Sub: Production planning and control
Branch : Mechanical Engineering Marks: 20
Date of Exam: 10-02-2020 FN Time: 90 Minutes

PART-A
Note: Answer any TWO of the following questions
All questions carry equal marks (2 X 5 = 10)
1. Explain the functions of Production planning and control.
(OR)
2. Define continuous production system. Differentiate between mass production and flow production.
3. Forecast the Demand for the following series by exponential smoothing method, for the month of
Aug 2013, taking α=0.33
Jan 2013 Feb 2013 Mar 2013 Apr2013 May 2013 Jun 2013 Jul 2013
584 610 655 747 862 913 963
(OR)

4. M/s Tubes ltd are manufacturing of picture tubes for TV, the following are details

Average Monthly Market Demand 2000 Tubes


Ordering cost Rs 100 per order
Carrying cost 20% p a
Cost of Tubes Rs 500 per tube
Normal usage 100 tubes per week
Minimum usage 50 tubes per week
Maximum usage 200 tubes per week
Load time to supply 6-8 weeks

Calculate: if the supplier is willing to supply Quarterly 1500 units at a Discount of 5% is it worth
Accepting?
2. Maximum level of stock
3. Minimum level of stock
4. Re-order Level
PART -B
I. Answer All Questions in Answer Booklet. All Questions Carry Equal Marks
I. Choose the correct alternative

1. Which of the following is not a part of Five M’s [ ]


a)Material b)Machine c)Method d)Motion
2. The bill of material doesn’t consist of [ ]
a)part number b)Specifications of part c)Name of part d)Price of part
3. Planning phase [ ]
a)Forecasting b)Process planning c)Loading d)Dispatching
4. Forecasting Means [ ]
a)Prediction b)short term c)Long term d)Sales
5. In Smoothing Method Forecast for the past means [ ]
a)Ft b)Dt-1 c)Ft-1 d)α
6. Objectives of forecasting are [ ]
a)short term b)Long term c)Both d)None
7. Continuous production Means [ ]
a)Mass production b)Flow production c)Both d)None
8. Batch production means [ ]
a)Short run b)Long run c)Both d)None
9. Inventory means [ ]
a)Stock b)goods c)store room d)None
10. ABC analysis means [ ]
a)Always b)Better c)Control d)All

II. Fill in the Blanks

11. EOQ means………………………………

12. Define ABC analysis……………………………

13. Re order Level…………..

14. Maximum Level………………..

15. Minimum Level……………………………..

III. Match the following:


16. ABC analysis ( ) a) Dispatching
17. VED analysis ( ) b) scheduling
18. Prior planning ( ) c) Order writing
19. Action planning ( ) d) Essential
20. Action Phase ( ) e) Better