You are on page 1of 1

ESPULGAR, SOFIA J.

ENGG 411 FORM 6 – WORK IMPROVEMENT WORKSHEET


WORK
TARGET AREA PRESENT CONDITION DESIRED CONDITION IMPROVEMENT SCHEME BENEFIT/SAVINGS
ACTIVITY
Employee to double
check own work
Inaccuracy of To produce accurate before submission, Improved
Accuracy – in Researching prices Prices and to enable Keeping records of handling
Pre-construction Researching updated (not updated price list) meaningful analysis research carried complex data and capability in
price list. involving for researching and gathering out to refer to. Time
construction materials prices for proper documentations. Supervisor to also management
check data against
records.

Foundation

Have some Project Quality Perform walkthroughs and


To ensure strict adherence to the use inspections to identify defects.
Organizational skills - Issues (project managers or By consistently conducting an
of standard equipment and materials Furthermore, find and correct
Drawing Difficulty in supervisors fail to carry out ocular inspection, the project
that have been specified for defects early. Finding defects
Project management. adequate inspection in the deadline can be meet.
construction downstream will be more
course of the process) costly

Landscaping/
Design

Outlook training
Final Details/ To effectively
completed
Close Out Have some deadlines manage workload Operate daily ‘To
, daily to do lists
Organizational skills - missed (Turn-over of the on a daily basis, Do’ check list and a
being written.
difficulty project) and meet deadlines diary. To respond
Responding to emails
keeping up with the complaint efficiently, prioritize to emails received
faster, but further
deadlines on a daily basis. received from tasks and respond within the designated time
improvement needed.
Final Draw Client to emails in a timely given.
Work shadowing will
manner
continue.

You might also like