Conbextra HF
Uses
Conbextra HF is used for free flow precision grouting in a wide Conbextra is suitable for use in contact with potable water.
range of applications. These critical uses include heavy duty "Water Bye-laws Scheme - approved product" (Listing no.
support beneath machine base plates, bridge bearings and 9106511).
crane rails. Conbextra HF can also be used for heavy duty
anchoring. These include bolts, starter bars, tendons or
dowels in drilled or formed holes located in concrete masonry, Description
brick work and natural rock formation. Conbextra HF shrinkage compensated cementitious
precision grout, is supplied as a ready to use dry powder. The
Conbextra HF can also be used as a patch repair material for
addition of a controlled amount of clean water produces a free-
minor concrete defects in new construction.
flowing precision grout for gap thicknesses up to 125 mm. In
addition the low water requirement ensures high early strength
Advantages
and long term durability.
T Unique non-metallic dual expansion system compensates
Conbextra HF is a blend of Portland cements, graded fillers
for shrinkage in both the plastic and hardened states.
and chemical additives which impart controlled expansion in
T Excellent initial flow and flow retention.
both the plastic and hardened states. The filler grading
T High early strength facilitates rapid installation and early
minimises segregation and bleeding over a wide range of
operation of plant.
application consistencies.
T High ultimate strength and low permeability ensure
durability of the hardened grout. Technical support
T Hydrogen-free gaseous expansion. Fosroc offers comprehensive technical support, including
T Chloride free. help at the design stage, application advice and on site
T Suitable for pumping or pouring over a large range of problem solving. Specifiers and contractors are encouraged
application consistencies and temperatures. to contact our trained staff for answers to their questions.
Standards compliance For further information please contact Fosroc.
Conbextra HF conforms fully to U.S.Corps of Engineers
Specification for non-shrink grout CRD-C621-82A and ASTM
C1107-91 (Type C).
Levelling devices
Steel shims, elastic stools, double nuts. See
note on alternative Levelling devices in this data
sheet.
Typical Properties It shall be mixed with clean water to the required consistency
The following typical results were obtained at a water powder and not exhibit bleed or segregation.
ratio of 0.19 and a temperature of 20OC. A volumetric expansion of up to 1% shall occur while the grout
is in a plastic state by means of a gaseous, hydrogen-free
Test method for Typical result
system. The grout must also be compensated for shrinkage
Compressive strength
in the hardened state.
BS 1881: part 116 1983: 20 N/mm2 @ 1 day
44 N/mm2 @ 7 days The compressive strength of the grout must exceed 40 N/mm2
56 N/mm2 @ 14 days at 7 days and 60 N/mm2 at 28 days.
64 N/mm2 @ 28 days The grout shall fully conform to the requirements of US Army
82 N/mm2 @ 180 days Corps of Engineers Specification for non-shrink grout CRD-
Flexural strength C621-82A or ASTM C 1107-91.
The storage, handling and placement of the grout must be in
BS 4551 1980: 2.5 N/mm2 @ 1 day
strict accordance with the manufacturer’s instructions.
8.0 N/mm2 @ 7 days
9.5 N/mm2 @ 14 days Supplier specification
10.0 N/mm2 @ 28 days All precision grouting (specify details and areas of application)
11.0 N/mm2 @ 180 days must be carried out using Conbextra HF manufactured by
Setting time Fosroc and used in accordance with the manufacturer’s data
BS 4550 part 3 1978: sheet.
Initial set: 5.5 hours
Final set: 7.5 hours Application instructions
Time for expansion Preparation
Plastic state: Start 15 minutes
Foundation surface
Finish initial set
Hardened state: Start initial set The substrate surface must be free from oil, grease or any
Finish up to 28 days loosely adherent material. If the concrete surface is defective
Fresh wet density: Approximately 2200 kg/m3 or has laitance, it must be cut back to a sound base. Bolt holes
depending on actual or fixing pockets must be blown clean of any dirt or debris.
consistency used. Pre-soaking
Young’s modulus Several hours prior to grouting, the area of cleaned foundation
ASTM C-469-83: 29 KN/mm2 should be flooded with fresh water. Immediately before grouting
Expansion takes place, any free water should be removed. Particular care
characteristics: An expansion of up to 1% when should be taken to blow out all bolt holes and pockets.
measured according to ASTM
Base plate
C 827 overcomes plastic
settlement in the unset material. It is essential that this is clean and free from oil, grease or scale.
Longer term expansion in the Air pressure relief holes should be provided to allow venting of
hardened state is designed to any isolated high spots.
comply with the requirements of Levelling shims
ASTM C 1107-91 to compensate
If these are to be removed after the grout has hardened, they
for drying shrinkage.
should be treated with a thin layer of grease.
page 2
Conbextra HF
In some cases it is practical to use a sacrificial semi-dry sand Fluid: 10 900 2500
and cement formwork. The formwork should include outlets 20 1900 3000
for the pre-soaking water. 30 3000 3000+
The unrestrained surface area of the grout must be kept to a 40 3000+ 3000+
minimum. Generally the gap width between the perimeter
Placing
formwork and the plate edge should not exceed 150 mm on
the pouring side and 50 mm on the opposite side. There Place the grout within 15 minutes of mixing to gain the full
should be no gap at the flank sides. benefit of the expansion process.
It is essential that machine mixing capacity and labour Continuous grout flow is essential.
availability is adequate to enable the grouting operation to be
carried out continuously. This may require the use of a holding Figure 2: Typical hopper system
tank with provision for gentle agitation to maintain fluidity.
Removable hopper: For larger pours the grout may be hand
The selected water content should be accurately measured placed or pumped into a removable hopper (trough).
into the mixer. Slowly add the total contents of the Conbextra
HF bag, mix continuously for 5 minutes, ensuring a smooth,
even consistency is obtained.
Sampling Procedure
Fosroc standard test methods must be employed when
performance testing this product. For full information please
contact your local Fosroc office.
Grout Gap depth 100 mm 250 mm Sufficient grout must be available prior to starting and the time
consistency mm head head taken to pour a batch must be regulated to the time taken to
Flowable: 10 360 1200 prepare the next one.
20 950 2600 The mixed grout should be poured only from one side of the
30 1500 3000 void to eliminate the entrapment of air or surplus pre-soaking
40 2200 3000+ water. This is best achieved by pouring the grout across the
shortest distance of travel. The grout head must be maintained
50 3000 3000+
at all times so that a continuous grout front is achieved.
Where large volumes have to be placed Conbextra HF may be
pumped. A heavy duty diaphragm pump is recommended for
this purpose. Screw feed and piston pumps may also be
suitable.
page 3
Conbextra HF
Curing Yield
On completion of the grouting operation, exposed areas Allowance should be made for wastage when estimating
should be thoroughly cured. This should be done by the use quantities required. The approximate yield per 25 kg bag for
of Concure curing membrane, continuous application of different consistencies is:
water and/or wet hessian.
Consistency Trowellable Flowable Fluid
Cleaning
Yield (litres) 11.5 13.25 13.5
Conbextra HF should be removed from tools and equipment
with clean water immediately after use. Cured material can be Storage
removed mechanically.
Conbextra HF has a shelf life of 9 months if kept in a dry store
Limitations in the original, unopened bags.
Low temperature working Precautions
When the air or contact surface temperatures are 5OC or below Health and safety
on a falling thermometer, warm water (30-40 O C) is
Conbextra HF is alkaline and should not come into contact
recommended to accelerate strength development.
with skin and eyes. Avoid inhalation of dust during mixing.
For ambient temperatures below 10OC the grout consistency Gloves, goggles and dust mask should be worn.
should be flowable and the formwork should be maintained
If contact with skin occurs, wash with water. Splashes to eyes
in place for at least 36 hours.
should be washed immediately with plenty of clean water and
Normal precautions for winter working with cementitious medical advice sought.
materials should then be adopted.
For further information, refer to the product Material safety Data
High temperature working Sheet.
At ambient temperatures above 35OC the mixed grout should Fire
be stored in the shade. Cool water (below 200C) should be
Conbextra HF is non-flammable.
used for mixing the grout.
Estimating
Supply
Conbextra HF is supplied in 25 kg moisture resistant bags.
Note: In accordance with Commercial or Health & Safety
requirements packaging detail may alter. Please contact your
local Fosroc office for detail.
!"#!$#!%$
-./0-$12230-$4$560.706$384.$60514$
0/12
)
.34
+)*5 +
67*
.4
+1%8+
!9"#%$#%' &
!9"#%$#%#*
!+
-
./*
!"#$###%%
&
!"#$#''( :
;
".<.$=>8+?3+
+
3+
)*
!+,-
./* &.:
5
;
7
&.
/
((()*+ ,), &.+.8+
7
&.4
+
/
FIL/MAR/07/F
Page 1 of 3
Transmittal AAHK-TRANSMIT-000393
To Mr Bernard Rooney - Gammon Construction Limited
Cc Mr Henry Chan - Airport Authority
Mr Kent Ng - Airport Authority
Mr Lee Betteridge - Gammon Construction Limited
Mr Chi-Fat Chan - Gammon Construction Limited
Ms Ernie Fung - Gammon Construction Limited
Mr Kin Man Ha (HD) - Gammon Construction Limited
Mr Tak Kin Leung - Gammon Construction Limited
Ms Iris Wong - Gammon Construction Limited
Mr Kai Yip - Gammon Construction Limited
Ms Connie Ng - MAJV
From Mr Colin Batchelor - Airport Authority
Sent Tuesday, 29 May 2012
Subject Re: GCL/P533/M/00076/A - STRUCTURAL STEELWORK BASEPLATE GROUT MATERIAL
COMMENTS:
Subject to the following, I have no adverse comment to your proposed proprietary grout - Conbextra HF
by Fosroc, for use in relation to the grouting between RC structures and baseplates/structural steelwork:
1. Please provide written confirmation from the manufacturer that the propriety grout does not contain
high alumina cement. (PS App G Cl 22.3.21(d) refers.)
2. Please ensure to follow the manufacturer's recommendation for application of the proposed
material.
3. Trial mix to be carried out and tested to demonstrate that the grout and method of appication
complies with the requiremetn on bleeding, free expansion, flow cone efflux time and crushing
strength.
4. The proposed material is for application as shown on the steelwork drawings only. Proposal of
applying this proprietary grout for any repairing or remedial works in this project shall be submitted
and reviewed separately.
https://hk1.aconex.com/ViewCorrespondence?Correspondence_ID=1084213084&CO... 29/05/2012
Page 2 of 3
Name:
Signature:
Date:
From: B Rooney
Sent: 17/05/2012 11:32:50 AM HKT (GMT +08:00)
To: Colin Batchelor, Mark Hawley
Cc: Lee Betteridge, Chi-Fat Chan, Ernie Fung, Kin Man Ha (HD), Tak Kin Leung, Bernard Rooney, Iris Wong, Kai Yip
Mail Number: GCL-TRANSMIT-000164
Subject: GCL/P533/M/00076/A - STRUCTURAL STEELWORK BASEPLATE GROUT MATERIAL
CONTRACTOR’S SUBMISSION
DESCRIPTION OF CONTENTS :
We submit herewith the data sheets, project reference and test reports for the grout material “Conbextra
HF”which is proposed to be used in relation to the structural steelworks of the Midfield Concourse for
your reference and approval.
https://hk1.aconex.com/ViewCorrespondence?Correspondence_ID=1084213084&CO... 29/05/2012
Page 3 of 3
https://hk1.aconex.com/ViewCorrespondence?Correspondence_ID=1084213084&CO... 29/05/2012
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Yuen Long Chung Fook, Phase 4 Bearing Plinth 800 L&M --- 1992
Kwai Fuk Road, Footbridges Bridge bearings 320 Franki Kier --- 1992
Tai Hing Estate - Tuen Mun Concrete Yin Wing Const. Co Ltd /
Re-casting Beam soffits 5600 --- 1993
Repair Sun On Eng.
Fosroc
Hong Kong Ltd
2001-5A Pacific Plaza
410 Des Voeux Road West telephone: fax: email:
Hong Kong ++ (852) 2882 8662 ++ (852) 2895 2931 hongkong@fosroc.com
www.fosroc.com
Page 1 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Yantin Port Terminal Crane Rail Grouting 2720 --- Maunsell 1994
Tsing Ma Bridge Bridge bearings 320 Cleveland Structural Engineering Mott McDonald 1995-96
Kap Shui Mun Bridge Bridge bearings 320 Kumagai Mott McDonald 1995-96
Tai Wai KCRC Station --- 800 Tobishima Corp --- 1997
Hung Hom Bypass Bridge bearings 3200 Maeda-Chun Wo J.V. --- 1997-98
Kwai Fong Estate Phase 5 --- 320 Sun Fook Kong (Civil) --- 1998
Mong Kok West Area 20 Phase 1 Dowel bars anchoring 1200 Hsin Chong Const --- 1998
Tin Shui Wai Area 3 Phase 1 --- 800 Hsin Chong Const --- 1998
Page 2 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Tin Shui Wai Area 3 Phase 2 --- 1920 Hsin Chong Const --- 1998-99
Tai Koo Shing Plaza --- 400 China Link Const --- 1998
2 Gough Hill Road --- 400 Cheung Key Const --- 1998
Tseung Kwan O Area 74 Phase 2 --- 1600 Paul Y. - ITC --- 1998-2000
Tin Shui Wai Area 102 Phase 6 Dowel bars anchoring 2400 Hsin Chong Const HKHA 1998-99
Tsz Oi Estate Phase 4 Dowel bars anchoring 11200 Leighton HKHA 1998-99
Tung Chung Town Lot 2 --- 240 Hip Hing Const --- 1998-99
Chuk Yuen North Tile bolt hole --- Wecon HKHA 1999
Page 3 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Tuen Mun Area 52 Phase 2 --- 12000 Paul Y. - ITC --- 1999
Shatin Area 14 Phase 2 Dowel bars anchoring 2400 Paul Y. - ITC HKHA 1999
Tin Shui Wai Area 101 Phase 1 --- 800 Hsin Chong Const --- 1999
Tin Shui Wai Area 101 Phase 6 --- 400 Hsin Chong Const --- 1999
Cheung Sha Wan Phase 1 and 2 --- 1600 Yau Lee Const --- 1999
North District Hospital --- --- Hsin Chong Const --- 1999
Page 4 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Shatin Area 14 Phase 1 Dowel bars anchoring 4000 Paul Y - ITC HKHA 1998-2000
Shatin Area 14 Phase 5 Dowel bars anchoring 480 Paul Y - ITC HKHA 1999-2000
Shatin Area 14 Phase 3 Dowel bars anchoring 1200 Paul Y - ITC HKHA 1999-2000
Shatin Area 14 Phase 4 Dowel bars anchoring 5360 Paul Y - ITC HKHA 1999-2000
Chuk Yuen North Tile bolt hole 1200 Wecon --- 1999-2000
Tung Chung Area 30 Phase 2 --- --- Hsin Chong Const --- 1999-2000
Tung Chung Area 30 Phase 1 --- --- Hip Hing Const Co Ltd --- 2000
Yau Tong Phase 2 Sealing of tie hole 3200 Ngo Kee Const Ltd --- 2000-01
Page 5 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Yau Tong Phase 1 Repair water tank --- Paul Y - ITC --- 2000
Tsing Yi Area 10 Ph 1 Sealing of tie hole --- Nishimatsu Const HKHA 2000
Po Lam Road Ph 3 Sealing of tie hole --- Shui On Const HKHA 2000
Canton Road Repair honey comb --- Paul Y ITC Const & Eng --- 2001
Cyber Port Repair honey comb --- Paul Y ITC General Contractors --- 2001
Hunghom Bay Sealing of tie hole 2400 Ngo Kee Const --- 2001
Lei Yue Mun Phase 1 Concrete repair 880 Paul Y ITC General Contractors --- 2001
Po Lam Road Phase 3 Sealing of tie hole 400 Gammon Const --- 2001
Tsing Yi Area 10 Ph 1 Grouting of precast staircase 880 Nishimatsu Const --- 2001
Page 6 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Sheung Shui Govt Secondary School Grouting --- China Harbour ASD 2001
Queen Street --- 1280 China State Const & Eng co --- 2002
Hung Hom Bay site B --- 240 Ngo Kee Const Co Ltd --- 2002
Olympic Station Ph.1 & 3 --- 800 Hyundai Eng & Const Co Ltd --- 2002
Mongkok K2 --- 1600 Sun Fook Kong Const Ltd --- 2002
Ma On Shan Power Station --- 80 Paul Y -ITC Const & Eng --- 2002
University of Science & Technology --- 160 China State Const & Eng co --- 2002
Repulse Bay International School --- 80 Gammon Skanska Ltd --- 2002
Page 7 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Tsing Yi Hotel --- 480 Paul Y ITC Const & Eng --- 2002
Kowloon Station Ph.4 --- 2560 Hip Hing Const Co Ltd --- 2002
57 Shouson Hill Road --- 160 Hip Hing Const Co Ltd --- 2002
Aldrich Bay Ph.4 --- 2480 Nishimatsu Const co Ltd --- 2002
Tai Po Complex Bldg --- 560 China State Const & Eng co --- 2002
Tai Po Shui Wai --- 2880 Gammon Skanska Ltd --- 2002
Science Park --- 1360 China State Const & Eng co --- 2002
Taikoo Valley Ph.5 --- 1200 Hip Hing Const Co Ltd --- 2002
Page 8 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Tsing Yi, CT9 Grouting 320 Hyundai CCECC JV Scott Wilson Maunsell 2003
21 On Lai Street, Shek Mun --- 400 Nesco-China State-Hip Hing --- 2003
Hang Chi Street --- 240 Glory Fair Eng Ltd --- 2003
Mei Foo Station --- 240 Southwell Eng Ltd --- 2003
Tin Shui Wai Lot 27 --- 800 China State Const & Eng --- 2003
1 Queen’s Road East --- 1040 Gammon Const Ltd --- 2003-04
Aldrich Bay Ph.4 --- 1920 Nishimatsu Const Co Ltd --- 2003-04
Page 9 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Science Park Anchoring 1760 China State Const & Eng. Leigh and Orange 2003-04
Tai Po Complex Bldg Anchoring 6800 China State Const & Eng --- 2003-04
Deep Bay Link Grouting 480 Ming Tat Const Eng. Co Ltd --- 2004-05
Princess Margaret Hospital Anchoring 960 Eastwell Engineering Ltd --- 2004-05
Olympic Station Anchoring 400 Sanfield Bldg Contrs Ltd --- 2004-05
Tung Chung Hotel Anchoring 160 Fuk Lam Eng Ltd --- 2004-05
Page 10 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
P350 Skyplaza Bldg Works Anchoring 640 Chun Wo – Fujita JV ARUP 2005
226-242 Cheung Sha Wan Rd Anchoring 320 Wing Bo Bldg Const Ltd --- 2005
Tung Chung Hotel Anchoring 80 Fuk Lam Eng Ltd --- 2005
Heung Fan Liu Street, Tai Wai --- 1040 Active Way Ltd --- 2007
Yuen Long South Road --- 400 Barbican Const Co Ltd --- 2007-08
Tai Wai KCRC Station --- 650 China Overseas Building Co Ltd --- 2007-08
Fanling Area 36 Ph. 2 --- 2240 China State Const Eng --- 2007
Page 11 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Tseung Kwan O Area 45 --- 700 China State Const Eng --- 2007-08
Kowloon Station Ph. 7 --- 105 Chung Kee Eng Co Ltd --- 2007
Hanoi Road, TST --- 360 Hip Hing Builders Co Ltd --- 2007-08
Hung Hom Bay --- 200 Hip Hing Leader JV Ltd --- 2007
Atrium Hotel --- 1705 Hsin Chong Const (Asia) Ltd --- 2007-08
Eagles Nest Tunnel Route 8 --- 1005 Leighton Kumagai JV --- 2007
Gate #3 Austin Road West --- 670 Link 200 Station JV --- 2007-08
Page 12 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Kowloon Station Ph. 7 --- 500 Sanfield Bldg Const --- 2007-08
Disneyland --- 800 Sun Fook Kong Const Ltd --- 2007-08
Amoy Plaza Ph. I & II --- 350 Martin Const Co Ltd --- 2007
Kowloon Station --- 880 Mass Chemical Hong Kong Ltd --- 2007
Shek Lei Est Ph. 10 --- 410 Nishimatsu Const Co Ltd --- 2007
Upper Ngau Tau Kok Est Ph. 2 & 3 --- 560 Paul Y. General Construction --- 2007
Ngau Tam Mei, Yuen Long --- 600 Maple Bldg Material Co Ltd --- 2007
HK Air Cargo Terminal --- 800 Union Eng Ltd --- 2007
Central Concourse P384 --- 150 Gammon Const Ltd --- 2008
Page 13 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Le Royal Arc Macau --- 700 Paul Y. Const Co Ltd --- 2008
Venetian, Macau --- 360 Top Builders International Co ltd --- 2008
Ocean Park --- 1440 Leighton Contractors (Asia) Ltd --- 2009-10
Kowloon Station Package 7 --- 4005 Sanfield (Management) Ltd --- 2010
Hoi Fai Road, Tai Kok Tsui --- 580 Sanfield (Management) Ltd --- 2010
Page 14 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
No.24-32 Ming Yuen Western St, NP --- 180 Wing Sum Const. & Eng. Co Ltd --- 2010
Tuen Mun 477 Ph.1 --- 700 Freyssinet Hong Kong Ltd --- 2011
Tin Chiu Street, North Point --- 1304 Gammon Const. Ltd --- 2011
Chun Yan Street, Wong Tai Sin --- 700 KPA Eng. Ltd --- 2011
Page 15 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Stanley Plaza Ph.1B --- 250 Ray On Const. Co Ltd --- 2011-12
Tsz Shan Temple, Tai Po --- 220 Wah Tung Metal Eng. Co Ltd --- 2011-12
Kai Fuk Rd, Kowloon Bay --- 450 Biwater Man Lee Ltd --- 2013
Ko Shan Park Road, Hung Hom --- 930 Gammon Construction Ltd --- 2013
Page 16 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Hong Lok Yuen, Tai Po --- 750 Gammon Construction Ltd --- 2013
Area P5, Chep Lap Kok, HK Airport --- 200 Gammon Construction Ltd --- 2013
Science Park Ph.3 --- 5155 Gammon Construction Ltd --- 2013
Sha Kok Shopping Centre --- 600 Ka Shun Civil Eng Co Ltd --- 2013
Page 17 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Midfield Area P5, Chep Lap Kok --- 600 Gammon Construction Ltd --- 2014
Hk Science Park Ph.3 --- 300 Gammon Construction Ltd --- 2014-16
Page 18 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Louis Vuitton Store, Landmark --- 115 Alpha Building Const Ltd --- 2016
West Kowloon Terminus Station North --- 162 Biwater Man Lee Ltd --- 2016
New World Centre, TST --- 500 Build King Const Ltd --- 2016
Page 19 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
Queen Mary Hospital Pokfulam Road --- 425 Carrier Const Ltd --- 2016
Murray Building --- 208 Delta Const Eng Ltd --- 2016
New World Centre --- 6735 New World Construction Co Ltd --- 2015-17
Page 20 of 21
job reference constructive solutions
Conbextra HF
Quantity Main Contractor, Specifier/ Project
Project Name Application (Bags) (Subcontractor) Consultant Year
22 Tak Fung St, Hung Hom --- 595 Tysan Bldg Const Co Ltd --- 2015-17
Exchange Square --- 175 Alpha Building Const Ltd --- 2016-17
Citygate, Tung Chung --- 775 Yee Hop Eng Co Ltd --- 2017
Salisbury Rd, Tst --- 530 Permasteelisa Hong Kong Ltd --- 2017
Page 21 of 21