You are on page 1of 52

HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement

External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Internal:
Weldment: Level 2
DOSH Blinding, Open Handhole/ nozzle, Boron Internal:
1 D-3104 PH PMT 80433 BF3 DRUM VESSEL G Shell wall: Level 2 YES
INSPECTION Cleaning, Inspection, Box up, Deblinding. Triflouride Sp3
Others: Water medium
prohibited

External:
DOSH Boron External:
2 D-3106 PH PMT 80432 NH3 DRUM VESSEL G External cleaning, Inspection, C-scanning Weldment: Level 3 YES EXTERNAL
INSPECTION Triflouride Sp3

Internal:
External: Weldment: Level 3
Blinding, Dismantling Equipment, Remove
Shell : steam Sp3, Hpwj Shell wall: Level 2
NITROGEN DOSH Channel head,open nozzle, Pull out tube
3 E-3101 PH PMT 80367 EXCHANGER 2ND Tube : 'Internal: Tube internal: Level 4 YES
HEATER INSPECTION bundle, cleaning, Inspection, Box up and
Nitrogen Sp3, HPWJ, Air Tube external: Level 4
Deblinding.
blow Dish head: Level 2
Others: Tube air blow

Internal:
Shell : Brine Internal:
ISOBUTENE DOSH Blinding, Remove Channel head, Tube Tube internal: Level 4
4 E-3103 PH PMT 80390 EXCHANGER 1ST Tube : Sp3, HPWJ, Air
COOLER INSPECTION Cleaning, Inspection, Box up, Deblinding. Dish head: Level 2
Isobutane blow
Others: air blow

ISOBUTENE DOSH External: External:


5 F-3100A PH PMT 80376 FILTER 1ST, 2ND External inspection only isobutane YES EXTERNAL
ABSORBER INSPECTION Sp3 Level 3

ISOBUTENE DOSH External: External:


6 F-3100B PH PMT 80377 FILTER 1ST, 2ND External inspection only isobutane YES EXTERNAL
ABSORBER INSPECTION Sp3 Level 3

'Internal:
Shelll: Internal:
Blinding, Remove Channel heads, Open Sp3, HPWJ, Air
DOSH Ammonia Tube internal: Level 4
7 R-3105 PH PMT 80435 REACTOR REACTOR G drain/vent, tube cleaning,Inspection, Box blow YES
INSPECTION Tube: Dish head: Level 2
up, Deblinding.
Isobutene

'Internal: Internal:
Blinding, Open Handhole, Open nozzle,
DOSH Air blow 'Weldment: Level 2
8 D-3110 PH PMT 80431 METHANOL DRUM VESSEL G Cleaning, Inspection, Box up and Methanol YES
INSPECTION Shell wall: Level 2
deblinding.

'Internal: Internal:
Blinding, Open Handhole, Open nozzle,
DOSH Air blow Weldment: Level 2
9 D-3113 PH PMT 80786 ACETONE DRUM VESSEL G Cleaning, Inspection, Box up and Acetone YES
INSPECTION Shell wall: Level 2
deblinding.

'Internal:
Shell: Internal:
Blinding, Remove Channel head, open Sp3, HPWJ, Air
DOSH Ammonia Tube internal: Level 4
10 E-3113 PH PMT 80436 CHILLER EXCHANGER G drain/vent, tube cleaning, Inspection, Box blow YES
INSPECTION Tube: Dish head: Level 2
up and Deblinding.
Iosbutene Others: air blow

Internal:
'Internal:
Blinding, Open manhole & nozzle, unload Weldment: Level 3
PHASE DOSH Sp3, Air blow
11 D-3202 PH PMT 80393 VESSEL G, 1ST packing (pall ring), Cleaning, Inspection, isobutane Shell wall: Level 2 YES YES
SEPARATOR INSPECTION
loading packing, Box up and Deblinding. Dish head: Level 2

Page 1
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Internal:
'Internal:
Blinding, Open manhole & nozzle, remove Weldment: Level 3
DOSH Sp3, Air blow
12 D-3204 PH PMT 80731 COALESCER VESSEL G,1ST perforated plate , Cleaning, Inspection, isobutane Shell wall: Level 2 YES YES
INSPECTION
Install filter, Box up and Deblinding. Dish head: Level 2

Internal:
'Internal:
Blinding, Open manhole & nozzle, unload Weldment: Level 3
PHASE DOSH Sp3, Air blow
13 D-3206 PH PMT 80392 VESSEL 1ST packing (pall ring), Cleaning, Inspection, isobutane Shell wall: Level 2 YES YES
SEPARATOR INSPECTION
loading packing, Box up and Deblinding. Dish head: Level 2

Shell: 'Internal: Internal:


Blinding, Remove channel head, open
DOSH Condensate Sp3, Air blow Tube internal: Level 4
14 E-3250 PH PMT 80389 PREHEATER EXCHANGER nozzle, Tube cleaning, Inspection, Box up
INSPECTION Tube: Dish head: Level 2
and Deblinding.
Polyisobutane

DOSH
15 F-3251A PH PMT 80378 PIB ABSORBER FILTER 3RD External inspection only PIB Isobutane YES EXTERNAL
INSPECTION

DOSH
16 F-3251B PH PMT 80379 PIB ABSORBER FILTER 3RD External inspection only PIB Isobutane YES EXTERNAL
INSPECTION

DOSH
17 F-3251C PH PMT 80380 PIB ABSORBER FILTER 3RD External inspection only PIB Isobutane YES EXTERNAL
INSPECTION

Blinding,Open manhole, Internal 'Internal: Internal:


FALLING FILM
DOSH scaffolding, Cleaning, inspection, Remove Sp3, Air blow Weldment: Level 3
18 D-3302 PH PMT 80430 EVAPORATOR VESSEL 1ST PolyIsobutene YES
INSPECTION internal scaffolding, Box up and Shell wall: Level 2
VESSEL
deblinding. Dish head: Level 2

Blinding, Open manhole, Internal 'Internal: Internal:


DEGASSING DOSH scaffolding, Cleaning, inspection, Remove Sp3, Air blow Weldment: Level 3
19 D-3304 PH PMT 80429 VESSEL G PolyIsobutene YES
DRUM INSPECTION internal scaffolding, Box up and Shell wall: Level 2
deblinding. Dish head: Level 2

Internal:
Blinding, Open top channel head and Shell: LP Internal:
FALLING FILM DOSH Tube internal: Level 4
20 E-3301 PH PMT 80388 EXCHANGER 1ST, 2ND nozzle,Lifting, Tube cleaning, Inspection, steam Sp3, HPWJ, Air YES
EVAPORATOR INSPECTION Dish head: Level 2
Box up and Deblinding. Tube: Hexane blow

Shell: LP Internal:
Blinding, Remove both channel head and Internal:
DEGASSING DOSH steam Tube internal: Level 4
21 E-3305 PH PMT 80366 EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
PREHEATER INSPECTION Tube: Dish head: Level 2
and Deblinding. blow
Isobutane

Shell: Internal:
WATER Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
22 E-3306 PH PMT 80365 CONDENSER (2ND EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
INSPECTION Tube: LP Dish head: Level 2
DEGASSING) and Deblinding. blow
steam

Page 2
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Internal:
NH3 CONDENSER Blinding, Open top channel head and Shell: Internal:
DOSH Tube internal: Level 4
23 E-3308 PH PMT 80387 (VACUUM EXCHANGER G, 1ST nozzle, Tube cleaning, Inspection, C- Ammonia Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
DEGASSING) scanning, Box up and Deblinding. Tube: Product blow

Blinding, Open manhole, M1-4,


DOSH
24 T-3300 PH PMT 80383 FLASH TOWER TOWER 1ST, 2ND videoscope Inspection, Box up and Polyisobutane YES INSPECTION ONLY
INSPECTION
Deblinding.

Shell: MP Internal:
DEGASSING Blinding, Remove both channel head and Internal:
DOSH steam Tube internal: Level 4
25 E-3312 PH PMT 80364 FALLING FILM EXCHANGER 1ST, 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air YES
INSPECTION Tube: Dish head: Level 2
EVAPARATOR and Deblinding. blow
Polyisobutane

Internal:
Blinding, Remove both channel head, Shell: Internal:
DOSH Tube internal: Level 4
26 ZE-3310-2 PH PMT 80440 CONDENSER EXCHANGER 1ST Tube cleaning, Inspection, Box up and N2/Hexane Sp3, HPWJ, Air
INSPECTION Dish head: Level 2
Deblinding. Tube: water blow

Internal:
Blinding, Remove both channel head , Internal:
HEAT DOSH Shell: water Tube internal: Level 4
27 ZE-3310-4 PH PMT 80441 EXCHANGER 1ST Tube cleaning, Inspection, Box up and Sp3, HPWJ, Air
EXCHANGER INSPECTION Tube: water Dish head: Level 2
Deblinding. blow

Blinding, Open manhole and nozzle, Internal:


PIB VACUUM
DOSH Internal scaffolding, Cleaning, Inspection, Internal: Weldment: Level 3
28 D-3320 PH PMT 80428 DEGASSING VESSEL G, 1ST PolyIsobutene YES
INSPECTION Remove internal scaffolding, Box up and Sp3, Air blow Shell wall: Level 2
DRUM
Deblinding. Dish head: Level 2

FALLING FILM Shell: MP Internal:


Blinding, Remove both channel head and Internal:
EVAPORATOR DOSH steam Tube internal: Level 4
29 E-3322 PH PMT 80363 EXCHANGER G, 1ST, 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air YES
(VACUUM INSPECTION Tube: Dish head: Level 2
and Deblinding. blow
DEGASSING) Polyisobutane

Shell: Internal:
WATER Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
30 E-3323 PH PMT 80362 CONDENSER (2ND EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
INSPECTION Tube: Cooling Dish head: Level 2
DEGASSING) and Deblinding. blow
water

Blinding, Remove channel cover and Internal:


Shell: PIB Internal:
DOSH nozzle, pull out tube bundle, Tube Tube internal: Level 4
31 E-3327 A PH PMT 80476 PIB COOLER EXCHANGER 1ST Tube: Hot Sp3, HPWJ, Air YES
INSPECTION cleaning, Inspection, install tube bundle, Dish head: Level 2
Condensate blow
Box up and Deblinding.

Blinding, Remove channel cover and Internal:


Shell: PIB Internal:
DOSH nozzle, pull out tube bundle, Tube Shell wall: Level 2
32 E-3327 B PH PMT 80477 PIB COOLER EXCHANGER 1ST Tube: Hot Sp3, HPWJ, Air
INSPECTION cleaning, Inspection, Box up and Tube internal: Level 4
Condensate blow
Deblinding. Dish head: Level 2

Internal:
Blinding, Open top cover, Shell:
DOSH Internal: Weldment: Level 3
33 F-3325 PH PMT 80385 PIB FILTER FILTER 1ST Cleaning,videoscope Inspection, install Polyisobutene YES
INSPECTION Sp3, Air blow Shell wall: Level 2
filter element, Box up and Deblinding. Jacket: Steam
Dish head: Level 2

Page 3
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Blinding, Open manhole and nozzle, Internal:


DOSH Internal scaffolding, Cleaning, Inspection, Internal: Weldment: Level 3
34 D-3404 PH PMT 80391 SOLVENT DRUM VESSEL 1ST isobutane YES YES
INSPECTION Remove internal scaffolding, Box up and Sp3, Air blow Shell wall: Level 2
Deblinding. Dish head: Level 2

Internal:
Blinding, Open both channel head and Shell: MP Internal:
DOSH Tube internal: Level 4
35 E-3401 PH PMT 80807 REBOILER EXCHANGER G, 1ST nozzle, Tube cleaning, Inspection, Box up steam Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube: Hexane blow

Shell: Internal:
Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
36 E-3402 PH PMT 80361 CONDENSER EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air
INSPECTION Tube: Cooling Dish head: Level 2
and Deblinding. blow
water

Shell: Internal:
Blinding, Remove both channel head and Internal:
DOSH Isobutane Tube internal: Level 4
37 E-3407 PH PMT 80360 COOLER EXCHANGER 2ND nozzle, Tube cleaning, Inspection, Box up Sp3, HPWJ, Air YES
INSPECTION Tube: Cooling Dish head: Level 2
and Deblinding. blow
water

MIXED-C4
DOSH
38 F-3408A PH PMT 80381 RETURN FILTER 1ST, 2ND External inspection only Isobutane YES EXTERNAL
INSPECTION
ADSORBER

MIXED-C4
DOSH
39 F-3408B PH PMT 80382 RETURN FILTER 1ST, 2ND External inspection only isobutane YES EXTERNAL
INSPECTION
ADSORBER

Blinding, Open manhole M1-3, Internal Internal:


OLIGOMER
DOSH scaffolding, Open/refit tray manways, Internal: Weldment: Level 3
40 T-3400 PH PMT 80434 DISTILLATION TOWER G, 1ST, 2ND Hexene YES
INSPECTION Cleaning, Inspection, Remove internal Sp3, Air blow Shell wall: Level 2
TOWER
scaffolding, box up and Deblinding. Dish head: Level 2

Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
41 E-3505 PH PMT 80369 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow

Internal:
Blinding, Remove both channel head, Shell : LP Internal:
PIB HEATER DOSH Tube internal: Level 4
42 E-3516 PH PMT 80370 EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
(TK3515) INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow

Internal:
Blinding, Remove both channel head, Shell : LP Internal:
PIB HEATER DOSH Tube internal: Level 4
43 E-3527 PH PMT 80371 EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
(TK3526) INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow

Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
44 E-3532 PH PMT 80372 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow

Page 4
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
45 E-3536 PH PMT 80373 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow

Internal:
Blinding, Remove both channel head, Shell : LP Internal:
DOSH Tube internal: Level 4
46 E-3547 PH PMT 80374 PIB HEATER EXCHANGER GTA Open nozzle, Cleaning, Inspection, Box up condensate Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
and Deblinding. Tube : PIB blow

Internal:
Blinding, Open manhole, remove
PHASE DOSH Internal: Weldment: Level 3
47 D-3604 PH PMT 80427 VESSEL G perforated plate , Cleaning, Inspection, waste water YES YES
SEPARATOR INSPECTION Sp3, Air blow Shell wall: Level 2
Box up and Deblinding.
Dish head: Level 2

Blinding, Open manhole M1, Open nozzle Internal:


DOSH R1-R3, Internal scaffolding, Cleaning, Shell: Off gas Internal: Weldment: Level 3
48 D-3607 PH PMT 80438 OFFGAS DRUM VESSEL G YES
INSPECTION Inspection, Remove internal scaffolding, Coil: Lp steam Sp3, Air blow Shell wall: Level 2
Box up and Deblinding. Dish head: Level 2

Blinding, Open manhole M1, Open nozzle Internal:


DOSH R1, Internal Scaffolding, Cleaning, Internal: Weldment: Level 3
49 D-3608 PH PMT 80437 OFFGAS DRUM VESSEL G Off Gas YES
INSPECTION Inspection, Remove internal scaffolding, Sp3, Air blow Shell wall: Level 2
Box up and Deblinding. Dish head: Level 2

Internal:
Blinding, remove top side channel head, Shell: Internal:
DOSH Tube internal: Level 4
50 E-3609 PH PMT 80386 CONDENSER EXCHANGER G, 1ST Open nozzle , Inspection , Box up and Ammonia Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
Deblinding. Tube: Product blow

WASTE WATER
DOSH
51 T-3600 PH PMT 80384 STRIPPING TOWER G, 1ST, 2ND External Inspection only waste water YES EXTERNAL
INSPECTION
TOWER

Internal:
Blinding, Open manhole, Open nozzle,
CAUSTIC SODA DOSH Caustic soda Internal: Weldment: Level 3
52 D-3614 PH PMT 80375 VESSEL 2ND Cleaning, Inspection, Box up and YES
DRUM INSPECTION 25% Sp3, Air blow Shell wall: Level 2
Deblinding.
Dish head: Level 2

Blinding, Open manhole, Open nozzle, Internal:


MP NITROGEN DOSH Internal scaffolding, Cleaning, Inspection, Internal: Weldment: Level 3
53 D-3701 PH PMT 80395 VESSEL G Nitrogen YES YES
BUFFER INSPECTION Remove internal scaffolding, Box up and Sp3, Air blow Shell wall: Level 2
Deblinding. Dish head: Level 2

Blinding, Open manhole M1, Open nozzle Internal:


LP CONDENSATE DOSH R1, Internal Scaffolding, Cleaning, Internal: Weldment: Level 3
54 D-3703 PH PMT 80469 VESSEL G Condensate YES YES
DRUM INSPECTION Inspection, Remove internal scaffolding, Sp3, Air blow Shell wall: Level 2
Box up and Deblinding. Dish head: Level 2

Internal:
Blinding, Open handhole H1,H2, Open
DOSH Internal: Weldment: Level 2
55 D-3724 PH PMT 80368 BRINE DRUM VESSEL 2ND nozzle R1,R2, Cleaning, Inspection, box Brine YES
INSPECTION Sp3, Air blow Shell wall: Level 2
up and Deblinding.
Dish head: Level 2

Page 5
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Internal:
Blinding, Open handhole H1,H2, Open
INSTRUMENT AIR DOSH Internal: Weldment: Level 2
56 D-3730 PH PMT 80466 VESSEL 1ST nozzle R1, Cleaning, Inspection, box up Instrument air YES
BUFFER INSPECTION Air blow Shell wall: Level 2
and Deblinding.
Dish head: Level 2

FLOODED
Blinding, Remove Channel heads, Open
ECONOMIZER DOSH Shell: R717 EXTERNAL (SCOPE
57 ZE 3120-02 PH PMT 80442 EXCHANGER G drain/vent, tube cleaning, Inspection, Box YES
WITH SURGE INSPECTION Tube: R717 CHANGE)
up, Deblinding.
DRUM

DOSH Blinding, Open drain/vent, Cleaning, EXTERNAL (SCOPE


58 ZD 3120-07 PH PMT 80448 RECEIVER VESSEL G R717 YES
INSPECTION Inspection, Box up and Deblinding. CHANGE)

DOSH Blinding, Open drain/vent, Cleaning, EXTERNAL (SCOPE


59 ZD 3120-08 PH PMT 80443 SURGE DRUM VESSEL G R717 YES
INSPECTION Inspection, Box up and Deblinding. CHANGE)

DOSH Blinding, Open drain/vent, Cleaning, EXTERNAL (SCOPE


60 ZD 3120-09 PH PMT 80449 OIL POT VESSEL G R717 YES
INSPECTION Inspection, Box up and Deblinding. CHANGE)

DOSH Blinding, Open drain/vent, Cleaning, EXTERNAL (SCOPE


61 ZD 3120-10 PH PMT 80808 OIL POT VESSEL G R717 YES
INSPECTION Inspection, Box up and Deblinding. CHANGE)

Internal:
Blinding, Open manhole, Open nozzle,
Shell wall: Level 2
PM PMT CRYSTALACTOR DOSH Internal scaffolding, Unloading/Loading Internal:
62 ZR 3660 REACTOR G, 1ST waste water Dish head: Level 2 YES YES
80471 REACTOR INSPECTION sand (~4.81m3), Cleaning, Inspection, box Air blow
Others: Cautions on Butyl
up and Deblinding.
Rubber lining

Internal:
Blinding, Remove both channel head, Internal:
DOSH Shell: R134a Tube internal: Level 4
63 ZE3720-01 PH PMT 80444 DX ECONOMIZER EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Sp3, HPWJ, Air YES
INSPECTION Tube: R134a Dish head: Level 2
Box up and Deblinding. blow

Internal:
Blinding, Remove both channel head, Internal:
DOSH Shell: Lube oil Tube internal: Level 4
64 ZE3720-02 PH PMT 80445 OIL COOLER EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Sp3, HPWJ, Air YES
INSPECTION Tube: Water Dish head: Level 2
Box up and Deblinding. blow

Internal:
Blinding, Remove both channel head, Shell: R134a Internal:
WATER COOLED DOSH Tube internal: Level 4
65 ZE3720-03 PH PMT 80446 EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Tube: Cooling Sp3, HPWJ, Air YES
CONDENSER INSPECTION Dish head: Level 2
Box up and Deblinding. water blow

Internal:
Blinding, Remove both channel head, Shell:30% Internal:
DOSH Tube internal: Level 4
66 ZE3720-04 PH PMT 80447 DX EVAPORATOR EXCHANGER 2ND Open nozzle, Tube Cleaning, Inspection, Glycol Sp3, HPWJ, Air YES
INSPECTION Dish head: Level 2
Box up and Deblinding. Tube: R134a blow

Page 6
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Primary: N2
PLATE HEAT Secondary:
1 E-3102 EXCHANGER 2ND NON DOSH External Inspection only EXTERNAL
EXCHANGER Process
stream

Internal:
Blinding, Open handhole, Open top head, Weldment: Level 3
Nitrogen / Internal:
2 ZD-3310-5 SEPARATOR SEPARATOR G NON DOSH Remove demister, Cleaning, Inspection, Shell wall: Level 2 YES
Hexane Sp3, Air blow
Install demister, Box up and Deblinding. Dish head: Level 2
Others: Demister, Level 2

STEAM
3 ZD-3310-6 Drum G NON DOSH External inspection only steam YES EXTERNAL
DENCENTER

Primary:
CONDENSATE
Cooling water
4 E-3328 COOLER (PIB EXCHANGER 1ST NON DOSH External Inspection Only EXTERNAL
Scnd:Hot
COOLER)
condensate

Internal:
Blinding, Dismantle all return bend (3nos), Shell: water Internal:
OLIGOMER Tube internal: Level 4
5 E-3406 EXCHANGER G NON DOSH Cleaning, Inspection, Box up and Tube: Sp3, HPWJ, Air YES
COOLER Dish head: Level 2
Deblinding Oligomers blow

Internal:
Shell: steam Internal:
STEAM Blinding, Open N3 & N4, Tube Cleaning, Tube internal: Level 4
6 E-3702 EXCHANGER 1ST NON DOSH Tube: cooling Sp3, HPWJ, Air
CONDENSER Inspection, Box up and Deblinding. Dish head: Level 2
water blow

Internal:
Blinding, Open top blind flange, Open Shell: Cooling Internal:
HEAT Tube internal: Level 4
7 PE 3704A EXCHANGER G NON DOSH drain N1,N2,N3, Cleaning, Inspection, Box water Sp3, HPWJ, Air
EXCHANGER Tube external: Level 2
up and Deblinding. Tube: Water blow
Dish head: Level 2

Blinding, Open top blind flange, Open Shell: Cooling


HEAT
8 PE 3704B HEAT EXCHANGER G NON DOSH drain N1,N2,N3, Cleaning, Inspection, Box water DELETE
EXCHANGER
up and Deblinding. Tube: Water

Internal:
Blinding, Remove channel head, open Shell: Lube oil Internal:
Oil Cooler Tube internal: Level 4
9 ZE 3120-01 EXCHANGER G NON DOSH nozzle, Tube cleaning, Inspection, Box up Tube: Cooling Sp3, HPWJ, Air YES
ZE 3120-01 Dish head: Level 2
and Deblinding. Water blow

Primary: Hot
Plate Heat
water
10 ZE 3120-03 ExchangerZE 3120- EXCHANGER G NON DOSH External inspection only EXTERNAL
Second:
03
Chilled water

Plate Heat Shell:


11 ZE 3120-04 ExchangerZE 3120- EXCHANGER G NON DOSH External inspection only Ammonia YES EXTERNAL
04 Tube: water

Page 7
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Suction Filter Blinding, Open blind cover, Cleaning, EXTERNAL (SCOPE


12 ZD 3120-01 DRUM G NON DOSH R717 YES
ZD 3120-01 Inspection, Box up and Deblinding. CHANGE)

Blinding, Open blind cover, Remove filter Internal:


Oil Strainer Internal:
13 ZD 3120-02 DRUM G NON DOSH element, Cleaning, Inspection, Install filter Lube Oil Weldment: Level 3
ZD 3120-02 Sp3, Air blow
element, Box up and Deblinding. Shell wall: Level 2

Blinding, Open blind cover, Remove filter Internal:


Oil Filter Internal:
14 ZD 3120-03 DRUM G NON DOSH element, Cleaning, Inspection, Install filter Lube Oil Weldment: Level 3 YES
ZD 3120-03 Sp3, Air blow
element, Box up and Deblinding. Shell wall: Level 2

Blinding, Open blind cover, Remove filter Internal:


Oil Filter Internal:
15 ZD 3120-04 DRUM G NON DOSH element, Cleaning, Inspection, Install filter Lube Oil Weldment: Level 3 YES
ZD 3120-04 Sp3, Air blow
element, Box up and Deblinding. Shell wall: Level 2

Blinding, Open top cover N2, Open nozzle,


Remove filter element, Internal scaffolding,
Oil Separator EXTERNAL (SCOPE
16 ZD 3120-05 DRUM G NON DOSH Cleaning, Inspection, Remove int R717 YES
ZD 3120-05 CHANGE)
scaffolding, Install filter element, Box up
and Deblinding.

Blinding, Open bottom head, Open vent ,


Secondary Oil
Remove filter element, Cleaning, EXTERNAL (SCOPE
17 ZD 3120-06 Separator DRUM G NON DOSH R717 YES
Inspection, Install filter element, Box up CHANGE)
ZD 3120-06
and Deblinding.

Blinding, Open top manhole, Open bottom Internal:


Sand filter manhole, Remove end flange, unloading Internal: Weldment: Level 2
18 ZF 3664 A FILTER G NON DOSH Waste water YES YES
ZF 3664 A sand, Internal cleaning, Inspection, Sp2, Air blow Shell wall: Level 2
Loading sand, Box up and Deblinding. Dish head: Level 2

Sand filter
19 ZF 3664 B FILTER G NON DOSH External inspection only Waste water YES INSPECTION ONLY
ZF 3664 B

Sand filter
20 ZF 3664 C FILTER G NON DOSH External inspection only Waste water YES INSPECTION ONLY
ZF 3664 C

Internal:
Suction Filter Blinding,Open blind cover, Cleaning, Internal:
21 15137-002-091 FILTER G NON DOSH R 134 a Weldment: Level 3 YES
15137-002-091 Inspection, box up and deblinding. Sp3, Air blow
Shell wall: Level 2

Blinding, Open blind cover, Remove filter Internal:


Oil Strainer Internal:
22 15137-002-700 FILTER G NON DOSH element, Cleaning, Inspection, Box up and Lube Oil Weldment: Level 3
15137-002-700 Sp3, Air blow
Deblinding. Shell wall: Level 2

Page 8
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Oil Filter Blinding, Open blind cover, Remove filter Internal:


15137-002- Internal:
23 15137-002-705.1 & FILTER G NON DOSH element, Cleaning, Inspection, Box up and Lube Oil Weldment: Level 3
705.1 Sp3, Air blow
705.2 Deblinding. Shell wall: Level 2

Oil Filter Blinding, Open blind cover, Remove filter Internal:


15137-002- Internal: SEPARATE FROM
24 15137-002-705.1 & FILTER G NON DOSH element, Cleaning, Inspection, Box up and Lube Oil Weldment: Level 3
705.2 Sp3, Air blow ITEM 23
705.2 Deblinding. Shell wall: Level 2

Blinding, Open blind cover, Open drain , Internal:


Oil Separator Internal:
25 ZD 3720-01 DRUM G NON DOSH Cleaning, Inspection, Box up and R 134 a Weldment: Level 3 YES
ZD3720-01 Sp3, Air blow
Deblinding. Shell wall: Level 2

Pressure Safety Remove valve, Send to servicing area,


1 PSV-31151 PSV G PM Boron Triflouride
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


2 PSV-31152 PSV G PM Boron Triflouride
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


3 PSV-31153 PSV G # steam ADDITIONAL
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


4 PSV-31154 PSV G PM Boron Triflouride
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


5 PSV-31041 PSV G PM Boron Triflouride
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


6 PSV-31211 PSV # steam ADDITIONAL
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


7 PSV-32011 PSV # steam ADDITIONAL
Valve Reinstall

Pressure Safety Remove valve, Send to servicing area,


8 PSV-32012 PSV # steam ADDITIONAL
Valve Reinstall

Page 9
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Remove valve, Send to servicing area,


1 PV-310410-1 BF3 to D 3104 CV # steam Boron Triflouride
Reinstall

Remove valve, Send to servicing area,


2 PV-310410-2 BF3 to D 3104 CV Boron Triflouride
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
3 FV-310530-1 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
4 FV-310530-2 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
5 XV-310545 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
6 XV-310415 BF3 to R 3105 CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
7 XZV-310430 ON-OFF VALVE CV to operation within Boron Triflouride
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
BF3 from sphere 1 Remove valve, Send to servicing area,
8 XZV-311515 CV to operation within Boron Triflouride
to D 3104 Reinstall
24 hours or below
during TAR

BF3 to pressure Remove valve, Send to servicing area,


9 XZV-311517 CV Boron Triflouride
control Reinstall

BF3 from sphere 2 Remove valve, Send to servicing area,


10 XZV-311525 CV Boron Triflouride
to D 3104 Reinstall

Equipment to be
complete handover
BF3 from sphere 3 Remove valve, Send to servicing area,
11 XZV-311535 CV to operation within Boron Triflouride
to D 3104 Reinstall
24 hours or below
during TAR

Page 10
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Remove valve, Send to servicing area,


1 PVRV 35011 Release Valve RV GTA # steam OFF GAS ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


2 PVRV 35012 Release Valve RV GTA # steam OFF GAS ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


3 PVRV 35052 Release Valve RV GTA # steam PIB 1300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


4 PVRV 35053 Release Valve RV GTA # steam PIB 1300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


5 PVRV 35072 Release Valve RV GTA # steam PIB 2300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


6 PVRV 35073 Release Valve RV GTA # steam PIB 2300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


7 PVRV 35091 Release Valve RV GTA # steam NITROGEN ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


8 PVRV 35032 Release Valve RV GTA # steam PIB 1000 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


9 PVRV 35033 Release Valve RV GTA # steam PIB 1000 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


10 PVRV 35132 Release Valve RV GTA # steam OFF SPEC HR PIB ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


11 PVRV 35133 Release Valve RV GTA # steam OFF SPEC HR PIB ADDITIONAL
Reinstall

Page 11
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Remove valve, Send to servicing area,


12 PVRV 35462 Release Valve RV GTA # steam PIB 2300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


13 PVRV 35463 Release Valve RV GTA # steam PIB 2300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


14 PVRV 35352 Release Valve RV GTA # steam PIB 1300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


15 PVRV 35353 Release Valve RV GTA # steam PIB 1300 ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


1 SMA 35011 Flame Arresstor SMA GTA # steam NITROGEN ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


2 SMA 36292 Flame Arresstor SMA OFF GAS ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
3 SMA 36291 Flame Arresstor SMA to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
4 SMA 35091 Flame Arresstor SMA GTA to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
5 PSE 35011 Flame Arresstor PSE GTA to operation within RESIDUE ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
6 PSE 35051 Flame Arresstor PSE GTA to operation within PIB 1300 ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
7 PSE 35071 Flame Arresstor PSE GTA to operation within PIB 2300 ADDITIONAL
Reinstall
24 hours or below
during TAR

Page 12
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Equipment to be
complete handover
Remove valve, Send to servicing area,
8 PSE 35031 Flame Arresstor PSE GTA to operation within PIB 1000 ADDITIONAL
Reinstall
24 hours or below
during TAR

Remove valve, Send to servicing area,


9 PSE 35131 Flame Arresstor PSE GTA HR PIB ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


10 PSE 35461 Flame Arresstor PSE GTA PIB 2300 ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
11 PSE 35351 Flame Arresstor PSE GTA to operation within PIB 1300 ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
12 PSE 31211 Flame Arresstor PSE to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
13 PSE 32012 Flame Arresstor PSE to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
14 PSE 32011 Flame Arresstor PSE to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Remove valve, Send to servicing area,


1 F(Z)-310165 ORIFICE PLATE F(Z) # steam OFF GAS ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


2 F(Z)-311320 ORIFICE PLATE F(Z) OFF GAS ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
3 F(Z)-311552 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
4 F(Z)-310567 ORIFICE PLATE F(Z) to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Page 13
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Equipment to be
complete handover
Remove valve, Send to servicing area,
5 F(Z)-320115 ORIFICE PLATE F(Z) to operation within CONDENSATE ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
6 F(Z)-320235 ORIFICE PLATE F(Z) to operation within WASTE WATER ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
7 F(Z)-320315 ORIFICE PLATE F(Z) to operation within CONDENSATE ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
8 F(Z)-320442 ORIFICE PLATE F(Z) to operation within WASTE WATER ADDITIONAL
Reinstall
24 hours or below
during TAR

Remove valve, Send to servicing area,


9 F(Z)-320642 ORIFICE PLATE F(Z) WASTE WATER ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


10 F(Z)-330515 ORIFICE PLATE F(Z) LP STEAM ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
11 F(Z)-330144 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
12 F(Z)-330115 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
13 F(Z)-331212 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
14 F(Z)-332212 ORIFICE PLATE F(Z) to operation within MP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR

Remove valve, Send to servicing area,


15 F(Z)-340105 ORIFICE PLATE F(Z) # steam MP STEAM ADDITIONAL
Reinstall

Page 14
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Remove valve, Send to servicing area,


16 F(Z)-340411 ORIFICE PLATE F(Z) OFF GAS ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
17 F(Z)-340565 ORIFICE PLATE F(Z) to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
18 F(Z)-340845 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
19 F(Z)-350220 ORIFICE PLATE F(Z) to operation within OFF GAS ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
20 F(Z)-350325 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
21 F(Z)-350425 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
22 F(Z)-352625 ORIFICE PLATE F(Z) to operation within NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Remove valve, Send to servicing area,


23 F(Z)-351525 ORIFICE PLATE F(Z) LP NITROGEN ADDITIONAL
Reinstall

Remove valve, Send to servicing area,


24 F(Z)-353025 ORIFICE PLATE F(Z) LP NITROGEN ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
25 F(Z)-353525 ORIFICE PLATE F(Z) to operation within LP NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
26 F(Z)-354625 ORIFICE PLATE F(Z) to operation within LP NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Page 15
HR-PIB TAR 2019 DOSH EQUIPMENT Access Requirement
External Internal
Work Description Method Platform / Platform /
No. Tag/ line No. PMT No. Equipment Name Equipment Type Location Work Title Product Level Cleaning Scaffolding Scaffolding Remarks
Cleaning Ladder Ladder

Equipment to be
complete handover
Remove valve, Send to servicing area,
27 F(Z)-361388 ORIFICE PLATE F(Z) to operation within LP STEAM ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
28 F(Z)-371008 ORIFICE PLATE F(Z) to operation within CONDENSATE ADDITIONAL
Reinstall
24 hours or below
during TAR

Remove valve, Send to servicing area,


29 F(Z)-372919 ORIFICE PLATE F(Z) NITROGEN ADDITIONAL
Reinstall

Equipment to be
complete handover
Remove valve, Send to servicing area,
30 F(Z)-372979 ORIFICE PLATE F(Z) to operation within INSTRUMENT AIR ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
31 F(Z)-311008 ORIFICE PLATE F(Z) to operation within METHANOL ADDITIONAL
Reinstall
24 hours or below
during TAR

Equipment to be
complete handover
Remove valve, Send to servicing area,
32 F(Z)-370120 ORIFICE PLATE F(Z) to operation within MP NITROGEN ADDITIONAL
Reinstall
24 hours or below
during TAR

Page 16
HR-PIB TAR 2019 DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Function Location EQUIPMENT TYPE LOCATION Work Title Quantity Remarks SCAFF CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND INPECTION CLEANING INSP HT DOSH BOX-UP DE-BLIND REMARKS
Work Type N CH / TRAY PACKING BUNDLE

Blinding, Open Handhole/ nozzle, Cleaning, Inspection, Box D : Drums (in process
1 100 2019CAA-M-001 D-3104 BF3 DRUM MY9W-VM01-V01-100-1100 -E1100A VESSEL G DOSH INSPECTION
up, Deblinding. service)
1

D : Drums (in process


2 100 2019CAA-M-002 D-3106 NH3 DRUM MY9W-VM01-V01-100-1100 -E1100B VESSEL G DOSH INSPECTION External cleaning, Inspection, C-scanning
service)
1

Blinding, Dismantling Equipment, Remove Channel


3 100 2019CAA-M-003 E-3101 NITROGEN HEATER MY9W-VM01-V01-100-1100 -E1130 EXCHANGER DOSH INSPECTION head,open nozzle, Pull out tube bundle, cleaning, HE : Heat Exchangers 1
Inspection, Box up and Deblinding.

Blinding, Remove Channel head, Tube Cleaning,


4 100 2019CAA-M-004 E-3103 ISOBUTENE COOLER MY9W-VM01-V01-100-1100 -F1100 EXCHANGER DOSH INSPECTION
Inspection, Box up, Deblinding.
HE : Heat Exchangers 1

Blinding, Open top cover and nozzle, Remove filter


5 100 2019CAA-M-005 F-3100A ISOBUTENE ABSORBER MY9W-VM01-V01-100-1200 -E1200A FILTER DOSH INSPECTION element, Internal Scaffolding, Cleaning, Inspection, Install F : Filters 1 EXTERNAL
filter element Box up and deblinding.

Blinding, Open top cover and nozzle, Remove filter


6 100 2019CAA-M-006 F-3100B ISOBUTENE ABSORBER MY9W-VM01-V01-100-1200 -E1200B FILTER DOSH INSPECTION element, Internal Scaffolding, Cleaning, Inspection, Install F : Filters 1 EXTERNAL
filter element Box up and deblinding.

Blinding, Remove Channel heads, Open drain/vent, tube


7 100 2019CAA-M-007 R-3105 REACTOR MY9W-VM01-V01-110-1400 -E1400 REACTOR DOSH INSPECTION
cleaning, Inspection, Box up, Deblinding.
R : Reactor 1

Blinding, Open Handhole, Open nozzle, Cleaning, D : Drums (in process


8 100 2019CAA-M-008 D-3110 METHANOL DRUM MY9W-VM01-V01-120-2100 -E2110 VESSEL DOSH INSPECTION
Inspection, Box up and deblinding. service)
1

Blinding, Open Handhole, Open nozzle, Cleaning, D : Drums (in process


9 100 2019CAA-M-009 D-3113 ACETONE DRUM MY9W-VM01-V01-120-2100 -E2130 VESSEL DOSH INSPECTION
Inspection, Box up and deblinding. service)
1

Blinding, Remove Channel head, open drain/vent, tube


10 100 2019CAA-M-010 E-3113 CHILLER MY9W-VM01-V01-120-2100 -E2140 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open manhole & nozzle, unload packing (pall


D : Drums (in process
11 110 2019CAA-M-011 D-3202 PHASE SEPARATOR MY9W-VM01-V01-120-2100 -E2160 VESSEL DOSH INSPECTION ring), Cleaning, Inspection, loading packing, Box up and
service)
1
Deblinding.

Blinding, Open manhole & nozzle, remove filter @ N1,N2 , D : Drums (in process
12 110 2019CAA-M-012 D-3204 COALESCER MY9W-VM01-V01-120-2100 -R2100 VESSEL DOSH INSPECTION
Cleaning, Inspection, Install filter, Box up and Deblinding. service)
1

Blinding, Open manhole & nozzle, unload packing (pall


D : Drums (in process
13 110 2019CAA-M-013 D-3206 PHASE SEPARATOR MY9W-VM01-V01-120-2100 -R2150 VESSEL DOSH INSPECTION ring), Cleaning, Inspection, loading packing, Box up and
service)
1
Deblinding.

Blinding, Remove channel head, open nozzle, Tube


14 110 2019CAA-M-014 E-3250 PREHEATER MY9W-VM01-V01-120-2200 -E2210 EXCHANGER DOSH INSPECTION HE : Heat Exchangers 1
cleaning, Inspection, Box up and Deblinding.

Blinding, Open top cover and nozzle, unload packing,


15 110 2019CAA-M-015 F-3251A PIB ABSORBER MY9W-VM01-V01-120-2200 -E2230 FILTER DOSH INSPECTION Internal scaffolding, Cleaning, Inspection, Remove int F : Filters 1 EXTERNAL
scaffolding, loading packing, Box up and Deblinding.

Blinding, Open top cover and nozzle, unload packing,


16 110 2019CAA-M-016 F-3251B PIB ABSORBER MY9W-VM01-V01-120-2200 -E2240 FILTER DOSH INSPECTION Internal scaffolding, Cleaning, Inspection, Remove int F : Filters 1 EXTERNAL
scaffolding, loading packing, Box up and Deblinding.

Blinding, Open top cover and nozzle, unload packing,


17 110 2019CAA-M-017 F-3251C PIB ABSORBER MY9W-VM01-V01-120-2200 -E2260 FILTER DOSH INSPECTION Internal scaffolding, Cleaning, Inspection, Remove int F : Filters 1 EXTERNAL
scaffolding, loading packing, Box up and Deblinding.

Blinding,Open manhole, Internal scaffolding, Cleaning,


FALLING FILM D : Drums (in process
18 120 2019CAA-M-018 D-3302
EVAPORATOR VESSEL
MY9W-VM01-V01-120-2200 -R2200 VESSEL DOSH INSPECTION inspection, Remove internal scaffolding, Box up and
service)
1
deblinding.

Blinding, Open manhole, Internal scaffolding, Cleaning,


D : Drums (in process
19 120 2019CAA-M-019 D-3304 DEGASSING DRUM MY9W-VM01-V01-120-2200 -R2250 VESSEL DOSH INSPECTION inspection, Remove internal scaffolding, Box up and
service)
1
deblinding.

FALLING FILM Blinding, Open top channel head and nozzle,Lifting, Tube
20 120 2019CAA-M-020 E-3301
EVAPORATOR
MY9W-VM01-V01-120-2500 -D2500 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head and nozzle, Tube


21 120 2019CAA-M-021 E-3305 DEGASSING PREHEATER MY9W-VM01-V01-120-2500 -E2510 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

WATER CONDENSER Blinding, Remove both channel head and nozzle, Tube
22 120 2019CAA-M-022 E-3306
(2ND DEGASSING)
MY9W-VM01-V02-200-3000 -T3000 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

NH3 CONDENSER Blinding, Open top channel head and nozzle, Tube
23 120 2019CAA-M-023 E-3308
(VACUUM DEGASSING)
MY9W-VM01-V02-200-3100 -E3110A EXCHANGER DOSH INSPECTION
cleaning, Inspection, C-scanning, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open manhole, M1-4, unload packing material,


24 120 2019CAA-M-024 T-3300 FLASH TOWER MY9W-VM01-V02-200-3100 -E3110B TOWER DOSH INSPECTION Internal scaffolding, Cleaning, Inspection, Remove int T : Tower 1
scaffolding, loading packing, Box up and Deblinding.

DEGASSING FALLING Blinding, Remove both channel head and nozzle, Tube
25 120 2019CAA-M-025 E-3312
FILM EVAPARATOR
MY9W-VM01-V02-200-3100 -E3120A EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Page 17 of 52
HR-PIB TAR 2019 DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Function Location EQUIPMENT TYPE LOCATION Work Title Quantity Remarks SCAFF CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND INPECTION CLEANING INSP HT DOSH BOX-UP DE-BLIND REMARKS
Work Type N CH / TRAY PACKING BUNDLE

Blinding, Remove both channel head, Tube cleaning,


26 120 2019CAA-M-026 ZE-3310-2 CONDENSER MY9W-VM01-V02-200-3100 -E3120B EXCHANGER DOSH INSPECTION
Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head , Tube cleaning,


27 120 2019CAA-M-027 ZE-3310-4 HEAT EXCHANGER MY9W-VM01-V02-200-3100 -E3120C EXCHANGER DOSH INSPECTION
Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open manhole and nozzle, Internal scaffolding,


PIB VACUUM DEGASSING D : Drums (in process
28 120 2019CAA-M-028 D-3320
DRUM
MY9W-VM01-V02-200-3100 -E3120D VESSEL DOSH INSPECTION Cleaning, Inspection, Remove internal scaffolding, Box up
service)
1
and Deblinding.

FALLING FILM
Blinding, Remove both channel head and nozzle, Tube
29 120 2019CAA-M-029 E-3322 EVAPORATOR (VACUUM MY9W-VM01-V02-200-3100 -E3130A EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1
DEGASSING)

WATER CONDENSER Blinding, Remove both channel head and nozzle, Tube
30 120 2019CAA-M-030 E-3323
(2ND DEGASSING)
MY9W-VM01-V02-200-3100 -E3130B EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove channel cover and nozzle, pull out tube


31 120 2019CAA-M-031 E-3327 A PIB COOLER MY9W-VM01-V02-200-3100 -E3140 EXCHANGER DOSH INSPECTION bundle, Tube cleaning, Inspection, install tube bundle, Box HE : Heat Exchangers 1
up and Deblinding.

Blinding, Remove channel cover and nozzle, pull out tube


32 120 2019CAA-M-032 E-3327 B PIB COOLER MY9W-VM01-V02-200-3100 -E3180 EXCHANGER DOSH INSPECTION
bundle, Tube cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open top cover, remove filter element and clean,


33 120 2019CAA-M-033 F-3325 PIB FILTER MY9W-VM01-V02-200-3100 -T3100 FILTER DOSH INSPECTION Cleaning, Inspection, install filter element, Box up and F : Filters 1
Deblinding.

Blinding, Open manhole and nozzle, Internal scaffolding,


D : Drums (in process
34 130 2019CAA-M-034 D-3404 SOLVENT DRUM MY9W-VM01-V02-200-3190 -T3190 VESSEL DOSH INSPECTION Cleaning, Inspection, Remove internal scaffolding, Box up
service)
1
and Deblinding.

Blinding, Open both channel head and nozzle, Tube


35 130 2019CAA-M-035 E-3401 REBOILER MY9W-VM01-V02-200-3200 -E3200A EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head and nozzle, Tube


36 130 2019CAA-M-036 E-3402 CONDENSER MY9W-VM01-V02-200-3200 -E3200B EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head and nozzle, Tube


37 130 2019CAA-M-037 E-3407 COOLER MY9W-VM01-V02-200-3200 -E3250 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open top cover and nozzle, Remove filter


MIXED-C4 RETURN
38 130 2019CAA-M-038 F-3408A
ADSORBER
MY9W-VM01-V02-200-3200 -E3250B FILTER DOSH INSPECTION element, Internal scaffolding, Cleaning, Inspection, Remove F : Filters 1 EXTERNAL
int scaffolding, install filter element, Box up and Deblinding.

Blinding, Open top cover and nozzle, Remove filter


MIXED-C4 RETURN
39 130 2019CAA-M-039 F-3408B MY9W-VM01-V02-200-3200 -E3260 FILTER DOSH INSPECTION element, Internal scaffolding, Cleaning, Inspection, Remove F : Filters 1 EXTERNAL
ADSORBER
int scaffolding, install filter element, Box up and Deblinding.

Blinding, Open manhole M1-3, Internal scaffolding,


OLIGOMER DISTILLATION
40 130 2019CAA-M-040 T-3400
TOWER
MY9W-VM01-V02-200-3200-T3200 TOWER DOSH INSPECTION Open/refit tray manways, Cleaning, Inspection, Remove T : Tower 1
internal scaffolding, box up and Deblinding.

Blinding, Remove both channel head, Open nozzle,


41 140 2019CAA-M-041 E-3505 PIB HEATER MY9W-VM01-V02-200-3300 -CD3370 EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head, Open nozzle,


42 140 2019CAA-M-042 E-3516 PIB HEATER (TK3515) MY9W-VM01-V02-200-3300 -D3333 EXCHANGER DOSH INSPECTION HE : Heat Exchangers 1
Cleaning, Inspection, Box up and Deblinding.

Blinding, Remove both channel head, Open nozzle,


43 140 2019CAA-M-043 E-3527 PIB HEATER (TK3526) MY9W-VM01-V02-200-3300 -E3325A EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head, Open nozzle,


44 140 2019CAA-M-044 E-3532 PIB HEATER MY9W-VM01-V02-200-3300 -E3325B EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head, Open nozzle,


45 140 2019CAA-M-045 E-3536 PIB HEATER MY9W-VM01-V02-200-3300 -E3330A EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head, Open nozzle,


46 140 2019CAA-M-046 E-3547 PIB HEATER MY9W-VM01-V02-200-3300 -E3330B EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open manhole, remove perforated plate (if D : Drums (in process
47 150 2019CAA-M-047 D-3604 PHASE SEPARATOR MY9W-VM01-V02-200-3300 -E3330C VESSEL DOSH INSPECTION
required), Cleaning, Inspection, Box up and Deblinding. service)
1

Blinding, Open manhole M1, Open nozzle R1-R3, Internal


D : Drums (in process
48 150 2019CAA-M-048 D-3607 OFFGAS DRUM MY9W-VM01-V02-200-3300 -E3340A VESSEL DOSH INSPECTION scaffolding, Cleaning, Inspection, Remove internal
service)
1
scaffolding, Box up and Deblinding.

Blinding, Open manhole M1, Open nozzle R1, Internal


D : Drums (in process
49 150 2019CAA-M-049 D-3608 OFFGAS DRUM MY9W-VM01-V02-200-3300 -E3340B VESSEL DOSH INSPECTION Scaffolding, Cleaning, Inspection, Remove internal
service)
1
scaffolding, Box up and Deblinding.

Blinding, remove top side channel head, Open nozzle ,


50 150 2019CAA-M-050 E-3609 CONDENSER MY9W-VM01-V02-200-3300 -E3341 EXCHANGER DOSH INSPECTION
Inspection , Box up and Deblinding.
HE : Heat Exchangers 1

Page 18 of 52
HR-PIB TAR 2019 DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Function Location EQUIPMENT TYPE LOCATION Work Title Quantity Remarks SCAFF CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND INPECTION CLEANING INSP HT DOSH BOX-UP DE-BLIND REMARKS
Work Type N CH / TRAY PACKING BUNDLE

Blinding, Open top head, Open handhole H1,H2,H3, Open


WASTE WATER nozzle R1-R3, Remove demister, Unload packing,
51 150 2019CAA-M-051 T-3600
STRIPPING TOWER
MY9W-VM01-V02-200-3300 -E3350A TOWER DOSH INSPECTION
Cleaning, Inspection, loading packing, install demister, Box
T : Tower 1
up and Deblinding.

Blinding, Open manhole, Open nozzle, Cleaning, D : Drums (in process


52 150 2019CAA-M-052 D-3614 CAUSTIC SODA DRUM MY9W-VM01-V02-200-3300 -E3350B VESSEL DOSH INSPECTION
Inspection, Box up and Deblinding. service)
1

Blinding, Open manhole, Open nozzle, Internal scaffolding,


D : Drums (in process
53 160 2019CAA-M-053 D-3701 MP NITROGEN BUFFER MY9W-VM01-V02-200-3300 -E3360A VESSEL G DOSH INSPECTION Cleaning, Inspection, Remove internal scaffolding, Box up
service)
1
and Deblinding.

Blinding, Open manhole M1, Open nozzle R1, Internal


D : Drums (in process
54 160 2019CAA-M-054 D-3703 LP CONDENSATE DRUM MY9W-VM01-V02-200-3300 -E3360B VESSEL DOSH INSPECTION Scaffolding, Cleaning, Inspection, Remove internal
service)
1
scaffolding, Box up and Deblinding.

Blinding, Open handhole H1,H2, Open nozzle R1,R2, D : Drums (in process
55 160 2019CAA-M-055 D-3724 BRINE DRUM MY9W-VM01-V02-200-3300 -T3300 VESSEL DOSH INSPECTION
Cleaning, Inspection, box up and Deblinding. service)
1

Blinding, Open handhole H1,H2, Open nozzle R1, D : Drums (in process
56 160 2019CAA-M-056 D-3730 INSTRUMENT AIR BUFFER MY9W-VM01-V02-210-3400 -CD3420 VESSEL DOSH INSPECTION
Cleaning, Inspection, box up and Deblinding. service)
1

FLOODED ECONOMIZER Blinding, Remove Channel heads, Open drain/vent, tube


57 100 2019CAA-M-057 ZE 3120-02
WITH SURGE DRUM
MY9W-VM01-V02-210-3400 -D3400 EXCHANGER DOSH INSPECTION
cleaning, Inspection, Box up, Deblinding.
HE : Heat Exchangers 1

Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
58 100 2019CAA-M-058 ZD 3120-07 RECEIVER MY9W-VM01-V02-210-3400 -D3410 VESSEL DOSH INSPECTION
Deblinding. service)
1

Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
59 100 2019CAA-M-059 ZD 3120-08 SURGE DRUM MY9W-VM01-V02-210-3400 -D3450 VESSEL DOSH INSPECTION
Deblinding. service)
1

Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
60 100 2019CAA-M-060 ZD 3120-09 OIL POT MY9W-VM01-V02-210-3400 -D3510 VESSEL DOSH INSPECTION
Deblinding. service)
1

Blinding, Open drain/vent, Cleaning, Inspection, Box up and D : Drums (in process
61 100 2019CAA-M-061 ZD 3120-10 OIL POT MY9W-VM01-V02-210-3400 -D3515 VESSEL DOSH INSPECTION
Deblinding. service)
1

Blinding, Open manhole, Open nozzle, Internal scaffolding,


CRYSTALACTOR
62 150 2019CAA-M-062 ZR 3660
REACTOR
MY9W-VM01-V02-210-3400 -E3400 REACTOR DOSH INSPECTION Unloading/Loading sand, Cleaning, Inspection, box up and R : Reactor 1
Deblinding.

Blinding, Remove both channel head, Open nozzle, Tube


63 160 2019CAA-M-063 ZE3720-01 DX ECONOMIZER MY9W-VM01-V02-210-3400 -E3410 EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head, Open nozzle, Tube


64 160 2019CAA-M-064 ZE3720-02 OIL COOLER MY9W-VM01-V02-210-3600 -D3610 EXCHANGER DOSH INSPECTION HE : Heat Exchangers 1
Cleaning, Inspection, Box up and Deblinding.

WATER COOLED Blinding, Remove both channel head, Open nozzle, Tube
65 160 2019CAA-M-065 ZE3720-03
CONDENSER
MY9W-VM01-V02-210-3600 -F3620 EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Remove both channel head, Open nozzle, Tube


66 160 2019CAA-M-066 ZE3720-04 DX EVAPORATOR MY9W-VM01-V02-210-3600 -K3600 EXCHANGER DOSH INSPECTION
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Page 19 of 52
HR-PIB TAR 2019 NON DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Work Title
Work Type
Quantity Remarks SCAFF N CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND
CH / TRAY PACKING INPECTION
CLEANING INSP HT DOSH
BUNDLE
BOX-UP DE-BLIND REMARKS

Blinding, Dismantle pressure plate, Dismantle heat transfer


1 100 2019CAA-M-067 E-3102 PLATE HEAT EXCHANGER NON DOSH plate, Cleaning, Inspection, install pressure plate, Install HE : Heat Exchangers 1
heat transfer plate, Box up and Deblinding.

Blinding, Open handhole, Open top head, Remove


D : Drums (in process
2 120 2019CAA-M-068 ZD-3310-5 SEPARATOR NON DOSH demister, Cleaning, Inspection, Install demister, Box up and
service)
1
Deblinding.

D : Drums (in process


3 120 2019CAA-M-069 ZD-3310-6 STEAM DENCENTER NON DOSH External inspection
service)
1

Blinding, Dismantle pressure plate, Dismantle heat transfer


CONDENSATE COOLER
4 120 2019CAA-M-070 E-3328 NON DOSH plate, Cleaning, Inspection, install pressure plate, Install HE : Heat Exchangers 1
(PIB COOLER)
heat transfer plate, Box up and Deblinding.

Blinding, Dismantle all return bend (3nos), Cleaning,


5 130 2019CAA-M-071 E-3406 OLIGOMER COOLER NON DOSH
Inspection, Box up and Deblinding
HE : Heat Exchangers 1

Blinding, Open N3 & N4, Tube Cleaning, Inspection, Box up


6 160 2019CAA-M-072 E-3702 STEAM CONDENSER NON DOSH
and Deblinding.
HE : Heat Exchangers 1

Blinding, Open top blind flange, Open drain N1,N2,N3,


7 2019CAA-M-073 PE 3704A HEAT EXCHANGER NON DOSH
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Open top blind flange, Open drain N1,N2,N3,


8 2019CAA-M-074 PE 3704B HEAT EXCHANGER NON DOSH
Cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Oil Cooler Blinding, Remove channel head, open nozzle, Tube


9 100 2019CAA-M-075 ZE 3120-01
ZE 3120-01
NON DOSH
cleaning, Inspection, Box up and Deblinding.
HE : Heat Exchangers 1

Blinding, Dismantle pressure plate, Dismantle heat transfer


Plate Heat ExchangerZE
10 100 2019CAA-M-076 ZE 3120-03
3120-03
NON DOSH plate, Cleaning, Inspection, install pressure plate, Install HE : Heat Exchangers 1
heat transfer plate, Box up and Deblinding.

Blinding, Dismantle pressure plate, Dismantle heat transfer


Plate Heat ExchangerZE
11 100 2019CAA-M-087 ZE 3120-04
3120-04
NON DOSH plate, Cleaning, Inspection, install pressure plate, Install HE : Heat Exchangers 1
heat transfer plate, Box up and Deblinding.

Suction Filter Blinding, Open blind cover, Cleaning, Inspection, Box up D : Drums (in process
12 100 2019CAA-M-088 ZD 3120-01
ZD 3120-01
NON DOSH
and Deblinding. service)
1

Blinding, Open blind cover, Remove filter element,


Oil Strainer D : Drums (in process
13 100 2019CAA-M-089 ZD 3120-02 NON DOSH Cleaning, Inspection, Install filter element, Box up and 1
ZD 3120-02 service)
Deblinding.

Blinding, Open blind cover, Remove filter element,


Oil Filter D : Drums (in process
14 100 2019CAA-M-090 ZD 3120-03
ZD 3120-03
NON DOSH Cleaning, Inspection, Install filter element, Box up and
service)
1
Deblinding.

Blinding, Open blind cover, Remove filter element,


Oil Filter D : Drums (in process
15 100 2019CAA-M-092 ZD 3120-04
ZD 3120-04
NON DOSH Cleaning, Inspection, Install filter element, Box up and
service)
1
Deblinding.

Blinding, Open top cover N2, Open nozzle, Remove filter


Oil Separator D : Drums (in process
16 100 2019CAA-M-093 ZD 3120-05 NON DOSH element, Internal scaffolding, Cleaning, Inspection, Remove 1
ZD 3120-05 service)
int scaffolding, Install filter element, Box up and Deblinding.

Blinding, Open bottom head, Open vent , Remove filter


Secondary Oil Separator D : Drums (in process
17 100 2019CAA-M-094 ZD 3120-06
ZD 3120-06
NON DOSH element, Cleaning, Inspection, Install filter element, Box up
service)
1
and Deblinding.

Blinding, Open manhole M1-M2, Open drain and handhole,


Sand filter Unloading sand, Internal scaffolding, Cleaning, Inspection,
18 150 2019CAA-M-095 ZF 3664 A
ZF 3664 A
NON DOSH
Remove int scaffolding, loading sand, Box up and
F : Filters 1
Deblinding.

Blinding, Open manhole M1-M2, Open drain and handhole,


Sand filter Unloading sand, Internal scaffolding, Cleaning, Inspection,
19 150 2019CAA-M-096 ZF 3664 B
ZF 3664 B
NON DOSH
Remove int scaffolding, loading sand, Box up and
F : Filters 1
Deblinding.

Blinding, Open manhole M1-M2, Open drain and handhole,


Sand filter Unloading sand, Internal scaffolding, Cleaning, Inspection,
20 150 2019CAA-M-097 ZF 3664 C NON DOSH F : Filters 1
ZF 3664 C Remove int scaffolding, loading sand, Box up and
Deblinding.

Page 20 of 52
HR-PIB TAR 2019 NON DOSH EQUIPMENT
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR INSULATIO LOADING / OPEN MH / REMOVE PRE- INSERT
No. Unit Item No. Tag/ line No. Equipment Name Work Title
Work Type
Quantity Remarks SCAFF N CSE INT SCAFF HPWJ HT UNLOADING REMARKS EIS BLIND
CH / TRAY PACKING INPECTION
CLEANING INSP HT DOSH
BUNDLE
BOX-UP DE-BLIND REMARKS

Suction Filter Blinding,Open blind cover, Cleaning, Inspection, box up


21 2019CAA-M-098 15137-002-091 NON DOSH F : Filters 1
15137-002-091 and deblinding.

Oil Strainer Blinding, Open blind cover, Remove filter element,


22 2019CAA-M-099 15137-002-700
15137-002-700
NON DOSH
Cleaning, Inspection, Box up and Deblinding.
F : Filters 1

Oil Filter Blinding, Open blind cover, Remove filter element,


23 2019CAA-M-100 15137-002-705.1
15137-002-705.1 & 705.2
NON DOSH
Cleaning, Inspection, Box up and Deblinding.
F : Filters 1

Oil Filter Blinding, Open blind cover, Remove filter element,


24 2019CAA-M-100 15137-002-705.2 NON DOSH F : Filters 1
15137-002-705.1 & 705.2 Cleaning, Inspection, Box up and Deblinding.

Oil Separator Blinding, Open blind cover, Open drain , Cleaning, D : Drums (in process
25 160 2019CAA-M-101 ZD 3720-01
ZD3720-01
NON DOSH
Inspection, Box up and Deblinding. service)
1

Page 21 of 52
HR-PIB TAR 2019 PSV
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR
No. Unit Item No. Tag/ line No. Equipment Name Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND REMOVE SERVICE INSTALL DE-BLIND REMARKS
Work Type

PSV : Pressure safety


1 100 2019CAA-M-102 PSV-31151 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


2 100 2019CAA-M-103 PSV-31152 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


3 100 2019CAA-M-104 PSV-31153 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


4 100 2019CAA-M-104 PSV-31154 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


5 2019CAA-M-105 PSV-31041 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


6 2019CAA-M-105 PSV-31211 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


7 2019CAA-M-105 PSV-32011 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV : Pressure safety


8 2019CAA-M-105 PSV-32012 Pressure Safety Valve PM Remove valve, Send to servicing area, Reinstall
valve
1

PSV 31151

PSV 31152

PSV 31153

PSV 31154

PSV 31041

PSV 31211

PSV 32011

PSV 32012

Page 22 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type

1 100 2019CAA-M-106 PV-310410-1 BF3 to D 3104 MY9W-VM01-V03-330-8150 -E8155 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1

2 100 2019CAA-M-107 PV-310410-2 BF3 to D 3104 MY9W-VM01-V50-900-4000 -D0800 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1

3 100 2019CAA-M-108 FV-310530-1 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4410 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1

4 100 2019CAA-M-109 FV-310530-2 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4420 PM Remove valve, Send to servicing area, Reinstall CV : Control Valves 1

5 100 2019CAA-M-110 XV-310545 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4430 PM Remove valve, Send to servicing area, Reinstall XV : ON-OFF valve 1

6 100 2019CAA-M-111 XV-310415 BF3 to R 3105 MY9W-VM01-V50-900-4000 -D4450 PM Remove valve, Send to servicing area, Reinstall XV : ON-OFF valve 1

7 2019CAA-M-112 XZV-310430 ON-OFF VALVE MY9W-VM01-V50-900-4000 -D4460 PM Remove valve, Send to servicing area, Reinstall XV : ON-OFF valve 1

BF3 from sphere 1 SIS : Loop Check (incl.


8 100 2019CAA-M-113 XZV-311515
to D 3104
MY9W-VM01-V50-900-4000 -D4480 PM Remove valve, Send to servicing area, Reinstall
SIS)
1

BF3 to pressure SIS : Loop Check (incl.


9 100 2019CAA-M-114 XZV-311517
control
MY9W-VM01-V50-900-4000 -D4730 PM Remove valve, Send to servicing area, Reinstall
SIS)
1

BF3 from sphere 2 SIS : Loop Check (incl.


10 100 2019CAA-M-115 XZV-311525
to D 3104
MY9W-VM01-V50-900-4000 -D8000 PM Remove valve, Send to servicing area, Reinstall
SIS)
1

BF3 from sphere 3 SIS : Loop Check (incl.


11 100 2019CAA-M-116 XZV-311535
to D 3104
MY9W-VM01-V50-900-4000 -F4440 PM Remove valve, Send to servicing area, Reinstall
SIS)
1

Page 23 of 52
HR-PIB TAR 2019 PSV
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR
No. Unit Item No. Tag/ line No. Equipment Name Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND REMOVE SERVICE INSTALL DE-BLIND REMARKS
Work Type

1 PVRV 35011 Remove valve, Send to servicing area, Reinstall

2 PVRV 35012 Remove valve, Send to servicing area, Reinstall

3 PVRV 35052 Remove valve, Send to servicing area, Reinstall

4 PVRV 35053 Remove valve, Send to servicing area, Reinstall

5 PVRV 35072 Remove valve, Send to servicing area, Reinstall

6 PVRV 35073 Remove valve, Send to servicing area, Reinstall

7 PVRV 35091 Remove valve, Send to servicing area, Reinstall

8 PVRV 35032 Remove valve, Send to servicing area, Reinstall

9 PVRV 35033 Remove valve, Send to servicing area, Reinstall

10 PVRV 35132 Remove valve, Send to servicing area, Reinstall

11 PVRV 35133 Remove valve, Send to servicing area, Reinstall

12 PVRV 35462 Remove valve, Send to servicing area, Reinstall

13 PVRV 35463 Remove valve, Send to servicing area, Reinstall

14 PVRV 35352 Remove valve, Send to servicing area, Reinstall

15 PVRV 35353 Remove valve, Send to servicing area, Reinstall

Page 24 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type

1 SMA 35011 PM Remove valve, Send to servicing area, Reinstall SMA 1

2 SMA 36292 PM Remove valve, Send to servicing area, Reinstall SMA 1

3 SMA 36291 PM Remove valve, Send to servicing area, Reinstall SMA 1

4 SMA 35091 PM Remove valve, Send to servicing area, Reinstall SMA 1

5 PSE 35011 PM Remove valve, Send to servicing area, Reinstall PSE 1

6 PSE 35051 PM Remove valve, Send to servicing area, Reinstall PSE 1

7 PSE 35071 PM Remove valve, Send to servicing area, Reinstall PSE 1

8 PSE 35031 PM Remove valve, Send to servicing area, Reinstall PSE 1

9 PSE 35131 PM Remove valve, Send to servicing area, Reinstall PSE 1

10 PSE 35461 PM Remove valve, Send to servicing area, Reinstall PSE 1

11 PSE 35351 PM Remove valve, Send to servicing area, Reinstall PSE 1

12 PSE 31211 PM Remove valve, Send to servicing area, Reinstall PSE 1

13 PSE 32012 PM Remove valve, Send to servicing area, Reinstall PSE 1

14 PSE 32011 PM Remove valve, Send to servicing area, Reinstall PSE 1

Page 25 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type

1 F(Z)-310165 PM Remove valve, Send to servicing area, Reinstall 1

2 F(Z)-311320 PM Remove valve, Send to servicing area, Reinstall 1

3 F(Z)-311552 PM Remove valve, Send to servicing area, Reinstall 1

4 F(Z)-310567 PM Remove valve, Send to servicing area, Reinstall 1

5 F(Z)-320115 PM Remove valve, Send to servicing area, Reinstall 1

6 F(Z)-320235 PM Remove valve, Send to servicing area, Reinstall 1

7 F(Z)-320315 PM Remove valve, Send to servicing area, Reinstall 1

8 F(Z)-320442 PM Remove valve, Send to servicing area, Reinstall 1

9 F(Z)-320642 PM Remove valve, Send to servicing area, Reinstall 1

10 F(Z)-330515 PM Remove valve, Send to servicing area, Reinstall 1

11 F(Z)-330144 PM Remove valve, Send to servicing area, Reinstall 1

12 F(Z)-330115 PM Remove valve, Send to servicing area, Reinstall 1

13 F(Z)-331212 PM Remove valve, Send to servicing area, Reinstall 1

14 F(Z)-332212 PM Remove valve, Send to servicing area, Reinstall 1

15 F(Z)-340105 PM Remove valve, Send to servicing area, Reinstall 1

16 F(Z)-340411 PM Remove valve, Send to servicing area, Reinstall 1

17 F(Z)-340565 PM Remove valve, Send to servicing area, Reinstall 1

18 F(Z)-340845 PM Remove valve, Send to servicing area, Reinstall 1

Page 26 of 52
HR-PIB TAR 2019 CONTROL VALVES
ACTIVITY PROGRESS UPDATE
Work Description Equipment or Pre-TAR REMOVE INSTALL
No. Unit Item No. Tag/ line No. Equipment Name Function Location Work Title Quantity Remarks SCAFF INSULATION REMARKS EIS BLIND ACCESSORIES REMOVE SERVICE INSTALL ACCESSORIES DE-BLIND REMARKS
Work Type

19 F(Z)-350220 PM Remove valve, Send to servicing area, Reinstall 1

20 F(Z)-350325 PM Remove valve, Send to servicing area, Reinstall 1

21 F(Z)-350425 PM Remove valve, Send to servicing area, Reinstall 1

22 F(Z)-352625 PM Remove valve, Send to servicing area, Reinstall 1

23 F(Z)-351525 PM Remove valve, Send to servicing area, Reinstall 1

24 F(Z)-353025 PM Remove valve, Send to servicing area, Reinstall 1

25 F(Z)-353525 PM Remove valve, Send to servicing area, Reinstall 1

26 F(Z)-354625 PM Remove valve, Send to servicing area, Reinstall 1

27 F(Z)-361388 PM Remove valve, Send to servicing area, Reinstall 1

28 F(Z)-371008 PM Remove valve, Send to servicing area, Reinstall 1

29 F(Z)-372919 PM Remove valve, Send to servicing area, Reinstall 1

30 F(Z)-372979 PM Remove valve, Send to servicing area, Reinstall 1

31 F(Z)-311008 PM Remove valve, Send to servicing area, Reinstall 1

32 F(Z)-370120 PM Remove valve, Send to servicing area, Reinstall 1

Page 27 of 52
Task Name Task Name
DOSH NON DOSH
PG 100 D-3104 D-3104 PG 100
1 D-3104 D-3106 D-3106 1 E-3102
2 D-3106 E-3101 E-3101 2 ZD-3120-01
3 D-3110 E-3103 E-3103 3 ZD 3120-02
4 D-3113 F-3100A F-3100A 4 ZD 3120-03
5 E-3101 F-3100B F-3100B 5 ZD 3120-04
6 E-3103 R-3105 R-3105 6 ZD 3120-05
7 E-3113 D-3110 D-3110 7 ZD 3120-06
8 F-3100A D-3113 D-3113 8 ZE 3120-01
9 F-3100B E-3113 E-3113 9 ZE 3120-03
10 R-3105 D-3202 D-3202 10 ZE 3120-04
11 ZD-3120-07 D-3204 D-3204 PG 120
12 ZD-3120-08 D-3206 D-3206 11 E-3328
13 ZD-3120-09 E-3250 E-3250 12 ZD-3310-05
14 ZD-3120-10 F-3251A F-3251A 13 ZD-3310-06
15 ZE-3120-02 F-3251B F-3251B PG 130
PG 110 F-3251C F-3251C 14 E-3406
16 D-3202 D-3302 D-3302 PG 150
17 D-3204 D-3304 D-3304 15 ZF 3664 A
18 D-3206 E-3301 E-3301 16 ZF 3664 B
19 E-3250 E-3305 E-3305 17 ZF 3664 C
F-3251A E-3306 PG 160
20 E-3306
F-3251B E-3308 18 15137-002-091
21 E-3308
F-3251C T-3300 19 15137-002-700
22 T-3300
PG 120 E-3312 E-3312 20 15137-002-705.1
ZE-3310-
D-3302 21 15137-002-705.2
23 2 ZE-3310-2
ZE-3310-
D-3304 22 E-3702
24 4 ZE-3310-4
25 D-3320 D-3320 D-3320 23 PE 3704A
26 E-3301 E-3322 E-3322 24 PE 3704B
27 E-3305 E-3323 E-3323 25 ZD 3720-01
28 E-3306 E-3327 A E-3327 A
29 E-3308 E-3327 B E-3327 B
30 E-3312 F-3325 F-3325
31 E-3322 D-3404 D-3404
32 E-3323 E-3401 E-3401
33 E-3327 A E-3402 E-3402
34 E-3327 B E-3407 E-3407
35 F-3325 F-3408A F-3408A
36 T-3300 F-3408B F-3408B
37 ZE-3310-2 T-3400 T-3400
38 ZE-3310-4 E-3505 E-3505
PG 130 E-3516 E-3516
39 D-3404 E-3527 E-3527
40 E-3401 E-3532 E-3532
41 E-3402 E-3536 E-3536
42 E-3407 E-3547 E-3547
43 F-3408A D-3604 D-3604
44 F-3408B D-3607 D-3607
45 T-3400 D-3608 D-3608
PG 140 E-3609 E-3609
46 E-3505 T-3600 T-3600
47 E-3516 D-3614 D-3614
48 E-3527 D-3701 D-3701
49 E-3532 D-3703 D-3703
50 E-3536 D-3724 D-3724
51 E-3547 D-3730 D-3730
PG 150 ZE-3120-
02 ZE-3120-02
D-3604 ZD-3120-
52 07 ZD-3120-07
D-3607 ZD-3120-
53 08 ZD-3120-08
D-3608 ZD-3120-
54 09 ZD-3120-09
D-3614 ZD-3120-
55 10 ZD-3120-10
56 E-3609 ZR-3660 ZR-3660
T-3600 ZE-3720-
57 01 ZE-3720-01
ZR-3660 ZE-3720-
58 02 ZE-3720-02
PG 160 ZE-3720-
03 ZE-3720-03
D-3701 ZE-3720-
59 04 ZE-3720-04
60 D-3703
61 D-3724
62 D-3730
63 ZE-3720-01
64 ZE-3720-02
65 ZE-3720-03
66 ZE-3720-04
E-3102 1 E-3102
ZD-3310-05 2 ZD-3310-05
ZD-3310-06 3 ZD-3310-06
E-3328 4 E-3328
E-3406 5 E-3406
E-3702 6 E-3702
PE 3704A 7 PE 3704A
PE 3704B 8 PE 3704B
ZE 3120-01 9 ZE 3120-01
ZE 3120-03 10 ZE 3120-03
ZE 3120-04 11 ZE 3120-04
ZD-3120-01 12 ZD-3120-01
ZD 3120-02 13 ZD 3120-02
ZD 3120-03 14 ZD 3120-03
ZD 3120-04 15 ZD 3120-04
ZD 3120-05 16 ZD 3120-05
ZD 3120-06 17 ZD 3120-06
ZF 3664 A 18 ZF 3664 A
ZF 3664 B 19 ZF 3664 B
ZF 3664 C 20 ZF 3664 C
15137-002-091
21 15137-002-091
15137-002-700
22 15137-002-700
15137-002-705
23 #N/A
ZD 3720-01 24 ZD 3720-01
COST DOSH NDOSH
1 D-3104 DOSH 1 D-3104 DOSH 1
2 D-3106 DOSH 2 D-3106 DOSH 2
3 E-3101 DOSH 3 E-3101 DOSH
4 E-3103 DOSH 4 E-3103 DOSH
5 R-3105 DOSH 5 F-3100A DOSH
6 D-3110 DOSH 6 F-3100B DOSH
7 D-3113 DOSH 7 R-3105 DOSH
8 E-3113 DOSH 8 D-3110 DOSH
9 D-3202 DOSH 9 D-3113 DOSH
10 D-3204 DOSH 10 E-3113 DOSH
11 D-3206 DOSH 11 D-3202 DOSH
12 E-3250 DOSH 12 D-3204 DOSH
13 D-3302 DOSH 13 D-3206 DOSH
14 D-3304 DOSH 14 E-3250 DOSH
15 E-3301 DOSH 15 F-3251A DOSH
16 E-3305 DOSH 16 F-3251B DOSH
17 E-3306 DOSH 17 F-3251C DOSH
18 E-3308 DOSH 18 D-3302 DOSH
19 T-3300 DOSH 19 D-3304 DOSH
20 E-3312 DOSH 20 E-3301 DOSH
21 ZE-3310-2 DOSH 21 E-3305 DOSH
22 ZE-3310-4 DOSH 22 E-3306 DOSH
23 D-3320 DOSH 23 E-3308 DOSH
24 E-3322 DOSH 24 T-3300 DOSH
25 E-3323 DOSH 25 E-3312 DOSH
26 E-3327 A DOSH 26 ZE-3310-2 DOSH
27 E-3327 B DOSH 27 ZE-3310-4 DOSH
28 F-3325 DOSH 28 D-3320 DOSH
29 D-3404 DOSH 29 E-3322 DOSH
30 E-3401 DOSH 30 E-3323 DOSH
31 E-3402 DOSH 31 E-3327 A DOSH
32 E-3407 DOSH 32 E-3327 B DOSH
33 T-3400 DOSH 33 F-3325 DOSH
34 E-3505 DOSH 34 D-3404 DOSH
35 E-3516 DOSH 35 E-3401 DOSH
36 E-3527 DOSH 36 E-3402 DOSH
37 E-3532 DOSH 37 E-3407 DOSH
38 E-3536 DOSH 38 F-3408A DOSH
39 E-3547 DOSH 39 F-3408B DOSH
40 D-3604 DOSH 40 T-3400 DOSH
41 D-3607 DOSH 41 E-3505 DOSH
42 D-3608 DOSH 42 E-3516 DOSH
43 E-3609 DOSH 43 E-3527 DOSH
44 T-3600 DOSH 44 E-3532 DOSH
45 D-3614 DOSH 45 E-3536 DOSH
46 D-3701 DOSH 46 E-3547 DOSH
47 D-3703 DOSH 47 D-3604 DOSH
48 D-3724 DOSH 48 D-3607 DOSH
49 D-3730 DOSH 49 D-3608 DOSH
50 ZE 3120-02 DOSH 50 E-3609 DOSH
51 ZD 3120-07 DOSH 51 T-3600 DOSH
52 ZD 3120-08 DOSH 52 D-3614 DOSH
53 ZD 3120-09 DOSH 53 D-3701 DOSH
54 ZD 3120-10 DOSH 54 D-3703 DOSH
55 ZR 3660 DOSH 55 D-3724 DOSH
56 ZE3720-01 DOSH 56 D-3730 DOSH
57 ZE3720-02 DOSH 57 ZE 3120-02 DOSH
58 ZE3720-03 DOSH 58 ZD 3120-07 DOSH
59 ZE3720-04 DOSH 59 ZD 3120-08 DOSH
60 E-3102 NDOSH 60 ZD 3120-09 DOSH
61 ZD-3310-5 NDOSH 61 ZD 3120-10 DOSH
62 ZD-3310-6 NDOSH 62 ZR 3660 DOSH
63 E-3328 NDOSH 63 ZE3720-01 DOSH
64 E-3406 NDOSH 64 ZE3720-02 DOSH
65 E-3702 NDOSH 65 ZE3720-03 DOSH
66 PE 3704A NDOSH 66 ZE3720-04 DOSH
67 PE 3704B NDOSH 67 E-3102 NDOSH
68 ZE 3120-01 NDOSH 68 ZD-3310-5 NDOSH
69 ZE 3120-03 NDOSH 69 ZD-3310-6 NDOSH
70 ZE 3120-04 NDOSH 70 E-3328 NDOSH
71 ZD 3120-01 NDOSH 71 E-3406 NDOSH
72 ZD 3120-02 NDOSH 72 E-3702 NDOSH
73 ZD 3120-03 NDOSH 73 PE 3704A NDOSH
74 ZD 3120-04 NDOSH 74 PE 3704B NDOSH
75 ZD 3120-05 NDOSH 75 ZE 3120-01 NDOSH
76 ZD 3120-06 NDOSH 76 ZE 3120-03 NDOSH
77 ZF 3664 A NDOSH 77 ZE 3120-04 NDOSH
78 ZF 3664 B NDOSH 78 ZD 3120-01 NDOSH
79 ZF 3664 C NDOSH 79 ZD 3120-02 NDOSH
80 15137-002-091 NDOSH 80 ZD 3120-03 NDOSH
81 15137-002-700 NDOSH 81 ZD 3120-04 NDOSH
82 15137-002-705 NDOSH 82 ZD 3120-05 NDOSH
83 ZD 3720-01 NDOSH 83 ZD 3120-06 NDOSH
84 84 ZF 3664 A NDOSH
85 85 ZF 3664 B NDOSH
86 86 ZF 3664 C NDOSH
87 87 15137-002-091 NDOSH
88 88 15137-002-700 NDOSH
89 89 15137-002-705 NDOSH
90 90 ZD 3720-01 NDOSH
X
D-3104
D-3106
E-3101
E-3103
#N/A
#N/A
R-3105
D-3110
D-3113
E-3113
D-3202
D-3204
D-3206
E-3250
#N/A
#N/A
#N/A
D-3302
D-3304
E-3301
E-3305
E-3306
E-3308
T-3300
E-3312
ZE-3310-2
ZE-3310-4
D-3320
E-3322
E-3323
E-3327 A
E-3327 B
F-3325
D-3404
E-3401
E-3402
E-3407
#N/A
#N/A
T-3400
E-3505
E-3516
E-3527
E-3532
E-3536
E-3547
D-3604
D-3607
D-3608
E-3609
T-3600
D-3614
D-3701
D-3703
D-3724
D-3730
ZE 3120-02
ZD 3120-07
ZD 3120-08
ZD 3120-09
ZD 3120-10
ZR 3660
ZE3720-01
ZE3720-02
ZE3720-03
ZE3720-04
E-3102
ZD-3310-5
ZD-3310-6
E-3328
E-3406
E-3702
PE 3704A
PE 3704B
ZE 3120-01
ZE 3120-03
ZE 3120-04
ZD 3120-01
ZD 3120-02
ZD 3120-03
ZD 3120-04
ZD 3120-05
ZD 3120-06
ZF 3664 A
ZF 3664 B
ZF 3664 C
15137-002-091
15137-002-700
15137-002-705
ZD 3720-01
DOSH NON DOSH
cost work list result cost
D-3104 1 D-3104 E-3102 1
D-3104 D-3104
D-3106 2 D-3106 ZD-3310-5 2
D-3106 D-3106
E-3101 3 E-3101 ZD-3310-6 3
E-3101 E-3101
E-3103 4 E-3103 E-3328 4
E-3103 E-3103
R-3105 5 F-3100A E-3406 5
#N/A R-3105
D-3110 6 F-3100B E-3702 6
#N/A D-3110

D-3113 7 R-3105 PE 3704A 7


R-3105 D-3113

E-3113 8 D-3110 PE 3704B 8


D-3110 E-3113
ZE 3120-
D-3202 9 D-3113 9
D-3113 D-3202 01
ZE 3120-
D-3204 10 E-3113 10
E-3113 D-3204 03
ZE 3120-
D-3206 11 D-3202 11
D-3202 D-3206 04
ZD 3120-
E-3250 12 D-3204 12
D-3204 E-3250 01
ZD 3120-
D-3302 13 D-3206 13
D-3206 D-3302 02
ZD 3120-
D-3304 14 E-3250 14
E-3250 D-3304 03
ZD 3120-
E-3301 15 F-3251A 15
#N/A E-3301 04
ZD 3120-
E-3305 16 F-3251B 16
#N/A E-3305 05
ZD 3120-
E-3306 17 F-3251C 17
#N/A E-3306 06

E-3308 18 D-3302 ZF 3664 A 18


D-3302 E-3308

T-3300 19 D-3304 ZF 3664 B 19


D-3304 T-3300

E-3312 20 E-3301 ZF 3664 C 20


E-3301 E-3312
15137-
ZE-3310-2 21 E-3305 21
E-3305 ZE-3310-2 002-091
15137-
ZE-3310-4 22 E-3306 22
E-3306 ZE-3310-4 002-700
15137-
D-3320 23 E-3308 23
E-3308 D-3320 002-705
ZD 3720-
E-3322 24 T-3300 24
T-3300 E-3322 01
E-3323 25 E-3312 E-3312 E-3323
ZE-3310-
E-3327 A 26
2 ZE-3310-2E-3327 A
ZE-3310-
E-3327 B 27
4 ZE-3310-4E-3327 B
F-3325 28 D-3320 D-3320 F-3325
D-3404 29 E-3322 E-3322 D-3404
E-3401 30 E-3323 E-3323 E-3401
E-3402 31 E-3327 A E-3327 A E-3402
E-3407 32 E-3327 B E-3327 B E-3407
T-3400 33 F-3325 F-3325 T-3400
E-3505 34 D-3404 D-3404 E-3505
E-3516 35 E-3401 E-3401 E-3516
E-3527 36 E-3402 E-3402 E-3527
E-3532 37 E-3407 E-3407 E-3532
E-3536 38 F-3408A #N/A E-3536
E-3547 39 F-3408B #N/A E-3547
D-3604 40 T-3400 T-3400 D-3604
D-3608 41 E-3505 E-3505 D-3608
E-3609 42 E-3516 E-3516 E-3609
T-3600 43 E-3527 E-3527 T-3600
D-3614 44 E-3532 E-3532 D-3614
D-3701 45 E-3536 E-3536 D-3701
D-3703 46 E-3547 E-3547 D-3703
D-3724 47 D-3604 D-3604 D-3724
D-3730 48 D-3607 #N/A D-3730
ZR-3660 49 D-3608 D-3608 ZR-3660
50 E-3609 E-3609 #N/A
51 T-3600 T-3600 #N/A
52 D-3614 D-3614 #N/A
53 D-3701 D-3701 #N/A
54 D-3703 D-3703 #N/A
55 D-3724 D-3724 #N/A
56 D-3730 D-3730 #N/A
ZE-3120-
57
02 #N/A #N/A
ZD-3120-
58
07 #N/A #N/A
ZD-3120-
59
08 #N/A #N/A
ZD-3120-
60
09 #N/A #N/A
ZD-3120-
61
10 #N/A #N/A
62 ZR-3660 ZR-3660 #N/A
ZE-3720-
63
01 #N/A #N/A
ZE-3720-
64
02 #N/A #N/A
ZE-3720-
65
03 #N/A #N/A
ZE-3720-
66
04 #N/A #N/A
PSV CV
work list result work list cost result Cost work list
PSV- PV-
E-3102 PSV-31151 XZV-311515
E-3102 31151 PSV-31151 310410-1
ZD-3310- PSV- PV-
PSV-31152 XZV-311525
5 ZD-3310-5 31152 PSV-31152 310410-2
ZD-3310- PSV- FV-
PSV-31154 XZV-311535
6 ZD-3310-6 31154 PSV-31154 310530-1
PSV- FV-
E-3328 PSV-31041 XZV-311517
E-3328 31041 PSV-31041 310530-2
XV-
E-3406 PV-310410-1
E-3406 310545
XV-
E-3702 PV-310410-2
E-3702 310415
XV-
PE 3704A FV-310530-1
PE 3704A 310430
XZV-
PE 3704B FV-310530-2
PE 3704B 311515
ZE 3120- XZV-
XV-310545
01 ZE 3120-01 311517
ZE 3120- XZV-
XV-310415
03 ZE 3120-03 311525
ZE 3120- XZV-
XV-310430
04 ZE 3120-04 311535
ZD 3120-
01 ZD 3120-01
ZD 3120-
02 ZD 3120-02
ZD 3120-
03 ZD 3120-03
ZD 3120-
04 ZD 3120-04
ZD 3120-
05 ZD 3120-05
ZD 3120-
06 ZD 3120-06
ZF 3664
A ZF 3664 A
ZF 3664
B ZF 3664 B
ZF 3664
C ZF 3664 C
15137-
002-091 15137-002-091
15137-
002-700 15137-002-700
15137-
002-705 15137-002-705
ZD 3720-
01 ZD 3720-01
result

PV-310410-1

PV-310410-2

FV-310530-1

FV-310530-2

XV-310545

XV-310415

XV-310430

XZV-311515

XZV-311517

XZV-311525

XZV-311535
BASF PETRONAS Chemicals Sdn Bhd
HR-PIB Complex 2019 Major Turnaround

PART II - SECTION 2.1 - Schedule of Prices


Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Weldment - Level 2
1 D-3104 PH PMT 80433 BF3 DRUM Shell Wall - Level 2 L2-cloth wiping
Others - Water medium prohibited

Weldment - Level 3
2 D-3106 PH PMT 80432 NH3 DRUM Shell Wall - Level 2
Dish head - Level 2

Shell Wall - Level 2


Tube Internal - Level 4
3 E-3101 PH PMT 80367 NITROGEN HEATER Tube External - Level 4
Dish head - Level 2
Others - Tube air blow

Tube Internal - Level 4


4 E-3103 PH PMT 80390 ISOBUTENE COOLER Dish head - Level 2
Others - Air Blow

Weldment - Level 3
Shell Wall - Level 2
5 F-3100A PH PMT 80376 ISOBUTENE ABSORBER
Dish head - Level 2
Others - Clean/ replace filter element

Weldment - Level 3
Shell Wall - Level 2
6 F-3100B PH PMT 80377 ISOBUTENE ABSORBER
Dish head - Level 2
Others - Clean/ replace filter element

Tube Internal - Level 4


7 R-3105 PH PMT 80435 REACTOR
Dish head - Level 2
Weldment - Level 2
8 D-3110 PH PMT 80431 METHANOL DRUM
Shell Wall - Level 2
Weldment - Level 2
9 D-3113 ? ACETONE DRUM
Shell Wall - Level 2

Page 40 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Tube Internal - Level 4


10 E-3113 PH PMT 80436 CHILLER Dish head - Level 2
Others - Air Blow

Weldment - Level 3
11 D-3202 PH PMT 80393 PHASE SEPARATOR Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 3
12 D-3204 PH PMT 80731 COALESCER Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 3
13 D-3206 PH PMT 80392 PHASE SEPARATOR Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


14 E-3250 PH PMT 80389 PREHEATER
Dish head - Level 2

Weldment - Level 3
Shell Wall - Level 2
15 F-3251A PH PMT 80378 PIB ABSORBER
Dish head - Level 2
Others - Clean/ replace packing

Weldment - Level 3
Shell Wall - Level 2
16 F-3251B PH PMT 80379 PIB ABSORBER
Dish head - Level 2
Others - Clean/ replace packing

Weldment - Level 3
Shell Wall - Level 2
17 F-3251C PH PMT 80380 PIB ABSORBER
Dish head - Level 2
Others - Clean/ replace packing

Weldment - Level 3
18 D-3302 PH PMT 80430 FALLING FILM EVAPORATOR VESSEL Shell Wall - Level 2
Dish head - Level 2

Page 41 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Weldment - Level 3
19 D-3304 PH PMT 80429 DEGASSING DRUM Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


20 E-3301 PH PMT 80388 FALLING FILM EVAPORATOR
Dish head - Level 2
Tube Internal - Level 4
21 E-3305 PH PMT 80366 DEGASSING PREHEATER
Dish head - Level 2
Tube Internal - Level 4
22 E-3306 PH PMT 80365 WATER CONDENSER (2ND DEGASSING)
Dish head - Level 2
Tube Internal - Level 4
23 E-3308 PH PMT 80387 NH3 CONDENSER (VACUUM DEGASSING)
Dish head - Level 2

Weldment - Level 3
24 T-3300 PH PMT 80383 FLASH TOWER Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


25 E-3312 PH PMT 80364 DEGASSING FALLING FILM EVAPARATOR
Dish head - Level 2
Tube Internal - Level 4
26 ZE-3310-2 PH PMT 80440 CONDENSER
Dish head - Level 2
Tube Internal - Level 4
27 ZE-3310-4 PH PMT 80441 HEAT EXCHANGER
Dish head - Level 2

Weldment - Level 3
28 D-3320 PH PMT 80428 PIB VACUUM DEGASSING DRUM Shell Wall - Level 2
Dish head - Level 2

FALLING FILM EVAPORATOR (VACUUM Tube Internal - Level 4


29 E-3322 PH PMT 80363
DEGASSING) Dish head - Level 2
Tube Internal - Level 4
30 E-3323 PH PMT 80362 WATER CONDENSER (2ND DEGASSING)
Dish head - Level 2
Tube Internal - Level 4
31 E-3327 PH PMT 80476 PIB COOLER
Dish head - Level 2
Tube Internal - Level 4
32 E-3327 B PH PMT 80477 PIB COOLER
Dish head - Level 2

Page 42 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Weldment - Level 3
Shell Wall - Level 2
33 F-3325 PH PMT 80385 PIB FILTER
Dish head - Level 2
Others - Clean/ replace filter element

Weldment - Level 3
34 D-3404 PH PMT 80391 SOLVENT DRUM Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


35 E-3401 ? REBOILER
Dish head - Level 2
Tube Internal - Level 4
36 E-3402 PH PMT 80361 CONDENSER
Dish head - Level 2
Tube Internal - Level 4
37 E-3407 PH PMT 80360 COOLER
Dish head - Level 2

Weldment - Level 3
Shell Wall - Level 2
38 F-3408A PH PMT 80381 MIXED-C4 RETURN ADSORBER
Dish head - Level 2
Others - replace packing

Weldment - Level 3
Shell Wall - Level 2
39 F-3408B PH PMT 80382 MIXED-C4 RETURN ADSORBER
Dish head - Level 2
Others - replace packing

Weldment - Level 3
40 T-3400 PH PMT 80434 OLIGOMER DISTILLATION TOWER Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


41 E-3505 PH PMT 80369 PIB HEATER
Dish head - Level 2
Tube Internal - Level 4
42 E-3516 PH PMT 80370 PIB HEATER (TK3515)
Dish head - Level 2
Tube Internal - Level 4
43 E-3527 PH PMT 80371 PIB HEATER (TK3526)
Dish head - Level 2

Page 43 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Tube Internal - Level 4


44 E-3532 PH PMT 80372 PIB HEATER
Dish head - Level 2
Tube Internal - Level 4
45 E-3536 PH PMT 80373 PIB HEATER
Dish head - Level 2
Tube Internal - Level 4
46 E-3547 PH PMT 80374 PIB HEATER
Dish head - Level 2

Weldment - Level 3
47 D-3604 PH PMT 80427 PHASE SEPARATOR Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 3
48 D-3607 PH PMT 80438 OFFGAS DRUM Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 3
49 D-3608 PH PMT 80437 OFFGAS DRUM Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


50 E-3609 PH PMT 80386 CONDENSER
Dish head - Level 2

Weldment - Level 3
Shell Wall - Level 2
51 T-3600 PH PMT 80384 WASTE WATER STRIPPING TOWER
Dish head - Level 2
Others - Demister ; Level 2

Weldment - Level 3
52 D-3614 PH PMT 80375 CAUSTIC SODA DRUM Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 3
53 D-3701 PH PMT 80395 MP NITROGEN BUFFER Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 3
54 D-3703 PH PMT 80469 LP CONDENSATE DRUM Shell Wall - Level 2
Dish head - Level 2

Page 44 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Weldment - Level 2
55 D-3724 PH PMT 80368 BRINE DRUM Shell Wall - Level 2
Dish head - Level 2

Weldment - Level 2
56 D-3730 PH PMT 80466 INSTRUMENT AIR BUFFER Shell Wall - Level 2
Dish head - Level 2

Tube Internal - Level 4


57 ZE 3120-02 PH PMT 80442 FLOODED ECONOMIZER WITH SURGE DRUM
Dish head - Level 2
Weldment - Level 3
58 ZD 3120-07 PH PMT 80448 RECEIVER
Shell Wall - Level 2
Weldment - Level 3
59 ZD 3120-08 PH PMT 80443 SURGE DRUM
Shell Wall - Level 2
Weldment - Level 3
60 ZD 3120-09 PH PMT 80449 OIL POT
Shell Wall - Level 2
Weldment - Level 3
61 ZD 3120-10 ? OIL POT
Shell Wall - Level 2

Shell Wall - Level 2


62 ZR 3660 PH PMT 80471 CRYSTALACTOR REACTOR Dish head - Level 2
Others - cautions on Butyl Rubber lining

Tube Internal - Level 4


63 ZE3720-01 PH PMT 80444 DX ECONOMIZER
Dish head - Level 2
Tube Internal - Level 4
64 ZE3720-02 PH PMT 80445 OIL COOLER
Dish head - Level 2
Tube Internal - Level 4
65 ZE3720-03 PH PMT 80446 WATER COOLED CONDENSER
Dish head - Level 2
Tube Internal - Level 4
66 ZE3720-04 PH PMT 80447 DX EVAPORATOR
Dish head - Level 2
Shell Wall - Level 3
67 E-3102 Non DOSH PLATE HEAT EXCHANGER
Heat transfer plate - Level 4

Page 45 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Weldment - Level 3
Shell Wall - Level 2
68 ZD-3310-5 Non DOSH SEPARATOR
Dish head - Level 2
Others - Demister ; Level 2

69 ZD-3310-6 Non DOSH STEAM DENCENTER Missing


Shell Wall - Level 3
70 E-3328 Non DOSH CONDENSATE COOLER (PIB COOLER)
Heat transfer plate - Level 4
Tube Internal - Level 4
71 E-3406 Non DOSH OLIGOMER COOLER
Dish head - Level 2
Tube Internal - Level 4
72 E-3702 Non DOSH STEAM CONDENSER
Dish head - Level 2

Tube Internal - Level 4


Centrifugal Pump Cooling Tank
73 PE 3704A Non DOSH Tube External - Level 2
PE 3704A
Dish head - Level 2

Tube Internal - Level 4


Centrifugal Pump Cooling Tank
74 PE 3704B Non DOSH Tube External - Level 2
PE 3704[B]
Dish head - Level 2

Oil Cooler Tube Internal - Level 4


75 ZE 3120-01 Non DOSH
ZE 3120-01 Dish head - Level 2
Shell Wall - Level 3
76 ZE 3120-03 Non DOSH Plate Heat ExchangerZE 3120-03
Heat transfer plate - Level 4
Shell Wall - Level 3
77 ZE 3120-04 Non DOSH Plate Heat ExchangerZE 3120-04
Heat transfer plate - Level 4
Suction Filter Weldment - Level 3
78 ZD 3120-01 Non DOSH
ZD 3120-01 Shell Wall - Level 2
Oil Strainer Weldment - Level 3
79 ZD 3120-02 Non DOSH
ZD 3120-02 Shell Wall - Level 2
Oil Filter Weldment - Level 3
80 ZD 3120-03 Non DOSH
ZD 3120-03 Shell Wall - Level 2
Oil Filter Weldment - Level 3
81 ZD 3120-04 Non DOSH
ZD 3120-04 Shell Wall - Level 2

Page 46 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

Oil Separator Weldment - Level 3


82 ZD 3120-05 Non DOSH
ZD 3120-05 Shell Wall - Level 2
Secondary Oil Separator Weldment - Level 3
83 ZD 3120-06 Non DOSH
ZD 3120-06 Shell Wall - Level 2

Shell Wall - Level 2


Sand filter
84 ZF 3664 A Non DOSH Dish head - Level 2
ZF 3664 A
Others - cautions on Butyl Rubber lining

Shell Wall - Level 2


Sand filter
85 ZF 3664 B Non DOSH Dish head - Level 2
ZF 3664 B
Others - cautions on Butyl Rubber lining

Shell Wall - Level 2


Sand filter
86 ZF 3664 C Non DOSH Dish head - Level 2
ZF 3664 C
Others - cautions on Butyl Rubber lining

Suction Filter Weldment - Level 3


87 15137-002-091 Non DOSH
15137-002-091 Shell Wall - Level 2
Oil Strainer Weldment - Level 3
88 15137-002-700 Non DOSH
15137-002-700 Shell Wall - Level 2
Oil Filter Weldment - Level 3
89 15137-002-705 Non DOSH
15137-002-705.1 & 705.2 Shell Wall - Level 2
Oil Separator Weldment - Level 3
90 ZD 3720-01 Non DOSH
ZD3720-01 Shell Wall - Level 2

Total for HR-PIB

Note:
Note 1 The total quoted fixed lump sum price for Directs is inclusive of the followings;
1.a Direct manpower including qualification, mobilization, and demobilization                                                                                                   

Page 47 of 52
PART II - SECTION 2.1 - Schedule of Prices
Schedule of Prices - HR-PIB
Price Break down / package

DOSH Registered Vessels

No. TAG PMT No. Description Cleaning Level Proposed Cleaning Method

1.b Tools and Equipments, not  limited to air compressors, torque wrenches (manual or hydraulic torque), lightings, blowers, ventilators, etc., but excluding the supply of breathing apparatus   
1.c Hydroblasting equipment and manpower, tools, consumables, and other related items
1.d Consumables i.e. anti-seize lubricants, cotton rags,  etc                                                                                            
1.e Temporary gaskets (compressed non-asbestos fibre gaskets), isolation spades and blinds. BPC to specify the specs i.e. material, thickness, etc.                      
1.f Flange protection to be provided, installed after breaking flange until reinstallation in order to protect from flange face damage/cut
1.g Craneage, lifting and transportation equipment
1.h PPEs as per BPC HSE requirement
1.i All bolts equal and below than 25mm (1 inch) diameter shall be tightened using manual type torque wrenches with a positive (click) type indication when the selected torque
value is reached. Bolts above 25mm (1 inch) diameter shall use hydraulic torque wrench

Page 48 of 52
BASF PETRONAS Chemicals Sdn Bhd
HR-PIB Complex 2019 Major Turnaround

PART II - SECTION 2.2 - Schedule of Prices


Price Break down / package

PRESSURE SAFETY VALVES

Valve Description
Item P&ID Size
Plant Area Tag Number Equipment To Be Protected
No Sheet No.
Flange Flange Flange Flange Outlet Gasket
Inlet Gasket Type
Inlet Rating Outlet Rating Type

1 HONEYDEW C500 PSV-31151 3115 1/2" MNPT 1" 150#

2 HONEYDEW C500 PSV-31152 3115 1/2" MNPT 1" 150#

3 HONEYDEW C500 PSV-31154 3115 1/2" MNPT 1" 150#


4 PSV-31041 1/2" 1500# 1" 150#

E - Total for Pressure Safety Valves


Note:

Note 1 The total quoted fixed lump sum price for Directs is inclusive of the followings;
1.a Direct manpower including qualification, mobilization, and demobilization                                                                                                   
1.b Tools and Equipments, not  limited to air compressors, torque wrenches (manual or hydraulic torque), lightings, blowers, ventilators, etc., but excluding the supply of breathing
apparatus                                             
1.c Hydroblasting equipment and manpower, tools, consumables, and other related items
1.d Consumables i.e. anti-seize lubricants, cotton rags,  etc                                                                                            
1.e Temporary gaskets (compressed non-asbestos fibre gaskets), isolation spades and blinds. BPC to specify the specs i.e. material, thickness, etc.                      
1.f Flange protection to be provided, installed after breaking flange until reinstallation in order to protect from flange face damage/cut
1.g Craneage, lifting and transportation equipment
1.h PPEs as per BPC HSE requirement
1.i All bolts equal and below than 25mm (1 inch) diameter shall be tightened using manual type torque wrenches with a positive (click) type indication when the selected torque
value is reached. Bolts above 25mm (1 inch) diameter shall use hydraulic torque wrench.

Page 49 of 52
PART II - SECTION 2.2 - Schedule of Prices
Price Break down / package

PRESSURE SAFETY VALVES

Note 2 The Quoted Lump Sum Prices for Control Valves Shall include the followings;
1 All related tubings and termination removal/ installation will be done by TAR contractor.
2 Cotton rags c/w the masking tape to be cover and wraping at the control valve inlet and outlet piping (Cotton rags c/w the masking tape by contractors)
3 After the removal, the control valves shall be sent to OWNER's workshop for repairs (transportation by contractors)
4 Should the valve contaminated, it should be clean (at washing bay before sending to OWNER's workshop for repairs- transportation by contractors
5 Upon repair completion, contractor will collect the valves for re-installation at site.
6 Spare parts will be provided by OWNER

Remarks:
a) Valves repairs will be done by OWNERS

Page 50 of 52
BASF PETRONAS Chemicals Sdn Bhd
HR-PIB Complex 2019 Major Turnaround

PART II - SECTION 2.3 - Schedule of Prices


Price Break down / package

CONTROL VALVES

Manufacturer
No Tag Number Service Model Name Line Number P& ID Inlet Connec Rating
Name

1 XZV-311515 BF3 from sphere 1 to D 3104 Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"

2 XZV-311525 BF3 from sphere 2 to D 3104 Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"

3 XZV-311535 BF3 from sphere 3 to D 3104 Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"

4 XZV-311517 BF3 to pressure control Argus FK79 1/2"-I504-3115.001-HS02-1500S180-U-- 3115 1/2"

5 PV-310410-1 BF3 to D 3104 Samson 3510 1/2"-I504-3115.001-HS02-1500S180-U-- 3119 1/2"

6 PV-310410-2 BF3 to D 3104 Samson 3510 1/2"-I504-3115.001-HS02-1500S180-U-- 3119 1/2"

7 FV-310530-1 BF 3 to R 3105 Samson 3510 1/2"-I504-3119.001-HS02-1500S180-U-- 3119 1/2"

8 FV-310530-2 BF 3 to R 3105 Samson 3510 1/2"-I504-3119.001-HS02-1500S180-U-- 3119 1/2"

9 XV-310545 BF3 to R 3105 Argus FK79 1/2"-I504-3119.001-HS02-1500S180-U-- 3119 1/2"

10 XV-310415 BF3 to R 3105 Argus FK79 1/2"-I504-3119.005-HS02-1500S180-U-- 3119 1/2"

11 XV-310430

Total for Control Valves

Note:
Note 1 The total quoted fixed lump sum price for Directs is inclusive of the followings;
1.a Direct manpower including qualification, mobilization, and demobilization                                                                                                   
1.b Tools and Equipments, not  limited to air compressors, torque wrenches (manual or hydraulic torque), lightings, blowers, ventilators, etc., but excluding the supply of breathing                                  
apparatus    
1.c Hydroblasting equipment and manpower, tools, consumables, and other related items

Page 51 of 52
PART II - SECTION 2.3 - Schedule of Prices
Price Break down / package

CONTROL VALVES

1.d Consumables i.e. anti-seize lubricants, cotton rags,  etc                                                                                            


1.e Temporary gaskets (compressed non-asbestos fibre gaskets), isolation spades and blinds. BPC to specify the specs i.e. material, thickness, etc.                      
1.f Flange protection to be provided, installed after breaking flange until reinstallation in order to protect from flange face damage/cut

1.g Craneage, lifting and transportation equipment


1.h PPEs as per BPC HSE requirement
1.i All bolts equal and below than 25mm (1 inch) diameter shall be tightened using manual type torque wrenches with a positive (click) type indication when the selected torque value
is reached. Bolts above 25mm (1 inch) diameter shall use hydraulic torque wrench

Note 2 The Quoted Lump Sum Prices for Control Valves Shall include the followings;
1 All related tubings and termination removal/ installation will be done by TAR contractor.
2 Cotton rags c/w the masking tape to be cover and wraping at the control valve inlet and outlet piping (Cotton rags c/w the masking tape by contractors)
3 After the removal, the control valves shall be sent to OWNER's workshop for repairs (transportation by contractors)
4 Should the valve contaminated, it should be clean (at washing bay before sending to OWNER's workshop for repairs- transportation by contractors
5 Upon repair completion, contractor will collect the valves for re-installation at site.
6 Spare parts will be provided by OWNER

Remarks:
a) Valves repairs will be done by OWNERS

Page 52 of 52

You might also like