You are on page 1of 66

constructive solutions

Conbextra HF
(Anchoring)

Fosroc
Hong Kong Ltd
2001-05A Pacific Plaza
telephone: fax: email:
410 Des Voeux Road West
Hong Kong ++ (852) 2882 8662 ++ (852) 2895 2931 hongkong@fosroc.com

www.fosroc.com


Conbextra HF 
 

Shrinkage compensated cementitious precision


grout

Uses
Conbextra HF is used for free flow precision grouting in a wide Conbextra is suitable for use in contact with potable water.
range of applications. These critical uses include heavy duty "Water Bye-laws Scheme - approved product" (Listing no.
support beneath machine base plates, bridge bearings and 9106511).
crane rails. Conbextra HF can also be used for heavy duty
anchoring. These include bolts, starter bars, tendons or
dowels in drilled or formed holes located in concrete masonry, Description
brick work and natural rock formation. Conbextra HF shrinkage compensated cementitious
precision grout, is supplied as a ready to use dry powder. The
Conbextra HF can also be used as a patch repair material for
addition of a controlled amount of clean water produces a free-
minor concrete defects in new construction.
flowing precision grout for gap thicknesses up to 125 mm. In
addition the low water requirement ensures high early strength
Advantages
and long term durability.
T Unique non-metallic dual expansion system compensates
Conbextra HF is a blend of Portland cements, graded fillers
for shrinkage in both the plastic and hardened states.
and chemical additives which impart controlled expansion in
T Excellent initial flow and flow retention.
both the plastic and hardened states. The filler grading
T High early strength facilitates rapid installation and early
minimises segregation and bleeding over a wide range of
operation of plant.
application consistencies.
T High ultimate strength and low permeability ensure
durability of the hardened grout. Technical support
T Hydrogen-free gaseous expansion. Fosroc offers comprehensive technical support, including
T Chloride free. help at the design stage, application advice and on site
T Suitable for pumping or pouring over a large range of problem solving. Specifiers and contractors are encouraged
application consistencies and temperatures. to contact our trained staff for answers to their questions.
Standards compliance For further information please contact Fosroc.
Conbextra HF conforms fully to U.S.Corps of Engineers
Specification for non-shrink grout CRD-C621-82A and ASTM
C1107-91 (Type C).

Figure 1: Typical specification drawing


Shuttering details: installation and grouting of base plates

Holding down bolts


Non-removable: Re-bar bold
(with/without extended thread length and sleeve)
Removable: Loksleeve bolt with stud - fully
sleeved.
Removable: Loksleeve bolt with hexagon
head, bolt, fully sleeved.

ShutteringTimber: All timber to be 50 x 75


mm. Bolted to the substrate or fixed to baseplate
where appropriate.
Plywood: All plywood to be 20 mm thick.

Levelling devices
Steel shims, elastic stools, double nuts. See
note on alternative Levelling devices in this data
sheet.

For pouring head and pouring distances see


table in this data sheet.

Drawing not to scale


Conbextra HF

Typical Properties It shall be mixed with clean water to the required consistency
The following typical results were obtained at a water powder and not exhibit bleed or segregation.
ratio of 0.19 and a temperature of 20OC. A volumetric expansion of up to 1% shall occur while the grout
is in a plastic state by means of a gaseous, hydrogen-free
Test method for Typical result
system. The grout must also be compensated for shrinkage
Compressive strength
in the hardened state.
BS 1881: part 116 1983: 20 N/mm2 @ 1 day
44 N/mm2 @ 7 days The compressive strength of the grout must exceed 40 N/mm2
56 N/mm2 @ 14 days at 7 days and 60 N/mm2 at 28 days.
64 N/mm2 @ 28 days The grout shall fully conform to the requirements of US Army
82 N/mm2 @ 180 days Corps of Engineers Specification for non-shrink grout CRD-
Flexural strength C621-82A or ASTM C 1107-91.
The storage, handling and placement of the grout must be in
BS 4551 1980: 2.5 N/mm2 @ 1 day
strict accordance with the manufacturer’s instructions.
8.0 N/mm2 @ 7 days
9.5 N/mm2 @ 14 days Supplier specification
10.0 N/mm2 @ 28 days All precision grouting (specify details and areas of application)
11.0 N/mm2 @ 180 days must be carried out using Conbextra HF manufactured by
Setting time Fosroc and used in accordance with the manufacturer’s data
BS 4550 part 3 1978: sheet.
Initial set: 5.5 hours
Final set: 7.5 hours Application instructions
Time for expansion Preparation
Plastic state: Start 15 minutes
Foundation surface
Finish initial set
Hardened state: Start initial set The substrate surface must be free from oil, grease or any
Finish up to 28 days loosely adherent material. If the concrete surface is defective
Fresh wet density: Approximately 2200 kg/m3 or has laitance, it must be cut back to a sound base. Bolt holes
depending on actual or fixing pockets must be blown clean of any dirt or debris.
consistency used. Pre-soaking
Young’s modulus Several hours prior to grouting, the area of cleaned foundation
ASTM C-469-83: 29 KN/mm2 should be flooded with fresh water. Immediately before grouting
Expansion takes place, any free water should be removed. Particular care
characteristics: An expansion of up to 1% when should be taken to blow out all bolt holes and pockets.
measured according to ASTM
Base plate
C 827 overcomes plastic
settlement in the unset material. It is essential that this is clean and free from oil, grease or scale.
Longer term expansion in the Air pressure relief holes should be provided to allow venting of
hardened state is designed to any isolated high spots.
comply with the requirements of Levelling shims
ASTM C 1107-91 to compensate
If these are to be removed after the grout has hardened, they
for drying shrinkage.
should be treated with a thin layer of grease.

Specification clauses Formwork

Performance specification The formwork should be constructed to be leakproof as


Conbextra HF is a free flowing grout. This can be achieved by
All precision grouting (specify details and areas of application)
using foam rubber strip or mastic sealant beneath the
must be carried out with a pre-packaged cement based
constructed formwork and between joints.
product, which is non-metallic and chloride-free.

 
 
 
 page 2
Conbextra HF

In some cases it is practical to use a sacrificial semi-dry sand Fluid: 10 900 2500
and cement formwork. The formwork should include outlets 20 1900 3000
for the pre-soaking water. 30 3000 3000+
The unrestrained surface area of the grout must be kept to a 40 3000+ 3000+
minimum. Generally the gap width between the perimeter
Placing
formwork and the plate edge should not exceed 150 mm on
the pouring side and 50 mm on the opposite side. There Place the grout within 15 minutes of mixing to gain the full
should be no gap at the flank sides. benefit of the expansion process.

Mixing Conbextra HF can be placed in thicknesses up to 125 mm in


a single pour. For thickness above 125 mm please contact
For best results a mechanically powered grout mixer should
your local Fosroc office for advice.
be used. For quantities up to 50 kg a slow speed drill fitted with
a high shear paddle is suitable. Larger quantities will require Any bolt pockets must be grouted prior to grouting between the
a high shear vane mixer. Do not use a colloidal impeller mixer. substrate and the base plate.

It is essential that machine mixing capacity and labour Continuous grout flow is essential.
availability is adequate to enable the grouting operation to be
carried out continuously. This may require the use of a holding Figure 2: Typical hopper system
tank with provision for gentle agitation to maintain fluidity.
Removable hopper: For larger pours the grout may be hand
The selected water content should be accurately measured placed or pumped into a removable hopper (trough).
into the mixer. Slowly add the total contents of the Conbextra
HF bag, mix continuously for 5 minutes, ensuring a smooth,
even consistency is obtained.

Sampling Procedure
Fosroc standard test methods must be employed when
performance testing this product. For full information please
contact your local Fosroc office.

Consistency of mixed grout


To achieve the consistencies which are defined in CRD-
C621-82A, the amount of clean water that is added to a
25 kg bag at 20OC is:

Trowellable: 2.5 litres to 3.8 litres


Flowable: 4.5 litres
Fluid: 4.8 litres

Maximum flow distance at 20OC


Max. flow distance in mm

Grout Gap depth 100 mm 250 mm Sufficient grout must be available prior to starting and the time
consistency mm head head taken to pour a batch must be regulated to the time taken to
Flowable: 10 360 1200 prepare the next one.
20 950 2600 The mixed grout should be poured only from one side of the
30 1500 3000 void to eliminate the entrapment of air or surplus pre-soaking
40 2200 3000+ water. This is best achieved by pouring the grout across the
shortest distance of travel. The grout head must be maintained
50 3000 3000+
at all times so that a continuous grout front is achieved.
Where large volumes have to be placed Conbextra HF may be
pumped. A heavy duty diaphragm pump is recommended for
this purpose. Screw feed and piston pumps may also be
suitable.

 
 
 
 page 3
Conbextra HF

Curing Yield
On completion of the grouting operation, exposed areas Allowance should be made for wastage when estimating
should be thoroughly cured. This should be done by the use quantities required. The approximate yield per 25 kg bag for
of Concure curing membrane, continuous application of different consistencies is:
water and/or wet hessian.
Consistency Trowellable Flowable Fluid
Cleaning
Yield (litres) 11.5 13.25 13.5
Conbextra HF should be removed from tools and equipment
with clean water immediately after use. Cured material can be Storage
removed mechanically.
Conbextra HF has a shelf life of 9 months if kept in a dry store
Limitations in the original, unopened bags.
Low temperature working Precautions
When the air or contact surface temperatures are 5OC or below Health and safety
on a falling thermometer, warm water (30-40 O C) is
Conbextra HF is alkaline and should not come into contact
recommended to accelerate strength development.
with skin and eyes. Avoid inhalation of dust during mixing.
For ambient temperatures below 10OC the grout consistency Gloves, goggles and dust mask should be worn.
should be flowable and the formwork should be maintained
If contact with skin occurs, wash with water. Splashes to eyes
in place for at least 36 hours.
should be washed immediately with plenty of clean water and
Normal precautions for winter working with cementitious medical advice sought.
materials should then be adopted.
For further information, refer to the product Material safety Data
High temperature working Sheet.
At ambient temperatures above 35OC the mixed grout should Fire
be stored in the shade. Cool water (below 200C) should be
Conbextra HF is non-flammable.
used for mixing the grout.

Estimating
Supply
Conbextra HF is supplied in 25 kg moisture resistant bags.
Note: In accordance with Commercial or Health & Safety
requirements packaging detail may alter. Please contact your
local Fosroc office for detail.

Conbextra is the trademark of Fosroc International Limited.

  !"#!$#!%$
  
    
 
   
  
      
        

 
 
 


        
   

   

   

      
  
  
 
       
   
 
  

   
  

  
   
 
      
  
 
  

  
   
     
  
 
   
     
     

  

  


   -./0-$12230-$4$560.706$384.$60514$
 
   

0/12

)
.3  4
+) * 5  +
67*

 


 . 4
+1%8+ 



!9"#%$#%' &
!9"#%$#%#*
! + 
- . / *

!"#$###%%   
 
 

&
!"#$#''( :


;
" . <.$= > 8+? 3+
+

3+
)*
!+,- . / * &.:

5
;
7
 
&.  /
((()*+ ,), &.+.   8+ 
7
 
&. 4
+ /
FIL/MAR/07/F
Page 1 of 3

Transmittal AAHK-TRANSMIT-000393
To Mr Bernard Rooney - Gammon Construction Limited
Cc Mr Henry Chan - Airport Authority
Mr Kent Ng - Airport Authority
Mr Lee Betteridge - Gammon Construction Limited
Mr Chi-Fat Chan - Gammon Construction Limited
Ms Ernie Fung - Gammon Construction Limited
Mr Kin Man Ha (HD) - Gammon Construction Limited
Mr Tak Kin Leung - Gammon Construction Limited
Ms Iris Wong - Gammon Construction Limited
Mr Kai Yip - Gammon Construction Limited
Ms Connie Ng - MAJV
From Mr Colin Batchelor - Airport Authority
Sent Tuesday, 29 May 2012
Subject Re: GCL/P533/M/00076/A - STRUCTURAL STEELWORK BASEPLATE GROUT MATERIAL

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION

TITLE OF SUBMISSION: Grout Material

SUMBISSION NUMBER: GCL/P533/M/00076/A


RESPONSE:
Submission for Review
A -Notice of No-Objections
(Ref. GS 18.4)
B -Notice of No-Objection subject to B
comments,(please resubmit)
C -Notice of Objection, please resubmit
Submission for Permission or Consent D -Notification of Permission or
Consent
(Ref GS 18.5)
E -Notification of Permission or
Consent subject to compliance with
conditions; please confirm acceptance
of conditions
F -Permission or Consent withheld
Submission for information R -Submission acknowledged

COMMENTS:

Subject to the following, I have no adverse comment to your proposed proprietary grout - Conbextra HF
by Fosroc, for use in relation to the grouting between RC structures and baseplates/structural steelwork:
1. Please provide written confirmation from the manufacturer that the propriety grout does not contain
high alumina cement. (PS App G Cl 22.3.21(d) refers.)
2. Please ensure to follow the manufacturer's recommendation for application of the proposed
material.
3. Trial mix to be carried out and tested to demonstrate that the grout and method of appication
complies with the requiremetn on bleeding, free expansion, flow cone efflux time and crushing
strength.
4. The proposed material is for application as shown on the steelwork drawings only. Proposal of
applying this proprietary grout for any repairing or remedial works in this project shall be submitted
and reviewed separately.

https://hk1.aconex.com/ViewCorrespondence?Correspondence_ID=1084213084&CO... 29/05/2012
Page 2 of 3

AA DISTRIBUTION: From: PM’s Representative Contractor’s Stamp


File Ref:15.00/CFR

Name Action Info

Name:

Signature:

Date:

From: B Rooney
Sent: 17/05/2012 11:32:50 AM HKT (GMT +08:00)
To: Colin Batchelor, Mark Hawley
Cc: Lee Betteridge, Chi-Fat Chan, Ernie Fung, Kin Man Ha (HD), Tak Kin Leung, Bernard Rooney, Iris Wong, Kai Yip
Mail Number: GCL-TRANSMIT-000164
Subject: GCL/P533/M/00076/A - STRUCTURAL STEELWORK BASEPLATE GROUT MATERIAL

CONTRACTOR’S SUBMISSION

TITLE OF SUBMISSION : GROUT MATERIAL

SUBMISSION NUMBER : GCL/P533/M/00076/A

SPECIFICATION REFERENCE : N/A

DRAWING REFERENCE : STRUCTURAL DRAWING FOR MIDFIELD CONCOURSE

DESCRIPTION OF CONTENTS :

We submit herewith the data sheets, project reference and test reports for the grout material “Conbextra
HF”which is proposed to be used in relation to the structural steelworks of the Midfield Concourse for
your reference and approval.

Remarks : AA Distribution File Ref.: 15.00/CFR


Name Action Comments Info

https://hk1.aconex.com/ViewCorrespondence?Correspondence_ID=1084213084&CO... 29/05/2012
Page 3 of 3

Originator: K M Ha Gammon Construction Ltd


Date: May 17, 2012
Review by Dept Head: Bernard Rooney

This mail was prepared by W Chu

https://hk1.aconex.com/ViewCorrespondence?Correspondence_ID=1084213084&CO... 29/05/2012
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Bearing Plinth:1.7m x 2.7m x H.K. Electric Holdings


Lamma Island Power Station 3200 Argos 1990
75mm Ltd
Bearing Plinths to run-on slabs
HIT No.7 800 Argos Maunsell 1991
& bedding to hold down plates

Yuen Long, Au Tau Bearing Plinth 1200 L&M --- 1991

Yuen Long Chung Fook, Phase 4 Bearing Plinth 800 L&M --- 1992

Kwai Fuk Road, Footbridges Bridge bearings 320 Franki Kier --- 1992

Tai Hing Estate - Tuen Mun Concrete Yin Wing Const. Co Ltd /
Re-casting Beam soffits 5600 --- 1993
Repair Sun On Eng.

Fosroc
Hong Kong Ltd
2001-5A Pacific Plaza
410 Des Voeux Road West telephone: fax: email:
Hong Kong ++ (852) 2882 8662 ++ (852) 2895 2931 hongkong@fosroc.com

www.fosroc.com

Page 1 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Yantin Port Terminal Crane Rail Grouting 2720 --- Maunsell 1994

Tsing Ma Bridge Bridge bearings 320 Cleveland Structural Engineering Mott McDonald 1995-96

Kap Shui Mun Bridge Bridge bearings 320 Kumagai Mott McDonald 1995-96

Kau To Shan --- 560 Gammon Const --- 1997

Tai Wai KCRC Station --- 800 Tobishima Corp --- 1997

Hung Hom Bypass Bridge bearings 3200 Maeda-Chun Wo J.V. --- 1997-98

Kwai Fong Estate Phase 5 --- 320 Sun Fook Kong (Civil) --- 1998

Mong Kok West Area 20 Phase 1 Dowel bars anchoring 1200 Hsin Chong Const --- 1998

Tin Shui Wai Area 3 Phase 1 --- 800 Hsin Chong Const --- 1998

Page 2 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Tin Shui Wai Area 3 Phase 2 --- 1920 Hsin Chong Const --- 1998-99

Tai Koo Shing Plaza --- 400 China Link Const --- 1998

2 Gough Hill Road --- 400 Cheung Key Const --- 1998

Rumsey Street --- 800 B+B Const Co Ltd --- 1998

Tseung Kwan O Area 74 Phase 2 --- 1600 Paul Y. - ITC --- 1998-2000

Tin Shui Wai Area 102 Phase 6 Dowel bars anchoring 2400 Hsin Chong Const HKHA 1998-99

Tsz Oi Estate Phase 4 Dowel bars anchoring 11200 Leighton HKHA 1998-99

Tung Chung Town Lot 2 --- 240 Hip Hing Const --- 1998-99

Chuk Yuen North Tile bolt hole --- Wecon HKHA 1999

Page 3 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Tuen Mun Area 52 Phase 2 --- 12000 Paul Y. - ITC --- 1999

Hong Kong Coliseum --- --- Gammon Const --- 1999

Shatin Area 14 Phase 2 Dowel bars anchoring 2400 Paul Y. - ITC HKHA 1999

Tin Shui Wai Area 101 Phase 1 --- 800 Hsin Chong Const --- 1999

Tin Shui Wai Area 101 Phase 6 --- 400 Hsin Chong Const --- 1999

Yau Tong Phase 1 --- 2000 Paul Y - ITC HKHA 1999

Cheung Sha Wan Phase 1 and 2 --- 1600 Yau Lee Const --- 1999

North District Hospital --- --- Hsin Chong Const --- 1999

Ngau Tam Mei --- --- Aoki Corp --- 1999

Page 4 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Shatin Area 14 Phase 1 Dowel bars anchoring 4000 Paul Y - ITC HKHA 1998-2000

Shatin Area 14 Phase 5 Dowel bars anchoring 480 Paul Y - ITC HKHA 1999-2000

Shatin Area 14 Phase 3 Dowel bars anchoring 1200 Paul Y - ITC HKHA 1999-2000

Shatin Area 14 Phase 4 Dowel bars anchoring 5360 Paul Y - ITC HKHA 1999-2000

Chuk Yuen North Tile bolt hole 1200 Wecon --- 1999-2000

Ko Chiu Road Phase 5 --- 6400 Paul Y - ITC --- 1999-2001

Tung Chung Area 30 Phase 2 --- --- Hsin Chong Const --- 1999-2000

Tung Chung Area 30 Phase 1 --- --- Hip Hing Const Co Ltd --- 2000

Yau Tong Phase 2 Sealing of tie hole 3200 Ngo Kee Const Ltd --- 2000-01

Page 5 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Yau Tong Phase 1 Repair water tank --- Paul Y - ITC --- 2000

Tsing Yi Area 10 Ph 1 Sealing of tie hole --- Nishimatsu Const HKHA 2000

Po Lam Road Ph 3 Sealing of tie hole --- Shui On Const HKHA 2000

Canton Road Repair honey comb --- Paul Y ITC Const & Eng --- 2001

Cyber Port Repair honey comb --- Paul Y ITC General Contractors --- 2001

Hunghom Bay Sealing of tie hole 2400 Ngo Kee Const --- 2001

Lei Yue Mun Phase 1 Concrete repair 880 Paul Y ITC General Contractors --- 2001

Po Lam Road Phase 3 Sealing of tie hole 400 Gammon Const --- 2001

Tsing Yi Area 10 Ph 1 Grouting of precast staircase 880 Nishimatsu Const --- 2001

Page 6 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Sheung Shui Govt Secondary School Grouting --- China Harbour ASD 2001

Police Training School, Wong Chuk


Grouting --- Fu Shing Engrg Co Ltd ASD 2001
Hang

Queen Street --- 1280 China State Const & Eng co --- 2002

Hung Hom Bay site B --- 240 Ngo Kee Const Co Ltd --- 2002

Olympic Station Ph.1 & 3 --- 800 Hyundai Eng & Const Co Ltd --- 2002

Mongkok K2 --- 1600 Sun Fook Kong Const Ltd --- 2002

Ma On Shan Power Station --- 80 Paul Y -ITC Const & Eng --- 2002

Chai Wan Depot --- 8400 MTRC Corporation --- 2002

University of Science & Technology --- 160 China State Const & Eng co --- 2002

Repulse Bay International School --- 80 Gammon Skanska Ltd --- 2002

Page 7 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Tsing Yi Hotel --- 480 Paul Y ITC Const & Eng --- 2002

Kowloon Station Ph.4 --- 2560 Hip Hing Const Co Ltd --- 2002

57 Shouson Hill Road --- 160 Hip Hing Const Co Ltd --- 2002

Aldrich Bay Ph.4 --- 2480 Nishimatsu Const co Ltd --- 2002

Tai Po Complex Bldg --- 560 China State Const & Eng co --- 2002

Tai Po Shui Wai --- 2880 Gammon Skanska Ltd --- 2002

Science Park --- 1360 China State Const & Eng co --- 2002

Taikoo Valley Ph.5 --- 1200 Hip Hing Const Co Ltd --- 2002

Chinese University of HK --- 80 Wecon Const & Engrg --- 2002

Mandrarin Oriental Hotel --- 80 Pat Davie Ltd --- 2002

Disneyland --- 80 Taisei -Hip Hing JV --- 2002

Page 8 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Tsing Yi, CT9 Grouting 320 Hyundai CCECC JV Scott Wilson Maunsell 2003

21 On Lai Street, Shek Mun --- 400 Nesco-China State-Hip Hing --- 2003

Chai Wan Depot --- 4800 MTRC Corporation MTRC 2003

Cyberport --- 240 Gammon Construction Ltd --- 2003

Hang Chi Street --- 240 Glory Fair Eng Ltd --- 2003

Heng Fa Chuen Depot --- 800 M T R Corporation MTRC 2003

Ma On Shan --- 320 China Overseas Building --- 2003

Mei Foo Station --- 240 Southwell Eng Ltd --- 2003

Tin Shui Wai Lot 27 --- 800 China State Const & Eng --- 2003

1 Queen’s Road East --- 1040 Gammon Const Ltd --- 2003-04

Aldrich Bay Ph.4 --- 1920 Nishimatsu Const Co Ltd --- 2003-04

Page 9 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Disneyland Hotel Anchoring 640 Quattro Eng Co Ltd Maunsell 2003-04

Science Park Anchoring 1760 China State Const & Eng. Leigh and Orange 2003-04

Tai Po Complex Bldg Anchoring 6800 China State Const & Eng --- 2003-04

Yau Tong Anchoring 5680 Leighton Contractors --- 2003-04

Diamond Hill Anchoring 3440 Nishimatsu Const. Ltd --- 2004

Tsing Yi Hospital Anchoring 80 Shui On Const Co --- 2004

Cyberport Grouting 640 Chun Wo Const --- 2004-05

Deep Bay Link Grouting 480 Ming Tat Const Eng. Co Ltd --- 2004-05

Princess Margaret Hospital Anchoring 960 Eastwell Engineering Ltd --- 2004-05

Olympic Station Anchoring 400 Sanfield Bldg Contrs Ltd --- 2004-05

Tung Chung Hotel Anchoring 160 Fuk Lam Eng Ltd --- 2004-05

Page 10 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

P350 Skyplaza Bldg Works Anchoring 640 Chun Wo – Fujita JV ARUP 2005

226-242 Cheung Sha Wan Rd Anchoring 320 Wing Bo Bldg Const Ltd --- 2005

LCC330 – Lok Ma Chau Anchoring 80 Balfour Beatty Lam JV --- 2005

Tung Chung Hotel Anchoring 80 Fuk Lam Eng Ltd --- 2005

Stonecutter Island Bridge Grouting 40 Maeda Hitachi Yokogawa JV ARUP 2005

Aedas (Architect) / Ove


Venetian Parcel 1, Macau Grouting 2160 Sun Fook Kong Const Ltd 2007
Arup (Structural Eng)
Aedas (Architect) / Ove
Venetian Parcel 5, Macau Grouting 12800 Sun Fook Kong Const Ltd 2007
Arup (Structural Eng)

Heung Fan Liu Street, Tai Wai --- 1040 Active Way Ltd --- 2007

Yuen Long South Road --- 400 Barbican Const Co Ltd --- 2007-08

Tai Wai KCRC Station --- 650 China Overseas Building Co Ltd --- 2007-08

Fanling Area 36 Ph. 2 --- 2240 China State Const Eng --- 2007

Page 11 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Tseung Kwan O Area 45 --- 700 China State Const Eng --- 2007-08

Kowloon Station Ph. 7 --- 105 Chung Kee Eng Co Ltd --- 2007

Chap Lap Kok --- 4230 Henryvicy Const Co --- 2007-08

Hanoi Road, TST --- 360 Hip Hing Builders Co Ltd --- 2007-08

Hung Hom Bay --- 200 Hip Hing Leader JV Ltd --- 2007

Atrium Hotel --- 1705 Hsin Chong Const (Asia) Ltd --- 2007-08

Eagles Nest Tunnel Route 8 --- 1005 Leighton Kumagai JV --- 2007

Tai Wai, Shatin --- 636 Leighton Kumagai JV --- 2007

Gate #3 Austin Road West --- 670 Link 200 Station JV --- 2007-08

Jordon Road --- 450 Link 200 Station JV --- 2007

Kowloon Bay Depot --- 16000 M T R Corporation MTRC 2007-08

Page 12 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Chai Wan Depot --- 5480 M T R Corporation MTRC 2007-08

Kowloon Station Ph. 7 --- 500 Sanfield Bldg Const --- 2007-08

Disneyland --- 800 Sun Fook Kong Const Ltd --- 2007-08

Amoy Plaza Ph. I & II --- 350 Martin Const Co Ltd --- 2007

Kowloon Station --- 880 Mass Chemical Hong Kong Ltd --- 2007

Shek Lei Est Ph. 10 --- 410 Nishimatsu Const Co Ltd --- 2007

Upper Ngau Tau Kok Est Ph. 2 & 3 --- 560 Paul Y. General Construction --- 2007

Ngau Tam Mei, Yuen Long --- 600 Maple Bldg Material Co Ltd --- 2007

HK Air Cargo Terminal --- 800 Union Eng Ltd --- 2007

Central Concourse P384 --- 150 Gammon Const Ltd --- 2008

Chai Wan Depot --- 16400 M T R Corporation MTRC 2008-09

Page 13 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Kowloon Bay Depot --- 1200 M T R Corporation MTRC 2008-09

Le Royal Arc Macau --- 700 Paul Y. Const Co Ltd --- 2008

Venetian, Macau --- 360 Top Builders International Co ltd --- 2008

Ocean Park --- 1440 Leighton Contractors (Asia) Ltd --- 2009-10

Tamar Gov’t HQ --- 7600 Gammon-Hip Hing JV --- 2010-11

L4 External Works, Pacific Place


--- 70 Amen Const. Co Ltd --- 2010
Admiralty
DC/2007/18 Yung Shue Wan & Sok
--- 180 Kaden Const. Ltd DSD 2010-11
Kwu Wan Village Sewage Treatment
Ocean Park Deve. Contract No. SC03,
--- 800 Kaden Const. Ltd --- 2010
Thrill Mountain & Polar Adventure

Kowloon Station Package 7 --- 4005 Sanfield (Management) Ltd --- 2010

Hoi Fai Road, Tai Kok Tsui --- 580 Sanfield (Management) Ltd --- 2010

Page 14 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

No.24-32 Ming Yuen Western St, NP --- 180 Wing Sum Const. & Eng. Co Ltd --- 2010

Tolo Highway - Lot 82 Ta Kwu Ling,


--- 2900 Active Way Ltd HYD 2011-12
No.1344 (close to Lee Uk Tsuen)
Contract No. HK/2009/01 Wan Chai
Deve. Central – Wan Chai Bypass at --- 2440 Chun Wo – Leader JV --- 2011-12
HK Convention & Exhibition Centre
MTRC 820/821 Nam Cheong Station,
--- 180 Dragages – Bouygues JV --- 2011
Sham Mong Road

Tuen Mun 477 Ph.1 --- 700 Freyssinet Hong Kong Ltd --- 2011

Tin Chiu Street, North Point --- 1304 Gammon Const. Ltd --- 2011

Contract No. SSS328 TKO Hospital


--- 400 Hip Hing – Chun Wo JV --- 2011-12
Expansion, Po Ling Lane, Hang Hau

Chun Yan Street, Wong Tai Sin --- 700 KPA Eng. Ltd --- 2011

Kowloon Bay Depot --- 2400 M T R Corporation MTRC 2011

Page 15 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Fo Tan Station --- 3000 M T R Corporation MTRC 2011

Chai Wan Depot --- 11200 M T R Corporation MTRC 2011-12

Stanley Plaza Ph.1B --- 250 Ray On Const. Co Ltd --- 2011-12

Residential Development at Hoi Fai


--- 800 Sanfield (Management) Ltd --- 2011
Rd, Tai Kok Tsui
HK Disneyland – Toy Story Land &
--- 660 Sun Fook Kong Const. Ltd --- 2011-12
Mystic Point Projects

Tsz Shan Temple, Tai Po --- 220 Wah Tung Metal Eng. Co Ltd --- 2011-12

Berth No. 4 Exxon Mobil Hk Terminal,


--- 180 Wai Lee Eng. Co Ltd --- 2012
Tsing Yi

Kai Fuk Rd, Kowloon Bay --- 450 Biwater Man Lee Ltd --- 2013

Jardine House, Central --- 260 Brainfield Ltd --- 2013

Ko Shan Park Road, Hung Hom --- 930 Gammon Construction Ltd --- 2013

Page 16 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Hong Lok Yuen, Tai Po --- 750 Gammon Construction Ltd --- 2013

Area P5, Chep Lap Kok, HK Airport --- 200 Gammon Construction Ltd --- 2013

Science Park Ph.3 --- 5155 Gammon Construction Ltd --- 2013

Hang Cheong Machinery Eng


Yick Yuen, Yuen Long --- 2360 --- 2013
(Hk) Co Ltd
Tsing Lung Road, Area 58
--- 200 Hsin Chong Const (Asia) Ltd --- 2013
Siu Lam, Tuen Mun
Tmtl422 Tsing Lung Road, Area 58,
--- 300 Hsin Chong Const (Asia) Ltd --- 2013
Siu Lam, Tuen Mun

Sha Kok Shopping Centre --- 600 Ka Shun Civil Eng Co Ltd --- 2013

Fanling Station --- 681 Kpa Engineering Ltd --- 2013

Chai Wan Depot


--- 12000 M T R Corporation Ltd MTRC 2013
70 Shing Tai Road,Chai Wan

Kam Tin Site --- 710 Maeda-China State JV --- 2013

Page 17 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Kowloon Bay Depot,MTR Tower,


Telford Plaza, 33 Wai Yip Street, --- 1600 M T R Corporation Ltd MTRC 2013-16
Kowloon Bay
8 West Fire Services Street, Sheung
Wan (Central Preliminary Sewage --- 510 The Jardine Eng Corp Ltd --- 2013
Treatment Plant)
MTR Contract No. 830 -
Guangzhou-Shenzhen-Hong Kong
Chun Wo - CRGL - QR Joint
Express Rail Link (Hong Kong --- 780 --- 2014-16
Venture
Section): Track Work And Overhead
Line System

Midfield Area P5, Chep Lap Kok --- 600 Gammon Construction Ltd --- 2014

Hk Science Park Ph.3 --- 300 Gammon Construction Ltd --- 2014-16

MTRExpress Rail Link C 810B West


--- 400 Golden Resources Eng Ltd --- 2014-16
Kowloon Terminus Station South

Page 18 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

KTE MTRC1002 Whampoa Station,


--- 150 Chun Wo - Hip Hing JV --- 2015
Hung Lok Road, Hunghom

CCB Tower --- 80 Kpa Engineering (Hk) Ltd --- 2015

West Kowloon Terminus Approach


--- 2360 Golden Resources Eng Ltd --- 2015-16
Tunnel (South)

Louis Vuitton Store, Landmark --- 115 Alpha Building Const Ltd --- 2016

Hong Kong Boundary


Crossing Facilities (HKBCF) - Artificial --- 432 Biwater Man Lee Ltd --- 2016
Island

West Kowloon Terminus Station North --- 162 Biwater Man Lee Ltd --- 2016

New World Centre, TST --- 500 Build King Const Ltd --- 2016

Page 19 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

Queen Mary Hospital Pokfulam Road --- 425 Carrier Const Ltd --- 2016

Murray Building --- 208 Delta Const Eng Ltd --- 2016

Dragages - China Harbour - VSL


To Kau Wan, Lantau Island --- 20550 --- 2015-17
Joint Venture
MTR Express Rail Link 810B - West Laing O'rourke - Hsin Chong -
--- 1890 --- 2015-17
Kowloon Terminus Station South Paul Y. JV
MTR Express Rail Link 810A West
Kowloon Terminus Station, 38 Austin --- 25000 Leighton-Gammon JV --- 2015-17
Road

New World Centre --- 6735 New World Construction Co Ltd --- 2015-17

XRL Contract 802-Nam Cheong


Property Foundation --- 3030 Sanfield (Management) Ltd --- 2015-17
Removal/Reprovisioning

Page 20 of 21
job reference constructive solutions

Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year

22 Tak Fung St, Hung Hom --- 595 Tysan Bldg Const Co Ltd --- 2015-17

Gammon Engineering &


Taikoo Place Phase 2a --- 900 --- 2016-17
Construction Co Ltd

Exchange Square --- 175 Alpha Building Const Ltd --- 2016-17

Tai Po Water Treatment Works 2880


--- 470 Atal Eng Ltd --- 2017
Tai Wo Section,Tai Po Rd

Citygate, Tung Chung --- 775 Yee Hop Eng Co Ltd --- 2017

Salisbury Rd, Tst --- 530 Permasteelisa Hong Kong Ltd --- 2017

Page 21 of 21