Professional Documents
Culture Documents
(})ecfaration
Ebn~~~~
Chief Engineer
Roads and Highways Department
Sarak Bhaban, Tejgaon, Dhaka.
Roads and Highways Department
Ministry of Road Transport and Bridges
Poreword
The Roads and Highways Department is pleased to publish the RHO
Schedule of Rates 2018 for Road and Bridge Works. Since the last
publication of RHO Schedule of Rates 2015, there have been some
significant changes in prices of materials, labors and equipment. In
addition to changes in prices , advanced technological development for
work accomplishment have been considered for some civil work items.
In this context, RHO felt the necessity of updating the RHO Schedule of
Rates to reflect above changes.
I wish that RHO Schedule of Rates 2018 will be useful for the works of
Road and Bridges in Roads and Highways Department. The "RHO
Schedule of Rates 2018 (For Road and Bridge Works)" shall be made
effective from 01 July 2018.
Ebn~~~~~
Chief Engineer
Roads and Highways Department
Sarak Bhaban, Tejgaon, Dhaka.
RHO Schedule of Rates 2018
~-
c Sl.
No
Item Code Description. Unit RHO SoR
2015
RHO SoR
2018
RHDSoR
2018
RHO SoR
2018
RHO SoR
2018
RHO SoR
2018
Dhaka SylhetZone Khulna Rajshahi Chattogram
Mymenisngh Barisal Rangpur Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 1 ·General & Site Facilities
Lump
1 1/1/01 Maintenance and Protection of Traffic 80,257.00 144,431 .00 144,042.00 144,431.00 144,042.00 144,431.00
Sum
Maintain Temp.Structures & Equipment for
2 1/1/02 day 1,913.00 2,218.00 2,105.00 2,218.00 2,105.00 2,218.00
the Maintenance and Protection of Traffic
Supply, Erect and Remove Field Office for Lump
3 1/2/01 249,497.00 254,930.00 254,930.00 254,930.00 254,930.00 254,930.00
Engineer Sum
Maintenance, Staffing, Security and Cleaning
4 1/2/02 Month 11,000.00 50,233.00 50,233.00 50,233.00 50,233.00 50,233.00
of the Field Office for the Engineer
Provision of Office Equipment and
5 1/2/03 Month 7,700.00 7,868.00 7,868.00 7,868.00 7,868.00 7,868.00
Consumables
Provision, Maintenance and Removal of Sign Lump
6 1/2/04 8,849.00 9,042.00 9,042.00 9,042.00 9,042.00 9,042.00
Boards Sum
Provision and Maintenance of Survey
7 1/2105 month 897.00 917.00 917.00 917.00 917.00 917.00
Equipment
8 1/2/07 Progress Photographs Month 1,000.00 1,022.00 1,022.00 1,022.00 1,022.00 1,022.00
10 1/3/02 Maintain Site Laboratory Month 7,699.00 7,866.00 7,866.00 7,866.00 7,866.00 7,866.00
12 1/4/01 Saloon Car 1200cc Capacity Month 55,000.00 119,302.00 119,302.00 119,302.00 119,302.00 119,302.00
13 1/4/02 Pick- up (Double Cab) Month 66,000.00 169,535.00 169,535.00 169,535.00 169,535.00 169,535.00
14 1/4/03 Four Wheel Drive Vehicle Min. 6 seats Month 77,799.00 295,116.00 295,116.00 295,116.00 295,116.00 295,116.00
15 1/4/04 Motor Cycle 125cc Month 4,425.00 5,651 .00 5,651.00 5,651.00 5,651.00 5,651.00
16 1/4/05 Motor Boat min 5m length Month 16,500.00 16,859.00 16,859.00 16,859.00 16,859.00 16,859.00
«
Sl. Item Code Description. Unit RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR RHDSoR
"· No 2015 2018 2018 2018 2018 2018
c Dhaka
Mymenisngh
SylhetZone Khulna
Barisal
Rajshahi
Rang pur
Chattogram
Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 2- Earthwork
1 211/01 Clearing and Grubbing sq. metre 45.00 55.00 51.00 55.00 51.00 55.00
3 212102 Roadway Excavation in Suitable Soil cu metre 171 .00 144.00 141.00 144.00 141.00 144.00
a 214/01 Channel Excavation in Unsuitable Materials cu metre 173.00 211.00 198.00 211 .00 198.00 211.00
9 214/02 Channel Excavation in Suitable Material cu metre 173.00 211.00 198.00 211.00 198.00 211.00
10 215/01 Excavation and Backfill for Structures cu metre 360.00 447.00 424.00 447.00 424.00 447.00
11 215102 Concrete Backfill for Structures cu metre 10,197.00 12,533.00 11,506.00 12,050.00 11,390.00 12,087.00
12 215103 Sand Backfill for Structures cu metre 1,174.00 1,309.00 1,250.00 1,352.00 1,365.00 1,381.00
13 210611(a) Embankment Fill from Excavation on site. cu metre 245.00 144.00 141.00 144.00 141.00 144.00
16 216103 Sand Backfill to Swamp cu metre 468.00 791.00 786.00 791 .00 858.00 834.00
17 2/7/01 Preparation of Subgrade 300 mm Depth sq. metre 69.00 24.00 24.00 24.00 24.00 24.00
18 2/7/02 Preparation of Subgrade 450 mm depth sq. metre 103.00 40.00 39.00 40.00 39.00 40.00
19 218/01 Improved Subgrade cu metre 916.00 1,043.00 985.00 1,057.00 1,097.00 1,099.00
24 2110/01 Construction of Soil Earthen Shoulders cu metre 259.00 838.00 801.00 797.00 807.00 840.00
25 2112101 Subgrade Drains Lin. Metre 270.00 385.00 357.00 404.00 372.00 380.00
:4- <if « ~
~~~
Sl. Item Code Description. Unit RHDSoR RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR
'" No 2015 2018 2018 2018 2018 2018
(' Dhaka SylhetZone Khulna Rajshahi Chattogram
Mymenisngh Barisal Rangpur Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate {Tk.) Rate {Tk.) Rate (Tk.) Rate (Tk.) Rate {Tk.) Rate (Tk.)
2 3/1102 Repair of Potholes on the Existing Pavement cu metre 15,733.00 21,452.00 20,418.00 21,451.00 20,609.00 20,514.00
3 03/02/01 (a) Sub-Base cu metre 4,361.00 5,400.00 5,776.00 5,074.00 4,766.00 5,174.00
4 03/02/01 (b) Sub-Base (with Paver} cu metre 5,588.00 5,968.00 5,263.00 4,959.00 5,363.00
5 03/03/01(a} Aggregate Base Type I cu metre 6,566.00 8,832.00 7,926.00 8,384.00 7,720.00 8,273.00
6 03/03/01 (b) Aggregate Base Type I (with Paver} cu metre 9,020.00 8,118.00 8,572.00 7,912.00 8,461.00
7 03/03/02 (a} Aggregate Base Type II cu metre 4,732.00 5,932.00 6,378.00 5,554.00 5,194.00 5,662.00
8 03/03/02 (b) Aggregate Base Type II (with Paver} cu metre 6,120.00 6,570.00 5,742.00 5,386.00 5,850.00
9 03/06/1a Bituminous Prime Coat (Plant Placed) sq. metre 123.00 114.00 116.00 117.00 120.00 113.00
10 03/06/1b Bituminous Prime Coat (hand placed} sq. metre 121.00 109.00 110.00 112.00 114.00 107.00
11 03/07/1a Bituminous Tack Coat (Plant Work} sq. metre 48.00 51 .00 51 .00 53.00 54.00 50.00
13 3/8/01 Primer seal sq. metre 111.00 113.00 111 .00 115.00 114.00 112.00
24 3/11/01 Premix Bituminous Carpeting cu metre 16,013.00 / 20,841.00 19,648.00 20,666.00 19,776.00 19,831 .00
#. <tf c:K ~
\9v ~ ~ ~ ;; '
\ '
51. Item Code Description. Unit RHO SoR RHO SoR RHDSoR RHO SoR RHO SoR RHDSoR
' ·'
c No 2015 2018
Dhaka
Mymenisngh
2018
SylhetZone
2018
Khulna
Barisal
2018
Rajshahi
Rangpur
2018
Chattogram
Zone
Cumilla Zone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
4 (}( 4?- -~ ~
,,
Sl. Item Code Description. Unit RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR
No 2015 2018 2018 2018 2018 2018
(' Dhaka SylhetZone Khulna Rajshahi Chattogram
Mymenisngh Barisal Rangpur Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
2 04/01/1b Bored Cast in Place Piles [dia 600mm] Lin. Metre 4,595.00 5,592.00 5,278.00 5,508.00 5,245.00 5,438.00
3 04/01/1c Bored pile cast in place piles (dia 750 mm) Lin. Metre 7,214.00 8,818.00 8,332.00 8,687.00 8,280.00 8,580.00
4 04/01/1d Bored cast in place Piles (dia 900mm) Lin. Metre 10,651.00 13,129.00 12,426.00 12,942.00 12,352.00 12,787.00
5 04/01/1e Bored cast in Place Piles (dia 1000mm) Lin. Metre 12,551.00 15,406.00 14,550.00 15,174.00 14,459.00 14,983.00
6 04/01/1f Bored cast in Place Piles (dia 1200mm) Lin. Metre 18,585.00 22,813.00 21,546.00 22,470.00 21,411.00 22,187.00
7 04/01/1g Bored cast in Place Piles (dia 1500mm) Lin. Metre 33,131.00 40,667.00 38,408.00 40,055.00 38,168.00 39,550.00
9 4/1/04 High Yield Defonmed Steel Reinforcing Bars Tonne 95,236.00 92,710.00 92,918.00 94,004.00 93,564.00 92,064.00
19 04/02/1a Driven Pre-cast Piles (a) 300x300mm Lin. Metre 1,892.00 2,239.00 2,133.00 2,212.00 2,122.00 2,190.00
20 04/02/1b Driven Precast Piles (b) 350x350mm Lin. Metre 2,406.00 2,847.00 2,705.00 2,811.00 2,691.00 2,781.00
21 04/02/1c Driven Pre-cast Pile (c) 400x400mm Lin. Metre 2,931.46 3,464.42 3,281.28 3,417.25 3,262.82 3,378.28
22 412102 Driven Precast Pilot Piles Lin. Metre 651.00 762.00 752.00 762.00 752.00 762.00
24 4/2/04 High Yield Reinforcement Bars Tonne 95,236.00 92,710.00 92,918.00 94,004.00 93,564.00 92,064.00
25 4/3/01 King Post Lin. Metre 703.00 820.00 827.00 760.00 757.00 814.00
26 4/3/02 Raker Piles (including Tie Bars) Lin. Metre 1,000.00 1,168.00 1,178.00 1,082.00 1,078.00 1,160.00
31 04/04/1b Load test on cast in place piles (For 100 Ton) Number 160,170.00 174,847.00 168,995.00 174,847.00 171,193.00 176,166.00
32 04/04/1c Load Test on cast in place piles (For 200 Ton) Number 274,951.00 299,600.00 289,880.00 299,600.00 294,275.00 302,237.00
35 4/5/01 Bitumen Slip Layer to Concrete Piles Sq Metre 254.00 222.00 225.00 232.00 237.00 218.00
38 04/06/1c Driven Bullah Pile (175-200mm dia) Lin. Metre 928.00 975.00 967.00 975.00 967.00 975.00
39 04/06/1d Driven Bullah Pile (200-225mm dia} Lin. Metre 1,108.00 1,167.00 1,155.00 1,167.00 1,155.00 1,167.00
40 4f7/01 Cutting Edge (Well Shoe) Ton 106,348.00 110,072.00 109,582.00 110,147.00 109,620.00 110,034.00
41 4f7102 Class-20 Concrete for RCC Well cum 14,841.00 14,874.00 14,773.00 14,874.00 14,773.00 14,874.00
42 4f7103 Concrete in Top/Bottom Plugging cum 12,474.00 14,919.00 13,920.00 14,468.00 13,695.00 14,356.00
Labor for Well Sinking (Size
43 4/07/4(a) Metre 17,775.00 24,457.00 24,034.00 24,457.00 24,034.00 24,457.00
5000mmX10000mm} Depth Om-6m
Labor for Well Sinking (Size
44 4/07/4(b) Metre 25,236.00 37,497.00 37,195.00 37,497.00 37,195.00 37,497.00
5000mmX10000mm) Depth 6m-12m
Labor for Well Sinking (Size
45 4/07/4(c) Metre 28,514.00 42,415.00 42,114.00 42,415.00 42,114.00 42,415.00
5000mmX1 OOOOmm) Depth 12m-18m
Labor for Well Sinking (Size
46 4/07/4(d) Metre 35,704.00 53,874.00 53,517.00 53,874.00 53,517.00 53,874.00
5000mmX10000mm) Depth 18m-24m
Labor for Well Sinking (Size
47 4/07/4(e) Metre 42,259.00 64,340.00 63,982.00 64,340.00 63,982.00 64,340.00
5000mmX10000mm) Depth Above 24m
Labor for Well Sinking (Size
48 4/07/4(Q Metre 12,031.00 16,581.00 16,296.00 16,581.00 16,296.00 16,581.00
4270mmX7940mm) Depth Om-6m
Labor for Well Sinking (Size 4270mm X
49 4/07/4(g) Metre 17,254.00 25,650.00 25,447.00 25,650.00 25,447.00 25,650.00
7940mm) Depth 6m-12m
Labor for Well Sinking (Size
50 4/07/4(h) Metre 19,183.00 28,653.00 28,457.00 28,653.00 28,457.00 28,653.00
4270mmX7940mm} Depth 12m-18m
Labor for Well Sinking (Size 4270mm X
51 4/07/4(i) Metre 23,966.00 36,272.00 36,033.00 36,272.00 36,033.00 36,272.00
7940mm) Depth 18m-24m
Labor for Well Sinking (Size 4270mm X
52 4/07/40) Metre 28,586.00 43,503.00 43,259.00 43,503.00 43,259.00 43,503.00
7940mm) Depth Above 24m
53 4fl/05 Sand Filling cum 1,175.00 1,309.00 1,250.00 1,353.00 1,366.00 1,381.00
54 4f7/06 High Steel Reinforcement Bars Ton 95,236.00 93,966.00 94,173.00 95,260.00 94,820.00 93,320.00
~---
51. Item Code Description. Unit RHD SoR RHD SoR RHD SoR RHD SoR RHD SoR RHD SoR
·-. 2015 2018 2018 2018 2018 2018
c No
Dhaka
Mymenisngh
SylhetZone Khulna
Barisal
Rajshahi
Rang pur
Chattogram
Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate(Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 5 -Structures
1 511101 Single Layer Brick Flat Soling sq. metre 468.00 528.00 566.00 495.00 468.00 507.00
37 5/4/06 Anchor and Tie Bars Tonne 1,966.00 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00
38 5/5/01 New and Extended Brickwork cu metre 7,408.00 8,896.00 9,256.00 8,479.00 8,095.00 8,652.00
39 5/5/02 Brick Drainage Layer cu metre 4,444.00 5,902.00 6,354.00 5,511.00 5,106.00 5,608.00
40 5/5/03 Replacement of Defective Existing brick cu metre 11 ,783.00 14,193.00 14,485.00 13,783.00 13,302.00 13,937.00
41 5/5/04 Repainting of Existing Brickwork Joints sq. metre 533.00 622.00 612.00 620.00 619.00 626.00
64 5/15/01 Mobilization for railing type work, etc. Lin. Metre 1,868.00 2,612.00 2,567.00 2,612.00 2,567.00 2,612.00
65 5/16/01 Dismantling of deck slab, thickness 175mm. Sq Metre 5,998.00 6,757.00 6,375.00 6,757.00 6,375.00 6,757.00
66 5/16/02 Steel Beam (W 530 x 167) Lin. Metre 11.o3;.oo 11,306.00 f1,293.00 11 ,435.00 11,287.00 11,307.00
d:f (}( -A
"' 4!7- 1/b ~J ~ \Ck '( ~~ L
- ~
51. Item Code Description. Unit RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR
'., 2015 2018 2018 2018 2018 2018
I
c- No
Dhaka
Mymenisngh
SylhetZone Khulna
Barisal
Rajshahi
Rang pur
Chattogram
Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 6 · Incidental
1 6/1/01 Grouted Riprap Pavement sq. metre 2,178.00 2,895.00 2,472.00 2,752.00 2,389.00 2,709.00
2 611102 Concrete Slope Pro!ec!ion sq. metre 1,499.00 1,709.00 1,629.00 1,678.00 1,614.00 1,657.00
3 6/1/03 loose stone Riprap Pro!ec!ion cu metre 5,309.00 8,590.00 6,945.00 7,962.00 6,568.00 7,836.00
4 6/1/04 Concrete Cui-Off cu metre 15,990.00 18,884.00 17,780.00 18,550.00 17,629.00 18,321 .00
14 6/5/02 Road Marking - Road marking Pain! Sq Metre 412.00 499.00 498.00 499.00 498.00 499.00
15 6/5/03 Reflecting Road Studs Number 897.00 917.00 917.00 917.00 917.00 917.00
16 6/5/04 Application of Ballo!ini Sq Metre 349.00 126.00 126.00 126.00 126.00 126.00
17 6/6/01 Topsoil cu metre 332.00 553.00 509.00 509.00 491 .00 540.00
18 617/01 Grass Sodding Sq Metre 37.00 42.00 40.00 42.00 40.00 42.00
19 617/02 Grass Turfing Sq Metre 37.00 42.00 40.00 42.00 40.00 42.00
23 6/10/01 Traffic Signs Number 6,901.00 5,651.00 5,651 .00 5,651.00 5,651 .00 5,651 .00
24 6/10/02 Sign Post Number 3,073.00 3,140.00 3,140.00 3,140.00 3,140.00 3,140.00
25 6/11101 Rumble strips (Bituminous Concrete Volume) cum 14,717.00 16,311.00 15,652.00 16,464.00 15,995.00 15,617.00
~.
4 ~
<tf (f( y~ \{1 ~
Sl. Item Code Description. Unit RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR RHO SoR
,, No 2015 2018 2018 2018 2018 2018
c Dhaka
Mymenisngh
SylhetZone Khulna
Barisal
Rajshahi
Rang pur
Chattogram
Zone
CumillaZone Gopalganj Zone
Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
29 6/1311(a) Bullah Palisiding (150mm -175mm) Lin. Metre 9,410.00 10,032.00 9,902.00 10,032.00 9,902.00 10,032.00
31 6/14/01 Mobilization for deck slab repairing work, etc. Sq Metre 799.00 1,168.00 1,145.00 1,168.00 1,145.00 1,168.00
32 6/15/01 Concrete Guide Post (1.6 mlong, 200mm dia) No. 2,068.00 2,359.00 2,269.00 2,338.00 2,266.00 2,322.00
33 6/16/01 Concrete Kilometer Post (As per drawing) No. 8,656.00 9,048.00 8,733.00 8,811 .00 8,481 .00 8,825.00
34 6117!1(a) RCC Palisiding (4m post, 200mm X 200mm) Lin. Metre 10,037.00 10,328.00 9,934.00 10,251.00 9,925.00 10,171.00
35 6/17/1(b) RCC Palisiding (3m post, 150mm X 150mm) Lin. Metre 6,602.00 6,809.00 6,514.00 6,753.00 6,504.00 6,713.00
Special Note : _For Remote area under each Zone, the rate of each and every item of all the Divisions (1-6) of Schedule of Rate will be
enhanced by 5%. The list of the 'Remote Area' are as follows :
~o5- D?-f8
(Annesha Das)
r.r_cf~
"f"~~~Df-e9--/f{
(Md. Tanveer Hussain)
~~,..,
''f-. l
~
i!'5-.
7
(Nisat Noman)
\fb
Sub-Divisional Engineer (A. C), RHD Executive Engineer (C.C), RHD Executive Engineer, RHD
---------Materiai-T-esting-&t-----RH8-"Ffaining·Gentm,----!Gemi!!a-Reae-Qlvisleni---Docume ntetion-1!:-l~rocurement.Oivision----
Maintenance Sub-Division Road Laboratory, Camilla Sarak Bhaban, Tejgaon, Dhaka
Road Laboratory, Mirpur, Dhaka Mirpur, Dhaka and and
and and Member of Committee. Member of Committee.
Member of Committee. Co-opt Member of Committee.
~~-\'0
,-.
~
o~lo<t l?t- &joc;}::.>-6-
(Mst.Mahafuza Rahman) (Mohammad Shah~?sarker) ( d)
ExecutiveEngineer (C. C), RHD ExecutiveEngineer, RHD Superintending Engineer, RHD
Road Design & Standard Division, Road Safety Division, Workshop Circle,
Alenbari, Tejgaon, Dhaka Alenbari, Tejgaon, Dhaka Sarak Bhaban, Tejgaon, Dhaka
and and and
Member of Committee. Member of Committee. Member of Committee.
f. ,<b
~
~~~
A~rl ~~
(Mohammad Kamrul (Md.
~;y
uj din'khan) (Mohammad Rabiul Alam)
Superintending Engineer (C.C), RHD Superintending Engineer (C. C), RHD Superintending Engineer (C.C), RHD
Planning & Data Circle, Dhaka Road Circle, Planning &Programming Circle,
Sarak Bhaban, Tejgaon, Dhaka Alenbari, Tejgaon, Dhaka Sarak Bhaban, Tejgaon, Dhaka and
and and Member of Committee.
Member of Committee. Member of Committee.
~ lrv''~
4~-:t
( r. Waliur Rahman)
/.!V:~~ s ~.~
(Sh1shir Kanti Routh)
Additional Project Director (SE) (C.C), RHD Additional Project Director (SE) (C.C), RHD
SASEC Road Connectivity Project-2, 3'd Sitalakhaya Bridge Project,
Sarak Bhaban, Tejgaon, Dhaka Banani, Dhaka
and and
Member of Committee. Member of Committee.
~
~~
(A.K. Mohammad Fazlul Karim)
Superintending Engineer (C.C), RHD
~of"~
(A.K.M. Rafiqm'lslam)
Additional Chief Engineer (C.C), RHD
Road Design & Safety Circle, Technical Services Wing,
Alenbari, Tejgaon, Dhaka Alenbari, Tejgaon, Dhaka
and and
Member of Committee. Chairman of Committee.
)
ITEM TYPE : Labour
Sl. No. Category Unit Dhaka Sylhet Khulna Rajshahi Chattogram Zone
Mymensigh Zone Baris aI Rangpur
Cumilla Gopalganj Zone
Zone Zone
1 Ganger Per day 850 850 850 850 I 850
2 Fore man Per day 850 850 850 850 I 850 I
6 Steel fixers Per day 650 650 650 650 I 650 '
9mm cum - - - - - I
11 Stone Chippings (Pakur) 20mm cum 8100.00 8500.00 6600.00 6800.00 I 8000.00
14mm cum 7800.00 8200.00 6300.00 6500.00 I 7700.00
10mm cum 7500.00 7900.00 6000.00 6200.00 I 7400.00
12 Crusher (stone) dust cum 4000.00 3550.00 3900.00 3400.00 I 3600.00
13 Boulders 100-200mm cum 6500.00 5200.00 6000.00 4900.00 I 5900.00
14 Pea Gravels cum 2850.00 2300.00 2600.00 2150.00 I 2600.00
15 Gravels (as dug) cum 2470.00 2200.00 2372.22 2219.00 I 2500.00
16 Fire Wood Ton 6000.00 7000.00 5725.00 5930.00 5000.00
17 Wooden runner (using 6 times) cum 6500.00 9225.00 7460.00 8820.00 I 5000.00
18 Wooden Sieper LS 358.33 512.50 2420.00 412.00 I 375.00
19 Bullah Pile 6m long (Dia 150 - 175n Lin. meter 700.00 706.50 1183.00 565.00 500.00
6m long (Dia 150 - 200n Lin. meter 800.00 866.50 1346.00 614.00 550.00
20 Petrol ltr 86.00 86.00 86.00 86.00 86.00
21 Diesel ltr 65.00 65.00 65.00 65.00 65.00
22 Kerosene ltr 65.00 65.00 65.00 65.00 65.00
23 Soil cum 210.00 190.00 175.00 175.00 200.00
24 Imported suitable bulk fill cum 210.00 190.00 175.00 175.00 200.00
25 Plastic Tape Pks Pks 262.00 262.00 262.00 262.00 262.00
26 Steel Box for Traffic Man Nos Nos 100.00 100.00 100.00 100.00 100.00
27 Water Cum 12.00 12.00 12.00 12.00 12.00
28 Geotextile sq. m 122.00 122.00 122.00 122.00 122.00
29 G.l wire, nails etc kg 120.00 120.00 120.00 120.00 120.00
30 Polythene sheet sq. m 18.00 18.00 18.00 18.00 18.00
31 Wooden form work using 4 times cum 10000.00 8856.25 10530.00 7133.33 7500.00
32 Nuts, bolts, washers etc nos 80.00 80.00 80.00 80.00 80.00
33 Paint (Road Marking Berger brand) /1
Lit. 72~:00 725.00 725.00 725.00 725.00
crf ~ c/ ~
Y:k /~PY
')
~1. No Item Category Unit Dhaka
Mymensingh
Sylhet Khulna
Barisal
Rajshahi
Rangpur
Cl ttogram
Cumilla Gopalganj
34 Thiner (Jensolin T-4) Berger brand Lit. 230.00 230.00 230.00 230.00 I 230.00
38 Bentonite (50kg) bag 1000.00 1000.00 1000.00 1000.00 I 1000.00
39 6mm thick steel plate kg 85.00 85.00 85.00 85.00 I 85.00
40 Paint ltr 250.00 250.00 250.00 250.00 250.00
41 Angle Iron (b) 38x38x5mm for pre cast pile shutte tonne 60000.00 60000.00 60000.00 60000.00 1 6oooo.oo
42 Cost of platform (pre-cast pile) using 5 times sqm 60.00 60.00 60.00 60.00 I 60.00
43 F I bar (b) 38x5mm for pre cast pile shutter using 1 tonne 60000.00 60000.00 60000.00 60000.00 1 6oooo.oo
44 Nut bolt for pre cast pile shutter using 16 times kg 100.00 100.00 100.00 100.00 I 100.00
45 Pre-cast pile shoe (0.3x0.3m pile) No 300.00 300.00 300.00 300.00 I 300.00
46 Steel Plate 2mm for pre cast pile shutter using 16 t tonne 85000.00 85000.00 85000.00 85000.00 1 85ooo.oo
47 Nut Bolts (12 mm Dia 125 mm L) tonne 100000.00 100000.00 100000.00 100000.00 1100000.00
48 Angle Iron (62.5x62.5x6mm) using 20 times lin. metre 370.00 370.00 370.00 370.00 I 370.00
49 Cost of wooden shutter for concrete using 6 times sq. m 150.00 150.00 150.00 150.00 I 150.00
50 Nail kg 125.00 125.00 125.00 125.00 I 125.00
51 Admixture Liter 200.00 200.00 200.00 200.00 I 200.00
52 Cost of prefabricated steel shutter (using 50 times) sqm 900.00 900.00 900.00 900.00 I 900.00
53 Lifting anchorage No. 600.00 600.00 600.00 600.00 I 600.00
54 Sica LS 500.00 I
500.00 500.00 500.00 I 500.00
55 Hire cost of shuttering material sqm 150.00 I 150.00 150.00 150.00 I 150.00