YES
BUFFER INSPECTION Air blow Shell wall: Level 2
and Deblinding.
Dish head: Level 2
FLOODED
Blinding, Remove Channel heads, Open
ECONOMIZER DOSH Shell: R717 EXTERNAL (SCOPE
57 ZE 3120-02 PH PMT 80442 EXCHANGER G drain/vent, tube cleaning, Inspection, Box YES
WITH SURGE INSPECTION Tube: R717 CHANGE)
up, Deblinding.
DRUM
Internal:
Blinding, Open manhole, Open nozzle,
Shell wall: Level 2
PM PMT CRYSTALACTOR DOSH Internal scaffolding, Unloading/Loading Internal:
62 ZR 3660 REACTOR G, 1ST waste water Dish head: Level 2 YES YES
80471 REACTOR INSPECTION sand (~4.81m3), Cleaning, Inspection, box Air blow
Others: Cautions on Butyl
up and Deblinding.
Rubber lining
Internal:
Blinding, Remove both channel head, Internal:
DOSH Shell: R134a Tube internal: Level 4
63 ZE3720-01 PH PMT 80444 DX ECONOMIZER EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Sp3, HPWJ, Air YES
INSPECTION Tube: R134a Dish head: Level 2
Box up and Deblinding. blow
Internal:
Blinding, Remove both channel head, Internal:
DOSH Shell: Lube oil Tube internal: Level 4
64 ZE3720-02 PH PMT 80445 OIL COOLER EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Sp3, HPWJ, Air YES
INSPECTION Tube: Water Dish head: Level 2
Box up and Deblinding. blow
Internal:
Blinding, Remove both channel head, Shell: R134a Internal:
WATER COOLED DOSH Tube internal: Level 4
65 ZE3720-03 PH PMT 80446 EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Tube: Cooling Sp3, HPWJ, Air YES
CONDENSER INSPECTION Dish head: Level 2
Box up and Deblinding. water blow
Internal:
Blinding, Remove both channel head, Shell:30% Internal:
DOSH Tube internal: Level 4
66 ZE3720-04 PH PMT 80447 DX EVAPORATOR EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Glycol Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
Box up and Deblinding. Tube: R134a blow
Page 6
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Primary: N2
PLATE HEAT Secondary:
1 E-3102 EXCHANGER 2ND NON DOSH External Inspection only EXTERNAL
EXCHANGER Process
stream
Internal:
Blinding, Open handhole, Open top head, Weldment: Level 3
Nitrogen / Internal:
2 ZD-3310-5 SEPARATOR SEPARATOR G NON DOSH Remove demister, Cleaning, Inspection, Shell wall: Level 2 YES
Hexane Sp3, Air blow
Install demister, Box up and Deblinding. Dish head: Level 2
Others: Demister, Level 2
STEAM
3 ZD-3310-6 Drum G NON DOSH External inspection only steam YES EXTERNAL
DENCENTER
Primary:
CONDENSATE
Cooling water
4 E-3328 COOLER (PIB EXCHANGER 1ST NON DOSH External Inspection Only EXTERNAL
Scnd:Hot
COOLER)
condensate
Internal:
Blinding, Dismantle all return bend (3nos), Shell: water Internal:
OLIGOMER Tube internal: Level 4
5 E-3406 EXCHANGER G NON DOSH Cleaning, Inspection, Box up and Tube: Sp3, HPWJ, Air YES
COOLER Dish head: Level 2
Deblinding Oligomers blow
Internal:
Shell: steam Internal:
STEAM Blinding, Open N3 & N4, Tube Cleaning, Tube internal: Level 4
6 E-3702 EXCHANGER 1ST NON DOSH Tube: cooling Sp3, HPWJ, Air
CONDENSER Inspection, Box up and Deblinding. Dish head: Level 2
water blow
Internal:
Blinding, Open top blind flange, Open Shell: Cooling Internal:
HEAT Tube internal: Level 4
7 PE 3704A EXCHANGER G NON DOSH drain N1,N2,N3, Cleaning, Inspection, Box water Sp3, HPWJ, Air
EXCHANGER Tube external: Level 2
up and Deblinding. Tube: Water blow
Dish head: Level 2
Internal:
Blinding, Remove channel head, open Shell: Lube oil Internal:
Oil Cooler Tube internal: Level 4
9 ZE 3120-01 EXCHANGER G NON DOSH nozzle, Tube cleaning, Inspection, Box up Tube: Cooling Sp3, HPWJ, Air YES
ZE 3120-01 Dish head: Level 2
and Deblinding. Water blow
Primary: Hot
Plate Heat
water
10 ZE 3120-03 ExchangerZE 3120- EXCHANGER G NON DOSH External inspection only EXTERNAL
Second:
03
Chilled water
Page 7
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Sand filter
19 ZF 3664 B FILTER G NON DOSH External inspection only Waste water YES INSPECTION ONLY
ZF 3664 B
Sand filter
20 ZF 3664 C FILTER G NON DOSH External inspection only Waste water YES INSPECTION ONLY
ZF 3664 C
Internal:
Suction Filter Blinding,Open blind cover, Cleaning, Internal:
21 15137-002-091 FILTER G NON DOSH R 134 a Weldment: Level 3 YES
15137-002-091 Inspection, box up and deblinding. Sp3, Air blow
Shell wall: Level 2
Page 8
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Page 9
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Equipment to be
complete handover
Remove valve, Send to servicing area,
3 FV-310530-1 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
4 FV-310530-2 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
5 XV-310545 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
6 XV-310415 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
7 XZV-310430 ON-OFF VALVE CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
BF3 from sphere 1 Remove valve, Send to servicing area,
8 XZV-311515 CV to operation within Boron Triflouride
to D 3104 Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
BF3 from sphere 3 Remove valve, Send to servicing area,
11 XZV-311535 CV to operation within Boron Triflouride
to D 3104 Reinstall
24 hours or below
during TAR
Page 10
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Page 11
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Equipment to be
complete handover
Remove valve, Send to servicing area,
3 SMA 36291 Flame Arresstor SMA to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
4 SMA 35091 Flame Arresstor SMA GTA to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
5 PSE 35011 Flame Arresstor PSE GTA to operation within RESIDUE ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
6 PSE 35051 Flame Arresstor PSE GTA to operation within PIB 1300 ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
7 PSE 35071 Flame Arresstor PSE GTA to operation within PIB 2300 ADDITIONAL
Reinstall
24 hours or below
during TAR
Page 12
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Equipment to be
complete handover
Remove valve, Send to servicing area,
8 PSE 35031 Flame Arresstor PSE GTA to operation within PIB 1000 ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
11 PSE 35351 Flame Arresstor PSE GTA to operation within PIB 1300 ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
12 PSE 31211 Flame Arresstor PSE to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
13 PSE 32012 Flame Arresstor PSE to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
14 PSE 32011 Flame Arresstor PSE to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
3 F(Z)-311552 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
4 F(Z)-310567 ORIFICE PLATE F(Z) to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Page 13
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Equipment to be
complete handover
Remove valve, Send to servicing area,
5 F(Z)-320115 ORIFICE PLATE F(Z) to operation within CONDENSATE ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
6 F(Z)-320235 ORIFICE PLATE F(Z) to operation within WASTE WATER ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
7 F(Z)-320315 ORIFICE PLATE F(Z) to operation within CONDENSATE ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
8 F(Z)-320442 ORIFICE PLATE F(Z) to operation within WASTE WATER ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
11 F(Z)-330144 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
12 F(Z)-330115 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
13 F(Z)-331212 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
14 F(Z)-332212 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR
Page 14
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Equipment to be
complete handover
Remove valve, Send to servicing area,
17 F(Z)-340565 ORIFICE PLATE F(Z) to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
18 F(Z)-340845 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
19 F(Z)-350220 ORIFICE PLATE F(Z) to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
20 F(Z)-350325 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
21 F(Z)-350425 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
22 F(Z)-352625 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
25 F(Z)-353525 ORIFICE PLATE F(Z) to operation within LP NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
26 F(Z)-354625 ORIFICE PLATE F(Z) to operation within LP NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Page 15
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder
Equipment to be
complete handover
Remove valve, Send to servicing area,
27 F(Z)-361388 ORIFICE PLATE F(Z) to operation within LP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
28 F(Z)-371008 ORIFICE PLATE F(Z) to operation within CONDENSATE ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
30 F(Z)-372979 ORIFICE PLATE F(Z) to operation within INSTRUMENT AIR ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
31 F(Z)-311008 ORIFICE PLATE F(Z) to operation within METHANOL ADDITIONAL
Reinstall
24 hours or below
during TAR
Equipment to be
complete handover
Remove valve, Send to servicing area,
32 F(Z)-370120 ORIFICE PLATE F(Z) to operation within MP NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR
Page 16
HR-PIB TAR 2019 DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Function Location EQUIPMENT TYPE LOCATION Work Title Quantity Remarks SCAFF CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND INPECTION CLEANING INSP HT DOSH BOX-UP DE-BLIND REMARKS
Work Type N CH / TRAY PACKING BUNDLE
Blinding, Open Handhole/ nozzle, Cleaning, Inspection, Box D : Drums (in process
1 100 2019CAA-M-001 D-3104 BF3 DRUM MY9W-VM01-V01-100-1100 -E1100A VESSEL G DOSH INSPECTION
up, Deblinding. service)
1
Blinding, Open manhole & nozzle, remove filter @ N1,N2 , D : Drums (in process
12 110 2019CAA-M-012 D-3204 COALESCER MY9W-VM01-V01-120-2100 -R2100 VESSEL DOSH INSPECTION
Cleaning, Inspection, Install filter, Box up and Deblinding. service)
1
FALLING FILM Blinding, Open top channel head and nozzle,Lifting, Tube
20 120 2019CAA-M-020 E-3301
EVAPORATOR
MY9W-VM01-V01-120-2500 -D2500 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
WATER CONDENSER Blinding, Remove both channel head and nozzle, Tube
22 120 2019CAA-M-022 E-3306
(2ND DEGASSING)
MY9W-VM01-V02-200-3000 -T3000 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
NH3 CONDENSER Blinding, Open top channel head and nozzle, Tube
23 120 2019CAA-M-023 E-3308
(VACUUM DEGASSING)
MY9W-VM01-V02-200-3100 -E3110A EXCHANGER DOSH INSPECTION
cleaning, Inspection, C-scanning, Box up and Deblinding.
HE : Heat Exchangers 1
DEGASSING FALLING Blinding, Remove both channel head and nozzle, Tube
25 120 2019CAA-M-025 E-3312
FILM EVAPARATOR
MY9W-VM01-V02-200-3100 -E3120A EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
Page 17 of 52
HR-PIB TAR 2019 DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Function Location EQUIPMENT TYPE LOCATION Work Title Quantity Remarks SCAFF CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND INPECTION CLEANING INSP HT DOSH BOX-UP DE-BLIND REMARKS
Work Type N CH / TRAY PACKING BUNDLE
FALLING FILM
Blinding, Remove both channel head and nozzle, Tube
29 120 2019CAA-M-029 E-3322 EVAPORATOR (VACUUM MY9W-VM01-V02-200-3100 -E3130A EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
DEGASSING)
WATER CONDENSER Blinding, Remove both channel head and nozzle, Tube
30 120 2019CAA-M-030 E-3323
(2ND DEGASSING)
MY9W-VM01-V02-200-3100 -E3130B EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
Blinding, Open manhole, remove perforated plate (if D : Drums (in process
47 150 2019CAA-M-047 D-3604 PHASE SEPARATOR MY9W-VM01-V02-200-3300 -E3330C VESSEL DOSH INSPECTION
required), Cleaning, Inspection, Box up and Deblinding. service)
1
Page 18 of 52
HR-PIB TAR 2019 DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Function Location EQUIPMENT TYPE LOCATION Work Title Quantity Remarks SCAFF CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND INPECTION CLEANING INSP HT DOSH BOX-UP DE-BLIND REMARKS
Work Type N CH / TRAY PACKING BUNDLE
Blinding, Open handhole H1,H2, Open nozzle R1,R2, D : Drums (in process
55 160 2019CAA-M-055 D-3724 BRINE DRUM MY9W-VM01-V02-200-3300 -T3300 VESSEL DOSH INSPECTION
Cleaning, Inspection, box up and Deblinding. service)
1
Blinding, Open handhole H1,H2, Open nozzle R1, D : Drums (in process
56 160 2019CAA-M-056 D-3730 INSTRUMENT AIR BUFFER MY9W-VM01-V02-210-3400 -CD3420 VESSEL DOSH INSPECTION
Cleaning, Inspection, box up and Deblinding. service)
1
Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
58 100 2019CAA-M-058 ZD 3120-07 RECEIVER MY9W-VM01-V02-210-3400 -D3410 VESSEL DOSH INSPECTION
Deblinding. service)
1
Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
59 100 2019CAA-M-059 ZD 3120-08 SURGE DRUM MY9W-VM01-V02-210-3400 -D3450 VESSEL DOSH INSPECTION
Deblinding. service)
1
Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
60 100 2019CAA-M-060 ZD 3120-09 OIL POT MY9W-VM01-V02-210-3400 -D3510 VESSEL DOSH INSPECTION
Deblinding. service)
1
Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
61 100 2019CAA-M-061 ZD 3120-10 OIL POT MY9W-VM01-V02-210-3400 -D3515 VESSEL DOSH INSPECTION
Deblinding. service)
1
WATER COOLED Blinding, Remove both channel head, Open nozzle, Tube
65 160 2019CAA-M-065 ZE3720-03
CONDENSER
MY9W-VM01-V02-210-3600 -F3620 EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
Page 19 of 52
HR-PIB TAR 2019 NON DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Work Title
Work Type
Quantity Remarks SCAFF N CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND
CH / TRAY PACKING INPECTION
CLEANING INSP HT DOSH
BUNDLE
BOX-UP DE-BLIND REMARKS
Suction Filter Blinding, Open blind cover, Cleaning, Inspection, Box up D : Drums (in process
12 100 2019CAA-M-088 ZD 3120-01
ZD 3120-01
NON DOSH
and Deblinding. service)
1
Page 20 of 52
HR-PIB TAR 2019 NON DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Work Title
Work Type
Quantity Remarks SCAFF N CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND
CH / TRAY PACKING INPECTION
CLEANING INSP HT DOSH
BUNDLE
BOX-UP DE-BLIND REMARKS
Oil Separator Blinding, Open blind cover, Open drain , Cleaning, D : Drums (in process
25 160 2019CAA-M-101 ZD 3720-01
ZD3720-01
NON DOSH
Inspection, Box up and Deblinding. service)
1
Page 21 of 52
HR-PIB TAR 2019 PSV
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR
No. Unit Item No. Tag/ line No. Equipment Name Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND REMOVE SERVICE INSTALL DE-BLIND REMARKS
Work Type
PSV 31151
PSV 31152
PSV 31153
PSV 31154
PSV 31041
PSV 31211
PSV 32011
PSV 32012
Page 22 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type
1 100 2019CAA-M-106 PV-310410-1 BF3 to D 3104 MY9W-VM01-V03-330-8150 -E8155 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1
2 100 2019CAA-M-107 PV-310410-2 BF3 to D 3104 MY9W-VM01-V50-900-4000 -D0800 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1
3 100 2019CAA-M-108 FV-310530-1 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4410 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1
4 100 2019CAA-M-109 FV-310530-2 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4420 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1
5 100 2019CAA-M-110 XV-310545 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4430 PM Remove valve, Send to servicing area, Reinstall XV : ON-OFF valve 1
6 100 2019CAA-M-111 XV-310415 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4450 PM Remove valve, Send to servicing area, Reinstall XV : ON-OFF valve 1
7 2019CAA-M-112 XZV-310430 ON-OFF VALVE MY9W-VM01-V50-900-4000 -D4460 PM Remove valve, Send to servicing area, Reinstall XV : ON-OFF valve 1
Page 23 of 52
HR-PIB TAR 2019 PSV
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR
No. Unit Item No. Tag/ line No. Equipment Name Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND REMOVE SERVICE INSTALL DE-BLIND REMARKS
Work Type
Page 24 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type
Page 25 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type
Page 26 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type
Page 27 of 52
Task Name Task Name
DOSH NON DOSH
PG 100 D-3104 D-3104 PG 100
1 D-3104 D-3106 D-3106 1 E-3102
2 D-3106 E-3101 E-3101 2 ZD-3120-01
3 D-3110 E-3103 E-3103 3 ZD 3120-02
4 D-3113 F-3100A F-3100A 4 ZD 3120-03
5 E-3101 F-3100B F-3100B 5 ZD 3120-04
6 E-3103 R-3105 R-3105 6 ZD 3120-05
7 E-3113 D-3110 D-3110 7 ZD 3120-06
8 F-3100A D-3113 D-3113 8 ZE 3120-01
9 F-3100B E-3113 E-3113 9 ZE 3120-03
10 R-3105 D-3202 D-3202 10 ZE 3120-04
11 ZD-3120-07 D-3204 D-3204 PG 120
12 ZD-3120-08 D-3206 D-3206 11 E-3328
13 ZD-3120-09 E-3250 E-3250 12 ZD-3310-05
14 ZD-3120-10 F-3251A F-3251A 13 ZD-3310-06
15 ZE-3120-02 F-3251B F-3251B PG 130
PG 110 F-3251C F-3251C 14 E-3406
16 D-3202 D-3302 D-3302 PG 150
17 D-3204 D-3304 D-3304 15 ZF 3664 A
18 D-3206 E-3301 E-3301 16 ZF 3664 B
19 E-3250 E-3305 E-3305 17 ZF 3664 C
F-3251A E-3306 PG 160
20 E-3306
F-3251B E-3308 18 15137-002-091
21 E-3308
F-3251C T-3300 19 15137-002-700
22 T-3300
PG 120 E-3312 E-3312 20 15137-002-705.1
ZE-3310-
D-3302 21 15137-002-705.2
23 2 ZE-3310-2
ZE-3310-
D-3304 22 E-3702
24 4 ZE-3310-4
25 D-3320 D-3320 D-3320 23 PE 3704A
26 E-3301 E-3322 E-3322 24 PE 3704B
27 E-3305 E-3323 E-3323 25 ZD 3720-01
28 E-3306 E-3327 A E-3327 A
29 E-3308 E-3327 B E-3327 B
30 E-3312 F-3325 F-3325
31 E-3322 D-3404 D-3404
32 E-3323 E-3401 E-3401
33 E-3327 A E-3402 E-3402
34 E-3327 B E-3407 E-3407
35 F-3325 F-3408A F-3408A
36 T-3300 F-3408B F-3408B
37 ZE-3310-2 T-3400 T-3400
38 ZE-3310-4 E-3505 E-3505
PG 130 E-3516 E-3516
39 D-3404 E-3527 E-3527
40 E-3401 E-3532 E-3532
41 E-3402 E-3536 E-3536
42 E-3407 E-3547 E-3547
43 F-3408A D-3604 D-3604
44 F-3408B D-3607 D-3607
45 T-3400 D-3608 D-3608
PG 140 E-3609 E-3609
46 E-3505 T-3600 T-3600
47 E-3516 D-3614 D-3614
48 E-3527 D-3701 D-3701
49 E-3532 D-3703 D-3703
50 E-3536 D-3724 D-3724
51 E-3547 D-3730 D-3730
PG 150 ZE-3120-
02 ZE-3120-02
D-3604 ZD-3120-
52 07 ZD-3120-07
D-3607 ZD-3120-
53 08 ZD-3120-08
D-3608 ZD-3120-
54 09 ZD-3120-09
D-3614 ZD-3120-
55 10 ZD-3120-10
56 E-3609 ZR-3660 ZR-3660
T-3600 ZE-3720-
57 01 ZE-3720-01
ZR-3660 ZE-3720-
58 02 ZE-3720-02
PG 160 ZE-3720-
03 ZE-3720-03
D-3701 ZE-3720-
59 04 ZE-3720-04
60 D-3703
61 D-3724
62 D-3730
63 ZE-3720-01
64 ZE-3720-02
65 ZE-3720-03
66 ZE-3720-04
E-3102 1 E-3102
ZD-3310-05 2 ZD-3310-05
ZD-3310-06 3 ZD-3310-06
E-3328 4 E-3328
E-3406 5 E-3406
E-3702 6 E-3702
PE 3704A 7 PE 3704A
PE 3704B 8 PE 3704B
ZE 3120-01 9 ZE 3120-01
ZE 3120-03 10 ZE 3120-03
ZE 3120-04 11 ZE 3120-04
ZD-3120-01 12 ZD-3120-01
ZD 3120-02 13 ZD 3120-02
ZD 3120-03 14 ZD 3120-03
ZD 3120-04 15 ZD 3120-04
ZD 3120-05 16 ZD 3120-05
ZD 3120-06 17 ZD 3120-06
ZF 3664 A 18 ZF 3664 A
ZF 3664 B 19 ZF 3664 B
ZF 3664 C 20 ZF 3664 C
15137-002-091
21 15137-002-091
15137-002-700
22 15137-002-700
15137-002-705
23 #N/A
ZD 3720-01 24 ZD 3720-01
COST DOSH NDOSH
1 D-3104 DOSH 1 D-3104 DOSH 1
2 D-3106 DOSH 2 D-3106 DOSH 2
3 E-3101 DOSH 3 E-3101 DOSH
4 E-3103 DOSH 4 E-3103 DOSH
5 R-3105 DOSH 5 F-3100A DOSH
6 D-3110 DOSH 6 F-3100B DOSH
7 D-3113 DOSH 7 R-3105 DOSH
8 E-3113 DOSH 8 D-3110 DOSH
9 D-3202 DOSH 9 D-3113 DOSH
10 D-3204 DOSH 10 E-3113 DOSH
11 D-3206 DOSH 11 D-3202 DOSH
12 E-3250 DOSH 12 D-3204 DOSH
13 D-3302 DOSH 13 D-3206 DOSH
14 D-3304 DOSH 14 E-3250 DOSH
15 E-3301 DOSH 15 F-3251A DOSH
16 E-3305 DOSH 16 F-3251B DOSH
17 E-3306 DOSH 17 F-3251C DOSH
18 E-3308 DOSH 18 D-3302 DOSH
19 T-3300 DOSH 19 D-3304 DOSH
20 E-3312 DOSH 20 E-3301 DOSH
21 ZE-3310-2 DOSH 21 E-3305 DOSH
22 ZE-3310-4 DOSH 22 E-3306 DOSH
23 D-3320 DOSH 23 E-3308 DOSH
24 E-3322 DOSH 24 T-3300 DOSH
25 E-3323 DOSH 25 E-3312 DOSH
26 E-3327 A DOSH 26 ZE-3310-2 DOSH
27 E-3327 B DOSH 27 ZE-3310-4 DOSH
28 F-3325 DOSH 28 D-3320 DOSH
29 D-3404 DOSH 29 E-3322 DOSH
30 E-3401 DOSH 30 E-3323 DOSH
31 E-3402 DOSH 31 E-3327 A DOSH
32 E-3407 DOSH 32 E-3327 B DOSH
33 T-3400 DOSH 33 F-3325 DOSH
34 E-3505 DOSH 34 D-3404 DOSH
35 E-3516 DOSH 35 E-3401 DOSH
36 E-3527 DOSH 36 E-3402 DOSH
37 E-3532 DOSH 37 E-3407 DOSH
38 E-3536 DOSH 38 F-3408A DOSH
39 E-3547 DOSH 39 F-3408B DOSH
40 D-3604 DOSH 40 T-3400 DOSH
41 D-3607 DOSH 41 E-3505 DOSH
42 D-3608 DOSH 42 E-3516 DOSH
43 E-3609 DOSH 43 E-3527 DOSH
44 T-3600 DOSH 44 E-3532 DOSH
45 D-3614 DOSH 45 E-3536 DOSH
46 D-3701 DOSH 46 E-3547 DOSH
47 D-3703 DOSH 47 D-3604 DOSH
48 D-3724 DOSH 48 D-3607 DOSH
49 D-3730 DOSH 49 D-3608 DOSH
50 ZE 3120-02 DOSH 50 E-3609 DOSH
51 ZD 3120-07 DOSH 51 T-3600 DOSH
52 ZD 3120-08 DOSH 52 D-3614 DOSH
53 ZD 3120-09 DOSH 53 D-3701 DOSH
54 ZD 3120-10 DOSH 54 D-3703 DOSH
55 ZR 3660 DOSH 55 D-3724 DOSH
56 ZE3720-01 DOSH 56 D-3730 DOSH
57 ZE3720-02 DOSH 57 ZE 3120-02 DOSH
58 ZE3720-03 DOSH 58 ZD 3120-07 DOSH
59 ZE3720-04 DOSH 59 ZD 3120-08 DOSH
60 E-3102 NDOSH 60 ZD 3120-09 DOSH
61 ZD-3310-5 NDOSH 61 ZD 3120-10 DOSH
62 ZD-3310-6 NDOSH 62 ZR 3660 DOSH
63 E-3328 NDOSH 63 ZE3720-01 DOSH
64 E-3406 NDOSH 64 ZE3720-02 DOSH
65 E-3702 NDOSH 65 ZE3720-03 DOSH
66 PE 3704A NDOSH 66 ZE3720-04 DOSH
67 PE 3704B NDOSH 67 E-3102 NDOSH
68 ZE 3120-01 NDOSH 68 ZD-3310-5 NDOSH
69 ZE 3120-03 NDOSH 69 ZD-3310-6 NDOSH
70 ZE 3120-04 NDOSH 70 E-3328 NDOSH
71 ZD 3120-01 NDOSH 71 E-3406 NDOSH
72 ZD 3120-02 NDOSH 72 E-3702 NDOSH
73 ZD 3120-03 NDOSH 73 PE 3704A NDOSH
74 ZD 3120-04 NDOSH 74 PE 3704B NDOSH
75 ZD 3120-05 NDOSH 75 ZE 3120-01 NDOSH
76 ZD 3120-06 NDOSH 76 ZE 3120-03 NDOSH
77 ZF 3664 A NDOSH 77 ZE 3120-04 NDOSH
78 ZF 3664 B NDOSH 78 ZD 3120-01 NDOSH
79 ZF 3664 C NDOSH 79 ZD 3120-02 NDOSH
80 15137-002-091 NDOSH 80 ZD 3120-03 NDOSH
81 15137-002-700 NDOSH 81 ZD 3120-04 NDOSH
82 15137-002-705 NDOSH 82 ZD 3120-05 NDOSH
83 ZD 3720-01 NDOSH 83 ZD 3120-06 NDOSH
84 84 ZF 3664 A NDOSH
85 85 ZF 3664 B NDOSH
86 86 ZF 3664 C NDOSH
87 87 15137-002-091 NDOSH
88 88 15137-002-700 NDOSH
89 89 15137-002-705 NDOSH
90 90 ZD 3720-01 NDOSH
X
D-3104
D-3106
E-3101
E-3103
#N/A
#N/A
R-3105
D-3110
D-3113
E-3113
D-3202
D-3204
D-3206
E-3250
#N/A
#N/A
#N/A
D-3302
D-3304
E-3301
E-3305
E-3306
E-3308
T-3300
E-3312
ZE-3310-2
ZE-3310-4
D-3320
E-3322
E-3323
E-3327 A
E-3327 B
F-3325
D-3404
E-3401
E-3402
E-3407
#N/A
#N/A
T-3400
E-3505
E-3516
E-3527
E-3532
E-3536
E-3547
D-3604
D-3607
D-3608
E-3609
T-3600
D-3614
D-3701
D-3703
D-3724
D-3730
ZE 3120-02
ZD 3120-07
ZD 3120-08
ZD 3120-09
ZD 3120-10
ZR 3660
ZE3720-01
ZE3720-02
ZE3720-03
ZE3720-04
E-3102
ZD-3310-5
ZD-3310-6
E-3328
E-3406
E-3702
PE 3704A
PE 3704B
ZE 3120-01
ZE 3120-03
ZE 3120-04
ZD 3120-01
ZD 3120-02
ZD 3120-03
ZD 3120-04
ZD 3120-05
ZD 3120-06
ZF 3664 A
ZF 3664 B
ZF 3664 C
15137-002-091
15137-002-700
15137-002-705
ZD 3720-01
DOSH NON DOSH
cost work list result cost
D-3104 1 D-3104 E-3102 1
D-3104 D-3104
D-3106 2 D-3106 ZD-3310-5 2
D-3106 D-3106
E-3101 3 E-3101 ZD-3310-6 3
E-3101 E-3101
E-3103 4 E-3103 E-3328 4
E-3103 E-3103
R-3105 5 F-3100A E-3406 5
#N/A R-3105
D-3110 6 F-3100B E-3702 6
#N/A D-3110
PV-310410-1
PV-310410-2
FV-310530-1
FV-310530-2
XV-310545
XV-310415
XV-310430
XZV-311515
XZV-311517
XZV-311525
XZV-311535
BASF PETRONAS Chemicals Sdn Bhd
HR-PIB Complex 2019 Major Turnaround
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 2
1 D-3104 PH PMT 80433 BF3 DRUM Shell Wall - Level 2 L2-cloth wiping
Others - Water medium prohibited
Weldment - Level 3
2 D-3106 PH PMT 80432 NH3 DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
Shell Wall - Level 2
5 F-3100A PH PMT 80376 ISOBUTENE ABSORBER
Dish head - Level 2
Others - Clean/ replace filter element
Weldment - Level 3
Shell Wall - Level 2
6 F-3100B PH PMT 80377 ISOBUTENE ABSORBER
Dish head - Level 2
Others - Clean/ replace filter element
Page 40 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 3
11 D-3202 PH PMT 80393 PHASE SEPARATOR Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
12 D-3204 PH PMT 80731 COALESCER Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
13 D-3206 PH PMT 80392 PHASE SEPARATOR Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
Shell Wall - Level 2
15 F-3251A PH PMT 80378 PIB ABSORBER
Dish head - Level 2
Others - Clean/ replace packing
Weldment - Level 3
Shell Wall - Level 2
16 F-3251B PH PMT 80379 PIB ABSORBER
Dish head - Level 2
Others - Clean/ replace packing
Weldment - Level 3
Shell Wall - Level 2
17 F-3251C PH PMT 80380 PIB ABSORBER
Dish head - Level 2
Others - Clean/ replace packing
Weldment - Level 3
18 D-3302 PH PMT 80430 FALLING FILM EVAPORATOR VESSEL Shell Wall - Level 2
Dish head - Level 2
Page 41 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 3
19 D-3304 PH PMT 80429 DEGASSING DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
24 T-3300 PH PMT 80383 FLASH TOWER Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
28 D-3320 PH PMT 80428 PIB VACUUM DEGASSING DRUM Shell Wall - Level 2
Dish head - Level 2
Page 42 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 3
Shell Wall - Level 2
33 F-3325 PH PMT 80385 PIB FILTER
Dish head - Level 2
Others - Clean/ replace filter element
Weldment - Level 3
34 D-3404 PH PMT 80391 SOLVENT DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
Shell Wall - Level 2
38 F-3408A PH PMT 80381 MIXED-C4 RETURN ADSORBER
Dish head - Level 2
Others - replace packing
Weldment - Level 3
Shell Wall - Level 2
39 F-3408B PH PMT 80382 MIXED-C4 RETURN ADSORBER
Dish head - Level 2
Others - replace packing
Weldment - Level 3
40 T-3400 PH PMT 80434 OLIGOMER DISTILLATION TOWER Shell Wall - Level 2
Dish head - Level 2
Page 43 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 3
47 D-3604 PH PMT 80427 PHASE SEPARATOR Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
48 D-3607 PH PMT 80438 OFFGAS DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
49 D-3608 PH PMT 80437 OFFGAS DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
Shell Wall - Level 2
51 T-3600 PH PMT 80384 WASTE WATER STRIPPING TOWER
Dish head - Level 2
Others - Demister ; Level 2
Weldment - Level 3
52 D-3614 PH PMT 80375 CAUSTIC SODA DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
53 D-3701 PH PMT 80395 MP NITROGEN BUFFER Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 3
54 D-3703 PH PMT 80469 LP CONDENSATE DRUM Shell Wall - Level 2
Dish head - Level 2
Page 44 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 2
55 D-3724 PH PMT 80368 BRINE DRUM Shell Wall - Level 2
Dish head - Level 2
Weldment - Level 2
56 D-3730 PH PMT 80466 INSTRUMENT AIR BUFFER Shell Wall - Level 2
Dish head - Level 2
Page 45 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Weldment - Level 3
Shell Wall - Level 2
68 ZD-3310-5 Non DOSH SEPARATOR
Dish head - Level 2
Others - Demister ; Level 2
Page 46 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
Note:
Note 1 The total quoted fixed lump sum price for Directs is inclusive of the followings;
1.a Direct manpower including qualification, mobilization, and demobilization
Page 47 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package
No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method
1.b Tools and Equipments, not limited to air compressors, torque wrenches (manual or hydraulic torque), lightings, blowers, ventilators, etc., but excluding the supply of breathing apparatus
1.c Hydroblasting equipment and manpower, tools, consumables, and other related items
1.d Consumables i.e. anti-seize lubricants, cotton rags, etc
1.e Temporary gaskets (compressed non-asbestos fibre gaskets), isolation spades and blinds. BPC to specify the specs i.e. material, thickness, etc.
1.f Flange protection to be provided, installed after breaking flange until reinstallation in order to protect from flange face damage/cut
1.g Craneage, lifting and transportation equipment
1.h PPEs as per BPC HSE requirement
1.i All bolts equal and below than 25mm (1 inch) diameter shall be tightened using manual type torque wrenches with a positive (click) type indication when the selected torque
value is reached. Bolts above 25mm (1 inch) diameter shall use hydraulic torque wrench
Page 48 of 52
BASF PETRONAS Chemicals Sdn Bhd
HR-PIB Complex 2019 Major Turnaround
Valve Description
Item P&ID Size
Plant Area Tag Number Equipment To Be Protected
No Sheet No.
Flange Flange Flange Flange Outlet Gasket
Inlet Gasket Type
Inlet Rating Outlet Rating Type
Note 1 The total quoted fixed lump sum price for Directs is inclusive of the followings;
1.a Direct manpower including qualification, mobilization, and demobilization
1.b Tools and Equipments, not limited to air compressors, torque wrenches (manual or hydraulic torque), lightings, blowers, ventilators, etc., but excluding the supply of breathing
apparatus
1.c Hydroblasting equipment and manpower, tools, consumables, and other related items
1.d Consumables i.e. anti-seize lubricants, cotton rags, etc
1.e Temporary gaskets (compressed non-asbestos fibre gaskets), isolation spades and blinds. BPC to specify the specs i.e. material, thickness, etc.
1.f Flange protection to be provided, installed after breaking flange until reinstallation in order to protect from flange face damage/cut
1.g Craneage, lifting and transportation equipment
1.h PPEs as per BPC HSE requirement
1.i All bolts equal and below than 25mm (1 inch) diameter shall be tightened using manual type torque wrenches with a positive (click) type indication when the selected torque
value is reached. Bolts above 25mm (1 inch) diameter shall use hydraulic torque wrench.
Page 49 of 52
PART II - SECTION 2.2 - Schedule of Prices
Price Break down / package
Note 2 The Quoted Lump Sum Prices for Control Valves Shall include the followings;
1 All related tubings and termination removal/ installation will be done by TAR contractor.
2 Cotton rags c/w the masking tape to be cover and wraping at the control valve inlet and outlet piping (Cotton rags c/w the masking tape by contractors)
3 After the removal, the control valves shall be sent to OWNER's workshop for repairs (transportation by contractors)
4 Should the valve contaminated, it should be clean (at washing bay before sending to OWNER's workshop for repairs- transportation by contractors
5 Upon repair completion, contractor will collect the valves for re-installation at site.
6 Spare parts will be provided by OWNER
Remarks:
a) Valves repairs will be done by OWNERS
Page 50 of 52
BASF PETRONAS Chemicals Sdn Bhd
HR-PIB Complex 2019 Major Turnaround
CONTROL VALVES
Manufacturer
No Tag Number Service Model Name Line Number P& ID Inlet Connec Rating
Name
1 XZV-311515 BF3 from sphere 1 to D 3104 Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"
2 XZV-311525 BF3 from sphere 2 to D 3104 Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"
3 XZV-311535 BF3 from sphere 3 to D 3104 Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"
11 XV-310430
Note:
Note 1 The total quoted fixed lump sum price for Directs is inclusive of the followings;
1.a Direct manpower including qualification, mobilization, and demobilization
1.b Tools and Equipments, not limited to air compressors, torque wrenches (manual or hydraulic torque), lightings, blowers, ventilators, etc., but excluding the supply of breathing
apparatus
1.c Hydroblasting equipment and manpower, tools, consumables, and other related items
Page 51 of 52
PART II - SECTION 2.3 - Schedule of Prices
Price Break down / package
CONTROL VALVES
Note 2 The Quoted Lump Sum Prices for Control Valves Shall include the followings;
1 All related tubings and termination removal/ installation will be done by TAR contractor.
2 Cotton rags c/w the masking tape to be cover and wraping at the control valve inlet and outlet piping (Cotton rags c/w the masking tape by contractors)
3 After the removal, the control valves shall be sent to OWNER's workshop for repairs (transportation by contractors)
4 Should the valve contaminated, it should be clean (at washing bay before sending to OWNER's workshop for repairs- transportation by contractors
5 Upon repair completion, contractor will collect the valves for re-installation at site.
6 Spare parts will be provided by OWNER
Remarks:
a) Valves repairs will be done by OWNERS