RESOURCE (MAN) MANHOURS RESOURCE (EQPT)

AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR

PIPING

1 IWR/BT2/2016/Dec/148 3/4"-AP-224318-1108B-NI PIPE REPLACEMENT & PAINTING


1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop SHOPWELD 6 (2BW, 2SW) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 0.68m2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 1 0.3 1 1 0.6 0 0.3 0 0.3 0 0 0 0 0 0 0.6
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Cutting, bevel and remove defect flange/pipe 3/4'' sch80 (TP01) HRSB 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
15 2-Execution Lift down existing pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
17 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Lift up new pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
3/4'' sch80 (SW) - TP01
19 2-Execution Fit-up the new weld fitting (TP01) HRSB 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
20 2-Execution Fit-up inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Perform full weld as per PPTSB requirement (TP01) HRSB 1 0.36 1 1 1 1.08 0 0 0 0.36 0 0 0.36 0.36 0 0 1.08
22 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution Cutting, bevel and remove defect flange/pipe 3/4'' sch80 (TP02) HRSB 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
25 2-Execution Lift down existing pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
26 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Lift up new pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
3/4'' sch80 (SW) - TP02
29 2-Execution Fit-up the new weld fitting (TP02) HRSB 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
30 2-Execution Fit-up inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Perform full weld as per PPTSB requirement (TP02) HRSB 1 0.36 1 1 1 1.08 0 0 0 0.36 0 0 0.36 0.36 0 0 1.08
32 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Hydrotest - Water filling If any 1 1 1 0 0 0 1 0 0 0 0 0 0 1
35 2-Execution Hydrotest - Set up & testing as per procedure (service test) If any PPTSB 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
36 2-Execution Final inspection for HT If any 0.5 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Drain water If any 1 1 1 0 0 0 1 0 0 0 0 0 0 1
38 2-Execution Remove Fitting HT If any 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
39 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.06 0.12 1 1 1 0.36 0 0.12 0 0.12 0 0 0.12 0 0 0 0.36
40 2-Execution Surface preparation inspection HRSB 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Apply 1st coat (touch up) HRSB 0.06 0.09 1 1 0.18 0 0 0 0.09 0 0 0 0 0.09 0 0.18
42 2-Execution Curing HRSB 0.06 8 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution 1st coat inspection HRSB 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Apply 2nd coat (touch up) HRSB 0.06 0.06 1 1 0.12 0 0 0 0.06 0 0 0 0 0.06 0 0.12
45 2-Execution Curing HRSB 0.06 4 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution 2nd coat inspection HRSB 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution Apply final coat (touch up) HRSB 0.06 0.06 1 1 0.12 0 0 0 0.06 0 0 0 0 0.06 0 0.12
48 2-Execution Curing HRSB 0.06 4 0 0 0 0 0 0 0 0 0 0 0 0
49 2-Execution Final inspection HRSB 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
50 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
51 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
52 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 1 0.4 1 1 0.8 0 0.4 0 0.4 0 0 0 0 0 0 0.8
53 2-Execution To Insert non-metallic pad at pipe support) HRSB 1 0.33
54 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

55 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


56 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
39.283333 32.8 0 11.82 2.2 12.95 2 0 2.54 1.12 0.21 0 32.84
2 IWR/BT2/2016/Dec/147 3/4''-WU-224264-1801X-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 0.26m2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 1 0.3 1 1 0.6 0 0.3 0 0.3 0 0 0 0 0 0 0.6
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Remove threaded pipe 3/4" sch80 (TP01 & TP02) HRSB 2 0.8 1 1 1.6 0 0 0.8 0.8 0 0 0 0 0 0 1.6
15 2-Execution Lift down existing pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
3/4'' sch80 (TRD)
17 2-Execution Lift up new pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
18 2-Execution Install threaded pipe 3/4" sch80 (TP01 & TP02) HRSB 2 0.8 1 1 1.6 0 0 0.8 0.8 0 0 0 0 0 0 1.6
19 2-Execution Final inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.02 0.04 1 1 1 0.12 0 0.04 0 0.04 0 0 0.04 0 0 0 0.12
21 2-Execution Surface preparation inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Apply 1st coat (touch up) HRSB 0.02 0.03 1 1 0.06 0 0 0 0.03 0 0 0 0 0.03 0 0.06
23 2-Execution Curing HRSB 0.02 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Apply 2nd coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
26 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Apply final coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
29 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0

Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
31 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 1 0.4 1 1 0.8 0 0.4 0 0.4 0 0 0 0 0 0 0.8
34 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

35 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


36 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
26.41 10.9 0 1.74 2.6 4.91 1 0 0.54 0 0.07 0 10.86
3 IWR/BT3/FY2018/575 10''-PL-294005-1101A-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop SHOPWELD=2 (BW) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 12.87m2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 3 3.5 2 1 10.5 0 7 0 3.5 0 0 0 0 0 0 10.5
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 4 1.8 1 1 3.6 0 1.8 0 1.8 0 0 0 0 0 0 3.6
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Cutting, bevel and remove defect flange/pipe 10'' sch30 HRSB 1 2.2 2 1 1 8.8 0 0 4.4 2.2 0 0 2.2 0 0 0 8.8
15 2-Execution Crane set up 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Lift down existing pipe (use 45t crane) HRSB 2 2.3 2 1 1 9.2 0 4.6 0 2.3 2.3 0 0 0 0 0 9.2
17 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up new pipe (use 45t crane) PIPE 10'' sch30 (BW)-TP HRSB 2 2.5 2 1 1 10 0 5 0 2.5 2.5 0 0 0 0 0 10
20 2-Execution Fit-up the new weld fitting FLG-01 HRSB 1 1.3 2 1 1 1 6.5 0 0 2.6 1.3 0 0 1.3 1.3 0 0 6.5
21 2-Execution Fit-up inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Perform full weld as per PPTSB requirement HRSB 1 2.6 1 1 1 7.8 0 0 0 2.6 0 0 2.6 2.6 0 0 7.8
23 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Cutting, bevel and remove defect flange/pipe 10'' sch30 HRSB 1 2.2 2 1 1 8.8 0 0 4.4 2.2 0 0 2.2 0 0 0 8.8
27 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Lift up new pipe HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Fit-up the new weld fitting PIPE 10'' sch30 (BW)-TP HRSB 1 1.3 2 1 1 1 6.5 0 0 2.6 1.3 0 0 1.3 1.3 0 0 6.5
31 2-Execution Fit-up inspection BW-05 INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Perform full weld as per PPTSB requirement HRSB 1 2.6 1 1 1 7.8 0 0 0 2.6 0 0 2.6 2.6 0 0 7.8
33 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Cutting, bevel and remove defect flange/pipe 10'' sch30 HRSB 1 2.2 2 1 1 8.8 0 0 4.4 2.2 0 0 2.2 0 0 0 8.8
37 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Fit-up the new weld fitting HRSB 1 1.3 2 1 1 1 6.5 0 0 2.6 1.3 0 0 1.3 1.3 0 0 6.5
40 2-Execution Fit-up inspection PIPE 10'' sch30 (BW) INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Perform full weld as per PPTSB requirement HRSB 1 2.6 1 1 1 7.8 0 0 0 2.6 0 0 2.6 2.6 0 0 7.8
42 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Cutting, bevel and remove defect flange/pipe 4'' sch80 HRSB 1 1.4 1 1 1 4.2 0 0 1.4 1.4 0 0 1.4 0 0 0 4.2
46 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Fit-up the new weld fitting HRSB 1 0.7 1 1 1 1 2.8 0 0 0.7 0.7 0 0 0.7 0.7 0 0 2.8
49 2-Execution Fit-up inspection PIPE 4'' sch80 (BW) HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
50 2-Execution Perform full weld as per PPTSB requirement HRSB 1 1.5 1 1 1 4.5 0 0 0 1.5 0 0 1.5 1.5 0 0 4.5
51 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
52 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
53 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
54 2-Execution Cutting, bevel and remove defect flange/pipe 3/4" sch 80 HRSB 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
55 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
56 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
57 2-Execution Fit-up the new weld fitting HRSB 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
58 2-Execution Fit-up inspection PIPE 3/4'' sch80 (BW) HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
59 2-Execution Perform full weld as per PPTSB requirement HRSB 1 0.6 1 1 1 1.8 0 0 0 0.6 0 0 0.6 0.6 0 0 1.8
60 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
61 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
62 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
63 2-Execution Hydrotest - Water filling 1 1 1 0 0 0 1 0 0 0 0 0 0 1
64 2-Execution Hydrotest - Set up & testing as per procedure HRSB 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
65 2-Execution Final inspection for HT 0.5 0 0 0 0 0 0 0 0 0 0 0 0
66 2-Execution Drain water 1 1 1 0 0 0 1 0 0 0 0 0 0 1
67 2-Execution Remove Fitting HT 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
68 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.75 1.50 1 1 1 4.5 0 1.5 0 1.5 0 0 1.5 0 0 0 4.5
69 2-Execution Surface preparation inspection HRSB 0.75 1 0 0 0 0 0 0 0 0 0 0 0 0
70 2-Execution Apply 1st coat (touch up) HRSB 0.75 1.13 1 1 2.26 0 0 0 1.13 0 0 0 0 1.13 0 2.26
71 2-Execution Curing HRSB 0.75 8 0 0 0 0 0 0 0 0 0 0 0 0
72 2-Execution 1st coat inspection HRSB 0.75 1 0 0 0 0 0 0 0 0 0 0 0 0
73 2-Execution Apply 2nd coat (touch up) HRSB 0.75 0.75 1 1 1.5 0 0 0 0.75 0 0 0 0 0.75 0 1.5
74 2-Execution Curing HRSB 0.75 4 0 0 0 0 0 0 0 0 0 0 0 0
75 2-Execution 2nd coat inspection HRSB 0.75 1 0 0 0 0 0 0 0 0 0 0 0 0
76 2-Execution Apply final coat (touch up) HRSB 0.75 0.75 1 1 1.5 0 0 0 0.75 0 0 0 0 0.75 0 1.5
77 2-Execution Curing HRSB 0.75 4 0 0 0 0 0 0 0 0 0 0 0 0
78 2-Execution Final inspection HRSB 0.75 1 0 0 0 0 0 0 0 0 0 0 0 0
79 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
80 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 3 4.1 2 1 12.3 0 8.2 0 4.1 0 0 0 0 0 0 12.3
81 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 4 2.2 1 1 4.4 0 2.2 0 2.2 0 0 0 0 0 0 4.4
82 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 2.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0


83 2-Execution Site preparation HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
84 2-Execution Surface preparation (Power tool) HRSB 36.98 73.96 1 1 1 221.88 0 73.96 0 73.96 0 0 73.96 0 0 0 221.88
85 2-Execution Inspection surface preparation by AIMD HRSB 36.98 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
86 2-Execution Painting 1st coat HRSB 36.98 55.47 1 1 110.94 0 0 0 55.47 0 0 0 0 55.47 0 110.94
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
87 2-Execution Overcoating interval HRSB 36.98 8 0.00 0 0 0 0 0 0 0 0 0 0 0.00
88 2-Execution 1st coat inspection by AIMD HRSB 36.98 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
89 2-Execution Painting 2nd coat HRSB 36.98 36.98 1 1 73.96 0 0 0 36.98 0 0 0 0 36.98 0 73.96
90 2-Execution Overcoating interval HRSB 36.98 4 0.00 0 0 0 0 0 0 0 0 0 0 0.00
91 2-Execution 2nd coat inspection by AIMD HRSB 36.98 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
92 2-Execution Painting final coat HRSB 36.98 36.98 1 1 73.96 0 0 0 36.98 0 0 0 0 36.98 0 73.96
93 2-Execution Overcoating interval HRSB 36.98 4 0.00 0 0 0 0 0 0 0 0 0 0 0.00
94 2-Execution Final coat inspection by AIMD HRSB 36.98 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
95 2-Execution To tighten bolt & nut 10''X150#- 1pt HRSB 1 0.69 2 1 2.07 0 1.38 0 0.69 0 0 0 0 0 0 2.07
96 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 3.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0


97 2-Execution Lift up pipe & support pipe using wooden block (1st side ) HRSB 8 2.67 1 1 5.33 0 2.6667 0 2.6667 0 0 0 0 0 0 5.33
98 2-Execution Surface preparation (Power tool) HRSB 2.66 5.33 1 1 1 15.99 0 5.33 0 5.33 0 0 5.33 0 0 0 15.99
99 2-Execution Inspection surface preparation by AIMD HRSB 2.66 1 0 0 0 0 0 0 0 0 0 0 0 0
100 2-Execution Painting 1st coat HRSB 2.66 4.00 1 1 8 0 0 0 4 0 0 0 0 4 0 8
101 2-Execution Overcoating interval HRSB 2.66 8 0 0 0 0 0 0 0 0 0 0 0 0
102 2-Execution 1st coat inspection by AIMD HRSB 2.66 1 0 0 0 0 0 0 0 0 0 0 0 0
103 2-Execution Painting 2nd coat HRSB 2.66 2.66 1 1 5.32 0 0 0 2.66 0 0 0 0 2.66 0 5.32
104 2-Execution Overcoating interval HRSB 2.66 4 0 0 0 0 0 0 0 0 0 0 0 0
105 2-Execution 2nd coat inspection by AIMD HRSB 2.66 1 0 0 0 0 0 0 0 0 0 0 0 0
106 2-Execution Painting final coat HRSB 2.66 2.66 1 1 5.32 0 0 0 2.66 0 0 0 0 2.66 0 5.32
107 2-Execution Overcoating interval HRSB 2.66 4 0 0 0 0 0 0 0 0 0 0 0 0
108 2-Execution Final coat inspection by AIMD HRSB 2.66 1 0 0 0 0 0 0 0 0 0 0 0 0
109 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) HRSB 8 2.67 1 1 5.33 0 2.6667 0 2.6667 0 0 0 0 0 0 5.33
110 2-Execution Lift up pipe,remove wooden block & lift down pipe HRSB 8 2.67 1 1 5.33 0 2.6667 0 2.6667 0 0 0 0 0 0 5.33
111 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

112 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


113 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
360.36 698.3 0 127.97 24.7 280.36 4.8 0 104.39 14.7 141.38 0 698.3
4 IWR/BT3/2019/057 6''-PL-294053-1101A-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 4.2 2 1 12.6 0 8.4 0 4.2 0 0 0 0 0 0 12.6
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 2 2.3 1 1 4.6 0 2.3 0 2.3 0 0 0 0 0 0 4.6
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Open flange at TP-08 & TP-01 HRSB 1 1.2 1 1 2.4 0 1.2 0 1.2 0 0 0 0 0 0 2.4
15 2-Execution Cutting, bevel and remove defect flange/pipe 2'' sch40 HRSB 1 0.9 1 1 1 2.7 0 0 0.9 0.9 0 0 0.9 0 0 0 2.7
16 2-Execution Lift down existing pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
17 2-Execution DPT on existing pipe HRSB 1 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
18 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up new pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
20 2-Execution Fit-up weld the new fitting 2'' sch40 (BW) - TP 06 HRSB 1 0.5 1 1 1 1 2 0 0 0.5 0.5 0 0 0.5 0.5 0 0 2
21 2-Execution Fit-up inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Perform full weld as per PPTSB requirement HRSB 1 0.9 1 1 1 2.7 0 0 0 0.9 0 0 0.9 0.9 0 0 2.7
23 2-Execution Perform DPT inspection HRSB 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
24 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Cutting, bevel and remove defect pipe 3/4'' sch xxs 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
27 2-Execution Lift down existing pipe (manual lifting) 0.5 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution DPT on existing pipe 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Perform visual inspection 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Lift up new pipe (manual lifting 0.5 0 0 0 0 0 0 0 0 0 0 0 0
3/4'' sch xxs (SW) - TP 05
31 2-Execution Fit-up weld the new fitting 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
32 2-Execution Fit-up inspection 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Perform full weld as per PPTSB requirement 1 0.36 1 1 1 1.08 0 0 0 0.36 0 0 0.36 0.36 0 0 1.08
34 2-Execution Perform DPT inspection 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
35 2-Execution Visual inspection by PPTSB rep 0.5 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Hydrotest - Water filling 1 1 1 0 0 0 1 0 0 0 0 0 0 1
37 2-Execution Hydrotest - Set up & testing as per procedure HRSB 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
38 2-Execution Final inspection for HT 0.5 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Drain water 1 1 1 0 0 0 1 0 0 0 0 0 0 1
40 2-Execution Remove Fitting HT 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
41 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.02 0.04 1 1 1 0.12 0 0.04 0 0.04 0 0 0.04 0 0 0 0.12
42 2-Execution Surface preparation inspection HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Apply 1st coat (touch up) HRSB 0.02 0.03 1 1 0.06 0 0 0 0.03 0 0 0 0 0.03 0 0.06
44 2-Execution Curing HRSB 0.02 8 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution 1st coat inspection HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Apply 2nd coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
47 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution 2nd coat inspection HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
49 2-Execution Apply final coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
50 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
51 2-Execution Final inspection HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
52 2-Execution Box up flange TP-08 & TP-01 HRSB 1 1.3 1 1 2.6 0 1.3 0 1.3 0 0 0 0 0 0 2.6
53 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
54 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 4.6 2 1 13.8 0 9.2 0 4.6 0 0 0 0 0 0 13.8
55 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 2 2.6 1 1 5.2 0 2.6 0 2.6 0 0 0 0 0 0 5.2
56 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 2.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0


57 2-Execution Site preparation HRSB 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
58 2-Execution Surface preparation (Power tool) HRSB 21.44 42.88 1 1 1 128.64 0 42.88 0 42.88 0 0 42.88 0 0 0 128.64
59 2-Execution Inspection surface preparation by AIMD HRSB 21.44 1 0 0 0 0 0 0 0 0 0 0 0 0
60 2-Execution Painting 1st coat HRSB 21.44 32.16 1 1 64.32 0 0 0 32.16 0 0 0 0 32.16 0 64.32
61 2-Execution Overcoating interval HRSB 21.44 8 0 0 0 0 0 0 0 0 0 0 0 0
62 2-Execution 1st coat inspection by AIMD HRSB 21.44 1 0 0 0 0 0 0 0 0 0 0 0 0
63 2-Execution Painting 2nd coat HRSB 21.44 21.44 1 1 42.88 0 0 0 21.44 0 0 0 0 21.44 0 42.88
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
64 2-Execution Overcoating interval HRSB 21.44 4 0 0 0 0 0 0 0 0 0 0 0 0
65 2-Execution 2nd coat inspection by AIMD HRSB 21.44 1 0 0 0 0 0 0 0 0 0 0 0 0
66 2-Execution Painting final coat HRSB 21.44 21.44 1 1 42.88 0 0 0 21.44 0 0 0 0 21.44 0 42.88
67 2-Execution Overcoating interval HRSB 21.44 4 0 0 0 0 0 0 0 0 0 0 0 0
68 2-Execution Final coat inspection by AIMD HRSB 21.44 1 0 0 0 0 0 0 0 0 0 0 0 0

69 2-Execution 3.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0


70 2-Execution Lift up pipe & support pipe using wooden block (1st side ) HRSB 10 3.3 1 1 6.6 0 3.3 0 3.3 0 0 0 0 0 0 6.6
71 2-Execution Surface preparation (Power tool) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
72 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
73 2-Execution Painting 1st coat HRSB 0 0 0 0 0 0 0 0 0 0 0 0
74 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
75 2-Execution 1st coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
76 2-Execution Painting 2nd coat HRSB 0 0 0 0 0 0 0 0 0 0 0 0
77 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
78 2-Execution 2nd coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
79 2-Execution Painting final coat HRSB 0 0 0 0 0 0 0 0 0 0 0 0
80 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
81 2-Execution Final coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
82 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) HRSB 10 3.3 1 1 6.6 0 3.3 0 3.3 0 0 0 0 0 0 6.6
83 2-Execution Surface preparation (Power tool) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
84 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
85 2-Execution Painting 1st coat INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
86 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
87 2-Execution 1st coat inspection by AIMD INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
88 2-Execution Painting 2nd coat INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
89 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
90 2-Execution 2nd coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
91 2-Execution Painting final coat INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
92 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
93 2-Execution Final coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
94 2-Execution Lift up pipe,remove wooden block & lift down pipe INSP HRSB 10 3.3 1 1 6.6 0 3.3 0 3.3 0 0 0 0 0 0 6.6
95 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

96 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


97 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
206.39 376.5 0 88.82 3 158.39 2.5 0 46.68 1.96 75.11 0 376.46
5 IWR/BT3/2019/055 12''-PL-294019-1101A-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 2 4.8 2 1 1 19.2 0 9.6 0 4.8 4.8 0 0 0 0 0 19.2
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 1 1.5 2 1 4.5 0 3 0 1.5 0 0 0 0 0 0 4.5
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Open flangeSW-02 8''X150 - 1jt HRSB 1 1.5 2 1 1 6 0 3 0 1.5 1.5 0 0 0 0 0 6
15 2-Execution Cutting, bevel pipe 8'' sch30 HRSB 1 2 2 1 1 1 10 0 0 4 2 0 0 2 2 0 0 10
16 2-Execution Crane set up 1 0 0 0 0 0 0 0 0 0 0 0 0
17 2-Execution Lift down existing pipe (use 45T crane) HRSB 1 2.4 2 1 1 9.6 0 4.8 0 2.4 2.4 0 0 0 0 0 9.6
18 2-Execution DPT on existing pipe HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Perform visual inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Lift up new pipe (use 45T crane) HRSB 1 2.8 2 1 1 11.2 0 5.6 0 2.8 2.8 0 0 0 0 0 11.2
8'' sch30 (BW) - FW-06
21 2-Execution Fit-up weld the new fitting HRSB 1.1 2 1 1 1 5.5 0 0 2.2 1.1 0 0 1.1 1.1 0 0 5.5
22 2-Execution Fit-up inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Perform full weld as per PPTSB requirement HRSB 2.4 1 1 1 7.2 0 0 0 2.4 0 0 2.4 2.4 0 0 7.2
24 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Perform RT 1 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution Cutting, bevel pipe 8'' sch30 2 2 1 1 1 10 0 0 4 2 0 0 2 2 0 0 10
28 2-Execution Lift down existing pipe (use 45T crane) 1 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution DPT on existing pipe 0.5 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Perform visual inspection 0.5 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up new pipe (use 45T crane) 0.5 0 0 0 0 0 0 0 0 0 0 0 0
8'' sch30 (BW) - FW-04
32 2-Execution Fit-up weld the new fitting 1.1 2 1 1 1 5.5 0 0 2.2 1.1 0 0 1.1 1.1 0 0 5.5
33 2-Execution Fit-up inspection 0.5 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Perform full weld as per PPTSB requirement 2.4 1 1 1 7.2 0 0 0 2.4 0 0 2.4 2.4 0 0 7.2
35 2-Execution Perform DPT inspection 0.5 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Visual inspection by PPTSB rep 0.5 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Box up flange SW-02 -8''X150 - 1jt 1.8 2 1 1 7.2 0 3.6 0 1.8 1.8 0 0 0 0 0 7.2
38 2-Execution Hydrotest - Water filling 1 1 1 0 0 0 1 0 0 0 0 0 0 1
39 2-Execution Hydrotest - Set up & testing as per procedure HRSB 4 1 2 12 0 4 0 8 0 0 0 0 0 0 12
40 2-Execution Final inspection for HT 0.5 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Drain water 1 1 1 0 0 0 1 0 0 0 0 0 0 1
42 2-Execution Remove Fitting HT 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
43 2-Execution Surface preparation, power tool and clean the surface. HRSB 1 1 1 1 3 0 1 0 1 0 0 1 0 0 0 3
44 2-Execution Surface preparation inspection HRSB 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Apply 1st coat (touch up) HRSB 0.17 0.255 1 1 0.51 0 0 0 0.255 0 0 0 0 0.255 0 0.51
46 2-Execution Curing HRSB 0.17 8 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution 1st coat inspection HRSB 0.17 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Apply 2nd coat (touch up) HRSB 0.17 0.17 1 1 0.34 0 0 0 0.17 0 0 0 0 0.17 0 0.34
49 2-Execution Curing HRSB 0.17 4 0 0 0 0 0 0 0 0 0 0 0 0
50 2-Execution 2nd coat inspection HRSB 0.17 1 0 0 0 0 0 0 0 0 0 0 0 0
51 2-Execution Apply final coat (touch up) HRSB 0.17 0.17 1 1 0.34 0 0 0 0.17 0 0 0 0 0.17 0 0.34
52 2-Execution Curing HRSB 0.17 4 0 0 0 0 0 0 0 0 0 0 0 0
53 2-Execution Final inspection HRSB 0.17 1 0 0 0 0 0 0 0 0 0 0 0 0
54 2-Execution Replace bolt & nut 1/2''Ø X 60mm LG HRSB 1 0.25 1 1 0.5 0 0.25 0 0.25 0 0 0 0 0 0 0.5
55 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 2 5.8 2 1 1 23.2 0 11.6 0 5.8 5.8 0 0 0 0 0 23.2
56 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 1 1.8 2 1 5.4 0 3.6 0 1.8 0 0 0 0 0 0 5.4
57 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
58 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
2-Execution 2.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
59 2-Execution Site preparation HRSB 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
60 2-Execution Remove & Install new U-bolt 12'' 2 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
61 2-Execution Surface preparation (Power tool) HRSB 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
62 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
63 2-Execution Painting 1st coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
64 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
65 2-Execution 1st coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
66 2-Execution Painting 2nd coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
67 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
68 2-Execution 2nd coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
69 2-Execution Painting final coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
70 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
71 2-Execution Final coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 3.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0


72 2-Execution Lift up pipe & support pipe using wooden block (1st side ) HRSB 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
73 2-Execution Surface preparation (Power tool) HRSB 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
74 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
75 2-Execution Painting 1st coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
76 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
77 2-Execution 1st coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
78 2-Execution Painting 2nd coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
79 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
80 2-Execution 2nd coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
81 2-Execution Painting final coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
82 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
83 2-Execution Final coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
84 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) HRSB 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
85 2-Execution Lift up pipe,remove wooden block & lift down pipe INSP HRSB 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
86 2-Execution To tighten bolt & nut 10''X300- 1pt 1 0.69 2 1 2.07 0 1.38 0 0.69 0 0 0 0 0 0 2.07
87 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

88 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


89 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
76.435 161.96 0 54.43 13.4 50.935 19.1 0 12.5 11 0.595 0 161.96
6 IWR/BT2/2016/Nov/92 2''-WU-243029-1801X-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 0.07m2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 1 0.3 1 1 0.6 0 0.3 0 0.3 0 0 0 0 0 0 0.6
12 2-Execution Remove threaded pipe 3/4" sch80 (TP01) & (TP02) HRSB 2 0.8 1 1 1.6 0 0 0.8 0.8 0 0 0 0 0 0 1.6
13 2-Execution Lift down existing pipe (manual lifting) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
14 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
Pipe 3/4" sch80
15 2-Execution Lift up new pipe (manual lifting) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution Install threaded pipe 3/4" sch80 (TP01) & (TP02) HRSB 2 0.8 1 1 1.6 0 0 0.8 0.8 0 0 0 0 0 0 1.6
17 2-Execution Final Inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.02 0.04 1 1 1 0.12 0 0.04 0 0.04 0 0 0.04 0 0 0 0.12
19 2-Execution Surface preparation inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Apply 1st coat (touch up) HRSB 0.02 0.03 1 1 0.06 0 0 0 0.03 0 0 0 0 0.03 0 0.06
21 2-Execution Curing HRSB 0.02 8 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution 1st coat inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Apply 2nd coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
24 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 2nd coat inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Apply final coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
27 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Final inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 1 0.4 1 1 0.8 0 0.4 0 0.4 0 0 0 0 0 0 0.8
32 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

33 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


34 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
25.41 8.9 0 1.74 1.6 4.41 1 0 0.04 0 0.07 0 8.86
7 IWR/BT2/2016/Nov/90 2''-AP-245026-1101B-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop 7 SHOPWELD (3SW, 4BW)
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 0.19m2
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 1 0.3 1 1 0.6 0 0.3 0 0.3 0 0 0 0 0 0 0.6
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Cutting, bevel and remove defect flange/pipe 3/4'' sch80 TP01 HRSB 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
15 2-Execution Lift down existing pipe (manual lifting) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
17 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Lift up new pipe (manual lifting) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
Open
3/4'' sch80 (SW)
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
3/4'' sch80 (SW)
19 2-Execution Fit-up the new weld fitting TP01 HRSB 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
20 2-Execution Fit-up inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Perform full weld as per PPTSB requirement HRSB 1 0.36 1 1 1 1.08 0 0 0 0.36 0 0 0.36 0.36 0 0 1.08
22 2-Execution Perform DPT inspection INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution Hydrotest - Water filling If any 1 1 1 0 0 0 1 0 0 0 0 0 0 1
25 2-Execution Hydrotest - Set up & testing as per procedure (service test) If any PPTSB 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
26 2-Execution Final inspection for HT If any 0.5 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution Drain water If any 1 1 1 0 0 0 1 0 0 0 0 0 0 1
28 2-Execution Remove Fitting HT If any 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
29 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.01 0.02 1 1 1 0.06 0 0.02 0 0.02 0 0 0.02 0 0 0 0.06
30 2-Execution Surface preparation inspection INSP HRSB 0.01 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Apply 1st coat (touch up) HRSB 0.01 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
32 2-Execution Curing HRSB 0.01 8 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution 1st coat inspection INSP HRSB 0.01 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Apply 2nd coat (touch up) HRSB 0.01 0.01 1 1 0.02 0 0 0 0.01 0 0 0 0 0.01 0 0.02
35 2-Execution Curing HRSB 0.01 4 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 2nd coat inspection INSP HRSB 0.01 1 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Apply final coat (touch up) HRSB 0.01 0.01 1 1 0.02 0 0 0 0.01 0 0 0 0 0.01 0 0.02
38 2-Execution Curing HRSB 0.01 4 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Final inspection INSP HRSB 0.01 1 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 1 0.4 1 1 0.8 0 0.4 0 0.4 0 0 0 0 0 0 0.8
43 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

44 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


45 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
34.22 26.1 0 10.72 1.6 10.72 1 0 1.48 0.56 0.04 0 26.12
8 IWR/BT2/2017/March/42 3/4''-AP-226434-1108B-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 0.10m2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 0.32 1 1 0.64 0 0.32 0 0.32 0 0 0 0 0 0 0.64
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Cutting, bevel and remove defect flange/pipe 3/4'' sch80 (TP01) HRSB 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
15 2-Execution Lift down existing pipe (manual lifting) HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
17 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Lift up new pipe (manual lifting HRSB 1 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
19 2-Execution Fit-up the new weld fitting (TP01) 3/4'' sch80 (BW) - TP01 HRSB 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
20 2-Execution Fit-up inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Perform full weld as per PPTSB requirement (TP01) HRSB 1 0.6 1 1 1 1.8 0 0 0 0.6 0 0 0.6 0.6 0 0 1.8
22 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Cutting, bevel and remove defect flange/pipe 3/4'' sch80 (TP02) HRSB 1 0.4 1 1 1 1.2 0 0 0.4 0.4 0 0 0.4 0 0 0 1.2
26 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution Perform visual inspection INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Fit-up the new weld fitting (TP02) HRSB 1 0.2 1 1 1 1 0.8 0 0 0.2 0.2 0 0 0.2 0.2 0 0 0.8
29 2-Execution Fit-up inspection 3/4'' sch80 (BW) - TP02 INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Perform full weld as per PPTSB requirement (TP02) HRSB 1 0.6 1 1 1 1.8 0 0 0 0.6 0 0 0.6 0.6 0 0 1.8
31 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Hydrotest - Water filling 1 1 1 0 0 0 1 0 0 0 0 0 0 1
35 2-Execution Hydrotest - Set up & testing as per procedure PPTSB 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
36 2-Execution Final inspection for HT 0.5 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Drain water 1 1 1 0 0 0 1 0 0 0 0 0 0 1
38 2-Execution Remove Fitting HT 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
39 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.02 0.04 1 1 1 0.12 0 0.04 0 0.04 0 0 0.04 0 0 0 0.12
40 2-Execution Surface preparation inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Apply 1st coat (touch up) HRSB 0.02 0.03 1 1 0.06 0 0 0 0.03 0 0 0 0 0.03 0 0.06
42 2-Execution Curing HRSB 0.02 8 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution 1st coat inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Apply 2nd coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
45 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution 2nd coat inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution Apply final coat (touch up) HRSB 0.02 0.02 1 1 0.04 0 0 0 0.02 0 0 0 0 0.02 0 0.04
48 2-Execution Curing HRSB 0.02 4 0 0 0 0 0 0 0 0 0 0 0 0
49 2-Execution Final inspection INSP HRSB 0.02 1 0 0 0 0 0 0 0 0 0 0 0 0
50 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
51 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
52 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 0.38 1 1 0.76 0 0.38 0 0.38 0 0 0 0 0 0 0.76
53 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

54 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


55 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
40.21 30.8 0 10.74 2.2 12.21 1 0 2.94 1.6 0.07 0 30.76
9 IWR/BT2/2017/FEB/33 1"CC-227545-3309A-PG/Z CHECK VALVE REPLACEMENT
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR

2-Execution 1.0 Valve replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 2 0.6 1 1 1.2 0 0.6 0 0.6 0 0 0 0 0 0 1.2
12 2-Execution Open flange at TP01 & TP02 HRSB 2 0.6 1 1 1.2 0 0.6 0 0.6 0 0 0 0 0 0 1.2
13 2-Execution Lift down existing check valve (manual lifting) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
14 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
Check valve 1"
15 2-Execution Lift up new pipe (manual lifting HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution Install flange at TP01 & TP02 HRSB 2 0.8 1 1 1.6 0 0.8 0 0.8 0 0 0 0 0 0 1.6
17 2-Execution Final inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 2 0.8 1 1 1.6 0 0.8 0 0.8 0 0 0 0 0 0 1.6
21 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

22 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


23 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
5.8 9.6 0 3.8 0 4.8 1 0 0 0 0 0 9.6
10 IWR/BT1/2019/018 2" PL SS line SPOOL REPLACEMENT
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop 5 SHOPWELD (BW) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool 0.09m2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Spool replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) Waiting for EIS HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) Waiting for EIS HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) Waiting for EIS HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution Open flange at tie-point TP01 & TP02 & TP03 HRSB 3 1.5 1 1 3 0 1.5 0 1.5 0 0 0 0 0 0 3
13 2-Execution Lift down existing pipe (manual lifting) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
14 2-Execution Perform visual inspection Short spool (TP01, TP02, INSP HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution Lift up new pipe (manual lifting) TP03) HRSB 0.5 1 1 1 1.5 0 0.5 0 0.5 0.5 0 0 0 0 0 1.5
16 2-Execution Install pipe spool (TP01, TP02 & TP03) HRSB 1.8 1 1 3.6 0 1.8 0 1.8 0 0 0 0 0 0 3.6
17 2-Execution Visual inspection by PPTSB rep INSP HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Deblinding as per EIS (above to 12" Nom Bore) Waiting for EIS HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Deblinding as per EIS (above to 4" Nom Bore) Waiting for EIS HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Deblinding as per EIS (up to 4" Nom Bore) Waiting for EIS HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

22 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


23 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6.3 10.6 0 4.3 0 5.3 1 0 0 0 0 0 10.6
11 IWR/BT3/FY2018/557 10''-PL-294006-1101A-NI PIPE REPLACEMENT & PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
8 1-Pre Execution Remove insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Piping replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Blinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (above to 4" Nom Bore) HRSB 3.5 2 1 10.5 0 7 0 3.5 0 0 0 0 0 0 10.5
11 2-Execution Blinding as per EIS (up to 4" Nom Bore) HRSB 2.4 1 1 4.8 0 2.4 0 2.4 0 0 0 0 0 0 4.8
12 2-Execution Setup preparation and marking the cutting point HRSB 0.5 1 1 1 0 0 0.5 0.5 0 0 0 0 0 0 1
13 2-Execution Drill Pilot Hole for gas test by Operation HRSB 0.5 1 1 1 0 0 0.5 0 0 0 0.5 0 0 0 1
14 2-Execution Cutting, bevel pipe 10'' sch30 HRSB 1 2.2 2 1 1 8.8 0 0 4.4 2.2 0 0 2.2 0 0 0 8.8
15 Crane set up 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Lift down existing pipe (use 45T crane) HRSB 1 2.3 2 1 1 9.2 0 4.6 0 2.3 2.3 0 0 0 0 0 9.2
17 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up new pipe (use 45T crane) HRSB 1 2.5 2 1 1 10 0 5 0 2.5 2.5 0 0 0 0 0 10
10'' sch30 (BW) - TP 06
20 2-Execution Fit-up weld the new fitting HRSB 1 1.3 2 1 1 1 6.5 0 0 2.6 1.3 0 0 1.3 1.3 0 0 6.5
21 2-Execution Fit-up inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Perform full weld as per PPTSB requirement HRSB 1 2.6 1 1 1 7.8 0 0 0 2.6 0 0 2.6 2.6 0 0 7.8
23 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution Visual inspection by PPTSB rep HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Cutting, bevel pipe 10'' sch30 1 2.2 2 1 1 8.8 0 0 4.4 2.2 0 0 2.2 0 0 0 8.8
27 2-Execution DPT on existing pipe 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Perform visual inspection 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Fit-up weld the new fitting 1 1.3 2 1 1 1 6.5 0 0 2.6 1.3 0 0 1.3 1.3 0 0 6.5
30 2-Execution Fit-up inspection 10'' sch30 (BW) - TP 02 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Perform full weld as per PPTSB requirement 1 2.6 1 1 1 7.8 0 0 0 2.6 0 0 2.6 2.6 0 0 7.8
32 2-Execution Perform DPT inspection 0.5 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Visual inspection by PPTSB rep 0.5 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Perform RT 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Hydrotest - Water filling 2 1 2 0 0 0 2 0 0 0 0 0 0 2
36 2-Execution Hydrotest - Set up & testing as per procedure HRSB 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
37 2-Execution Final inspection for HT 0.5 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Drain water 1 1 1 0 0 0 1 0 0 0 0 0 0 1
39 2-Execution Remove Fitting HT 0.5 2 1 1.5 0 1 0 0.5 0 0 0 0 0 0 1.5
40 2-Execution Surface preparation, power tool and clean the surface. HRSB 1 1 1 1 3 0 1 0 1 0 0 1 0 0 0 3
41 2-Execution Surface preparation inspection HRSB 0.21 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Apply 1st coat (touch up) HRSB 0.21 0.315 1 1 0.63 0 0 0 0.315 0 0 0 0 0.315 0 0.63
43 2-Execution Curing HRSB 0.21 8 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution 1st coat inspection HRSB 0.21 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Apply 2nd coat (touch up) HRSB 0.21 0.21 1 1 0.42 0 0 0 0.21 0 0 0 0 0.21 0 0.42
46 2-Execution Curing HRSB 0.21 4 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution 2nd coat inspection HRSB 0.21 1 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
48 2-Execution Apply final coat (touch up) HRSB 0.21 0.21 1 1 0.42 0 0 0 0.21 0 0 0 0 0.21 0 0.42
49 2-Execution Curing HRSB 0.21 4 0 0 0 0 0 0 0 0 0 0 0 0
50 2-Execution Final inspection HRSB 0.21 1 0 0 0 0 0 0 0 0 0 0 0 0
51 2-Execution Deblinding as per EIS (above to 12" Nom Bore) HRSB 0 0 0 0 0 0 0 0 0 0 0 0
52 2-Execution Deblinding as per EIS (above to 4" Nom Bore) HRSB 4.1 2 1 12.3 0 8.2 0 4.1 0 0 0 0 0 0 12.3
53 2-Execution Deblinding as per EIS (up to 4" Nom Bore) HRSB 2.9 1 1 5.8 0 2.9 0 2.9 0 0 0 0 0 0 5.8
54 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 2.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0


55 2-Execution Site preparation HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
56 2-Execution Surface preparation (Power tool) HRSB 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
57 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
58 2-Execution Painting 1st coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
59 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
60 2-Execution 1st coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
61 2-Execution Painting 2nd coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
62 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
63 2-Execution 2nd coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
64 2-Execution Painting final coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
65 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
66 2-Execution Final coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0

67 2-Execution 3.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0


68 2-Execution Lift up pipe & support pipe using wooden block (1st side ) HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
69 2-Execution Surface preparation (Power tool) HRSB 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
70 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
71 2-Execution Painting 1st coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
72 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
73 2-Execution 1st coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
74 2-Execution Painting 2nd coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
75 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
76 2-Execution 2nd coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
77 2-Execution Painting final coat HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
78 2-Execution Overcoating interval HRSB 0 0 0 0 0 0 0 0 0 0 0 0
79 2-Execution Final coat inspection by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
80 2-Execution Cutting round bar at pipe support 1 1 1 1 3 0 0 1 1 0 0 1 0 0 0 3
81 2-Execution Install & welding new round bar at pipe support 1 1 1 1 3 0 0 1 0 0 0 1 1 0 0 3
82 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) HRSB 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
83 2-Execution Lift up pipe,remove wooden block & lift down pipe INSP HRSB 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
84 To tighten bolt & nut 10''X300- 1pt 1 1.98 2 1 5.94 0 3.96 0 1.98 0 0 0 0 0 0 5.94
85 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

86 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


87 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
74.615 135.71 0 44.06 17 44.615 4.8 0 15.7 8.8 0.735 0 135.71

PAINTING
8''-PG-225178-1101A-PG
1 IWL/BT2/2018/21 PAINTING
2"-SVH-225380-1101A-NI
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 84.32 168.64371 1 1 1 505.9311 0 168.64 0 168.64 0 0 168.64 0 0 0 505.9311
9 2-Execution Inspection surface preparation by AIMD 84.32 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 84.32 126.48 1 1 252.9656 0 0 0 126.48 0 0 0 0 126.48 0 252.9656
11 2-Execution Overcoating interval HRSB 84.32 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 84.32 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 84.32 84.32 1 1 168.6437 0 0 0 84.322 0 0 0 0 84.322 0 168.6437
14 2-Execution Overcoating interval INSP 84.32 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 84.32 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 84.32 84.32 1 1 168.6437 0 0 0 84.322 0 0 0 0 84.322 0 168.6437
17 2-Execution Overcoating interval HRSB 84.32 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 84.32 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 1.80 3.6 1 1 1 10.8 0 3.6 0 3.6 0 0 3.6 0 0 0 10.8
22 2-Execution Inspection surface preparation by AIMD HRSB 1.80 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 1.80 2.70 1 1 5.4 0 0 0 2.7 0 0 0 0 2.7 0 5.4
24 2-Execution Overcoating interval HRSB 1.80 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 1.80 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 1.80 1.80 1 1 3.6 0 0 0 1.8 0 0 0 0 1.8 0 3.6
27 2-Execution Overcoating interval 1.80 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 1.80 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 1.80 1.80 1 1 3.6 0 0 0 1.8 0 0 0 0 1.8 0 3.6
30 2-Execution Overcoating interval 1.80 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 1.80 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
515.6702 1122.584 0 173.24 0 475.67 0 0 172.24 0 301.43 0 1122.584
2 IWL/BT2/2018/22 8''-PL-225127-1101A-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 56.51 113.02544 1 1 1 339.0763 0 113 0 113 0 0 113 0 0 0 339.0763
9 2-Execution Inspection surface preparation by AIMD 56.51 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 56.51 84.77 1 1 169.5382 0 0 0 84.769 0 0 0 0 84.769 0 169.5382
11 2-Execution Overcoating interval HRSB 56.51 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 56.51 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 56.51 56.51 1 1 113.0254 0 0 0 56.513 0 0 0 0 56.513 0 113.0254
14 2-Execution Overcoating interval INSP 56.51 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 56.51 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 56.51 56.51 1 1 113.0254 0 0 0 56.513 0 0 0 0 56.513 0 113.0254
17 2-Execution Overcoating interval HRSB 56.51 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 56.51 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 3.24 6.48 1 1 1 19.44 0 6.48 0 6.48 0 0 6.48 0 0 0 19.44
22 2-Execution Inspection surface preparation by AIMD HRSB 3.24 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 3.24 4.86 1 1 9.72 0 0 0 4.86 0 0 0 0 4.86 0 9.72
24 2-Execution Overcoating interval HRSB 3.24 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 3.24 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 3.24 3.24 1 1 6.48 0 0 0 3.24 0 0 0 0 3.24 0 6.48
27 2-Execution Overcoating interval 3.24 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 3.24 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 3.24 3.24 1 1 6.48 0 0 0 3.24 0 0 0 0 3.24 0 6.48
30 2-Execution Overcoating interval 3.24 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 3.24 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
370.63995 779.7853 0 120.51 0 330.64 0 0 119.51 0 209.13 0 779.7853
6''-PL-225136-3101A-NI
3 IWL/BT2/2018/10 PAINTING
4"-PL-225145-3101A-NI
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 93.27 186.54 1 1 1 559.62 0 186.54 0 186.54 0 0 186.54 0 0 0 559.62
9 2-Execution Inspection surface preparation by AIMD 93.27 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 93.27 139.91 1 1 279.81 0 0 0 139.91 0 0 0 0 139.91 0 279.81
11 2-Execution Overcoating interval HRSB 93.27 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 93.27 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 93.27 93.27 1 1 186.54 0 0 0 93.27 0 0 0 0 93.27 0 186.54
14 2-Execution Overcoating interval INSP 93.27 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 93.27 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 93.27 93.27 1 1 186.54 0 0 0 93.27 0 0 0 0 93.27 0 186.54
17 2-Execution Overcoating interval HRSB 93.27 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 93.27 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution 0 1 1 0
reinstate pipe support to its original position INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 6.16 12.32 1 1 1 36.96 0 12.32 0 12.32 0 0 12.32 0 0 0 36.96
21 2-Execution Inspection surface preparation by AIMD HRSB 6.16 1 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
22 2-Execution Painting 1st coat INSP 6.16 9.24 1 1 18.48 0 0 0 9.24 0 0 0 0 9.24 0 18.48
23 2-Execution Overcoating interval HRSB 6.16 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 6.16 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 6.16 6.16 1 1 12.32 0 0 0 6.16 0 0 0 0 6.16 0 12.32
26 2-Execution Overcoating interval 6.16 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 6.16 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 6.16 6.16 1 1 12.32 0 0 0 6.16 0 0 0 0 6.16 0 12.32
29 2-Execution Overcoating interval 6.16 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 6.16 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 6.16 2.0328 1 1 4.0656 0 2.0328 0 2.0328 0 0 0 0 0 0 4.0656
32 2-Execution Surface preparation (Power tool) 6.16 12.32 1 1 1 36.96 0 12.32 0 12.32 0 0 12.32 0 0 0 36.96
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
603.2178 1337.616 0 215.21 0 563.22 0 0 211.18 0 348 0 1337.616
4 IWL/BT2/2018/19 6''-PL-22064-3101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 79.39 158.77799 1 1 1 476.334 0 158.78 0 158.78 0 0 158.78 0 0 0 476.334
9 2-Execution Inspection surface preparation by AIMD 79.39 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 79.39 119.08 1 1 238.167 0 0 0 119.08 0 0 0 0 119.08 0 238.167
11 2-Execution Overcoating interval HRSB 79.39 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 79.39 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 79.39 79.39 1 1 158.778 0 0 0 79.389 0 0 0 0 79.389 0 158.778
14 2-Execution Overcoating interval INSP 79.39 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 79.39 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 79.39 79.39 1 1 158.778 0 0 0 79.389 0 0 0 0 79.389 0 158.778
17 2-Execution Overcoating interval HRSB 79.39 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 79.39 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 8.40 16.8 1 1 1 50.4 0 16.8 0 16.8 0 0 16.8 0 0 0 50.4
22 2-Execution Inspection surface preparation by AIMD HRSB 8.40 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 8.40 12.60 1 1 25.2 0 0 0 12.6 0 0 0 0 12.6 0 25.2
24 2-Execution Overcoating interval HRSB 8.40 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 8.40 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 8.40 8.40 1 1 16.8 0 0 0 8.4 0 0 0 0 8.4 0 16.8
27 2-Execution Overcoating interval 8.40 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 8.40 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 8.40 8.40 1 1 16.8 0 0 0 8.4 0 0 0 0 8.4 0 16.8
30 2-Execution Overcoating interval 8.40 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 8.40 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
524.83947 1144.257 0 176.58 0 484.84 0 0 175.58 0 307.26 0 1144.257
5 IWL/BT2/2018/5 24''-P2-225188-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 225.79 451.58081 1 1 1 1354.742 0 451.58 0 451.58 0 0 451.58 0 0 0 1354.742
9 2-Execution Inspection surface preparation by AIMD 225.79 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 225.79 338.69 1 1 677.3712 0 0 0 338.69 0 0 0 0 338.69 0 677.3712
11 2-Execution Overcoating interval HRSB 225.79 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 225.79 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 225.79 225.79 1 1 451.5808 0 0 0 225.79 0 0 0 0 225.79 0 451.5808
14 2-Execution Overcoating interval INSP 225.79 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 225.79 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 225.79 225.79 1 1 451.5808 0 0 0 225.79 0 0 0 0 225.79 0 451.5808
17 2-Execution Overcoating interval HRSB 225.79 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 225.79 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 7.58 15.16 1 1 1 45.48 0 15.16 0 15.16 0 0 15.16 0 0 0 45.48
22 2-Execution Inspection surface preparation by AIMD HRSB 7.58 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 7.58 11.37 1 1 22.74 0 0 0 11.37 0 0 0 0 11.37 0 22.74
24 2-Execution Overcoating interval HRSB 7.58 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 7.58 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 7.58 7.58 1 1 15.16 0 0 0 7.58 0 0 0 0 7.58 0 15.16
27 2-Execution Overcoating interval 7.58 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 7.58 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 7.58 7.58 1 1 15.16 0 0 0 7.58 0 0 0 0 7.58 0 15.16
30 2-Execution Overcoating interval 7.58 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 7.58 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
1325.5372 3036.815 0 467.74 0 1286 0 0 466.74 0 816.8 0 3036.815
6 IWL/BT2/2018/15 6''-PL-225064-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 44.38 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 44.38 88.766989 1 1 1 266.301 0 88.767 0 88.767 0 0 88.767 0 0 0 266.301
9 2-Execution Inspection surface preparation by AIMD 44.38 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 44.38 66.58 1 1 133.1505 0 0 0 66.575 0 0 0 0 66.575 0 133.1505
11 2-Execution Overcoating interval HRSB 44.38 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 44.38 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 44.38 44.38 1 1 88.76699 0 0 0 44.383 0 0 0 0 44.383 0 88.76699
14 2-Execution Overcoating interval INSP 44.38 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 44.38 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 44.38 44.38 1 1 88.76699 0 0 0 44.383 0 0 0 0 44.383 0 88.76699
17 2-Execution Overcoating interval HRSB 44.38 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 44.38 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution 0 1 1 0
reinstate pipe support to its original position INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 1.55 3.091251 1 1 1 9.273753 0 3.0913 0 3.0913 0 0 3.0913 0 0 0 9.273753
21 2-Execution Inspection surface preparation by AIMD HRSB 1.55 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 1.55 2.32 1 1 4.636876 0 0 0 2.3184 0 0 0 0 2.3184 0 4.636876
23 2-Execution Overcoating interval HRSB 1.55 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 1.55 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 1.55 1.55 1 1 3.091251 0 0 0 1.5456 0 0 0 0 1.5456 0 3.091251
26 2-Execution Overcoating interval 1.55 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 1.55 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 1.55 1.55 1 1 3.091251 0 0 0 1.5456 0 0 0 0 1.5456 0 3.091251
29 2-Execution Overcoating interval 1.55 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 1.55 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
294.61016 600.0786 0 92.858 0 254.61 0 0 91.858 0 160.75 0 600.0786
7 IWL/BT2/2018/23 3''-PG-225177-1101A-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 11.14 22.276073 1 1 1 66.82822 0 22.276 0 22.276 0 0 22.276 0 0 0 66.82822
9 2-Execution Inspection surface preparation by AIMD 11.14 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 11.14 16.71 1 1 33.41411 0 0 0 16.707 0 0 0 0 16.707 0 33.41411
11 2-Execution Overcoating interval HRSB 11.14 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 11.14 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 11.14 11.14 1 1 22.27607 0 0 0 11.138 0 0 0 0 11.138 0 22.27607
14 2-Execution Overcoating interval INSP 11.14 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 11.14 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 11.14 11.14 1 1 22.27607 0 0 0 11.138 0 0 0 0 11.138 0 22.27607
17 2-Execution Overcoating interval HRSB 11.14 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 11.14 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 0.50 1 1 1 1 3 0 1 0 1 0 0 1 0 0 0 3
22 2-Execution Inspection surface preparation by AIMD HRSB 0.50 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 0.50 0.75 1 1 1.5 0 0 0 0.75 0 0 0 0 0.75 0 1.5
24 2-Execution Overcoating interval HRSB 0.50 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 0.50 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 0.50 0.50 1 1 1 0 0 0 0.5 0 0 0 0 0.5 0 1
27 2-Execution Overcoating interval 0.50 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 0.50 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 0.50 0.50 1 1 1 0 0 0 0.5 0 0 0 0 0.5 0 1
30 2-Execution Overcoating interval 0.50 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 0.50 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
106.0092 154.2945 0 24.276 0 66.009 0 0 23.276 0 40.733 0 154.2945
8 IWL/BT2/2018/9 8''-MC-225274-3126A-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 27.54 55.072976 1 1 1 165.2189 0 55.073 0 55.073 0 0 55.073 0 0 0 165.2189
9 2-Execution Inspection surface preparation by AIMD 27.54 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 27.54 41.30 1 1 82.60946 0 0 0 41.305 0 0 0 0 41.305 0 82.60946
11 2-Execution Overcoating interval HRSB 27.54 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 27.54 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 27.54 27.54 1 1 55.07298 0 0 0 27.536 0 0 0 0 27.536 0 55.07298
14 2-Execution Overcoating interval INSP 27.54 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 27.54 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 27.54 27.54 1 1 55.07298 0 0 0 27.536 0 0 0 0 27.536 0 55.07298
17 2-Execution Overcoating interval HRSB 27.54 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 27.54 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 3.60 7.2 1 1 1 21.6 0 7.2 0 7.2 0 0 7.2 0 0 0 21.6
22 2-Execution Inspection surface preparation by AIMD HRSB 3.60 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 3.60 5.40 1 1 10.8 0 0 0 5.4 0 0 0 0 5.4 0 10.8
24 2-Execution Overcoating interval HRSB 3.60 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 3.60 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 3.60 3.60 1 1 7.2 0 0 0 3.6 0 0 0 0 3.6 0 7.2
27 2-Execution Overcoating interval 3.60 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 3.60 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 3.60 3.60 1 1 7.2 0 0 0 3.6 0 0 0 0 3.6 0 7.2
30 2-Execution Overcoating interval 3.60 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 3.60 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
213.25068 407.7743 0 63.273 0 173.25 0 0 62.273 0 109 0 407.7743
9 IWL/BT2/2018/17 2''-SA-283096-1112B-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 21.63 43.268521 1 1 1 129.8056 0 43.269 0 43.269 0 0 43.269 0 0 0 129.8056
9 2-Execution Inspection surface preparation by AIMD 21.63 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 21.63 32.45 1 1 64.90278 0 0 0 32.451 0 0 0 0 32.451 0 64.90278
11 2-Execution Overcoating interval HRSB 21.63 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 21.63 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 21.63 21.63 1 1 43.26852 0 0 0 21.634 0 0 0 0 21.634 0 43.26852
14 2-Execution Overcoating interval INSP 21.63 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 21.63 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 21.63 21.63 1 1 43.26852 0 0 0 21.634 0 0 0 0 21.634 0 43.26852
17 2-Execution Overcoating interval HRSB 21.63 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 21.63 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution reinstate pipe support to its original position 0 1 1 0
INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 2.85 5.704984 1 1 1 17.11495 0 5.705 0 5.705 0 0 5.705 0 0 0 17.11495
21 2-Execution Inspection surface preparation by AIMD HRSB 2.85 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 2.85 4.28 1 1 8.557476 0 0 0 4.2787 0 0 0 0 4.2787 0 8.557476
23 2-Execution Overcoating interval HRSB 2.85 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 2.85 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 2.85 2.85 1 1 5.704984 0 0 0 2.8525 0 0 0 0 2.8525 0 5.704984
26 2-Execution Overcoating interval 2.85 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 2.85 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 2.85 2.85 1 1 5.704984 0 0 0 2.8525 0 0 0 0 2.8525 0 5.704984
29 2-Execution Overcoating interval 2.85 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 2.85 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
176.67714 322.3278 0 50.974 0 136.68 0 0 48.974 0 85.704 0 322.3278
10 IWL/BT2/2018/20 3''-PL-225123-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 45.11 90.221587 1 1 1 270.6648 0 90.222 0 90.222 0 0 90.222 0 0 0 270.6648
9 2-Execution Inspection surface preparation by AIMD 45.11 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 45.11 67.67 1 1 135.3324 0 0 0 67.666 0 0 0 0 67.666 0 135.3324
11 2-Execution Overcoating interval HRSB 45.11 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 45.11 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 45.11 45.11 1 1 90.22159 0 0 0 45.111 0 0 0 0 45.111 0 90.22159
14 2-Execution Overcoating interval INSP 45.11 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 45.11 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 45.11 45.11 1 1 90.22159 0 0 0 45.111 0 0 0 0 45.111 0 90.22159
17 2-Execution Overcoating interval HRSB 45.11 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 45.11 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 8.75 17.5 1 1 1 52.5 0 17.5 0 17.5 0 0 17.5 0 0 0 52.5
22 2-Execution Inspection surface preparation by AIMD HRSB 8.75 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 8.75 13.13 1 1 26.25 0 0 0 13.125 0 0 0 0 13.125 0 26.25
24 2-Execution Overcoating interval HRSB 8.75 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 8.75 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 8.75 8.75 1 1 17.5 0 0 0 8.75 0 0 0 0 8.75 0 17.5
27 2-Execution Overcoating interval 8.75 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 8.75 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 8.75 8.75 1 1 17.5 0 0 0 8.75 0 0 0 0 8.75 0 17.5
30 2-Execution Overcoating interval 8.75 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 8.75 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
338.23437 703.1903 0 108.72 0 298.23 0 0 107.72 0 188.51 0 703.1903
11 IWL/BT2/2018/18 2''-PL-225067-3101A-ST PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 14.14 28.277293 1 1 1 84.83188 0 28.277 0 28.277 0 0 28.277 0 0 0 84.83188
9 2-Execution Inspection surface preparation by AIMD 14.14 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 14.14 21.21 1 1 42.41594 0 0 0 21.208 0 0 0 0 21.208 0 42.41594
11 2-Execution Overcoating interval HRSB 14.14 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 14.14 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 14.14 14.14 1 1 28.27729 0 0 0 14.139 0 0 0 0 14.139 0 28.27729
14 2-Execution Overcoating interval INSP 14.14 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 14.14 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 14.14 14.14 1 1 28.27729 0 0 0 14.139 0 0 0 0 14.139 0 28.27729
17 2-Execution Overcoating interval HRSB 14.14 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 14.14 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 2.47 4.942097 1 1 1 14.82629 0 4.9421 0 4.9421 0 0 4.9421 0 0 0 14.82629
22 2-Execution Inspection surface preparation by AIMD HRSB 2.47 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 2.47 3.71 1 1 7.413145 0 0 0 3.7066 0 0 0 0 3.7066 0 7.413145
24 2-Execution Overcoating interval HRSB 2.47 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 2.47 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 2.47 2.47 1 1 4.942097 0 0 0 2.471 0 0 0 0 2.471 0 4.942097
27 2-Execution Overcoating interval 2.47 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 2.47 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 2.47 2.47 1 1 4.942097 0 0 0 2.471 0 0 0 0 2.471 0 4.942097
30 2-Execution Overcoating interval 2.47 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 2.47 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
133.35332 218.926 0 34.219 0 93.353 0 0 33.219 0 58.134 0 218.926
12 IWL/BT2/2018/1 6''-PL-225110-1101A-IH PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 14.29m2 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 9.10 18.21 1 1 1 54.61613 0 18.205 0 18.205 0 0 18.205 0 0 0 54.61613
9 2-Execution Inspection surface preparation by AIMD 9.10 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 9.10 13.65 1 1 27.30806 0 0 0 13.654 0 0 0 0 13.654 0 27.30806
11 2-Execution Overcoating interval HRSB 9.10 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 9.10 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 9.10 9.10 1 1 18.20538 0 0 0 9.1027 0 0 0 0 9.1027 0 18.20538
14 2-Execution Overcoating interval INSP 9.10 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 9.10 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 9.10 9.10 1 1 18.20538 0 0 0 9.1027 0 0 0 0 9.1027 0 18.20538
17 2-Execution Overcoating interval HRSB 9.10 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 9.10 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 0.72 1.44 1 1 1 4.32 0 1.44 0 1.44 0 0 1.44 0 0 0 4.32
22 2-Execution Inspection surface preparation by AIMD HRSB 0.72 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 0.72 1.08 1 1 2.16 0 0 0 1.08 0 0 0 0 1.08 0 2.16
24 2-Execution Overcoating interval HRSB 0.72 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 0.72 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 0.72 0.72 1 1 1.44 0 0 0 0.72 0 0 0 0 0.72 0 1.44
27 2-Execution Overcoating interval 0.72 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 0.72 1 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 0.72 0.72 1 1 1.44 0 0 0 0.72 0 0 0 0 0.72 0 1.44
30 2-Execution Overcoating interval 0.72 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 0.72 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 14.29m2 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
96.024785 130.6949 0 20.645 0 56.025 0 0 19.645 0 34.379 0 130.6949
13 IWL/BT2/2018/4 6''-PL-225125-1101A-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 16.33 32.653314 1 1 1 97.95994 0 32.653 0 32.653 0 0 32.653 0 0 0 97.95994
9 2-Execution Inspection surface preparation by AIMD 16.33 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 16.33 24.49 1 1 48.97997 0 0 0 24.49 0 0 0 0 24.49 0 48.97997
11 2-Execution Overcoating interval HRSB 16.33 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 16.33 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 16.33 16.33 1 1 32.65331 0 0 0 16.327 0 0 0 0 16.327 0 32.65331
14 2-Execution Overcoating interval INSP 16.33 4 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
15 2-Execution 2nd coat inspection by AIMD INSP 16.33 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 16.33 16.33 1 1 32.65331 0 0 0 16.327 0 0 0 0 16.327 0 32.65331
17 2-Execution Overcoating interval HRSB 16.33 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 16.33 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 2.76 5.52 1 1 1 16.56 0 5.52 0 5.52 0 0 5.52 0 0 0 16.56
22 2-Execution Inspection surface preparation by AIMD HRSB 2.76 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 2.76 4.14 1 1 8.28 0 0 0 4.14 0 0 0 0 4.14 0 8.28
24 2-Execution Overcoating interval HRSB 2.76 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 2.76 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 2.76 2.76 1 1 5.52 0 0 0 2.76 0 0 0 0 2.76 0 5.52
27 2-Execution Overcoating interval 2.76 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 2.76 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 2.76 2.76 1 1 5.52 0 0 0 2.76 0 0 0 0 2.76 0 5.52
30 2-Execution Overcoating interval 2.76 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 2.76 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
146.97661 251.1265 0 39.173 0 107 0 0 38.173 0 66.803 0 251.1265
14 IWL/BT2/2018/136 4''-MC-225274-3126A-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation (PP CAGE) HRSB 24.17m2 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 39.75 79.499209 1 1 1 238.4976 0 79.499 0 79.499 0 0 79.499 0 0 0 238.4976
9 2-Execution Inspection surface preparation by AIMD 39.75 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 39.75 59.62 1 1 119.2488 0 0 0 59.624 0 0 0 0 59.624 0 119.2488
11 2-Execution Overcoating interval HRSB 39.75 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 39.75 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 39.75 39.75 1 1 79.49921 0 0 0 39.75 0 0 0 0 39.75 0 79.49921
14 2-Execution Overcoating interval INSP 39.75 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 39.75 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 39.75 39.75 1 1 79.49921 0 0 0 39.75 0 0 0 0 39.75 0 79.49921
17 2-Execution Overcoating interval HRSB 39.75 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 39.75 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 2.27 4.5432 1 1 1 13.6296 0 4.5432 0 4.5432 0 0 4.5432 0 0 0 13.6296
22 2-Execution Inspection surface preparation by AIMD HRSB 2.27 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 2.27 3.41 1 1 6.8148 0 0 0 3.4074 0 0 0 0 3.4074 0 6.8148
24 2-Execution Overcoating interval HRSB 2.27 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 2.27 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 2.27 2.27 1 1 4.5432 0 0 0 2.2716 0 0 0 0 2.2716 0 4.5432
27 2-Execution Overcoating interval 2.27 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 2.27 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 2.27 2.27 1 1 4.5432 0 0 0 2.2716 0 0 0 0 2.2716 0 4.5432
30 2-Execution Overcoating interval 2.27 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 2.27 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation (PP CAGE) 24.17m2 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
273.11663 549.2757 0 85.042 0 233.12 0 0 84.042 0 147.07 0 549.2757

14''-CS-244018-1120A-NI
14"-CR-244022-1120A-NI,
12''-CS-2254271-1120A-NI
12"-CR-225265-1120A-NI,
15 IWL/BT2/2018/12 PAINTING
10''-CS-225269-1120A-NI
10"-CR-225263-1120A-NI,
2''-CS-225486-1120A-NI
2"-CR-225487-1120A-NI

1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0


2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 502.94 1005.8806 1 1 1 3017.642 0 1006 0 1006 0 0 1006 0 0 0 3017.642
9 2-Execution Inspection surface preparation by AIMD 502.94 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 502.94 754.41 1 1 1508.821 0 0 0 754.41 0 0 0 0 754.41 0 1508.821
11 2-Execution Overcoating interval HRSB 502.94 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 502.94 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 502.94 502.94 1 1 1005.881 0 0 0 502.94 0 0 0 0 502.94 0 1005.881
14 2-Execution Overcoating interval INSP 502.94 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 502.94 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 502.94 502.94 1 1 1005.881 0 0 0 502.94 0 0 0 0 502.94 0 1005.881
17 2-Execution Overcoating interval HRSB 502.94 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 502.94 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 93.29 186.5777 1 1 1 559.7331 0 186.58 0 186.58 0 0 186.58 0 0 0 559.7331
22 2-Execution Inspection surface preparation by AIMD HRSB 93.29 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 93.29 139.93 1 1 279.8666 0 0 0 139.93 0 0 0 0 139.93 0 279.8666
24 2-Execution Overcoating interval HRSB 93.29 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 93.29 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 93.29 93.29 1 1 186.5777 0 0 0 93.289 0 0 0 0 93.289 0 186.5777
27 2-Execution Overcoating interval 93.29 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 93.29 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 93.29 93.29 1 1 186.5777 0 0 0 93.289 0 0 0 0 93.289 0 186.5777
30 2-Execution Overcoating interval 93.29 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 93.29 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
3321.2603 7753.979 0 1193 0 3281 0 0 1192 0 2087 0 7753.979
16 IWR/BT2/2016/Dec/129 2''-PL-225079-1101A-ST PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 91.08m2 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting Pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 29.25 58.50 1 1 1 175.4897 0 58.497 0 58.497 0 0 58.497 0 0 0 175.4897
9 2-Execution Inspection surface preparation by AIMD 29.25 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 29.25 43.87 1 1 87.74487 0 0 0 43.872 0 0 0 0 43.872 0 87.74487
11 2-Execution Overcoating interval HRSB 29.25 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 29.25 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 29.25 29.25 1 1 58.49658 0 0 0 29.248 0 0 0 0 29.248 0 58.49658
14 2-Execution Overcoating interval INSP 29.25 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 29.25 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 29.25 29.25 1 1 58.49658 0 0 0 29.248 0 0 0 0 29.248 0 58.49658
17 2-Execution Overcoating interval HRSB 29.25 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 29.25 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting Pipe Support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 7.22 14.44 1 1 1 43.32 0 14.44 0 14.44 0 0 14.44 0 0 0 43.32
22 2-Execution Inspection surface preparation by AIMD HRSB 7.22 1 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
23 2-Execution Painting 1st coat INSP 7.22 10.83 1 1 21.66 0 0 0 10.83 0 0 0 0 10.83 0 21.66
24 2-Execution Overcoating interval HRSB 7.22 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 7.22 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 7.22 7.22 1 1 14.44 0 0 0 7.22 0 0 0 0 7.22 0 14.44
27 2-Execution Overcoating interval 7.22 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 7.22 1 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 7.22 7.22 1 1 14.44 0 0 0 7.22 0 0 0 0 7.22 0 14.44
30 2-Execution Overcoating interval 7.22 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 7.22 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation HRSB 91.08m2 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
242.57559 477.0878 0 73.937 0 202.58 0 0 72.937 0 127.64 0 477.0878
17 IWL/BT2/2018/6 1''-PG-225176-1101A-PG PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 14.10 28.203378 1 1 1 84.61013 0 28.203 0 28.203 0 0 28.203 0 0 0 84.61013
9 2-Execution Inspection surface preparation by AIMD 14.10 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 14.10 21.15 1 1 42.30507 0 0 0 21.153 0 0 0 0 21.153 0 42.30507
11 2-Execution Overcoating interval HRSB 14.10 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 14.10 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 14.10 14.10 1 1 28.20338 0 0 0 14.102 0 0 0 0 14.102 0 28.20338
14 2-Execution Overcoating interval INSP 14.10 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 14.10 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 14.10 14.10 1 1 28.20338 0 0 0 14.102 0 0 0 0 14.102 0 28.20338
17 2-Execution Overcoating interval HRSB 14.10 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 14.10 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side )/ To 3 1 0
reinstate pipe support to its original position INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 2.32 4.64 1 1 1 13.92 0 4.64 0 4.64 0 0 4.64 0 0 0 13.92
21 2-Execution Inspection surface preparation by AIMD HRSB 2.32 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 2.32 3.48 1 1 6.96 0 0 0 3.48 0 0 0 0 3.48 0 6.96
23 2-Execution Overcoating interval HRSB 2.32 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 2.32 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 2.32 2.32 1 1 4.64 0 0 0 2.32 0 0 0 0 2.32 0 4.64
26 2-Execution Overcoating interval 2.32 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 2.32 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 2.32 2.32 1 1 4.64 0 0 0 2.32 0 0 0 0 2.32 0 4.64
29 2-Execution Overcoating interval 2.32 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 2.32 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 2.32 0.7656 1 1 1.5312 0 0.7656 0 0.7656 0 0 0 0 0 0 1.5312
32 2-Execution Surface preparation (Power tool) 2.32 4.64 1 1 1 13.92 0 4.64 0 4.64 0 0 4.64 0 0 0 13.92
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
44 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
137.72489 231.9332 0 39.249 0 97.725 0 0 37.483 0 57.476 0 231.9332
8''-BD-226060-1101A-NI
18 IWL/BT2/2018/145 PAINTING
8"-BD-226059-1101A--NI
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 15.49 30.978549 1 1 1 92.93565 0 30.979 0 30.979 0 0 30.979 0 0 0 92.93565
9 2-Execution Inspection surface preparation by AIMD 15.49 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 15.49 23.23 1 1 46.46782 0 0 0 23.234 0 0 0 0 23.234 0 46.46782
11 2-Execution Overcoating interval HRSB 15.49 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 15.49 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 15.49 15.49 1 1 30.97855 0 0 0 15.489 0 0 0 0 15.489 0 30.97855
14 2-Execution Overcoating interval INSP 15.49 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 15.49 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 15.49 15.49 1 1 30.97855 0 0 0 15.489 0 0 0 0 15.489 0 30.97855
17 2-Execution Overcoating interval HRSB 15.49 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 15.49 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution To reinstate pipe support to its original position / Insert round bar 3 1 0
0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 1.24 2.4710612 1 1 1 7.413184 0 2.4711 0 2.4711 0 0 2.4711 0 0 0 7.413184
22 2-Execution Inspection surface preparation by AIMD HRSB 1.24 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 1.24 1.85 1 1 3.706592 0 0 0 1.8533 0 0 0 0 1.8533 0 3.706592
24 2-Execution Overcoating interval HRSB 1.24 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 1.24 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 1.24 1.24 1 1 2.471061 0 0 0 1.2355 0 0 0 0 1.2355 0 2.471061
27 2-Execution Overcoating interval 1.24 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 1.24 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 1.24 1.24 1 1 2.471061 0 0 0 1.2355 0 0 0 0 1.2355 0 2.471061
30 2-Execution Overcoating interval 1.24 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 1.24 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 1 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
133.98643 220.4225 0 34.45 0 93.986 0 0 33.45 0 58.537 0 220.4225
19 IWR/BT3/FY2018/512 16''-PL-291020-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 30.47 60.945208 1 1 1 182.8356 0 60.945 0 60.945 0 0 60.945 0 0 0 182.8356
9 2-Execution Inspection surface preparation by AIMD 30.47 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 30.47 45.71 1 1 91.41781 0 0 0 45.709 0 0 0 0 45.709 0 91.41781
11 2-Execution Overcoating interval HRSB 30.47 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 30.47 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 30.47 30.47 1 1 60.94521 0 0 0 30.473 0 0 0 0 30.473 0 60.94521
14 2-Execution Overcoating interval INSP 30.47 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 30.47 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 30.47 30.47 1 1 60.94521 0 0 0 30.473 0 0 0 0 30.473 0 60.94521
17 2-Execution Overcoating interval HRSB 30.47 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 30.47 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side )/ To 0 1 1 0
reinstate pipe support to its original position INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 6.124 12.248 1 1 1 36.744 0 12.248 0 12.248 0 0 12.248 0 0 0 36.744
21 2-Execution Inspection surface preparation by AIMD HRSB 6.124 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 6.124 9.19 1 1 18.372 0 0 0 9.186 0 0 0 0 9.186 0 18.372
23 2-Execution Overcoating interval HRSB 6.124 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 6.124 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 6.124 6.12 1 1 12.248 0 0 0 6.124 0 0 0 0 6.124 0 12.248
26 2-Execution Overcoating interval 6.124 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 6.124 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 6.124 6.12 1 1 12.248 0 0 0 6.124 0 0 0 0 6.124 0 12.248
29 2-Execution Overcoating interval 6.124 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 6.124 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
242.28132 477.7559 0 74.193 0 202.28 0 0 73.193 0 128.09 0 477.7559
20 IWR/BT3/FY2018/524 4''-PL-291014-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 16.81 33.62 1 1 1 100.86 0 33.62 0 33.62 0 0 33.62 0 0 0 100.86
9 2-Execution Inspection surface preparation by AIMD 16.81 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 16.81 25.22 1 1 50.43 0 0 0 25.215 0 0 0 0 25.215 0 50.43
11 2-Execution Overcoating interval HRSB 16.81 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 16.81 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 16.81 16.81 1 1 33.62 0 0 0 16.81 0 0 0 0 16.81 0 33.62
14 2-Execution Overcoating interval INSP 16.81 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 16.81 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 16.81 16.81 1 1 33.62 0 0 0 16.81 0 0 0 0 16.81 0 33.62
17 2-Execution Overcoating interval HRSB 16.81 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 16.81 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 8 2.64 1 1 5.28 0 2.64 0 2.64 0 0 0 0 0 0 5.28
20 2-Execution To reinstate pipe support to its original position 1 2 3 1 8 0 6 0 2 0 0 0 0 0 0 8
21 2-Execution Surface preparation (Power tool) HRSB 2.372 4.744 1 1 1 14.232 0 4.744 0 4.744 0 0 4.744 0 0 0 14.232
22 2-Execution Inspection surface preparation by AIMD HRSB 2.372 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 2.372 3.56 1 1 7.116 0 0 0 3.558 0 0 0 0 3.558 0 7.116
24 2-Execution Overcoating interval HRSB 2.372 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 2.372 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 2.372 2.37 1 1 4.744 0 0 0 2.372 0 0 0 0 2.372 0 4.744
27 2-Execution Overcoating interval 2.372 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 2.372 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 2.372 2.37 1 1 4.744 0 0 0 2.372 0 0 0 0 2.372 0 4.744
30 2-Execution Overcoating interval 2.372 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 2.372 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 8 2.64 1 1 5.28 0 2.64 0 2.64 0 0 0 0 0 0 5.28
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 8 2.64 1 1 5.28 0 2.64 0 2.64 0 0 0 0 0 0 5.28
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Remove & install handle valve - 1 unit 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
157.421 276.206 0 53.284 0 117.42 0 0 38.364 0 67.137 0 276.206
21 IWR/BT3/FY2018/564 12''-PL-291012-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 8.07 16.141135 1 1 1 48.4234 0 16.141 0 16.141 0 0 16.141 0 0 0 48.4234
9 2-Execution Inspection surface preparation by AIMD 8.07 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 8.07 12.11 1 1 24.2117 0 0 0 12.106 0 0 0 0 12.106 0 24.2117
11 2-Execution Overcoating interval HRSB 8.07 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 8.07 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 8.07 8.07 1 1 16.14113 0 0 0 8.0706 0 0 0 0 8.0706 0 16.14113
14 2-Execution Overcoating interval INSP 8.07 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 8.07 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 8.07 8.07 1 1 16.14113 0 0 0 8.0706 0 0 0 0 8.0706 0 16.14113
17 2-Execution Overcoating interval HRSB 8.07 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 8.07 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side )/ To 0 1 1 0
reinstate pipe support to its original position INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
20 2-Execution Surface preparation (Power tool) HRSB 0.64 1.2726183 1 1 1 3.817855 0 1.2726 0 1.2726 0 0 1.2726 0 0 0 3.817855
21 2-Execution Inspection surface preparation by AIMD HRSB 0.64 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 0.64 0.95 1 1 1.908927 0 0 0 0.9545 0 0 0 0 0.9545 0 1.908927
23 2-Execution Overcoating interval HRSB 0.64 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 0.64 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 0.64 0.64 1 1 1.272618 0 0 0 0.6363 0 0 0 0 0.6363 0 1.272618
26 2-Execution Overcoating interval 0.64 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 0.64 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 0.64 0.64 1 1 1.272618 0 0 0 0.6363 0 0 0 0 0.6363 0 1.272618
29 2-Execution Overcoating interval 0.64 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 0.64 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 11.33 1 1 22.66 0 11.33 0 11.33 0 0 0 0 0 0 22.66
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 11.33 1 1 22.66 0 11.33 0 11.33 0 0 0 0 0 0 22.66
44 2-Execution To apply silicone sealant- 3 nos Gate Valve 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
112.54782 161.5094 0 41.074 0 72.548 0 0 17.414 0 30.474 0 161.5094
22 IWR/BT3/FY2018/565 12''-PL-291011-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 20.23 40.46 1 1 1 121.38 0 40.46 0 40.46 0 0 40.46 0 0 0 121.38
9 2-Execution Inspection surface preparation by AIMD 20.23 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 20.23 30.35 1 1 60.69 0 0 0 30.345 0 0 0 0 30.345 0 60.69
11 2-Execution Overcoating interval HRSB 20.23 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 20.23 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 20.23 20.23 1 1 40.46 0 0 0 20.23 0 0 0 0 20.23 0 40.46
14 2-Execution Overcoating interval INSP 20.23 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 20.23 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 20.23 20.23 1 1 40.46 0 0 0 20.23 0 0 0 0 20.23 0 40.46
17 2-Execution Overcoating interval HRSB 20.23 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 20.23 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution reinstate pipe support to its original position 0 1 1 0
INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 3.44 6.88 1 1 1 20.64 0 6.88 0 6.88 0 0 6.88 0 0 0 20.64
21 2-Execution Inspection surface preparation by AIMD HRSB 3.44 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 3.44 5.16 1 1 10.32 0 0 0 5.16 0 0 0 0 5.16 0 10.32
23 2-Execution Overcoating interval HRSB 3.44 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 3.44 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 3.44 3.44 1 1 6.88 0 0 0 3.44 0 0 0 0 3.44 0 6.88
26 2-Execution Overcoating interval 3.44 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 3.44 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 3.44 3.44 1 1 6.88 0 0 0 3.44 0 0 0 0 3.44 0 6.88
29 2-Execution Overcoating interval 3.44 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 3.44 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
46 2-Execution Housekeeping 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
172.185 311.71 0 49.34 0 132.19 0 0 47.34 0 82.845 0 311.71
23 IWR/BT3/FY2018/567 4''-PL-291025-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 4.13 8.26 1 1 1 24.78 0 8.26 0 8.26 0 0 8.26 0 0 0 24.78
9 2-Execution Inspection surface preparation by AIMD 4.13 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 4.13 6.20 1 1 12.39 0 0 0 6.195 0 0 0 0 6.195 0 12.39
11 2-Execution Overcoating interval HRSB 4.13 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 4.13 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 4.13 4.13 1 1 8.26 0 0 0 4.13 0 0 0 0 4.13 0 8.26
14 2-Execution Overcoating interval INSP 4.13 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 4.13 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 4.13 4.13 1 1 8.26 0 0 0 4.13 0 0 0 0 4.13 0 8.26
17 2-Execution Overcoating interval HRSB 4.13 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 4.13 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution reinstate pipe support to its original position 2 3 1 8
INSP HRSB 0 6 0 2 0 0 0 0 0 0 8
20 2-Execution Surface preparation (Power tool) HRSB 0.99 1.98 1 1 1 5.94 0 1.98 0 1.98 0 0 1.98 0 0 0 5.94
21 2-Execution Inspection surface preparation by AIMD HRSB 0.99 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 0.99 1.49 1 1 2.97 0 0 0 1.485 0 0 0 0 1.485 0 2.97
23 2-Execution Overcoating interval HRSB 0.99 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 0.99 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 0.99 0.99 1 1 1.98 0 0 0 0.99 0 0 0 0 0.99 0 1.98
26 2-Execution Overcoating interval 0.99 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 0.99 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 0.99 0.99 1 1 1.98 0 0 0 0.99 0 0 0 0 0.99 0 1.98
29 2-Execution Overcoating interval 0.99 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 0.99 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
44 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
72.16 77.56 0 17.24 0 32.16 0 0 10.24 0 17.92 0 77.56
24 IWL/BT3/FY2018/574 10''-PL-292600--1101ANI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) HRSB 8.8 17.6 1 1 1 52.8 0 17.6 0 17.6 0 0 17.6 0 0 0 52.8
9 2-Execution Inspection surface preparation by AIMD 8.8 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 8.8 13.2 1 1 26.4 0 0 0 13.2 0 0 0 0 13.2 0 26.4
11 2-Execution Overcoating interval HRSB 8.8 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 8.8 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 8.8 8.8 1 1 17.6 0 0 0 8.8 0 0 0 0 8.8 0 17.6
14 2-Execution Overcoating interval INSP 8.8 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 8.8 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 8.8 8.8 1 1 17.6 0 0 0 8.8 0 0 0 0 8.8 0 17.6
17 2-Execution Overcoating interval HRSB 8.8 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 8.8 1 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 23 7.59 1 1 15.18 0 7.59 0 7.59 0 0 0 0 0 0 15.18
20 2-Execution Surface preparation (Power tool) HRSB 0.92 12.14 1 1 1 36.42 0 12.14 0 12.14 0 0 12.14 0 0 0 36.42
21 2-Execution Inspection surface preparation by AIMD HRSB 0.92 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 0.92 9.105 1 1 18.21 0 0 0 9.105 0 0 0 0 9.105 0 18.21
23 2-Execution Overcoating interval HRSB 0.92 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 0.92 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 0.92 6.07 1 1 12.14 0 0 0 6.07 0 0 0 0 6.07 0 12.14
26 2-Execution Overcoating interval 0.92 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 0.92 1 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 0.92 6.07 1 1 12.14 0 0 0 6.07 0 0 0 0 6.07 0 12.14
29 2-Execution Overcoating interval 0.92 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 0.92 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) HRSB 23 7.59 1 1 15.18 0 7.59 0 7.59 0 0 0 0 0 0 15.18
32 2-Execution Surface preparation (Power tool) 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
40 2-Execution Painting final coat 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe HRSB 23 7.59 1 1 15.18 0 7.59 0 7.59 0 0 0 0 0 0 15.18
44 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Re instate Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Demobilization HRSB 0 0 0 0 0 0 0 0 0 0 0 0
146.555 241.85 0 53.51 0 106.56 0 0 29.74 0 52.045 0 241.85
25 IWR/BT3/FY2018/604 12''-PL-291007-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 43.92 87.84 1 1 1 263.52 0 87.84 0 87.84 0 0 87.84 0 0 0 263.52
9 2-Execution Inspection surface preparation by AIMD 43.92 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 43.92 65.88 1 1 131.76 0 0 0 65.88 0 0 0 0 65.88 0 131.76
11 2-Execution Overcoating interval HRSB 43.92 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 43.92 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 43.92 43.92 1 1 87.84 0 0 0 43.92 0 0 0 0 43.92 0 87.84
14 2-Execution Overcoating interval INSP 43.92 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 43.92 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 43.92 43.92 1 1 87.84 0 0 0 43.92 0 0 0 0 43.92 0 87.84
17 2-Execution Overcoating interval HRSB 43.92 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 43.92 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution 0 1 1 0
reinstate pipe support to its original position INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 6.12 12.24 1 1 1 36.72 0 12.24 0 12.24 0 0 12.24 0 0 0 36.72
21 2-Execution Inspection surface preparation by AIMD HRSB 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 6.12 9.18 1 1 18.36 0 0 0 9.18 0 0 0 0 9.18 0 18.36
23 2-Execution Overcoating interval HRSB 6.12 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 6.12 6.12 1 1 12.24 0 0 0 6.12 0 0 0 0 6.12 0 12.24
26 2-Execution Overcoating interval 6.12 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 6.12 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 6.12 6.12 1 1 12.24 0 0 0 6.12 0 0 0 0 6.12 0 12.24
29 2-Execution Overcoating interval 6.12 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Remove & install handle valve - 1 unit 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
316.22 652.52 0 101.08 0 276.22 0 0 100.08 0 175.14 0 652.52
26 IWR/BT3/FY2018/659 3''-HN-292011-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 2.3 4.6 1 1 1 13.8 0 4.6 0 4.6 0 0 4.6 0 0 0 13.8
9 2-Execution Inspection surface preparation by AIMD 2.3 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 2.3 3.45 1 1 6.9 0 0 0 3.45 0 0 0 0 3.45 0 6.9
11 2-Execution Overcoating interval HRSB 2.3 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 2.3 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 2.3 2.30 1 1 4.6 0 0 0 2.3 0 0 0 0 2.3 0 4.6
14 2-Execution Overcoating interval INSP 2.3 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 2.3 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 2.3 2.30 1 1 4.6 0 0 0 2.3 0 0 0 0 2.3 0 4.6
17 2-Execution Overcoating interval HRSB 2.3 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 2.3 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side )/ To 34 11.33 1 1 22.66
reinstate pipe support to its original position INSP HRSB 0 11.33 0 11.33 0 0 0 0 0 0 22.66
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
20 2-Execution Surface preparation (Power tool) HRSB 18.46 36.92 1 1 1 110.76 0 36.92 0 36.92 0 0 36.92 0 0 0 110.76
21 2-Execution Inspection surface preparation by AIMD HRSB 18.46 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 18.46 27.69 1 1 55.38 0 0 0 27.69 0 0 0 0 27.69 0 55.38
23 2-Execution Overcoating interval HRSB 18.46 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 18.46 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 18.46 18.46 1 1 36.92 0 0 0 18.46 0 0 0 0 18.46 0 36.92
26 2-Execution Overcoating interval 18.46 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 18.46 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 18.46 18.46 1 1 36.92 0 0 0 18.46 0 0 0 0 18.46 0 36.92
29 2-Execution Overcoating interval 18.46 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 18.46 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 34 11.33 1 1 22.66 0 11.33 0 11.33 0 0 0 0 0 0 22.66
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 34 11.33 1 1 22.66 0 11.33 0 11.33 0 0 0 0 0 0 22.66
44 2-Execution To apply silicone sealant- 3 nos Gate Valve 3 0.75 1 0.75 0 0.75 0 0 0 0 0 0 0 0 0.75
45 2-Execution Remove & install handle valve - 1 unit 1 0.5 1 1 1 0 0.5 0 0.5 0 0 0 0 0 0 1
46 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
191.42 342.61 0 77.76 0 150.67 0 0 41.52 0 72.66 0 342.61
27 IWR/BT3/FY2018/696 16''-PL-291020-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 27.98 55.96 1 1 1 167.88 0 55.96 0 55.96 0 0 55.96 0 0 0 167.88
9 2-Execution Inspection surface preparation by AIMD 27.98 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 27.98 41.97 1 1 83.94 0 0 0 41.97 0 0 0 0 41.97 0 83.94
11 2-Execution Overcoating interval HRSB 27.98 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 27.98 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 27.98 27.98 1 1 55.96 0 0 0 27.98 0 0 0 0 27.98 0 55.96
14 2-Execution Overcoating interval INSP 27.98 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 27.98 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 27.98 27.98 1 1 55.96 0 0 0 27.98 0 0 0 0 27.98 0 55.96
17 2-Execution Overcoating interval HRSB 27.98 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 27.98 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution reinstate pipe support to its original position 0 1 1 0
INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 6.12 12.24 1 1 1 36.72 0 12.24 0 12.24 0 0 12.24 0 0 0 36.72
21 2-Execution Inspection surface preparation by AIMD HRSB 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 6.12 9.18 1 1 18.36 0 0 0 9.18 0 0 0 0 9.18 0 18.36
23 2-Execution Overcoating interval HRSB 6.12 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 6.12 6.12 1 1 12.24 0 0 0 6.12 0 0 0 0 6.12 0 12.24
26 2-Execution Overcoating interval 6.12 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 6.12 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 6.12 6.12 1 1 12.24 0 0 0 6.12 0 0 0 0 6.12 0 12.24
29 2-Execution Overcoating interval 6.12 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 1.5 1 1.5 0 1.5 0 0 0 0 0 0 0 0 1.5
45 2-Execution Remove & install handle valve - 1 unit 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Housekeeping 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
230.05 446.8 0 70.7 0 188.55 0 0 68.2 0 119.35 0 446.8
28 IWR/BT3/FY2018/722 4''-PL-291024-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 5.34 10.68 1 1 1 32.04 0 10.68 0 10.68 0 0 10.68 0 0 0 32.04
9 2-Execution Inspection surface preparation by AIMD 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 5.34 8.01 1 1 16.02 0 0 0 8.01 0 0 0 0 8.01 0 16.02
11 2-Execution Overcoating interval HRSB 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 5.34 5.34 1 1 10.68 0 0 0 5.34 0 0 0 0 5.34 0 10.68
14 2-Execution Overcoating interval INSP 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 5.34 5.34 1 1 10.68 0 0 0 5.34 0 0 0 0 5.34 0 10.68
17 2-Execution Overcoating interval HRSB 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 3 0.99 1 1 1.98 0 0.99 0 0.99 0 0 0 0 0 0 1.98
20 2-Execution Surface preparation (Power tool) HRSB 1.2 2.4 1 1 1 7.2 0 2.4 0 2.4 0 0 2.4 0 0 0 7.2
21 2-Execution Inspection surface preparation by AIMD HRSB 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 1.2 1.80 1 1 3.6 0 0 0 1.8 0 0 0 0 1.8 0 3.6
23 2-Execution Overcoating interval HRSB 1.2 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 1.2 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 1.2 1.20 1 1 2.4 0 0 0 1.2 0 0 0 0 1.2 0 2.4
26 2-Execution Overcoating interval 1.2 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 1.2 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 1.2 1.20 1 1 2.4 0 0 0 1.2 0 0 0 0 1.2 0 2.4
29 2-Execution Overcoating interval 1.2 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 1.2 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 3 0.99 1 1 1.98 0 0.99 0 0.99 0 0 0 0 0 0 1.98
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 3 0.99 1 1 1.98 0 0.99 0 0.99 0 0 0 0 0 0 1.98
44 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
44 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
79.94 93.96 0 17.05 0 40.94 0 0 13.08 0 22.89 0 93.96
29 IWR/BT3/2019/227 6''-PL-294054-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 87.92 175.83383 1 1 1 527.5015 0 175.83 0 175.83 0 0 175.83 0 0 0 527.5015
9 2-Execution Inspection surface preparation by AIMD 87.92 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 87.92 131.88 1 1 263.7507 0 0 0 131.88 0 0 0 0 131.88 0 263.7507
11 2-Execution Overcoating interval HRSB 87.92 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 87.92 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 87.92 87.92 1 1 175.8338 0 0 0 87.917 0 0 0 0 87.917 0 175.8338
14 2-Execution Overcoating interval INSP 87.92 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 87.92 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 87.92 87.92 1 1 175.8338 0 0 0 87.917 0 0 0 0 87.917 0 175.8338
17 2-Execution Overcoating interval HRSB 87.92 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 87.92 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 119 39.27 1 1 78.54 0 39.27 0 39.27 0 0 0 0 0 0 78.54
20 2-Execution To reinstate pipe support to its original position / Insert round bar 1 2 3 1 8
0 6 0 2 0 0 0 0 0 0 8
21 2-Execution Surface preparation (Power tool) HRSB 59.11 118.2226 1 1 1 354.6678 0 118.22 0 118.22 0 0 118.22 0 0 0 354.6678
22 2-Execution Inspection surface preparation by AIMD HRSB 59.11 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 59.11 88.67 1 1 177.3339 0 0 0 88.667 0 0 0 0 88.667 0 177.3339
24 2-Execution Overcoating interval HRSB 59.11 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 59.11 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 59.11 59.11 1 1 118.2226 0 0 0 59.111 0 0 0 0 59.111 0 118.2226
27 2-Execution Overcoating interval 59.11 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 59.11 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 59.11 59.11 1 1 118.2226 0 0 0 59.111 0 0 0 0 59.111 0 118.2226
30 2-Execution Overcoating interval 59.11 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 59.11 1 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Cutting round bar at pipe support 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Install & welding new round bar at pipe support 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 119 39.27 1 1 78.54 0 39.27 0 39.27 0 0 0 0 0 0 78.54
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 119 39.27 1 1 78.54 0 39.27 0 39.27 0 0 0 0 0 0 78.54
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution To replace stainless steel bolting 2 0.67 1 1 1.333333 0 0.6667 0 0.6667 0 0 0 0 0 0 1.333333
47 2-Execution Remove & Install new U-bolt 12'' 1 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
972.13186 2161.32 0 420.53 0 932.13 0 0 294.06 0 514.6 0 2161.32
30 IWR/BT3/2019/223 4''-PL-291022-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 142.42 284.84 1 1 1 854.52 0 284.84 0 284.84 0 0 284.84 0 0 0 854.52
9 2-Execution Inspection surface preparation by AIMD 142.42 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 142.42 213.63 1 1 427.26 0 0 0 213.63 0 0 0 0 213.63 0 427.26
11 2-Execution Overcoating interval HRSB 142.42 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 142.42 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 142.42 142.42 1 1 284.84 0 0 0 142.42 0 0 0 0 142.42 0 284.84
14 2-Execution Overcoating interval INSP 142.42 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 142.42 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 142.42 142.42 1 1 284.84 0 0 0 142.42 0 0 0 0 142.42 0 284.84
17 2-Execution Overcoating interval HRSB 142.42 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 142.42 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 59 19.47 1 1 38.94 0 19.47 0 19.47 0 0 0 0 0 0 38.94
20 2-Execution To reinstate pipe support to its original position 1 2 3 1 8 0 6 0 2 0 0 0 0 0 0 8
21 2-Execution Surface preparation (Power tool) HRSB 5.8 11.6 1 1 1 34.8 0 11.6 0 11.6 0 0 11.6 0 0 0 34.8
22 2-Execution Inspection surface preparation by AIMD HRSB 5.8 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 5.8 8.70 1 1 17.4 0 0 0 8.7 0 0 0 0 8.7 0 17.4
24 2-Execution Overcoating interval HRSB 5.8 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 5.8 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 5.8 5.80 1 1 11.6 0 0 0 5.8 0 0 0 0 5.8 0 11.6
27 2-Execution Overcoating interval 5.8 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 5.8 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 5.8 5.80 1 1 11.6 0 0 0 5.8 0 0 0 0 5.8 0 11.6
30 2-Execution Overcoating interval 5.8 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 5.8 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 59 19.47 1 1 38.94 0 19.47 0 19.47 0 0 0 0 0 0 38.94
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 59 19.47 1 1 38.94 0 19.47 0 19.47 0 0 0 0 0 0 38.94
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Remove & install handle valve - 1 unit 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
917.62 2054.68 0 361.85 0 877.62 0 0 296.44 0 518.77 0 2054.68
31 IWR/BT3/2019/222 3''-PL-294340-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 7.03 14.051912 0 0 0 0 0 0 0 0 0 0 0 0
9 2-Execution Inspection surface preparation by AIMD 7.03 1 1 1 1 3 0 1 0 1 0 0 1 0 0 0 3
10 2-Execution Painting 1st coat INSP 7.03 10.54 1 1 21.07787 0 0 0 10.539 0 0 0 0 10.539 0 21.07787
11 2-Execution Overcoating interval HRSB 7.03 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 7.03 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 7.03 7.03 1 1 14.05191 0 0 0 7.026 0 0 0 0 7.026 0 14.05191
14 2-Execution Overcoating interval INSP 7.03 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 7.03 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 7.03 7.03 1 1 14.05191 0 0 0 7.026 0 0 0 0 7.026 0 14.05191
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
17 2-Execution Overcoating interval HRSB 7.03 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 7.03 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 18 5.94 1 1 11.88 0 5.94 0 5.94 0 0 0 0 0 0 11.88
20 2-Execution Surface preparation (Power tool) HRSB 2.39 4.78 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Inspection surface preparation by AIMD HRSB 2.39 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 2.39 3.585 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Overcoating interval HRSB 2.39 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 2.39 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 2.39 2.39 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Overcoating interval 2.39 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 2.39 1 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 2.39 2.39 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Overcoating interval 2.39 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 2.39 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 18 5.94 1 1 11.88 0 5.94 0 5.94 0 0 0 0 0 0 11.88
32 2-Execution Surface preparation (Power tool) 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 18 5.94 1 1 11.88 0 5.94 0 5.94 0 0 0 0 0 0 11.88
44 Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
111.60776 90.82169 0 19.82 0 45.411 0 0 1 0 24.591 0 90.82169
32 IWR/BT3/2019/206 3''-PL-294055-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 2.25 4.50 1 1 1 13.49928 0 4.4998 0 4.4998 0 0 4.4998 0 0 0 13.49928
9 2-Execution Inspection surface preparation by AIMD 2.25 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 2.25 3.37 1 1 6.749638 0 0 0 3.3748 0 0 0 0 3.3748 0 6.749638
11 2-Execution Overcoating interval HRSB 2.25 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 2.25 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 2.25 2.25 1 1 4.499758 0 0 0 2.2499 0 0 0 0 2.2499 0 4.499758
14 2-Execution Overcoating interval INSP 2.25 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 2.25 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 2.25 2.25 1 1 4.499758 0 0 0 2.2499 0 0 0 0 2.2499 0 4.499758
17 2-Execution Overcoating interval HRSB 2.25 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 2.25 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 27 8.91 1 1 17.82 0 8.91 0 8.91 0 0 0 0 0 0 17.82
20 2-Execution To reinstate pipe support to its original position 1 2 3 1 8 0 6 0 2 0 0 0 0 0 0 8
21 2-Execution Surface preparation (Power tool) HRSB 10.51 21.02 1 1 1 63.048 0 21.016 0 21.016 0 0 21.016 0 0 0 63.048
22 2-Execution Inspection surface preparation by AIMD HRSB 10.51 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 10.51 15.76 1 1 31.524 0 0 0 15.762 0 0 0 0 15.762 0 31.524
24 2-Execution Overcoating interval HRSB 10.51 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 10.51 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 10.51 10.51 1 1 21.016 0 0 0 10.508 0 0 0 0 10.508 0 21.016
27 2-Execution Overcoating interval 10.51 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 10.51 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 10.51 10.51 1 1 21.016 0 0 0 10.508 0 0 0 0 10.508 0 21.016
30 2-Execution Overcoating interval 10.51 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 10.51 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 27 8.91 1 1 17.82 0 8.91 0 8.91 0 0 0 0 0 0 17.82
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 27 8.91 1 1 17.82 0 8.91 0 8.91 0 0 0 0 0 0 17.82
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Remove & install spring support - 1 unit 1 2 1 1 4 0 2 0 2 0 0 0 0 0 0 4
47 2-Execution To replace and install new new bolt - 1 unit 1 0.5 1 1 1 0 0.5 0 0.5 0 0 0 0 0 0 1
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
143.39834 235.3124 0 61.746 0 103.4 0 0 25.516 0 44.653 0 235.3124
33 IWR/BT3/2019/181 20''-PL-292673-1101A-NI PAINTING

Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 7.89 15.78 1 1 1 47.34 0 15.78 0 15.78 0 0 15.78 0 0 0 47.34
9 2-Execution Inspection surface preparation by AIMD 7.89 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 7.89 11.84 1 1 23.67 0 0 0 11.835 0 0 0 0 11.835 0 23.67
11 2-Execution Overcoating interval HRSB 7.89 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 7.89 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 7.89 7.89 1 1 15.78 0 0 0 7.89 0 0 0 0 7.89 0 15.78
14 2-Execution Overcoating interval INSP 7.89 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 7.89 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 7.89 7.89 1 1 15.78 0 0 0 7.89 0 0 0 0 7.89 0 15.78
17 2-Execution Overcoating interval HRSB 7.89 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 7.89 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 72 23.76 1 1 47.52 0 23.76 0 23.76 0 0 0 0 0 0 47.52
20 2-Execution To reinstate pipe support to its original position 1 2 3 1 8 0 6 0 2 0 0 0 0 0 0 8
21 2-Execution Surface preparation (Power tool) HRSB 16.37 32.74 1 1 1 98.22 0 32.74 0 32.74 0 0 32.74 0 0 0 98.22
22 2-Execution Inspection surface preparation by AIMD HRSB 16.37 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 16.37 24.56 1 1 49.11 0 0 0 24.555 0 0 0 0 24.555 0 49.11
24 2-Execution Overcoating interval HRSB 16.37 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 16.37 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 16.37 16.37 1 1 32.74 0 0 0 16.37 0 0 0 0 16.37 0 32.74
27 2-Execution Overcoating interval 16.37 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 16.37 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 16.37 16.37 1 1 32.74 0 0 0 16.37 0 0 0 0 16.37 0 32.74
30 2-Execution Overcoating interval 16.37 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 16.37 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 72 23.76 1 1 47.52 0 23.76 0 23.76 0 0 0 0 0 0 47.52
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 72 23.76 1 1 47.52 0 23.76 0 23.76 0 0 0 0 0 0 47.52
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution To install sleeve cover 4 1 1 8 0 4 0 4 0 0 0 0 0 0 8
47 2-Execution Too remove steel wire 0.5 1 0.5 0 0 0 0.5 0 0 0 0 0 0 0.5
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
253.21 477.44 0 130.8 0 213.21 0 0 48.52 0 84.91 0 477.44
34 IWR/BT3/2019/146 6''-PL-294052-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 87.48 174.95273 1 1 1 524.8582 0 175 0 175 0 0 175 0 0 0 524.8582
9 2-Execution Inspection surface preparation by AIMD 87.48 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 87.48 131.21 1 1 262.4291 0 0 0 131.21 0 0 0 0 131.21 0 262.4291
11 2-Execution Overcoating interval HRSB 87.48 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 87.48 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 87.48 87.48 1 1 174.9527 0 0 0 87.476 0 0 0 0 87.476 0 174.9527
14 2-Execution Overcoating interval INSP 87.48 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 87.48 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 87.48 87.48 1 1 174.9527 0 0 0 87.476 0 0 0 0 87.476 0 174.9527
17 2-Execution Overcoating interval HRSB 87.48 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 87.48 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 39 12.87 1 1 25.74 0 12.87 0 12.87 0 0 0 0 0 0 25.74
20 2-Execution To reinstate pipe support to its original position 0 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 6.52 13.0408 1 1 1 39.1224 0 13.041 0 13.041 0 0 13.041 0 0 0 39.1224
22 2-Execution Inspection surface preparation by AIMD HRSB 6.52 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 6.52 9.78 1 1 19.5612 0 0 0 9.7806 0 0 0 0 9.7806 0 19.5612
24 2-Execution Overcoating interval HRSB 6.52 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 6.52 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 6.52 6.52 1 1 13.0408 0 0 0 6.5204 0 0 0 0 6.5204 0 13.0408
27 2-Execution Overcoating interval 6.52 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 6.52 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 6.52 6.52 1 1 13.0408 0 0 0 6.5204 0 0 0 0 6.5204 0 13.0408
30 2-Execution Overcoating interval 6.52 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 6.52 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 39 12.87 1 1 25.74 0 12.87 0 12.87 0 0 0 0 0 0 25.74
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 39 12.87 1 1 25.74 0 12.87 0 12.87 0 0 0 0 0 0 25.74
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution To remove and install spring hanger 4 1 1 8 0 4 0 4 0 0 0 0 0 0 8
47 2-Execution Too remove steel wire 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
51 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
601.59219 1310.178 0 231.6 0 561.59 0 0 188 0 329 0 1310.178
35 IWR/BT3/2019/051 3''-PL-294008-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 29.94 59.872 1 1 1 179.616 0 59.872 0 59.872 0 0 59.872 0 0 0 179.616
9 2-Execution Inspection surface preparation by AIMD 29.94 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 29.94 44.90 1 1 89.808 0 0 0 44.904 0 0 0 0 44.904 0 89.808
11 2-Execution Overcoating interval HRSB 29.94 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 29.94 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 29.94 29.94 1 1 59.872 0 0 0 29.936 0 0 0 0 29.936 0 59.872
14 2-Execution Overcoating interval INSP 29.94 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 29.94 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 29.94 29.94 1 1 59.872 0 0 0 29.936 0 0 0 0 29.936 0 59.872
17 2-Execution Overcoating interval HRSB 29.94 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 29.94 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 16 5.28 1 1 10.56 0 5.28 0 5.28 0 0 0 0 0 0 10.56
20 2-Execution To reinstate pipe support to its original position 3 1 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 2.1 4.2 1 1 1 12.6 0 4.2 0 4.2 0 0 4.2 0 0 0 12.6
22 2-Execution Inspection surface preparation by AIMD HRSB 2.1 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat INSP 2.1 3.15 1 1 6.3 0 0 0 3.15 0 0 0 0 3.15 0 6.3
24 2-Execution Overcoating interval HRSB 2.1 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD 2.1 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 2.1 2.10 1 1 4.2 0 0 0 2.1 0 0 0 0 2.1 0 4.2
27 2-Execution Overcoating interval 2.1 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD 2.1 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 2.1 2.10 1 1 4.2 0 0 0 2.1 0 0 0 0 2.1 0 4.2
30 2-Execution Overcoating interval 2.1 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD 2.1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 16 5.28 1 1 10.56 0 5.28 0 5.28 0 0 0 0 0 0 10.56
33 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Lift up pipe,remove wooden block & lift down pipe 16 5.28 1 1 10.56 0 5.28 0 5.28 0 0 0 0 0 0 10.56
45 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Remove & install spring support - 1 unit 1 2 1 1 4 0 2 0 2 0 0 0 0 0 0 4
47 2-Execution To service gate valve - 1 unit 1 2 1 1 4 0 2 0 2 0 0 0 0 0 0 4
48 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
50 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
238.038 459.148 0 84.912 0 198 0 0 64.072 0 112.13 0 459.148
36 IWR/BT3/2019/027 12''-PL-291021-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 40.59 81.18 1 1 1 243.54 0 81.18 0 81.18 0 0 81.18 0 0 0 243.54
9 2-Execution Inspection surface preparation by AIMD 40.59 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 40.59 60.89 1 1 121.77 0 0 0 60.885 0 0 0 0 60.885 0 121.77
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
11 2-Execution Overcoating interval HRSB 40.59 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 40.59 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 40.59 40.59 1 1 81.18 0 0 0 40.59 0 0 0 0 40.59 0 81.18
14 2-Execution Overcoating interval INSP 40.59 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 40.59 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 40.59 40.59 1 1 81.18 0 0 0 40.59 0 0 0 0 40.59 0 81.18
17 2-Execution Overcoating interval HRSB 40.59 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 40.59 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
Lift up pipe & support pipe using wooden block (1st side )/ To
19 2-Execution reinstate pipe support to its original position 0 1 1 0
INSP HRSB 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 6.12 12.24 1 1 1 36.72 0 12.24 0 12.24 0 0 12.24 0 0 0 36.72
21 2-Execution Inspection surface preparation by AIMD HRSB 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 6.12 9.18 1 1 18.36 0 0 0 9.18 0 0 0 0 9.18 0 18.36
23 2-Execution Overcoating interval HRSB 6.12 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 6.12 6.12 1 1 12.24 0 0 0 6.12 0 0 0 0 6.12 0 12.24
26 2-Execution Overcoating interval 6.12 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 6.12 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 6.12 6.12 1 1 12.24 0 0 0 6.12 0 0 0 0 6.12 0 12.24
29 2-Execution Overcoating interval 6.12 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 6.12 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution To apply silicone sealant 0 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Replace new U-bolt -1/2'' 1 unit 0.16 1 0.16 0 0.16 0 0 0 0 0 0 0 0 0.16
46 2-Execution Housekeeping 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
47 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
48 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
49 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
298.065 609.39 0 94.58 0 257.91 0 0 93.42 0 163.49 0 609.39
37 IWR/BT3/2019/012 12''-PL-291013-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation INSP 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 12.67 25.34 1 1 1 76.02 0 25.34 0 25.34 0 0 25.34 0 0 0 76.02
9 2-Execution Inspection surface preparation by AIMD 12.67 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat INSP 12.67 19.01 1 1 38.01 0 0 0 19.005 0 0 0 0 19.005 0 38.01
11 2-Execution Overcoating interval HRSB 12.67 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 12.67 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 12.67 12.67 1 1 25.34 0 0 0 12.67 0 0 0 0 12.67 0 25.34
14 2-Execution Overcoating interval INSP 12.67 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 12.67 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 12.67 12.67 1 1 25.34 0 0 0 12.67 0 0 0 0 12.67 0 25.34
17 2-Execution Overcoating interval HRSB 12.67 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 12.67 1 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Lift up pipe & support pipe using wooden block (1st side ) INSP HRSB 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
20 2-Execution Surface preparation (Power tool) HRSB 2.01 4.02 1 1 1 12.06 0 4.02 0 4.02 0 0 4.02 0 0 0 12.06
21 2-Execution Inspection surface preparation by AIMD HRSB 2.01 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat INSP 2.01 3.02 1 1 6.03 0 0 0 3.015 0 0 0 0 3.015 0 6.03
23 2-Execution Overcoating interval HRSB 2.01 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD 2.01 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 2.01 2.01 1 1 4.02 0 0 0 2.01 0 0 0 0 2.01 0 4.02
26 2-Execution Overcoating interval 2.01 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution 2nd coat inspection by AIMD 2.01 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 2.01 2.01 1 1 4.02 0 0 0 2.01 0 0 0 0 2.01 0 4.02
29 2-Execution Overcoating interval 2.01 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD 2.01 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Lift up pipe & support pipe using wooden block (2nd side ) 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Lift up pipe,remove wooden block & lift down pipe 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0
44 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
44 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
45 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
122.74 193.84 0 30.36 0 82.74 0 0 29.36 0 51.38 0 193.84
38 IWL/BT3/FY2018/723 1"-SOP-292047-1105D-NI BOLTS AND NUTS REPLACEMENT
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Replace bolt and nuts HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Blinding as per EIS (above to 12" Nom Bore) If any HRSB 0 0 0 0 0 0 0 0 0 0 0 0
9 2-Execution Blinding as per EIS (above to 4" Nom Bore) If any HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (up to 4" Nom Bore) If any HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Inspection by PPTSB reps INSP PPTSB 1.00 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
12 2-Execution
Unbolt bolt and nuts 32mm x 24pcs A193G R.B7/A194GR.2H HRSB 2.00 0.33 1 1 0.666667 0 0.3333 0 0.3333 0 0 0 0 0 0 0.666667
13 2-Execution Apply molykote on bolts and nuts (32MM) X 24 PCS 1 0 0 0 0 0 0 0 0 0 0 0 0
14 2-Execution Tightening new bolts and nuts HRSB 2.00 0.33 1 1 0.666667 0 0.3333 0 0.3333 0 0 0 0 0 0 0.666667
15 2-Execution Inspection by PPTSB reps INSP PPTSB 1.00 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
16 2-Execution Deblinding as per EIS (above to 12" Nom Bore) If any HRSB 0 0 0 0 0 0 0 0 0 0 0 0
17 2-Execution Deblinding as per EIS (above to 4" Nom Bore) If any HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Deblinding as per EIS (up to 4" Nom Bore) If any HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
20 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
21 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
22 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
3.6666667 5.333333 0 1.6667 0 2.6667 1 0 0 0 0 0 5.333333
39 IWL/BT3/FY2018/587 3"-SOP-292215-1105D-NI BOLTS AND NUTS REPLACEMENT
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Replace bolt and nuts HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Blinding as per EIS (above to 12" Nom Bore) If any HRSB 0 0 0 0 0 0 0 0 0 0 0 0
9 2-Execution Blinding as per EIS (above to 4" Nom Bore) If any HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Blinding as per EIS (up to 4" Nom Bore) If any HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Inspection by PPTSB reps INSP PPTSB 1.00 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
12 2-Execution
Unbolt bolt and nuts 32mm x 48pcs A193G R.B7/A194GR.2H HRSB 2.00 0.67 1 1 1.333333 0 0.6667 0 0.6667 0 0 0 0 0 0 1.333333
13 2-Execution Apply molykote on bolts and nuts S.BOLT/HEX.NUT. #150 1 0 0 0 0 0 0 0 0 0 0 0 0
14 2-Execution Tightening new bolts and nuts HRSB 2.00 0.33 1 1 0.666667 0 0.3333 0 0.3333 0 0 0 0 0 0 0.666667
15 2-Execution Inspection by PPTSB reps INSP PPTSB 1.00 0.5 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0.5
16 2-Execution Deblinding as per EIS (above to 12" Nom Bore) If any HRSB 0 0 0 0 0 0 0 0 0 0 0 0
17 2-Execution Deblinding as per EIS (above to 4" Nom Bore) If any HRSB 2 1 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Deblinding as per EIS (up to 4" Nom Bore) If any HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
20 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
21 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
22 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
4 6 0 2 0 3 1 0 0 0 0 0 6
40 IWR/BT3/FY2018/690 1"-PL-291043-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 0.70 1.3963102 1 1 1 4.18893 0 1.3963 0 1.3963 0 0 1.3963 0 0 0 4.18893
9 2-Execution Inspection surface preparation by AIMD INSP 0.70 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat 0.70 1.05 1 1 2.094465 0 0 0 1.0472 0 0 0 0 1.0472 0 2.094465
11 2-Execution Overcoating interval HRSB 0.70 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 0.70 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 0.70 0.70 1 1 1.39631 0 0 0 0.6982 0 0 0 0 0.6982 0 1.39631
14 2-Execution Overcoating interval 0.70 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 0.70 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 0.70 0.70 1 1 1.39631 0 0 0 0.6982 0 0 0 0 0.6982 0 1.39631
17 2-Execution Overcoating interval HRSB 0.70 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 0.70 1 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 2.0 Painting pipe support HRSB 0 0 0 0 0 0 0 0 0 0 0 0


19 2-Execution Site preparation 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
20 2-Execution Surface preparation (Power tool) HRSB 0.06 0.12 1 1 1 0.36 0 0.12 0 0.12 0 0 0.12 0 0 0 0.36
21 2-Execution Inspection surface preparation by AIMD INSP HRSB 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Painting 1st coat 0.06 0.09 1 1 0.18 0 0 0 0.09 0 0 0 0 0.09 0 0.18
23 2-Execution Overcoating interval HRSB 0.06 8 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 1st coat inspection by AIMD INSP 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Painting 2nd coat 0.06 0.06 1 1 0.12 0 0 0 0.06 0 0 0 0 0.06 0 0.12
26 2-Execution Overcoating interval 0.06 4 0 0 0 0 0 0 0 0 0 0 0 0
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
27 2-Execution 2nd coat inspection by AIMD INSP 0.06 1.00 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Painting final coat 0.06 0.06 1 1 0.12 0 0 0 0.06 0 0 0 0 0.06 0 0.12
29 2-Execution Overcoating interval 0.06 4 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Final coat inspection by AIMD INSP 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
43 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
44 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
47.169853 14.85602 0 3.5163 0 7.1699 0 0 1.5163 0 2.6535 0 14.85602
41 IWR/BT3/FY2018/707 1"-PL-291045-1101A-NI PAINTING
1 1-Pre Execution a) Site Preparation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Mobilization manpower, equipment, tools & consumable HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Apply protection on others PPTSB assets equipment/cable/tag number and etc. HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Shelter/Laydown erection 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Scaffolding erection HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Remove Insulation HRSB 0 0 0 0 0 0 0 0 0 0 0 0
HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution b) During Project Activity HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 1.0 Painting pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 2-Execution Site preparation 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
8 2-Execution Surface preparation (Power tool) 0.63 1.2651317 1 1 1 3.795395 0 1.2651 0 1.2651 0 0 1.2651 0 0 0 3.795395
9 2-Execution Inspection surface preparation by AIMD INSP 0.63 1 0 0 0 0 0 0 0 0 0 0 0 0
10 2-Execution Painting 1st coat 0.63 0.95 1 1 1.897697 0 0 0 0.9488 0 0 0 0 0.9488 0 1.897697
11 2-Execution Overcoating interval HRSB 0.63 8 0 0 0 0 0 0 0 0 0 0 0 0
12 2-Execution 1st coat inspection by AIMD INSP 0.63 1 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Painting 2nd coat HRSB 0.63 0.63 1 1 1.265132 0 0 0 0.6326 0 0 0 0 0.6326 0 1.265132
14 2-Execution Overcoating interval 0.63 4 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution 2nd coat inspection by AIMD INSP 0.63 1 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Painting final coat HRSB 0.63 0.63 1 1 1.265132 0 0 0 0.6326 0 0 0 0 0.6326 0 1.265132
17 2-Execution Overcoating interval HRSB 0.63 4 0 0 0 0 0 0 0 0 0 0 0 0
18 2-Execution Final coat inspection by AIMD INSP 0.63 1 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting pipe support 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Site preparation 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
20 2-Execution Lift up pipe & support pipe using wooden block (1st side ) HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution Surface preparation (Power tool) HRSB 0.06 0.12 1 1 1 0.36 0 0.12 0 0.12 0 0 0.12 0 0 0 0.36
22 2-Execution Inspection surface preparation by AIMD INSP HRSB 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Painting 1st coat 0.06 0.09 1 1 0.18 0 0 0 0.09 0 0 0 0 0.09 0 0.18
24 2-Execution Overcoating interval HRSB 0.06 8 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution 1st coat inspection by AIMD INSP 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
26 2-Execution Painting 2nd coat 0.06 0.06 1 1 0.12 0 0 0 0.06 0 0 0 0 0.06 0 0.12
27 2-Execution Overcoating interval 0.06 4 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution 2nd coat inspection by AIMD INSP 0.06 1.00 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Painting final coat 0.06 0.06 1 1 0.12 0 0 0 0.06 0 0 0 0 0.06 0 0.12
30 2-Execution Overcoating interval 0.06 4 0 0 0 0 0 0 0 0 0 0 0 0
31 2-Execution Final coat inspection by AIMD INSP 0.06 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Surface preparation (Power tool) 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Inspection surface preparation by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution Painting 1st coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
36 2-Execution 1st coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Painting 2nd coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
39 2-Execution 2nd coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Painting final coat 0.00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Overcoating interval 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution Final coat inspection by AIMD 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Housekeeping 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
3-Post Execution C) Post execution 0 0 0 0 0 0 0 0 0 0 0 0
44 3-Post Execution Re instate Insulation 0 0 0 0 0 0 0 0 0 0 0 0
45 3-Post Execution Dismantle External Scaffolding 0 0 0 0 0 0 0 0 0 0 0 0
46 3-Post Execution Demobilization 0 0 0 0 0 0 0 0 0 0 0 0
46.809112 14.00336 0 3.3851 0 6.8091 0 0 1.3851 0 2.424 0 14.00336

STRUCTURE

1 IWR/BT2/2016/Nov/107 HANDRAIL PIPE REPLACEMENT & PAINTING


1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Spool fabrication, NDT Inspection by AIMD at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Perform HT and Withness by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Perform blasting and painting on new spool HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Painting inspection by AIMD INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Handrail pipe replacement HRSB 0 0 0 0 0 0 0 0 0 0 0 0


19 2-Execution Site preparation HRSB 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
20 2-Execution Cutting, bevel and remove defect pipe 1.1/2" Ø HRSB 1 0.8 1 1 1 2.4 0 0 0.8 0.8 0 0 0.8 0 0 0 2.4
21 2-Execution Lift down existing pipe (manual lifting) HRSB 1 0.5 1 1 1 0 0.5 0 0 0.5 0 0 0 0 0 1
22 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
23 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution Lift up new pipe (manual lifting) HRSB 1 0.5 1 1 1 0 0.5 0 0 0.5 0 0 0 0 0 1
Pipe 1.1/2" Ø (BW)
25 2-Execution Fit-up the new fitting HRSB 1 0.4 1 1 1 1 1.6 0 0 0.4 0.4 0 0 0.4 0.4 0 0 1.6
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
Pipe 1.1/2" Ø (BW) (RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
26 2-Execution Fit-up inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution Perform full weld as per PPTSB requirement HRSB 1 0.6 1 1 1 1.8 0 0 0 0.6 0 0 0.6 0.6 0 0 1.8
28 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
29 2-Execution Visual inspection by PPTSB rep PPTSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
30 2-Execution Cutting, bevel and remove defect pipe 1.1/2" Ø HRSB 1 0.8 1 1 1 2.4 0 0 0.8 0.8 0 0 0.8 0 0 0 2.4
31 2-Execution DPT on existing pipe HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Perform visual inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
33 2-Execution Fit-up the new fitting HRSB 1 0.4 1 1 1 1 1.6 0 0 0.4 0.4 0 0 0.4 0.4 0 0 1.6
Pipe 1.1/2" Ø (BW)
34 2-Execution Fit-up inspection HRSB 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Perform full weld as per PPTSB requirement HRSB 1 0.6 1 1 1 1.8 0 0 0 0.6 0 0 0.6 0.6 0 0 1.8
36 2-Execution Perform DPT inspection HRSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution Visual inspection by PPTSB rep PPTSB 0.5 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Surface preparation, power tool and clean the surface. HRSB 0.12 0.24 1 1 1 0.72 0 0.24 0 0.24 0 0 0.24 0 0 0 0.72
39 2-Execution Surface preparation inspection INSP HRSB 0.12 1 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Apply 1st coat (touch up) HRSB 0.12 0.18 1 1 0.36 0 0 0 0.18 0 0 0 0 0.18 0 0.36
41 2-Execution Curing HRSB 0.12 8 0 0 0 0 0 0 0 0 0 0 0 0
42 2-Execution 1st coat inspection INSP HRSB 0.12 1 0 0 0 0 0 0 0 0 0 0 0 0
43 2-Execution Apply 2nd coat (touch up) HRSB 0.12 0.12 1 1 0.24 0 0 0 0.12 0 0 0 0 0.12 0 0.24
44 2-Execution Curing HRSB 0.12 4 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution 2nd coat inspection INSP HRSB 0.12 1 0 0 0 0 0 0 0 0 0 0 0 0
46 2-Execution Apply final coat (touch up) HRSB 0.12 0.12 1 1 0.24 0 0 0 0.12 0 0 0 0 0.12 0 0.24
47 2-Execution Curing HRSB 0.12 4 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Final inspection INSP HRSB 0.12 1 0 0 0 0 0 0 0 0 0 0 0 0
49 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 2.0 Painting Handrail Pipe HRSB 0 0 0 0 0 0 0 0 0 0 0 0


50 2-Execution Site preparation HRSB 48.63 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
51 2-Execution Surface preparation (Power tool) HRSB 48.63 97.27 1 1 1 291.81 0 97.27 0 97.27 0 0 97.27 0 0 0 291.81
52 2-Execution Inspection surface preparation by AIMD INSP HRSB 48.63 1 0 0 0 0 0 0 0 0 0 0 0 0
53 2-Execution Painting 1st coat HRSB 48.63 72.95 1 1 145.9 0 0 0 72.95 0 0 0 0 72.95 0 145.9
54 2-Execution Overcoating interval HRSB 48.63 8 0 0 0 0 0 0 0 0 0 0 0 0
55 2-Execution 1st coat inspection by AIMD INSP HRSB 48.63 1 0 0 0 0 0 0 0 0 0 0 0 0
56 2-Execution Painting 2nd coat HRSB 48.63 48.63 1 1 97.26 0 0 0 48.63 0 0 0 0 48.63 0 97.26
57 2-Execution Overcoating interval HRSB 48.63 4 0 0 0 0 0 0 0 0 0 0 0 0
58 2-Execution 2nd coat inspection by AIMD INSP HRSB 48.63 1 0 0 0 0 0 0 0 0 0 0 0 0
59 2-Execution Painting final coat HRSB 48.63 48.63 1 1 97.26 0 0 0 48.63 0 0 0 0 48.63 0 97.26
60 2-Execution Overcoating interval HRSB 48.63 4 0 0 0 0 0 0 0 0 0 0 0 0
61 2-Execution Final coat inspection by AIMD INSP HRSB 48.63 1 0 0 0 0 0 0 0 0 0 0 0 0
62 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

63 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0


321.74 653.4 0 100.51 2.4 275.74 1 0 101.11 2 170.63 0 653.39
2 IWR/BT2/2016/Nov/111 AFC EQUIPMENT REPAIR
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Fitting fabrication and hot dipped activities at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
6 1-Pre Execution Inspection by AIMD INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
7 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0

8 2-Execution 1.0 Fitting replacement at E22714-2 HRSB 0 0 0 0 0 0 0 0 0 0 0 0


9 2-Execution Site preparation HRSB 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
10 2-Execution To remove existing tie-rod at base plate 8pcs x 20mm Ø bolt HRSB 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
11 2-Execution To install new tie-rod at base plate with Hot-dip galvanized 8pcs x 20mm HRSB 1.5 1 1 3 0 1.5 0 1.5 0 0 0 0 0 0 3
12 2-Execution To remove existing 2pcs netting guard and hook clip HRSB 1.6 2 1 4.8 0 3.2 0 1.6 0 0 0 0 0 0 4.8
13 2-Execution To install new 2 pcs netting guard and hook clip with Hot-dip galvanized HRSB 2 2 1 6 0 4 0 2 0 0 0 0 0 0 6
14 2-Execution To replace bolting at plenum and fan ring with HotDip galvanizing type HRSB 64pcs 1.8 1 1 1 5.4 0 1.8 0 1.8 0 0 1.8 0 0 0 5.4
15 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
2-Execution 2.0 Painting Netting Guard Frame HRSB 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Site preparation HRSB 0.28 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
17 2-Execution Surface preparation (Power tool) HRSB 0.28 4.52 1 1 1 13.56 0 4.52 0 4.52 0 0 4.52 0 0 0 13.56
18 2-Execution Inspection surface preparation by AIMD INSP HRSB 0.28 1 0 0 0 0 0 0 0 0 0 0 0 0
19 2-Execution Apply 1st coat (touch up) HRSB 0.28 3.39 1 1 6.78 0 0 0 3.39 0 0 0 0 3.39 0 6.78
20 2-Execution Overcoating interval HRSB 0.28 8 0 0 0 0 0 0 0 0 0 0 0 0
21 2-Execution 1st coat inspection by AIMD INSP HRSB 0.28 1 0 0 0 0 0 0 0 0 0 0 0 0
22 2-Execution Apply 2nd coat (touch up) HRSB 0.28 2.26 1 1 4.52 0 0 0 2.26 0 0 0 0 2.26 0 4.52
23 2-Execution Overcoating interval HRSB 0.28 4 0 0 0 0 0 0 0 0 0 0 0 0
24 2-Execution 2nd coat inspection by AIMD INSP HRSB 0.28 1 0 0 0 0 0 0 0 0 0 0 0 0
25 2-Execution Apply final coat (touch up) HRSB 0.28 2.26 1 1 4.52 0 0 0 2.26 0 0 0 0 2.26 0 4.52
26 2-Execution Overcoating interval HRSB 0.28 4 0 0 0 0 0 0 0 0 0 0 0 0
27 2-Execution Final coat inspection by AIMD INSP HRSB 0.28 1 0 0 0 0 0 0 0 0 0 0 0 0
28 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 3.0 Painting Fan Motor HRSB 0 0 0 0 0 0 0 0 0 0 0 0


29 2-Execution Site preparation HRSB 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
30 2-Execution Surface preparation (Power tool) HRSB 1.51 3.02 1 1 1 9.06 0 3.02 0 3.02 0 0 3.02 0 0 0 9.06
31 2-Execution Inspection surface preparation by AIMD INSP HRSB 1.51 1 0 0 0 0 0 0 0 0 0 0 0 0
32 2-Execution Apply 1st coat (touch up) HRSB 1.51 2.265 1 1 4.53 0 0 0 2.265 0 0 0 0 2.265 0 4.53
33 2-Execution Overcoating interval HRSB 1.51 8 0 0 0 0 0 0 0 0 0 0 0 0
34 2-Execution 1st coat inspection by AIMD INSP HRSB 1.51 1 0 0 0 0 0 0 0 0 0 0 0 0
35 2-Execution Apply 2nd coat (touch up) HRSB 1.51 1.51 1 1 3.02 0 0 0 1.51 0 0 0 0 1.51 0 3.02
36 2-Execution Overcoating interval HRSB 1.51 4 0 0 0 0 0 0 0 0 0 0 0 0
37 2-Execution 2nd coat inspection by AIMD INSP HRSB 1.51 1 0 0 0 0 0 0 0 0 0 0 0 0
38 2-Execution Apply final coat (touch up) HRSB 1.51 1.51 1 1 3.02 0 0 0 1.51 0 0 0 0 1.51 0 3.02
39 2-Execution Overcoating interval HRSB 1.51 4 0 0 0 0 0 0 0 0 0 0 0 0
40 2-Execution Final coat inspection by AIMD INSP HRSB 1.51 1 0 0 0 0 0 0 0 0 0 0 0 0
41 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 4.0 Painting Plenum Structure HRSB 0 0 0 0 0 0 0 0 0 0 0 0


42 2-Execution Site preparation HRSB 4.90 1 1 1 2 0 1 0 1 0 0 0 0 0 0 2
43 2-Execution Surface preparation (Power tool) HRSB 4.90 9.8 1 1 1 29.4 0 9.8 0 9.8 0 0 9.8 0 0 0 29.4
44 2-Execution Inspection surface preparation by AIMD INSP HRSB 4.90 1 0 0 0 0 0 0 0 0 0 0 0 0
45 2-Execution Apply 1st coat (touch up) HRSB 4.90 7.35 1 1 14.7 0 0 0 7.35 0 0 0 0 7.35 0 14.7
46 2-Execution Overcoating interval HRSB 4.90 8 0 0 0 0 0 0 0 0 0 0 0 0
47 2-Execution 1st coat inspection by AIMD INSP HRSB 4.90 1 0 0 0 0 0 0 0 0 0 0 0 0
48 2-Execution Apply 2nd coat (touch up) HRSB 4.90 4.9 1 1 9.8 0 0 0 4.9 0 0 0 0 4.9 0 9.8
49 2-Execution Overcoating interval HRSB 4.90 4 0 0 0 0 0 0 0 0 0 0 0 0
50 2-Execution 2nd coat inspection by AIMD INSP HRSB 4.90 1 0 0 0 0 0 0 0 0 0 0 0 0
51 2-Execution Apply final coat (touch up) HRSB 4.90 4.9 1 1 9.8 0 0 0 4.9 0 0 0 0 4.9 0 9.8
Open
RESOURCE (MAN) MANHOURS RESOURCE (EQPT)
AWL F1 F2 GW RI HW FW WEL PNT CBT MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS MHRS
NO TASKID No TAPHASE TASK TASKNOTE OWNER CONTR DATA DUR (HRS) (AWL) (F1) (F2) (GW) MHRS (HW) (FW) (WEL) (PNT) (CBT) SCAFFOLDING (M3) INSULATION (M2)
(RI)
MHRS MHRS CRANE GEN SET WELDING SET HTW/HBT COMPRESSOR
52 2-Execution Overcoating interval HRSB 4.90 4 0 0 0 0 0 0 0 0 0 0 0 0
53 2-Execution Final coat inspection by AIMD INSP HRSB 4.90 1 0 0 0 0 0 0 0 0 0 0 0 0
54 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

55 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0


122.585 144.9 0 32.84 0 62.585 0 0 19.14 0 30.345 0 144.91
3 IWR/BT2/2017/Feb/32 FIREPROOFING STRUCTURE STRUCTURE REPAIR
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Plywood cutting, formwork fabrication at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Inspection by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Structure Repair HRSB 0 0 0 0 0 0 0 0 0 0 0 0


6 2-Execution Site preparation and location marking HRSB 4.89 1.00 1 1 2 0 1 0 1 0 0 0 0 0 0 2
7 2-Execution Inspection from PPTSB reps HRSB 4.89 0.5 0 0 0 0 0 0 0 0 0 0 0 0
8 2-Execution Hacking of concrete structure HRSB 4.89 4.00 1 2 1 16 0 4 0 8 0 0 4 0 0 0 16
9 2-Execution Installation of fireproofing galvanized mesh HRSB 4.89 5 2 1 15 0 10 0 5 0 0 0 0 0 0 15
10 2-Execution Inspection from PPTSB reps HRSB 4.89 0.50 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Install formwork on column and beam HRSB 4.89 4 2 1 12 0 8 0 4 0 0 0 0 0 0 12
12 2-Execution Casting / grouting on column and beam HRSB 4.89 3 2 1 9 0 6 0 3 0 0 0 0 0 0 9
13 2-Execution Curing HRSB 4.89 72 0 0 0 0 0 0 0 0 0 0 0 0
14 2-Execution Remove formwork from column and beam HRSB 4.89 1.00 1 1 2 0 1 0 1 0 0 0 0 0 0 2
15 2-Execution Final Inspection from PPTSB reps HRSB 4.89 0.50 0 0 0 0 0 0 0 0 0 0 0 0
16 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

17 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0


0 0 0 0 0 0 0 0 0 0 0 0
92.5 57.0 0 30 0 23 0 0 4 0 0 0 57
4 IWR/BT2/2017/March/49 E22901 SUPPORT PLATE STRUCTURE REPAIR AND PAINTING
1 1-Pre Execution Material delivery INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
2 1-Pre Execution Material inspection by AIMD Inspector INSP HRSB 0 0 0 0 0 0 0 0 0 0 0 0
3 1-Pre Execution Plywood cutting, formwork fabrication at workshop HRSB 0 0 0 0 0 0 0 0 0 0 0 0
4 1-Pre Execution Inspection by AIMD Inspector INSP 0 0 0 0 0 0 0 0 0 0 0 0
5 1-Pre Execution Erect external scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0

2-Execution 1.0 Support Plate Repair HRSB 0 0 0 0 0 0 0 0 0 0 0 0


6 2-Execution Site preparation and formwork marking HRSB 0.10 1.00 1 1 0 1 0 0 0 0 0 0 0 0 1
7 2-Execution Install formwork on pipe support HRSB 0.10 2.6 1 1 5.2 0 2.6 0 2.6 0 0 0 0 0 0 5.2
8 2-Execution Inspection from PPTSB reps HRSB 0.10 0.50 0 0 0 0 0 0 0 0 0 0 0 0
9 2-Execution Casting / grouting on pipe support HRSB 0.10 2.4 1 1 4.8 0 2.4 0 2.4 0 0 0 0 0 0 4.8
10 2-Execution Curing HRSB 0.10 24 0 0 0 0 0 0 0 0 0 0 0 0
11 2-Execution Remove formwork from support plate HRSB 0.10 1.00 1 1 0 1 0 0 0 0 0 0 0 0 1
12 2-Execution Final Inspection from PPTSB reps HRSB 0.10 0.50 0 0 0 0 0 0 0 0 0 0 0 0
13 2-Execution Housekeeping HRSB 1 1 1 0 0 0 1 0 0 0 0 0 0 1

2-Execution 2.0 Painting Support Plate HRSB 0 0 0 0 0 0 0 0 0 0 0 0


14 2-Execution Site preparation HRSB 1 1 0 0 0 0 0 0 0 0 0 0 0 0
15 2-Execution Surface preparation (Power tool) HRSB 3.35 6.70 1 1 1 20.10 0 6.7 0 6.7 0 0 6.7 0 0 0 20.10
16 2-Execution Inspection surface preparation by AIMD HRSB 3.35 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
17 2-Execution Painting 1st coat HRSB 3.35 5.03 1 1 10.05 0 0 0 5.025 0 0 0 0 5.025 0 10.05
18 2-Execution Overcoating interval HRSB 3.35 8 0.00 0 0 0 0 0 0 0 0 0 0 0.00
19 2-Execution 1st coat inspection by AIMD HRSB 3.35 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
20 2-Execution Painting 2nd coat HRSB 3.35 3.35 1 1 6.70 0 0 0 3.35 0 0 0 0 3.35 0 6.70
21 2-Execution Overcoating interval HRSB 3.35 4 0.00 0 0 0 0 0 0 0 0 0 0 0.00
22 2-Execution 2nd coat inspection by AIMD HRSB 3.35 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
23 2-Execution Painting final coat HRSB 3.35 3.35 1 1 6.70 0 0 0 3.35 0 0 0 0 3.35 0 6.70
24 2-Execution Overcoating interval HRSB 3.35 4 0.00 0 0 0 0 0 0 0 0 0 0 0.00
25 2-Execution Final coat inspection by AIMD HRSB 3.35 1 0.00 0 0 0 0 0 0 0 0 0 0 0.00
26 2-Execution Housekeeping HRSB 3.35 1 1 1 0 0 0 1 0 0 0 0 0 0 1

27 3-Post Execution Dismantle External Scaffolding HRSB 0 0 0 0 0 0 0 0 0 0 0 0


0 0 0 0 0 0 0 0 0 0 0 0
72.425 57.6 0 13.7 0 25.425 0 0 6.7 0 11.725 0 57.55

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
REMAKS

Open
EIS (above to 12" Nom Bore) DURATION HRS
BLIND NO SIZE RATING BLINDING DE.BLIND FIL HLP
0.00 0.00 2 1
0.00 0.00 2 1
TOTAL 0.0 0.0

EIS (above to 4" Nom Bore) DURATION HRS


BLIND NO SIZE RATING BLINDING DE.BLIND FIT HLP
0.00 0.00 2 1
0.00 0.00 2 1
0.00 0.00 2 1
0.00 0.00 2 1
TOTAL 0.0 0.0

EIS (up to 4" Nom Bore) DURATION HRS


BLIND NO SIZE RATING BLINDING DE.BLIND FIT HLP
1 2 150 0.32 0.38 1 1
0.00 0.00 1 1
0.00 0.00 1 1
0.00 0.00 1 1
0.00 0.00 1 1
TOTAL 0.3 0.4

DURATION HRS
qty
piping
cutting/
weld type SIZE sch fit up weld
bevel
SW 3/4 80 0.4 0.20 0.6 1
SW 3/4 80 0.4 0.20 0.6 1

TOTAL 0.80 0.40 1.20

life up pipe support DURATION HRS


step qty pipe support lift duration FIT S.S
1st side 1 0.33 0.33 1 1
2nd site 1 0.33 0.33 1 1
lift down 1 0.33 0.33 1 1
TOTAL 1.00 1.00

welding DURATION HRS


QTY SIZE RATING REMOVE INSTALL FIT HLP
1 0.00 0.00 2 1
0.00 0.00 2 1
TOTAL 0.00 0.00

painting DURATION HRS Minimum Resources

duration
QTY xtvt vol.m2 TOTAL SS FW
(hrs)
DURATION
Site pre 0.68 1 1
Surface prep 0.68 2 1.36323525 1 1
SP Insp. 0.68 1 0.681617625
1st coat 0.68 1.5 1.0224264375 1
curing 0.68 8 5.452941
1st coat Insp 0.68 1 0.681617625
2nd coat 0.68 1 0.681617625 1
curing 0.68 4 2.7264705
2nd coat Insp 0.68 1 0.681617625
Final coat 0.68 1 0.681617625 1
curing 0.68 4 2.7264705
Final coat Insp 0.68 1 0.681617625
TOTAL 0.00 0.00

NOZZLE UNLOAD DURATION HRS


QTY SIZE RATING REMOVE INSTALL FIT HLP
0.00 0.00 1 1
0.00 0.00 1 1
0.00 0.00 1 1
0.00 0.00 1 1
TOTAL 0.00 0.00

CLEANING FORMULA
ID H π D
SHELL 4.88 28.4 3.142 4.88
SHELL 3 20.315 4.142 3
ELLIP TOP 3 1 1.084 3
ELLIP BOTTOM 4.88 1 1.084 4.88

D
ELLIP SHELL bottom 4.942 1 1.084
1.084 0
CLEANING LGHT ID π TOTAL QTY PLATE
PERIMETER

WELDMENT SHELL 28.4 4.942 3.142 15.53 6.47


WELDMENT SHELL 20.315 3 4.142 12.43 5.18
WELDMENT ELLIP top 1 3 3.142 9.43 3.93
WELDMENT ELLIP bottom 1 4.942 3.142 15.53 6.47
3.142 0.00 0.00

CLEANING FORMULA
ID H π D
TRAY 4.942 3.142 4.942
TRAY 3 3.142 3

D
1.084 0
1.084 0

NDT
NO TYPE QTY DURATION TOTAL DUR
1 BORO 0.083 0.0
2 IRIS 0.367 0.0
3 RFET 0.083 0.0
TOTAL (HR) 0.53 0.0

INT.SCAFFOLDING DURATION
L W H M3 ERECT DISMANTLE
5 5 4 100 25 25 bottom
5 5 2.5 63 16 16 tray 35#
0 0 0
TOTAL 163 41 41

unloading & loading FORMULA


ID H π D
unloading 3.142 0
loading 3.142 0
remove tray
tray no bolt nut qty tray total bolt nut
MH 1A - Tray #64,63 and 61 322 24 966
MH 1B - Tray #58,57,55,54,52,51 and 49 322 56 2254
MH 1C - Tray #46,45,43,42,40,38 and 37 322 56 2254
MH 1D - Tray #33,32,30,29,27 and 26 322 96 1932
MH 1E - Tray #23,22,20,19,17,16 and 14 322 112 2254
MH 1F - Tray #11,10,8,7,5,4 and 2. 322 112 2254
total 1932 456 11914
RIG
1
1

RIG

open flange (up to 4" Nom Bore) DURATION HRS


RIG TP No SIZE RATING BLINDING
SPEC 0.00
0.00

0.00
TOTAL 0.0

HRS FOR
WELD
ONLY

0.36 FACTOR 0.6


0.36 FACTOR 0.6

RIG

RIG
1
1

TOUCH UP

Fitter Painter Ins xtvt

1 Site pre
1 Surface prep
1 SP Insp.
1 1st coat
curing
1 1st coat Insp
1 2nd coat
curing
1 2nd coat Insp
1 Final coat
curing
1 Final coat Insp

RIG

ORMULA DURATION
AREA M2
H WIRE BRUSH COTTON RAG POWER BRUSH
28.4 435.46 217.73 145.15 72.58
20.32 252.43 126.22 84.14 42.07
1 3.25 1.63 1.08 0.54
1 5.29 2.64 1.76 0.88

D
0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00
TOTAL 696.43 348.22 232.14 73.46

DURATION
TOTAL
WELMENT TOTAL
QTY PLATE WELDMENT POWER BRUSH
TOP ELLIP VESSEL
& LENGTH
BOTTOM
ELLIP
15.53 23.67 582.29 97.0
12.43 16.93 340.39 56.7
9.43 0.83 61.27 10.2
15.53 0.83 100.93 16.8
0.00 0.00 0.00 0.0
TOTAL 271.22 45.2 25% TOTAL WELDMENT

ORMULA DURATION
AREA M2
H WIRE BRUSH COTTON RAG POWER BRUSH
0 124.22 62.11 41.41 20.70
0 61.27 30.63 20.42 10.21

D
0 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00
TOTAL 185.49 92.75 61.83 30.92

ORMULA QTY DURATION


M3
H DRUM manual crane
0 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00
remove install
80.5 80.5
187.83 187.83
187.83 187.83
161.00 161.00
187.83 187.83
187.83 187.83
992.83333 992.83333333
DURATION HRS
DE.BLIND FIT HLP
0.00 1 1
0.00 1 1

0.00 1 1
0.0
DURATION HRS
Total
duration
vol.m2 duration
(hrs)
(hrs)
1 1
0.06 2 0.12
0.06 1 0.06
0.06 1.5 0.09
0.06 8 0.48
0.06 1 0.06
0.06 1 0.06
0.06 4 0.24
0.06 1 0.06
0.06 1 0.06
0.06 4 0.24
0.06 1 0.06
TOTAL 0.33

flushing
TOTAL WELDMENT

FIT HLP RIG

4 4 1
2 2 1
PCOGD SDN BHD TURNAROUND 2019

SUMMARY DEFECT AREA BUTANOL

NO WORK ID LINE NO JOINT SIZE SCH WELD TYPE FW/SW F/U V/I DPI RT RT 1 HT PAINTING REMARKS

IWR/BT2/2016/Dec/148 3/4"-AP-224318-1108B-NI
1 3/4"-AP-224318-1108B-NI 1 0.75 80 SW FW 3/4 @ 0.75
3/4"-AP-224318-1108B-NI 2 0.75 80 SW FW 3/4 @ 0.75
3/4"-AP-224318-1108B-NI 3 0.75 80 BW SW 3/4 @ 0.75
3/4"-AP-224318-1108B-NI 4 0.75 80 BW SW 3/4 @ 0.75
3/4"-AP-224318-1108B-NI 5 0.75 80 SW SW 3/4 @ 0.75
3/4"-AP-224318-1108B-NI 6 0.75 80 SW SW 3/4 @ 0.75

Fit-up Joint Dia inch Fit-up Joint Dia inch DPI Done RT Done Ht Done PAINTING
Welded Weld Done
0 0 0 0 0 0 0 0
WORK REQUERST
TOTAL TOTAL DIA
SHOP FIELD SHOP FIELD JOINT INCH (Overall)
(Overall)
SW BW SW BW TH TH
JOINT 2 2 2 0 0 0 6
DIA INCH 1.50 1.5 1.5 0 0 0 4.50
TOTAL JT 4 TOTAL JT 2
TOTAL Ø
TOTAL Ø INCH 3 INCH 1.5 RT (total) RT (SHOP) RT (FIELD)
JOINT SW TOTAL JOINT SHOP/FIELD 6 2 2 0
AND BW DIA INCH JOINT SHOP/FIELD 4.5

Socket Weld Butt weld


Fit-up RT
Qty Dia Inch Qty Dia Inch
Current 0 0 0 0 0 0
Progress workshop Total 4 2 1.50 2 1.5 29
Current 0 0 0 0 0 0
Progress Site Total 2 2 1.50 0 0 17
1.0 Table for piping painting

PIPE SIZE od (mm) radius (m) circumference(m)lght (M) qty m2


1/2 21.3 0.01065 0.07 0.00
New pipe 3/4 26.7 0.01335 0.08 6.5 1 0.68
Touch up (Paint) 3/4 26.7 0.01335 0.08 0.1 6 0.06
1 33.4 0.0167 0.10 0.00
1.5 48.3 0.02415 0.15 0.00
2 60.3 0.03015 0.19 0.00
2.5 73 0.0365 0.23 0.00
3 88.9 0.04445 0.28 0.00
4 114.3 0.05715 0.36 0.00
5 141.3 0.07065 0.44 0.00
6 168.3 0.08415 0.53 0.00
8 219.1 0.10955 0.69 0.00
10 273.1 0.13655 0.86 0.00
12 323.9 0.16195 1.02 0.00
14 343 0.1715 1.08 0.00
16 392 0.196 1.23 0.00
18 441 0.2205 1.39 0.00
20 490 0.245 1.54 0.00
22 539 0.2695 1.69 0.00
24 588 0.294 1.85 0.00
26 637 0.3185 2.00 0.00
28 686 0.343 2.16 0.00
30 735 0.3675 2.31 0.00
32 784 0.392 2.46 0.00
34 833 0.4165 2.62 0.00
36 882 0.441 2.77 0.00
system 1c UNIT RATE (RM) REVENUE
1st coat(L) 2nd coat(L) 3rd coat(L) 1st coat(L) 2nd coat(L) 3rd coat(L)
0.00 0.00 0.00 RM0.00
0.15 0.15 0.09 RM0.00
0.01 0.01 0.01 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
0.00 0.00 0.00 RM0.00
MPWR MATERIAL CONSUM TOTAL COST SITE MARGIN

#DIV/0!
MTO

Sch/
Item Qty Unit Size Description Rate (RM)
Rating
1 PIPE
2 6.5 m 3/4'' sch80 API5LGr.B SMLS PE SCH80
3
4
5 ELBOW 90
6 1 ea 3/4'' sch80 A234 GR.WPB SMLS BW
7
8
9 COUPLING
10 2 ea 3/4'' A234 WPB SW
11
12
13
14
15
16
17
18
19
20
21
Total (RM)