Ret: CAATCCOIRE7SICAS18/2020
Date: 06/Juner2020
To: Arab Towers Centracting Co. (ATCCO).
Yathreb Commercial Complex.
Waefi Al Tal tat, 11959
.0. Box (06) 593 Amman 11953 Jordan,
“Tels 962 6) 5530381, 5537064
Eng. Jamal arain
2675 — Abdall views Project, Plots 7At-a and 7At-b, Abdali Project District |
Subject: Additional Drain Outlets at Roof
Reference to the Contract’ letter ref, ATCCO-AV.CA2020-905 dated 18% April 2020,
pertaining to addtional drain outs at roof level, a per AOR’s response tothe RF of. S.G-
[ATC-RFLNLOS3, in which fle Design team has instructed the Contractor to follow the
‘Architectural drawing wit respect to roof drain outet quantities and distributions, since the
roof slopes are usualy decied bythe architectural drawings
‘As you are aware that “All Documents forming the Contract are to be taken as Mutually
‘explanatory to one another, it shall be deemed included in all regardless. that roof drain
‘outlets in the Architectural drawing are exceeding those presented in the Mechanical
rawings”
This is for your information end further action.
Regatts,
fiamdan
Project Manager / Contract Administrator